Service Guide Dear Customers, Based on the keenness of the Federal Electricity and Water Authority (FEWA) to raise awareness of our services, we have prepared this guide containing information about the services provided to all customers. FEWA strives to improve its services according to international standards and applies best practices to improve the quality of services provided to all customers. Our customers are the cornerstone of our success and we aim to harness all our capabilities and resources to achieve the highest level of happiness for our customers in line with the strategic plan of the Authority and the UAE Vision. General Director Introduction: Federal Electricity & Water Authority (FEWA) was established in 1999 under the Federal Law No. 31 of 1999 to carry out the duties assigned by Ministry of Electricity and Water in achieving several objectives. Its Main objective is to cater the needs of Electricity and potable Water for the population of the Emirates. To achieve this main objective FEWA has to create a balance between the cost of production and the distribution price in consideration with unifying the existing variable pricing strategies, study the consumption behaviors and create awareness to overcome the waste of electricity and water by consumers. FEWA also has to develop and improve revenue collection processes. One of its objectives is also to provide qualification and training to the citizens making them able to work in FEWA.

Upload: others

Post on 05-Apr-2022

14 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Service Guide - Etihad WE

Service Guide

Dear Customers,

Based on the keenness of the Federal Electricity and Water Authority (FEWA) to raise

awareness of our services, we have prepared this guide containing information about the

services provided to all customers. FEWA strives to improve its services according to

international standards and applies best practices to improve the quality of services provided

to all customers.

Our customers are the cornerstone of our success and we aim to harness all our capabilities

and resources to achieve the highest level of happiness for our customers in line with the

strategic plan of the Authority and the UAE Vision.

General Director

Introduction:

Federal Electricity & Water Authority (FEWA) was established in 1999 under the Federal

Law No. 31 of 1999 to carry out the duties assigned by Ministry of Electricity and Water in

achieving several objectives. Its Main objective is to cater the needs of Electricity and potable

Water for the population of the Emirates. To achieve this main objective FEWA has to create

a balance between the cost of production and the distribution price in consideration with

unifying the existing variable pricing strategies, study the consumption behaviors and create

awareness to overcome the waste of electricity and water by consumers. FEWA also has to

develop and improve revenue collection processes. One of its objectives is also to provide

qualification and training to the citizens making them able to work in FEWA.

Page 2: Service Guide - Etihad WE

Definitions:

Service : Series of activities or operations performed by federal

departments or through other bodies to meet the needs of

customers.

Structure of Services

Main Service : The range of services covering all sub-services and

supplementary services such as electricity service.

Sub-service : The modifications that may be added to the main service

depending on the type of customer or the purpose of the

service. Sub-services are usually provided through the

adoption of the same main procedures or through minor

modifications to such procedures, such as the meter

inspection service.

Supplementary Service : Services that are connected to the main service such as

transferring, cancellation, modification, and changing, such

as the meter transferring service

Service Name : Simplified summary of the service and associated activities.

Services Package : Process of services combining according to relevant events.

Service packages classified in this way will help the

Authority to meet the specific needs of customers by

combining services provided by federal department(s). The

benefits of service packages are evaluated based on the

expectations and needs of the customers and not based on the

institutional organization approved by the federal

department.

Categories of Services: The Federal Government classifies the customer services in five

main categories:

1. Information Services: group of services related to the transferring of information

from government to customers. These services may be provided through a

government initiative such as training programs or awareness campaigns, or at the

request of customers such as inquiries.

2. Procedural Services: This type of service includes all forms of services that meet

customer needs. Transactions are classified by nature, such as the service of issuing

land clearance certificate.

3. Commercial Services: group of services provided for the purpose of generating

government revenues such as sale of electricity and water.

Page 3: Service Guide - Etihad WE

4. Social Services: group of services provided by the government to promote the

welfare of society and specific sectors therein such as the installment services.

5. Control Services: This category includes all the procedures that customers should

undergo such as regular inspections of the safety of electrical connections.

Type of Services: The Federal Government classifies services according to three main

types:

1. Services provided by Government to Government: These services are provided by

one of the federal authorities through its various regulatory departments to other

government authorities.

2. Services provided by government to the business sector: These services are

provided by one of the federal authorities through its various regulatory departments

to the business sector.

3. Services provided by Government to individuals: services provided by a federal

authority through its regulatory services to individuals.

Limitation of Service: the obstacles and requirements that, if not available, may prevent

access to the required service.

Target Customers: customers are defined as users who benefit from the services of FEWA

through its different organizational units. Customers benefit from services through access to

information or submission of service applications. Customers include individuals,

companies, institutions and government authorities.

Service Requirements: Terms and conditions or any documents required to be submitted by

the customer in order to obtain the service.

Application Procedures: Procedures to be taken by the customer in order to apply for the

service.

Service Delivery Channels: Any means of communication between the customers and the

federal authorities through which customers can obtain the required services.

Service Hours: The times during which the customer can apply for services

Page 4: Service Guide - Etihad WE

Average Delivery Time of Service: The average time required for the federal authority to

provide services to the customers.

Service Fees: Fees are determined by federal decisions or by any internal administrative

decisions which stipulate the payment of specific fees in order to obtain services.

Government, Semi Government, Public Establishments & Authorities: All federal, local

and semi-governmental departments, public establishments and authorities, as well as

facilities used for carrying out the activities such as buildings or offices. Such facilities are

not used for business or investment activities.

Commercial and Industrial Projects: the establishments that are used to carry out

commercial and industrial activities of various kinds.

Farms: Lands allocated by municipalities to the UAE citizens for agricultural use only, and

not for practicing any commercial or investment activities.

Rest Houses: premises of a special nature that are used for leisure activities (for UAE

citizens) and not for commercial or investment activities.

Protected Areas: Areas designated for the conservation of scarce environmental resources

that serve the environmental activity within the United Arab Emirates. These areas are not

used for commercial or investment activities.

Houses for UAE Citizens constructed by government and non-government authorities:

houses constructed by (Initiatives of His Highness the President of the UAE, Initiatives of

Rulers of the Emirates, Sheikh Zayed Housing Program, Ministry of Infrastructure

Development, etc.), and such authorities are responsible for the payment of service

connection fees.

Sports and Cultural Clubs: sports clubs and youth centers working in the field of sports

and cultural activities and approved by the General Authority for Youth and Sports Welfare.

Non-Profit Entities: associations of public interest operating in the United Arab Emirates

and licensed by the Ministry of Community Development.

Residential Units (Expatriates) and Freehold: Premises owned by expatriates, joint

ownership, real estate developers or free zones; or the premises owned by UAE citizen and

are constructed by expatriates on the basis of usufruct contracts or investment. Residential

units are classified according to the following:

Residential Units (Expatriates)

Joint Ownership Units

Page 5: Service Guide - Etihad WE

Freehold Units and investment areas

Usufruct contracts and lands investment contracts

Free zones

Lands owned by UAE citizens, leased or constructed by expatriates, joint ownership,

freehold and any similar case.

Price Tariff: The financial value determined in advance under resolutions issued by the UAE

Cabinet or decisions issued by the Board of Directors of the FEWA for the consumption of

electricity services per kWh and water services per cubic meter.

Permanent Connection: connection of electricity and water on permanent basis by FEWA

to customers by using the electricity and water network owned or operated by FEWA.

