SERBIASERBIA ININ Е ЕUROPEUROPE
REPUBLIC OF SERBIAMINISTRY OF INFRASTRUCTURE AND ENERGY
SERBIA IN ЕUROPETransport and Energy Development opportunities
Mirjana Trifunović, Miloš Banjac
OBJECTIVE AND COURSES OF ACTIONOBJECTIVE AND COURSES OF ACTION IN THE TRANSPORT SECTOR IN THE TRANSPORT SECTOR
OBJECTIVEOBJECTIVE::
Transport network of Serbia is integrated in the Trans European Transport network of Serbia is integrated in the Trans European network with the efficient use of the advantages of all transport network with the efficient use of the advantages of all transport modesmodes
33
ROAD CORRIDOR XNorth branch: New bridge at Beska is constructed, Full profile of a highway from Novi
Sad to Horgos is constructed
Road bypass around Belgrade : The bridge Gazela is reconstructed, Ongoing construction of Road bypass
around Belgrade – 47,4 km, about 360 mil.eur.
South branch: Ongoing are works on section Donji
Neradovac - Levosoje, Crvena Reka – Ciflik, Pirot – Dimitrovgrad and road bypass of Dimitrovgrad
Highway E 80 on the section to the state border with Bulgaria will be finished till the end of 2013, аnd E 75 till the end of 2014
44
Under the construction is the section from Ub to
Lajkovac - 12,5 km and road bypass of Vrsac In the preparation are: tenders for the sections
Obrenovac – Ub (25km) and Lajkovac – Ljig (25км) Ljig-Preljina – for 40km, 300 mil.eur provided
through Loan Agreement with Azerbaijan
ROAD CORRIDOR XIROAD CORRIDOR XI
Around 3.5 billion dinars has been invested for realization of 312 projects in 112 towns and municipalities in the Republic of Serbia
55
ROADROAD Т ТRRААNSPORTNSPORT
Bilateral and multilateral cooperation for more efficient functioning of road transport
Annually is issued more than 360,000 licenses for international freight transport
Increase of basic quota of multilateral licenses has made Serbian transport economy more competitive on the European market.
The first effects of establishment of the Traffic Safety Agency:
66
The new building of Air Traffic The new building of Air Traffic Control CenterControl Center is constructed (smart (smart building)building) - - investments in the amountinvestments in the amount of 3.6 billion dinars.
Infrastructure works were performed on the airport “Nikola Tesla”, in Infrastructure works were performed on the airport “Nikola Tesla”, in the amount of 1.3 million eurothe amount of 1.3 million euro
AIRAIR Т ТRANSPORTRANSPORT
77
The section of the track Batajnica – Golubinci was completed in the length of 25 km (for 160 km/h).
Secured loans – investments for about 500 km of tracks:
Russian loan – 700 million dollars ЕBRD - 35 milliоn еuro Czech loan - 120 million euro Kuwaiti loan - 26 million euro ЕIB - 200 million euro
RAILWAY CORRIDOR X - INFRASTRUCTURE
88
RAILWAYRAILWAY TRANSPORTTRANSPORT – – ROLLING STOCKROLLING STOCK
EUROFIMA - 47 mil CHF Russian loan - 100 million dollars EBRD - 65 million euro EBRD – 100 million euro The repair of 2,100 freight wagons, 178 passenger wagons and 36
locomotives was finished. 917 new freight wagons was purchased. Today Railways of Serbia annually transport 8 million passengers and
13 million of goods.
99
INTERMODAL TRANSPORT
PROJECTS:
Facilitating intermodal transport in Serbia – 2 million euro
Construction of intermodal terminal in Belgrade – 19 million euro
1010
INLAND WATERWAYINLAND WATERWAY TRANSPORTTRANSPORT
Introduction of River Introduction of River Information Services – 11 Information Services – 11 million euromillion euro
Preparation of Preparation of documentation for hydro documentation for hydro technical works and technical works and dredging at selected dredging at selected locations on the Danube – locations on the Danube – 2 million euro2 million euro
Removal of Removal of unexploded unexploded ordnances – 3.8 million ordnances – 3.8 million euroeuro
1111
LEGISLATIVE ACTIVITIES - HARMONIZATION WITH EU LEGISLATION -
It was answered to the set of questions in the It was answered to the set of questions in the Questionnaire of the Questionnaire of the European Commission, that refer to transport, infrastructure and European Commission, that refer to transport, infrastructure and
energy,energy, 45 Laws are adopted, of which 10 are systemic laws
ORGANIZATIONAL REFORMS
Company Corridors of Serbia, Plc was establishedCompany Corridors of Serbia, Plc was established Transformation of the railway sector was doneTransformation of the railway sector was done Company “Railways of Serbia”, JSC was establishedCompany “Railways of Serbia”, JSC was established Traffic Safety Agency was establishedTraffic Safety Agency was established Legal basis was made for Legal basis was made for establishing theestablishing the Agency for management of
ports and Authority for transport of dangerous goods, etc
1212
Within four annual programmes 2007-2010, EU through IPA finances projects in transport and energy sector in the amount of around 120 million euro.