Temporary Connection: connection of electricity and water on temporary basis by FEWA

for a limited period of time by using the electricity and water network owned or operated by

FEWA, provided that the customer should provide the necessary materials for water and

electricity supply.

Billboards: billboards fixed on ground by company licensed by the competent government

authorities.

Premises located in places of special nature: premises located in rugged mountain places,

dunes or valleys.

Connection Point: the point closest to the distribution network.

Telephone Booths, transmission towers, and radars installed by government authorities

or by licensed companies operating in this field.

Actual Cost: The cost of materials and necessary installation works, in addition to 20% of

the total cost against supervision expenses.

Tariff Prices for Consumer Categories:

Residential (Citizen): Housing is for personal use by a UAE citizen.

Residential (Expatriates): Housing is for personal use by expatriates.

Government Authorities: Governmental and semi-governmental authorities (ministries,

federal departments, local governments, public institutions, associations, sports or cultural

clubs, etc.)

Page 6: Service Guide - Etihad WE

Commercial Establishments: establishments used for commercial activities of various

kinds.

Industrial Establishments: establishments used to carry out industrial activities of various

kinds.

Agricultural Establishments: lands allocated for citizens for agricultural use only.

Freehold and Enterprises Premises: Premises owned by expatriates, joint ownership, real

estate developers, free zones or premises owned by citizens and constructed by expatriates

on the basis of usufruct or investment contracts.

Temporary Connection: the provision of electricity or water services temporarily for a

specified period of time.

Page 7: Service Guide - Etihad WE

Services Packages Electricity / Water Package

Main Services

• Permanent Connection

Service

Connection

for

Residential

(Citizen)

Service Info

Service

Description

Connection of electricity and water on permanent basis by

FEWA to customers by using the electricity and water network

owned or operated by FEWA.

Service

Category:

Procedural

Sub-service

Service Type: From Government to Individuals

Target

Customers

UAE Citizens

Requirements

for Service

Connection

Connection application form signed by the owner and stamped by the approved engineering consultant.

Signed undertaking to comply with rules and regulations of connection, and signed undertaking for rules and regulations of contractual relationship.

Copy of valid UAE ID Card

Copy of the family book (Khulasat Al Qaid) (if the citizen holds more than one residential account)

Title Deed (if any)

Valid site plan

Building permit (upon submitting the application)

Certificate of completion before connection of service

Load card stamped by the electrical contractor and engineering consultant approved by FEWA (for electricity services)

The contract between the engineering consultant and

the owner of the building

Land Clearance Certificate previously approved by

FEWA.

Technical drawings approved by FEWA (for electricity

and water)

Copy of the accreditation license of engineering

consultant and electrical contractor.

Page 8: Service Guide - Etihad WE

Continued,,

Service

Connection

for

Residential

(Citizen)

Service Info

Service

Procedures The application shall be submitted by an engineering

consultant approved by the FEWA or by the main contractor for the new buildings, or by the electrical contractor for applications to add services without new buildings.

Application

Procedures Filling the application form attached with the required

documents according to the service delivery channel.

Issuing the customer's estimated cost invoice and communicate with the customer for the payment of fees.

Customer must pay the fees within 50 days.

The customer / electrical contractor must submit an application for building inspection when the building is completed, attached with the completion certificate if required.

Starting connection procedures in coordination with the main contractor / electrical contractor

Issue the final invoice

Provide the facility with the service Limitation of

Service

This service for residential units of citizens only.

Associated

Service

Municipalities

Package Electricity/ Water Package

Application

Submission

Service

Delivery

Channels:

Applications could be submitted online through the engineering consultant approved by FEWA

Customer Happiness Centers

Electricity

Service Fees:

AED 300 per KVA

Water Service

Fees:

Meter Type Fees \ AED

15 mm 2500

25 mm 3000

50 mm 10000

80 mm and above 20000

Time to

provide

service

Average waiting time Average time to complete the transaction

10 minutes 30 minutes

Period to

execute the

service

transaction

20 business days

Page 9: Service Guide - Etihad WE

Continued,,

Service

Connection

for

Residential

(Citizen)

Communicate

with the

customer

during the

procedures

Communicatio

n channels

• Text messages • Telephone calls

Obtaining the

Services

Tips and

suggestions

about the

service

Payment of the delivery fees within the specified period (50) days in order to avoid the cancellation of application.

Customer shall notify FEWA in case of changing nature of the establishment’s activity in order to avoid fines and penalties.

Notes

FEWA discounts 40% of the fees in favor of citizens working in the private sector carrying Absher Card, according to the following conditions:

This discount applies only to citizens who hold family book (Khulasat Al Qaid) and working in private sector.

The employer must be registered with the Ministry of Labor.

The citizen must submit a certificate issued by the employer and attested by the Ministry of Labor.

The citizen must be employed in his current job in the private sector for a period of not less than six months

The discount is applied only on residential units of citizens.

The discount is valid for one time only

Monthly salary should not exceed AED 30,000

Houses for

UAE Citizens

constructed

by

government

and non-

government

authorities

Service Info

Service

Description

Connection of electricity and water on permanent basis by FEWA to customers by using the electricity and water network owned or operated by FEWA.

Service

Category: Procedural

Sub-service Service Type: From Government to Government

From Government to Business Sector

Target

Customers

UAE Citizens

Page 10: Service Guide - Etihad WE

Continue,,

Houses for

UAE Citizens

constructed

by

government

and non-

government

authorities

Service Info

Requirements for

Service

Connection:

Connection application form signed and stamped by the approved engineering consultant and the related authority.

Valid site plan

Building Permit (Upon request)

Certificate of completion before connection of service

Undertaking Letter to pay the connection fees by the applicant.

Load card stamped by the electrical contractor and engineering consultant approved by FEWA (for electricity services)

Copy of the accreditation license of engineering consultant and electrical contractor

The contract between the engineering consultant and the concerned authority

Land Clearance Certificate previously approved by FEWA.

Technical drawings approved by FEWA (for electricity and water)

Service

Procedures

The application shall be submitted by an engineering consultant approved by the FEWA or by the main contractor for buildings.

Application

Procedures

Filling the application form attached with the required documents according to the service delivery channel.

Issuing the estimated cost invoice and communicate with the concerned authority for the payment of fees.

Payment of estimated cost invoice by the concerned authority.

The authority / electrical contractor must submit an application for building inspection when the building is completed, attached with the completion certificate if required.

Page 11: Service Guide - Etihad WE

Continue,,

Houses for

UAE Citizens

constructed

by

government

and non-

government

authorities

Service Info

Application

Procedures

Starting connection procedures in coordination with the main contractor / electrical contractor

Issue the final invoice

Provide the facility with the service.

Settlement of amounts and forwarding of balance credit or debit (if any)

The beneficiary shall visit the Customer Happiness Center to activate the account and pay the fees and deposit (if any) after providing FEWA with building handing over certificate.

Limitation of

Service

This service for residential units of citizens only.

Associated

Service

Municipalities

Package Electricity/ Water Package

Application Submission

Service Delivery

Channels:

- Applications could be submitted online through the engineering consultant approved by FEWA

- Customer Happiness Centers Electricity

Service Fees:

AED 300 per KVA

Water Service

Fees:

Meter Type Fees

15 mm AED 2500

25 mm AED 3000

50 mm AED 10000

80 mm and above AED 20000 Time to provide

service

Average waiting time

Average time to complete the transaction

10 minutes 30 minutes Period to execute

the service

transaction

20 business days

Communicate with the

customer during the course

of the procedures

Communication

channels:

• Text messages • Telephone calls

Page 12: Service Guide - Etihad WE

Continue,,

Houses for

UAE Citizens

constructed

by

government

and non-

government

authorities

Obtaining the Services

Tips and

suggestions about

the service

Payment of the delivery fees within

the specified period (50) days in order

to avoid the cancellation of

application.

Citizen shall notify FEWA after

connection of the service and provide

FEWA with handing over certificate

and UAE ID Card in order to sign the

required documents and activate the

account.

Notes

Please read this notice to avoid delay in service connection:

Connection application shall be submitted 6 months at least before the project’s completion date

Permanent

Connection

for Ranches,

wells,

Protected

Areas, and

premises

located in

rugged

mountain

places, dunes

or valleys

Service Info

Service

Description

Connection of electricity and water on permanent basis by FEWA to customers by using the electricity and water network owned or operated by FEWA.

Service Category: Procedural

Sub-service

Service Type:

From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All customers

Requirements for

Service

Connection:

Connection application form signed by the owner and stamped by the approved engineering consultant when the premises were constructed.

Signed undertaking to comply with rules and regulations of connection, and signed undertaking for rules and

Page 13: Service Guide - Etihad WE

Continue,,

Permanent

Connection

for Ranches,

wells,

Protected

Areas, and

premises

located in

rugged

mountain

places, dunes

or valleys

Service Info

Requirements for

Service

Connection:

regulations of contractual relationship.

Copy of valid UAE ID Card

Title Deed (if any)

Valid permanent site plan

Building permit (upon submitting the application, if any)

Certificate of completion before connection of service, or NOC from the Municipality if no building is constructed.

Load card stamped by the electrical contractor and engineering consultant approved by FEWA (for electricity services)

The trade license of the engineering consultant and electrical contractor.

Land Clearance Certificate previously approved by FEWA.

Technical drawings approved by FEWA (for electricity and water)

Service

Procedures

The application shall be submitted by an engineering consultant approved by the FEWA or by the main contractor for the new buildings, or by the electrical contractor for applications to add services without new buildings.

Application

Procedures

Filling the application form attached with the required documents according to the service delivery channel.

Issuing the customer's estimated cost invoice and communicate with the customer for the payment of fees.

Customer must pay the fees within 50 days.

The customer / electrical contractor must submit an application for building inspection when the building is completed, attached with the completion certificate if required.

Page 14: Service Guide - Etihad WE

Continue,,

Permanent

Connection

for Ranches,

wells,

Protected

Areas, and

premises

located in

rugged

mountain

places, dunes

or valleys

Service Info

Application

Procedures

Starting connection procedures in coordination with the main contractor / electrical contractor

Issue the final invoice

Provide the facility with the service.

Settlement of amounts and forwarding of balance credit or debit (if any)

Activate the account and payment of deposit (if any)

Limitation of

Service

All categories of customers

Associated Service Municipalities Package Electricity/ Water Package

Application Submission

Service Delivery

Channels:

Applications could be submitted online through the engineering consultant approved by FEWA Customer Happiness Centers

Service Fees: The accrual cost till the connection point including the meter.

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 30 minutes Period to execute

the service

transaction

Depends on the graphical nature of the site

Communicate with the

customer during the

course of the procedures

Communication

channels:

• Text messages • Telephone calls

Obtaining the Services

Tips and

suggestions about

the service

Payment of the delivery fees within the specified period (50) days in order to avoid the cancellation of application. Customer shall notify FEWA in case of changing nature of the establishment’s activity in order to avoid fines and penalties.

Page 15: Service Guide - Etihad WE

Continue,,

Public

Connections

including

housing of

expatriates,

commercial,

industrial and

investment

projects,

governmental

and semi-

governmental

departments,

public

establishments

, non-profit

charitable

organizations,

commercial

establishments

located in

agricultural

lands, and

establishments

owned by

citizens and

located in

freehold areas.

Service Info

Service

Description

Connection of electricity and water on permanent basis by FEWA to customers by using the electricity and water network owned or operated by FEWA.

Service Category: Procedural Sub-service

Service Type:

From Government to Government From Government to Individuals From Government to Business Sector

Target Customers All customers

Requirements for

Service

Connection:

Connection application form signed by the owner and stamped by the approved engineering consultant.

Signed undertaking to comply with rules and regulations of connection, and signed undertaking for rules and regulations of contractual relationship.

Copy of valid UAE ID Card/ Passport for non-residents in UAE only.

Title Deed (if any)

Valid site plan

Building permit (upon submitting the application)

Certificate of completion before connection of service

NOC issued by Civil Defense Department (before connection of service)

Load card stamped by the electrical contractor and engineering consultant approved by FEWA (for electricity services)

The trade license of the engineering consultant and contractor

Land Clearance Certificate previously approved by FEWA.

Technical drawings approved by FEWA (for electricity and water)

Page 16: Service Guide - Etihad WE

Continue,,

Public

Connections

including

housing of

expatriates,

commercial,

industrial and

investment

projects,

governmental

and semi-

governmental

departments,

public

establishments

, non-profit

charitable

organizations,

commercial

establishments

located in

agricultural

lands, and

establishments

owned by

citizens and

located in

freehold areas.

Service Info

Service

Procedures

The application shall be submitted by an engineering consultant approved by the FEWA or by the main contractor for the new buildings, or by the electrical contractor for applications to add services without new buildings.

Application Procedures

Filling the application form attached with the required documents according to the service delivery channel.

Issuing the customer's estimated cost invoice and communicate with the customer for the payment of fees.

Customer must pay the fees within 50 days.

The customer / electrical contractor must submit an application for building inspection when the building is completed, attached with the certificate issued by Civil Defense Department, if required.

Starting connection procedures in coordination with the main contractor / electrical contractor

Issue the final invoice

Provide the facility with the service.

Settlement of amounts and forwarding of balance credit or debit (if any)

Activate the account and payment of deposit (if any)

Limitation of

Service

All customers’ categories

Associated Service Municipalities

Package Electricity/ Water Package

Application Submission

Service Delivery

Channels:

Applications could be submitted online through

the engineering consultant approved by FEWA

Customer Happiness Centers

Continue,,

Description Fees \ AED

Up to 1000 KVA 600 per KVA

Above 1000 KVA 1200 per KVA

Page 17: Service Guide - Etihad WE

Public

Connections

including

housing of

expatriates,

commercial,

industrial and

investment

projects,

governmental

and semi-

governmental

departments,

public

establishments

, non-profit

charitable

organizations,

commercial

establishments

located in

agricultural

lands, and

establishments

owned by

citizens and

located in

freehold areas.

Application Submission

Electricity Service

Fees:

Mosques 300 per KVA

Water Service

Fees:

Investment projects that need more than 500

cubic meters of water every day:

The actual cost or the customer executes the

network at his own expense up to the

connection point in addition to the connection

fees of each meter.

Other categories: AED 8000 for each

connection point in addition to the connection

fees of each meter.