In programme package for 2011, for transport and energy will be allocated around 30 million euro
Some of the projects that are currently being implemented from EU funds: Project documentation for the construction of intermodal terminal in
Belgrade Project documentation for hydro technical works and dredging on identified
locations on the river Danube Analysis on the state of railway tracks Construction of Zezelj bridge Establishment of River Information Services (RIS) on the Danube Removal of of unexploded ordnances from the Danubeunexploded ordnances from the Danube Construction of the substation 400/110 kv Vranje and Leskovac 2Construction of the substation 400/110 kv Vranje and Leskovac 2 Reducing emissions from TPP Nikola Tesla Environmental protection in PE “Elektroprivreda Srbije"
PROGRAMMING OFЕU PRE-ACCESSION FUNDING
1313
THE MOST IMPORTANT PROJECTS IN THE FUTURE
Completion of Corridor X – Highway Е 80 on the section to the Bulgarian border will be completed by the end of 2013, and E 75 until 2014.
Construction of Corridor XI – sections Surcin-Obrenovac 25.5 km, Obrenovac-Ub 26.23 km and Lajkovac-Ljig 23.98 km, as well as highway Pancevo-Vrsac
Reconstruction, modernization and construction of the second track on Corridor X for double-track, electrified traffic and speed of 160 km/h, sections Stara Pazova-Novi Sad (estimated cost of works around 350 million euro) and Novi Sad-Subotica (estimated cost of works around 360 million euro)
Hydro technical works and dredging of critical sections on the Danube - estimated cost of works around 45 million euro for 25 sections
Removal of sunk vessels in the area of Prahovo – estimated cost of works is 12 million euro
Construction of Intermodal terminal in Belgrade 1414
1.
*
*
84. Republic of Serbia
*
87. Bulgaria
*
95. Romania
*
99. Bosnia and Herzegovina
*
142.
Based on the analysis of Global Economic Forum, on the state of infrastructure, Serbia is ranked on the position 84, out of total 142, which represents a jump of 18 positions on the world list for the state of infrastructure, compared to the year of 2009.
1515
The most significant investment activities in the energy sector in the period 2008-2011
ELECTRICITY
Revitalization and modernization in TENTA and TPP “Kostolac B” is completed
330 million euro
Revitalization of HPP “Bajina Basta” is completed, revitalization of HPP “Djerdap 1” is in progress
110 million euro
Construction of transmission lines and interconnections130 million euro
Loan for revitalization and desulphurization of TPP “Kostolac” is approved
250 million euro1616
The most significant investment activities in the energy sector in the period 2008-2011
OIL AND GAS
Pipelines Gospodjinci – Banatski Dvor
Kula – Odzaci – Ruski Krstur
31 million euro
Distribution network in municipalities: Vrbas, Kula, Apatin, Cacak, Smederevska Palanka, Raca, Lapovo, Krusevac, Cuprija, Jagodina, Paracin
100 million euro
Underground gas storage “Banatski Dvor”
31 million euro
Facilities Revitalization in NIS
540 million euro 1717
The most significant investment activities in the energy sector in the period 2008-2011
RENEWABLE ENERGY SOURCES
Republic of Serbia introduced feed-in tariffs for electricity generation using renewable energy sources in 2009 that are very attractive for investment in field of renewable energy sources
DISTRICT HEATING SYSTEMS
Rehabilitation of the district heating systems in Belgrade, Novi Sad, Nis, Kragujevac, Kraljevo, Pirot, Sombor and Zrenjanin
31 million euro
1818
TOTAL INVESTMENT IN ENERGY SECTOR OF THE REPUBLIC OF SERBIA IN THE PERIOD 2008-2011 AMOUNTS:
THREE BILLION EURO
1919
The most significant development activities in the energy sector in the future
ELECTRICITY (till 2017)
Continuation of revitalization in TPP “Kostolac”
HPP “Zvornik”, “Bajina Basta”, “Djerdap 1”
330 million euro
Environmental improvement of TPPs in the Republic of Serbia
725 million euro
2020
Project CapacityValue,
in mill euroCompletion of construction
ТPP Nikola Tesla B3
750 MW 1,300 2017
ТPP Kolubara B 700 MW 1,500 2015
ТPP Kostolac B3 350 MW 500 2020
CHPP Novi Sad (gas fired)
450 MWe300 MWt
320 2014
ELECTRICITY (till 2022)Projects with strategic partners
The most significant development activities in the energy sector in the future
2121
Project CapacityValue,
in mill euroCompletion of construction
HPP Ibar 103 MW 320 2020
HPP Velika Morava 190 MW 425 2020
PHPP Djerdap 3 4 X 600 MW 500 2018
HPP Gornja Drina 250 MW 435 2022
HPP Srednja Drina 320 MW 820 2023
HPP Bistrica 700 MW 600 2016
ELECTRICITY (till 2022)Projects with strategic partners
The most significant development activities in the energy sector in the future
2222
OIL AND GAS (till 2017)
The most significant development activities in the energy sector in the future
Pipeline “South Stream” and upgrade of gas storage “Banatski Dvor”
1,400 million euro
Construction of gas storage “Itebej” 100 million euro
Development of transport network for gas
210 million euro
Development of distribution network for gas
440 million euro
“Naftna Industrija Srbije”
1,500 million euro2323
Continuation of rehabilitation of district heating systemsin towns Cacak, Kragujevac, Krusevac, Novi Sad, Nis, Pirot, Subotica, Valjevo, Sabac, Backa Palanka, Bor, Jagodina, Knjazevac, Leskovac, Negotin, Novi Pazar, Ruma and Trstenik
55 million euro
DISTRICT HEATING SYSTEMS
The most significant development activities in the energy sector in the future
2424
Thank you !