Meter Type Fees \ AED

15 mm 2500

25 mm 3000

50 mm 10000

80 mm and above 20000

Time to provide

service

Average waiting time Average time to

complete the

transaction

10 minutes 30 minutes

Period to execute

the service

transaction

20 business days

Communicate with the

customer during the

course of the

procedures

Communication

channels:

• Text messages • Telephone calls

Obtaining the Services

Tips and

suggestions about

the service

Payment of the delivery fees within the specified period (50) days in order to avoid the cancellation of application.

Customer shall notify FEWA in case of changing nature of the establishment’s activity in order to avoid fines and penalties.

Accommodation of expatriates

The customer must pay the difference of connection fees on the basis of

Page 18: Service Guide - Etihad WE

Continue,,

Notes

freehold and non-citizen category in the event of changing the activity of the premises or if the premises are sold or leased

Supply and installation of materials at the customer's expense in the case of connections of services to investment projects (above 4 MVA)

Permanent

Connection

for Farms and

Rest Houses

Service Info

Service

Description

Connection of electricity and water on permanent basis by FEWA to customers by using the electricity and water network owned or operated by FEWA.

Service

Category: Procedural

Sub-service Service Type: From Government to Individuals

Target

Customers

UAE Citizens

Requirements for

Service

Connection:

Connection application form signed by the owner and stamped by the approved engineering consultant.

Signed undertaking to comply with rules and regulations of connection, and signed undertaking for rules and regulations of contractual relationship.

Copy of valid UAE ID Card

Title Deed (if any)

Valid site plan

Building permit (upon submitting the application)

Certificate of completion before connection of service

Load card stamped by the electrical contractor and engineering consultant approved by FEWA

The trade license of the consultant and electrical contractor

Page 19: Service Guide - Etihad WE

Continue,,

Permanent

Connection

for Farms and

Rest Houses

Service Info

Requirements for

Service

Connection:

The contract between the engineering consultant and the owner of the building

Contract concluded with the consultant

Land Clearance Certificate previously approved by FEWA.

Technical drawings approved by FEWA (for electricity and water)

Service

Procedures

The application shall be submitted by an engineering consultant approved by the FEWA or by the main contractor for the new buildings, or by the electrical contractor for applications to add services without new buildings.

Application

Procedures

Filling the application form attached with the required documents according to the service delivery channel.

Issuing the customer's estimated cost invoice and communicate with the customer for the payment of fees.

Customer must pay the fees within 50 days.

The customer / electrical contractor must submit an application for building inspection when the building is completed, attached with the completion certificate if required.

Starting connection procedures in coordination with the main contractor / electrical contractor

Issue the final invoice

Provide the facility with the service

Settlement of amounts and forwarding of balance credit or debit (if any)

Activate the account and payment of deposit (if any)

Service Info

Limitation of

Service

This service for farms and rest houses only.

Associated

Service

Municipalities

Page 20: Service Guide - Etihad WE

Continue,,

Permanent

Connection

for Farms and

Rest Houses

Package Electricity/ Water Package

Application Submission

Service Delivery

Channels:

Applications could be submitted online through the engineering consultant approved by FEWA Customer Happiness Centers

Electricity

Service Fees:

Description Fees \ AED

Up to 1000 KVA 600 per KVA

Above 1000 KVA 1200 per KVA

Water Service

Fees:

AED 30000 for each connection point in addition to the connection fees of each meter

Meter Type Fees \ AED

15 mm 2500

25 mm 3000

50 mm 10000

80 mm and above 20000

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 30 minutes

Period to execute

the service

transaction

20 business days

Communicate with the

customer during the

course of the procedures

Communication

channels:

• Text messages • Telephone calls

Obtaining the Services

Tips and

suggestions about

the service

Payment of the delivery fees within the specified period (50) days in order to avoid the cancellation of application. Customer shall notify FEWA in case of changing nature of the establishment’s activity in order to avoid fines and penalties.

Continue,,

The citizen customer can obtain an additional or more electricity / water connection to his / her personal farm provided that:

Page 21: Service Guide - Etihad WE

Permanent

Connection

for Farms and

Rest Houses

Notes

The customer must obtain the approval of the Technical Committee on the possibility of connection and technical specifications of connection.

The farm is intended for personal use by the same citizen owner and not for the purpose of permanent personal housing, commercial and investment use or for sale / leasing to others.

The customer can sell the farm / rest house to an expatriate, provided that the customer informs the Authority and pays the difference of connection fees.

Billboards,

Telephone

Booths,

transmission

towers, and

radars

excluding

those

installed in

area of

special nature

Continue,,

Service Info

Service Description Connection of electricity on permanent basis by FEWA to customers by using the electricity network owned or operated by FEWA.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Business Sector Target Customers Public Establishments and Companies

Requirements for Service

Connection:

Requirements for Service

Connection:

Connection application form signed by the competent authority.

Signed undertaking to comply with rules and regulations of connection, and signed undertaking for rules and regulations of contractual relationship.

Letter issued by the competent authority

Valid permanent site plan

NOC for connection of service issued by the municipality.

NOC for connection of service issued by Civil Defense Department (if applicable)

Load card stamped by the electrical contractor

Page 22: Service Guide - Etihad WE

Billboards,

Telephone

Booths,

transmission

towers, and

radars

excluding

those

installed in

area of

special nature

Service Info

S

Land Clearance Certificate previously approved by FEWA.

Service Procedures The application shall be submitted by the electrical contractor or by the owner.

Application Procedures

Filling the application form attached with the required documents according to the service delivery channel.

Issuing the customer's estimated cost invoice and communicate with the competent authority for the payment of fees.

The competent authority must pay the estimated cost invoice.

The customer / electrical contractor must submit an application for building inspection when the building is completed, attached with the completion certificate if required.

Starting connection procedures in coordination with the main contractor / electrical contractor

Issue the final invoice

Provide the facility with the service.

Final verification of the documents and final approval of the invoice

Settlement of amounts and forwarding of balance credit or debit (if any)

Activate the account and payment of deposit (if any)

Limitation of Service Public Establishments and Companies Associated Service Municipalities

Package Electricity

Application

Submission

Service Delivery

Channels:

Applications could be submitted online through the engineering consultant approved by FEWA

Customer Happiness Centers Service Fees: AED 1200 per KVA

Continue,,

Application

Submission

Time to provide service

Average waiting time Average time to complete the transaction

10 minutes 30 minutes

Page 23: Service Guide - Etihad WE

Billboards,

Telephone

Booths,

transmission

towers, and

radars

excluding

those

installed in

area of

special nature

Period to execute the

service transaction 20 business days

Communicate

with the customer

during the course

of the procedures

Communication channels: • Text messages • Telephone calls

Obtaining the

Services

Tips and suggestions

about the service

Payment of the delivery fees within the specified period (50) days in order to avoid the cancellation of application.

Freehold and

expatriate

Service Info

Service Description

Connection of electricity and water by FEWA to the facilities located within the free zones and investment zones; and to premises owned by expatriates, join ownerships, lands investment contracts, lands owned by UAE citizens, leased or constructed by expatriates, joint ownership.

Service Category: Procedural

Sub-service

Service Type: From Government to Individuals

From Government to Business Sector

Target Customers

premises owned by expatriates

premises owned under joint ownership

Premises under freehold and investment zones

Premises located in free zones

Lands owned by UAE citizens, leased or constructed by expatriates, joint ownership, and alike.

Page 24: Service Guide - Etihad WE

Continue,,

Freehold and

expatriate

Service Info

Requirements for Service

Connection:

Connection application form signed by the owner and stamped by the approved engineering consultant.

Signed undertaking to comply with rules and regulations of connection, and signed undertaking for rules and regulations of contractual relationship.

Copy of valid UAE ID Card/ Passport for non-residents in UAE only

Title Deed (if any)

Valid site plan

Building permit (upon submitting the application)

Certificate of completion before connection of service

NOC issued by Civil Defense Department

Load card stamped by the electrical contractor and engineering consultant approved by FEWA

The contract between the engineering consultant and the owner of the building

The trade license of the consultant and electrical contractor

Land Clearance Certificate previously approved by FEWA.

Technical drawings approved by FEWA (for electricity and water)

Service Procedures

The application shall be submitted by an engineering consultant approved by the FEWA or by the main contractor for the new buildings, or by the electrical contractor for applications to add services without new buildings.

Application Procedures

Filling the application form attached with the required documents according to the service delivery channel.

Issuing the customer's estimated cost invoice and communicate with the customer for the payment of fees.

Customer must pay the fees within 50 days.

The customer / electrical contractor must submit an application for building inspection

Page 25: Service Guide - Etihad WE

Continue,,

Freehold and

expatriate

Service Info

Application Procedures

when the building is completed, attached with the completion certificate if required.

Starting connection procedures in coordination with the main contractor / electrical contractor

Issue the final invoice

Provide the facility with the service

Settlement of amounts and forwarding of balance credit or debit (if any)

Activate the account and payment of deposit (if any)

Limitation of Service

This service for facilities located within the free zones, investment zones and premises owned by expatriates, and join ownerships, lands investment contracts, lands owned by UAE citizens, leased by expatriates or joint ownership.

Associated Service Municipalities Package Electricity/ Water Package

Application

Submission

Service Delivery

Channels:

Applications could be submitted online through the engineering consultant approved by FEWA

Customer Happiness Centers

Electricity Service Fees:

Description Fees \ AED

Up to 1000 KVA 800 per KVA

Above 1000 KVA 1500 per KVA

Water Service Fees:

AED 8000 for each connection point in addition to the connection fees of each meter

Meter Type Fees \ AED

15 mm 2500

25 mm 3000

50 mm 10000

80 mm and above 20000

Time to provide service

Average waiting time Average time to complete the transaction

10 minutes 30 minutes Period to execute the

service transaction 20 business days

Communicate

with the

customer during

the course of the

procedures

Communication channels:

• Text messages • Telephone calls

Page 26: Service Guide - Etihad WE

Continue,,

Freehold and

expatriate

Obtaining the

Services

Tips and suggestions

about the service

Payment of the delivery fees within the specified period (50) days in order to avoid the cancellation of application.

Customer shall notify FEWA in case of changing nature of the establishment’s activity in order to avoid fines and penalties.

Temporary Connection

Work sites

with fixing a

meter

Service Info

Service Description

Connection of electricity and water on temporary basis by FEWA for a limited period of time by using the electricity and water network owned or operated by FEWA.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Business Sector Target Customers Companies that execute the projects

Requirements for Service

Connection:

Connection application form signed by the owner and stamped by the concerned company

Signed undertaking to comply with rules and regulations of connection, and signed undertaking for rules and regulations of contractual relationship.

Copy of valid UAE ID Card of the licensee of the company that executes the project.

Valid permanent site plan

Building Permit upon submitting the application/NOC from Municipality

NOC issued by Civil Defense Department

Load card stamped by the electrical contractor (for electricity connection)

Letter issued by the company that executes the project.

Page 27: Service Guide - Etihad WE

Trade license of the company that executes the project

Continue,,

Work sites

with fixing a

meter

Service Info

Service Procedures The application shall be submitted by the main contract or the electrical contractor.

Application Procedures

Filling the application form attached with the required documents according to the service delivery channel.

Issuing the customer's estimated cost invoice and communicate with the company for the payment of fees.

The company must pay the estimated cost invoice within 50 days.

The customer / electrical contractor must submit an application for building inspection when the building is completed.

Starting connection procedures in coordination with the main contractor / electrical contractor

Issue the final invoice

Provide the facility with the service.

Settlement of amounts and forwarding of balance credit or debit (if any)

Activate the account and payment of deposit Limitation of Service Companies that execute the projects

Associated Service Municipalities Package Electricity / Water

Application

Submission

Service Delivery

Channels:

Applications could be submitted online through the engineering consultant approved by FEWA Customer Happiness Centers

Electricity Service Fees:

AED 300 per KVA for a maximum period of 3 years, provided that the customer shall supply and install all necessary materials for connection excluding the meter under the requirements and regulations of FEWA

Water Service Fees:

The actual cost or the customer executes the network at his own expense up to the connection point in addition to the connection fees of each meter.

Meter Type Fees \ AED

15 mm 2500

25 mm 3000

50 mm 10000

80 mm and above 20000

Page 28: Service Guide - Etihad WE

Continue,,

Work sites

with fixing a

meter

Application

Submission

Time to provide service

Average waiting time Average time to complete the transaction

10 minutes 30 minutes Period to execute the

service transaction 20 business days

Communicate

with the

customer during

the course of the

procedures

Communication

channels:

• Text messages • Telephone calls

Obtaining the

Services

Tips and suggestions

about the service

Payment of the delivery fees within the specified period (50) days in order to avoid the cancellation of application.

The customer shall notify FEWA upon completion of the works and apply for a clearance certificate to avoid accumulated meter fees.

Notes

Please read this notice to avoid delay in service connection:

Temporary connection are approved if the following requirements are met:

For companies that execute one of the Authority’s projects or for the execution of projects belonging to federal or local government departments.

For contraction companies that execute residential, commercial or industrial projects.

Page 29: Service Guide - Etihad WE

Temporary

connections

for festivals

and events for

a period more

than 3 months

– installation

of meter

Service Info

Service Description Connection of electricity on temporary basis by FEWA for a limited period of time by using the electricity network owned or operated by FEWA.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Business Sector

Target Customers Companies that organize the festivals/ government authorities

Requirements for

Service Connection:

Connection application form signed by and stamped by the company

Signed undertaking to comply with rules and regulations of connection, and signed undertaking for rules and regulations of contractual relationship.

Copy of valid UAE ID Card of the licensee of the company.

NOC issued by municipality (upon submitting the application)

NOC issued by Civil Defense Department (upon payment the fees)

Trade license of the company

Load card stamped by the electrical contractor, who is approved by FEWA

Trade license of the accredited electrical contractor

Service Procedures The application shall be submitted by the electrical contractor or concerned authority.

Application

Procedures

Filling the application form attached with the required documents according to the service delivery channel.

Issuing the customer's estimated cost invoice and communicate with the concerned authority for the payment of fees.

The concerned authority must pay the estimated cost invoice within 50 days.

The customer / electrical contractor must submit an application for building inspection when the building is completed

Page 30: Service Guide - Etihad WE

Continue,,

Temporary

connections

for festivals

and events for

a period more

than 3 months

– installation

of meter

Service Info

Application

Procedures

Starting connection procedures in coordination with the main contractor / electrical contractor

Issue the final invoice

Provide the facility with the service.

Settlement of amounts and forwarding of balance credit or debit (if any)

Activate the account and payment of deposit (if any) Limitation of Service Companies that organize festivals/ government

authorities Associated Service Municipalities

Package Electricity

Application

Submission

Service Delivery

Channels:

Applications could be submitted online through the engineering consultant approved by FEWA Customer Happiness Centers

Electricity Service

Fees:

AED 50 per KVA for a maximum period of 1 year, provided that the customer shall supply and install all necessary materials for connection excluding the meter under the requirements and regulations of FEWA

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 30 minutes Period to execute the

service transaction 20 business days

Communicate

with the customer

during the course

of the procedures

Communication

channels: • Text messages • Telephone calls

Obtaining the

Services

Notes

Please read this notice to avoid delay in service connection:

Temporary connection are approved if the following requirements are met:

The applicant is a government / semi-government authority or authorized by government / semi-government authority.

Submitting an official letter issued by the concerned authority clarifying the activities and require period of connection.

Page 31: Service Guide - Etihad WE

Festivals,

wedding

parties, social

parties,

Ramadan

playgrounds,

Ramadan

tents...etc.

(without

meter)

Service Info

Service Description Connection of electricity on temporary basis by FEWA for a limited period of time by using the electricity network owned or operated by FEWA.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories

Requirements for

Service Connection:

Application of temporary connection without a meter.

NOC issued by Civil Defense Department

Copy of valid UAE ID Card of the customer

The trade license

Application

Procedures

Filling the application form.

Payment of connection fees.

Starting connection procedures Limitation of Service Social occasions, playgrounds and Ramadan tents.

Associated Service None Package Electricity

Application

Submission

Service Delivery

Channels:

Applications could be submitted online through the engineering consultant approved by FEWA Customer Happiness Centers

Electricity Service

Fees:

AED 500 per 100 KVA per week. AED 500 per 100 KVA for Ramadan, playgrounds and tents during the month of Ramadan Customer shall provide the necessary materials for connection

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 10 minutes Period to execute the

service transaction Depends on the completion of connection by the applicant.

Communicate

with the

customer during

the course of the

procedures

Communication

channels:

• Text messages • Telephone calls

Compliance with the duration of connection

Page 32: Service Guide - Etihad WE

Continue,,

Obtaining the

Services

Tips and suggestions

about the service

The customer must return the site to its previous condition prior to the connection

The customer shall notify the Authority in case of desire to extend the period of the temporary connection before the expiry of the predetermined period, and pay the due fees for the new period.

Connections

for activities

during

Ramadan –

Iftar Tents

organized by

charity

organizations,

rulers or

individuals,

and

condolence

tents

Service Info

Service Description Connection of electricity on temporary basis by FEWA for a limited period of time by using the electricity network owned or operated by FEWA.

Service Category: Procedural

Sub-service Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories

Requirements for

Service Connection:

Application of temporary connection without a meter.

NOC issued by municipality for Iftar Tents organized by charity organizations, rulers or individuals

Valid UAE ID Card of the customer

Load card

NOC issued by Civil Defense Application

Procedures Filling the application form.

Starting connection procedures Limitation of Service Charity organizations or individuals

Associated Service None Package Electricity

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Service Fees: Free, provided that the customer shall provide all necessary materials for connection

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 10 minutes Period to execute the

service transaction Depends on the completion of connection by the applicant.

Page 33: Service Guide - Etihad WE

Continue,,

Connections

for activities

during

Ramadan –

Iftar Tents

organized by

charity

organizations,

rulers or

individuals,

and

condolence

tents

Communicate

with the

customer during

the course of the

procedures

Communication

channels:

• Text messages • Telephone calls

Obtaining the

Services

Tips and suggestions

about the service

Compliance with the duration of connection

The customer must return the site to its previous condition prior to the connection

The customer shall notify the Authority in case of desire to extend the period of the temporary connection before the expiry of the predetermined period.

Notes

Please read this notice to avoid delay in service connection:

Temporary connection shall be used for the specified and agreed purposes.

The customer shall notify the Authority in case of desire to extend the period of the temporary connection before the expiry of the predetermined period.

Other Services

Adding extra

loads /

expanding the

water line

Service Info

Service Description Adding extra loads or expanding the water line in the facility

Service Category: Procedural

Supplementary

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories

Requirements for

Service Connection:

In case of a new building in the site, the customer shall submit the same documents of the new connection.

in case of no building constructed in the site:

Connection application form

Page 34: Service Guide - Etihad WE

Continue,,

Adding extra

loads /

expanding the

water line

Service Info

Requirements for

Service Connection:

Signed undertaking to comply with rules and regulations of connection, and signed undertaking for rules and regulations of contractual relationship.

Copy of valid UAE ID Card of the customer

Title Deed (if any)

Valid site plan

NOC issued by Municipality

NOC issued by Civil Defense

Load card stamped by the electrical contractor approved by FEWA (for electricity services)

Copy of the accreditation certificate of the electrical contactor

Application

Procedures

The application shall be submitted by an engineering consultant approved by the FEWA or by the main contractor for the new buildings, or by the electrical contractor for applications to add new loads or expand the water line, without new buildings.

Service Procedures

Filling the application form attached with the required documents according to the service delivery channel.

Issuing the customer's estimated cost invoice and communicate with the customer for the payment of fees.

Customer must pay the fees within 50 days.

The customer / electrical contractor must submit an application for building inspection when the building is completed, attached with the completion certificate if required.

Starting connection procedures in coordination with the main contractor / electrical contractor

Issue the final invoice

Provide the facility with the service

Settlement of amounts and forwarding of balance credit or debit (if any)

Activate the account and payment of deposit (if any) Limitation of Service All categories

Associated Service Municipality Package Electricity/ water

Application

Submission

Service Delivery

Channels:

Customer Applications could be submitted online through the engineering consultant approved by FEWA Customer Happiness Centers

Service Fees: As per the fees of each category of service

Page 35: Service Guide - Etihad WE

Continue,,

Adding extra

loads /

expanding the

water line

Application

Submission

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 30 minutes Period to execute the

service transaction 20 business days

Communicate

with the

customer during

the course of the

procedures

Communication

channels:

• Text messages • Telephone calls

Obtaining the

Services

Tips and suggestions

about the service Payment of the delivery fees within the specified period (50) days in order to avoid the cancellation of application

Transfer of

service

(Electricity/

Water)

Service Info

Service Description This service includes modifying the line / transmission of the connection’s equipment in the same land.

Service Category: Procedural

Supplementary

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories

Requirements for

Service Connection:

Land Clearance Certificate clarifying the lines of service within the land.

Copy of valid UAE ID Card of the customer

Valid site plan

Application

Procedures and

Service Procedures

The customer shall submit the application to the Customer Happiness Center, and pay the fees related to the study of lines transferring.

Issuing the estimated cost invoice

Communicate with the customer for the payment of fees.

Customer must pay the fees within 50 days.

Starting transferring procedures after paying the fees.

Issue the final invoice

Settlement of amounts and forwarding of balance credit or debit (if any)

Page 36: Service Guide - Etihad WE

Continue,,

Transfer of

service

(Electricity/

Water

Service Info

Limitation of

Service All categories

Associated Service Municipality Package Electricity/ water

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Service Fees: AED 300/- in addition to the actual cost of transferring.

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 10 minutes Period to execute

the service

transaction

10 business days

Communicate

with the

customer during

the course of the

procedures

Communication

channels: • Text messages • Telephone calls

Obtaining the

Services

Tips and

suggestions about

the service

The customer shall obtain a Land Clearance Certificate after the completion of equipment transferring (the services)

Transfer of

Electricity/

Water meter

Service Info

Service Description This service includes transferring of the meter from place to another in the same land.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service Connection: Submitting the application

Copy of valid UAE ID Card

Page 37: Service Guide - Etihad WE

Continue,,

Transfer of

Electricity/

Water meter

Service Info

Application

Procedures and

Service Procedures

The customer shall submit the application to the Customer Happiness Center, and pay the fees.

Issuing the estimated cost invoice (if any)

Communicate with the customer for the payment of fees.

Customer must pay the estimated cost invoice (if any).

Starting transferring procedures after paying the fees. Limitation of Service All categories

Associated Service None Package Electricity/ Water

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Service Fees: AED 300/- in addition to the actual cost of materials (if any).

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 10 minutes Period to execute the

service transaction 10 business days

Communicate

with the

customer during

the course of the

procedures

Communication

channels: • Text messages • Telephone calls

Obtaining the

Services

Tips and suggestions

about the service The customer shall return the site to its previous condition prior to the transferring.

Page 38: Service Guide - Etihad WE

Electricity/

Water

Technical

Drawings

Approval

Service Info

Service Description Studying and approving the technical drawings and wiring specifications at the facility before starting the electricity / water supply procedures.

Service Category: Procedural

Sub-service Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories

Requirements for

Service Connection:

Application for technical drawings approval

Copy of valid UAE ID Card

Land Clearance Certificate previously approved by FEWA

The technical drawings to be approved.

Valid site plan

Service Procedures

and Application

Procedures

The application shall be submitted by an engineering consultant approved by the FEWA

Filling the application form attached with the required documents according to the service delivery channel.

Payment the service fees

Sending the application to the technical section

Studying and approving the drawings. Limitation of Service All categories

Associated Service Municipalities Package Electricity

Application

Submission

Service Delivery

Channels:

Applications could be submitted online through the engineering consultant approved by FEWA

Customer Happiness Centers Electricity Service

Fees: Description Fees \ AED

From 1KVA to 1000 KVA 300

Above 1000 KVA 3000

Water Service Fees:

Description Fees \ AED

Ground Floor Boiling/ Villa 100

Multi-storey building / commercial complex

400

Time to provide

service Average waiting time Average time to

complete the transaction

10 minutes 10 minutes Period to execute the

service transaction 5 business days

Page 39: Service Guide - Etihad WE

Continue,,

Communicate

with the

customer during

the course of the

procedures

Communication

channels: • Text messages • Telephone calls

Obtaining the

Services

Tips and suggestions

about the service The customer may submit the application of connection immediately after approval of the drawings.

Land

Clearance

Certificate

Service Info

Service Description

It is an official document issued by the Authority to the applicant clarifying the services provided by the Authority and authorizing the certificate holder to start the preparatory procedures for the project against the payment of the applicable fees in accordance with the regulations of the Authority.

Service Category: Procedural Sub-service

Service Type: From Government to Government From Government to Individuals From Government to Business Sector

Target Customers All categories

Requirements for

Service Connection:

Application for land clearance certificate

Copy of valid UAE ID Card

Valid site plan

NOC issued by municipality

Service Procedures

and Application

Procedures

The application shall be submitted by an engineering consultant approved by the FEWA, or by the customer in case of no building constructed.

Filling the application form attached with the required documents according to the service delivery channel.

Payment the service fees

Sending the application to the technical section

Studying and approving the application.

Customer receives SMS upon issuance of the certificate Limitation of

Service All categories

Associated Service Municipalities Package None

Page 40: Service Guide - Etihad WE

Continue,,

Land

Clearance

Certificate

Application

Submission

Service Delivery

Channels: Applications could be submitted online through the

engineering consultant approved by FEWA

Customer Happiness Centers

Electricity Service

Fees:

Government and Semi-government authorities are exempted from paying the fees under an agreement or memorandum of understating in this regard.

Description Fees \ AED

Residential (Citizen) 100 per application

Other categories 500 per application

New certificate in lieu of lost one 100

Water Service Fees:

Description Fees \ AED

Residential (Citizen) 100 per application

Other categories 500 per application

New certificate in lieu of lost one 100

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 10 minutes Period to execute

the service

transaction

3 business days

Communicate

with the

customer during

the course of the

procedures

Communication

channels:

• Text messages • Telephone calls

Obtaining the

Services

Tips and

suggestions about

the service

The customer shall keep a copy of the certificate to be used upon submitting an application for drawings approval and service connection.

Note

Please read this notice to avoid the delay in service connection:

The certificate is valid for 3 months from the date of issue, renewable for another 3 months without additional fees for one time only.

The customer may obtain a new certificate in lieu of lost one within a period of 6 months from issuing the certificate against a fee of AED 100

The application for the land clearance certificate cannot be issued for one service only, whether water or electricity.

The customer must determine the reason for submitting the application (demolition, construction, infrastructure projects, land’s consolidation).

Page 41: Service Guide - Etihad WE

Technical

Inspection

for

Electricity/

Water

Meter

Service Info

Service Description Perform a technical inspection of the meter to ensure its safety.

Service Category: Procedural

Supplementary Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service

Connection:

Copy of valid UAE ID Card Customer’s account number.

Service Procedures Submitting the application

Payment of applicable fees

Perform the technical inspection

Settlement the due amounts

Notify the customer about the results of inspection Limitation of

Service All categories

Associated Service None Package Electricity/ Water

Application

Submission

Service Delivery

Channels: Applications could be submitted online through the

engineering consultant approved by FEWA

Customer Happiness Centers

Service Fees: AED 500/- per meter if the inspection proves that the meter is correct.

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 10 minutes Period to execute

the service

transaction

10 business days

Communicate

with the

customer during

the course of the

procedures

Communication

channels: • Text messages • Telephone calls

Obtaining the

Services

Tips and

suggestions about

the service

The customer must confirm the monthly consumption of the meter.

Page 42: Service Guide - Etihad WE

Installation

of new

meter in lieu

of lost one

Service Info

Service Description Application submitted by the customer or concerned section to install a new meter in lieu of lost one

Service Category: Procedural

Supplementary

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service

Connection:

None

Service Procedures Submitting the application

Payment of applicable fees

Installment of the new meter

Forwarding the balance to the customer’s account Limitation of

Service All categories

Associated Service None Package Electricity/ Water

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Service Fees: AED 100/- in addition to the price of meter

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 10 minutes Period to execute

the service

transaction

3 business days

Communicate

with the

customer during

the course of the

procedures

Communication

channels: • Text messages • Telephone calls

Obtaining the

Services

Tips and

suggestions about

the service

The customer must be sure of receiving the monthly invoice which includes the monthly consumption of the meter.

Page 43: Service Guide - Etihad WE

Permanent

disconnectio

n of service

(Electricity/

Water)

Service Info

Service Description Application submitted by the customer (owner of facility) to disconnect the service on permanent basis in order to demolish the facility.

Service Category: Procedural

Supplementary

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories

Requirements for

Service

Connection:

Valid UAE ID Card

Copy of Clearance Certificate

Title Deed

Letter issued by the competent authority (in case of government authorities / business sector)

Service Procedures Submitting the application

Payment of applicable fees

Removing the meter and cancel it in the system. Limitation of

Service All categories

Associated Service Municipalities Package Electricity/ Water

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Service Fees: AED 100/- per meter

Time to provide

service

Average waiting time Average time to complete the transaction

10 minutes 10 minutes Period to execute

the service

transaction

10 business days

Communicate

with the

customer

during the

course of the

procedures

Communication

channels: • Text messages • Telephone calls

Obtaining the

Services

Tips and

suggestions about

the service

The customer must have a clearance certificate

Page 44: Service Guide - Etihad WE

Reporting

Emergency

Cases

(Electricity/

Water)

Service Info

Service Description Receiving customers’ calls regarding power outages, electrical faults, water outages, water service failures.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service

Connection:

Telephone number Account number

Service Procedures

Calling emergency number (991) for Electricity and (992) for Water

Use E- application and report the emergency case and the location will be identified through the application if possible.

Limitation of

Service All categories

Associated Service None Package None

Application

Submission

Service Delivery

Channels:

Calling emergency number (991) for Electricity and (992) for Water

Use the smartphone application (Ablighna)

Call Center 8003392 Service Fees: Free

Time to provide

service

Average waiting time to answer the call Average time to get the service

20 seconds 3 hours, 30 minutes

Communicate

with the

customer

during the

course of the

procedures

Communication

channels:

Telephone calls

Obtaining the

Services

Tips and

suggestions about

the service

Customer shall make sure that the service has been reconnected. Customers are advised to perform regular maintenance of all internal installations and wirings.

Notes In the event of fire, the customer must submit NOC issued Civil Defense before reconnecting electricity supply.

Page 45: Service Guide - Etihad WE

Bills Package:

Issuing a

Clearance

Certificate

Service Info

Service Description

An application submitted by customer to obtain a clearance certificate from FEWA stating that the customer is not liable for outstanding payments towards FEWA against the account number as provided, or requesting for final invoice in settlement of the account and disconnection of the service while vacating the premises.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service Connection: Filling the application for clearance certificate

Valid UAE ID Card

Service Procedures

Customer submits the application through services offices or FEWA Website.

FEWA officer will check the completeness of the required documents, enter the order in the system and collect the applicable fees.

FEWA officer will visit the site and take the final readings and disconnect the service with putting a sticker of (service disconnected) on the meter.

SMS will be sent to the customer stating the due amount.

Customer shall pay the due amount and receive the clearance certificate.

Limitation of

Service All categories

Associated Service Refund the deposit Package Bills

Application

Submission

Service Delivery

Channels: FEWA Website

Customer Happiness Centers Service Fees: AED 50/-

Time to provide

service

Average waiting time to provide the service

Average time to get the service

10 Minutes 10 Minutes

Page 46: Service Guide - Etihad WE

Continue,,

Issuing a

Clearance

Certificate

Communicate

with the

customer during

the course of the

procedures

Communication

channels:

SMS

Telephone calls

Email

Obtaining the

Services

Tips and

suggestions about

the service

Customer shall make sure of receiving the clearance certificate and the information written therein. Deposit will be refunded after settlement of due amount (if any).

Payment

of Due

Amounts

Service Info

Service Description

The customer should pay the due amount for the electricity and water consumption through main customer services centers, electronic payment channels or through external payment channels.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service Connection: Account Number

Service Procedures Account number

Collecting the due amount

Issuing a payment receipt Limitation of

Service All categories

Associated Service Different payment channels Package Bills

Application

Submission

Service Delivery

Channels:

Electronic Payment Channels

Customer Happiness Centers

External Payment Channels Service Fees: None

Page 47: Service Guide - Etihad WE

Continue,,

Payment

of Due

Amounts

Application

Submission

Time to provide

service

Average waiting time to provide the service

10 Minutes Average time to get the service

-Average Serving time \ Normal transaction

10 Minutes Depends on the payment channel used for the payment

Average Serving time \ Rapid transaction

5 Minutes

Communicate

with the

customer

during the

course of the

procedures

Communication

channels:

SMS

Email

Obtaining the

Services

Tips and

suggestions about

the service

Customer shall make sure that the account number is correct.

Paying all outstanding amounts to avoid service disconnection.

Customer shall make sure of paying the exact amount as mentioned in the receipt.

paying the

due

amounts

by

installmen

ts

Service Info

Service Description An application submitted by customer to pay the due amounts by installments such as fines or connection fees

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service Connection: Account number or application number

Service Procedures Verifying the data and approve the application Signing the agreements and submitting the cheques to FEWA

Limitation of

Service All categories

Associated Service None Package Bills

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Service Fees: AED 100/- for connection fees (commercial, industrial, and freehold)

Page 48: Service Guide - Etihad WE

Continue,,

paying the

due

amounts

by

installmen

ts

Application

Submission

Time to provide

service

Average waiting time to provide the service

Average time to get the service

10 Minutes 10 Minutes Period to execute

the service

transaction

3 business days

Communicate

with the

customer

during the

course of the

procedures

Communication

channels:

SMS

Telephone calls

Obtaining the

Services

Tips and

suggestions about

the service

Customer shall make sure of sufficient fund every month at the maturity date of the cheque.

Customer shall pay the monthly bills on time in addition to the installment amount.

Promise to

pay

Service Info

Service Description

An application submitted by customer to delay the service disconnection or service reconnection without payment of the amounts due on the account for a specified period during which the customer undertakes to pay the due amounts, provided that the period of postponement is at the minimum.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service Connection: Account number

Service Procedures Submitting the application at the customer services

centers

Verifying and creating the application

Application approval

The customer can use this service twice a year only. Limitation of Service All categories

Associated Service None Package Bills

Page 49: Service Guide - Etihad WE

Continue,,

Promise to

pay

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Service Fees: None

Time to provide

service

Average waiting time to provide the service Average time to get the service

10 Minutes 10 Minutes Period to execute the

service transaction 3 business days

Communicat

e with the

customer

during the

course of the

procedures

Communication

channels:

Customer Happiness Centers

Obtaining the

Services

Tips and suggestions

about the service Customer shall make sure of payment of the due amount within the agreed period to avoid the service disconnection.

Transferri

ng credit

balance in

the

account

Service Info

Service Description An application submitted by customer to transfer the credit balance in its account to another accounts registered in its name.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service Connection: Original receipt in case of wrong payment

Copy of UAE ID Card

Service Procedures Submitting the required documents

Creating the application by the front office

Verifying and approving the application Limitation of Service All categories

Associated Service None Package Bills

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Page 50: Service Guide - Etihad WE

Transferri

ng credit

balance in

the

account

Application

Submission

Service Fees: None Time to provide

service Average waiting time to provide the service Average time to

get the service 10 Minutes 10 Minutes

Period to execute the

service transaction 2 business days

Communicat

e with the

customer

during the

course of the

procedures

Communication

channels: SMS

Obtaining the

Services

Tips and suggestions

about the service

Customer shall make sure of receiving the monthly bills and to ensure that the information contained therein is correct.

In order to facilitate access to services, please register in the FEWA App, which is a platform for tracking and payment of invoices and obtaining other services available on the Authority's website.

Refund of

credit

balance in

the

account

Service Info Service Description An application submitted by customer to refund the credit balance in its account

Service Category: Procedural

Sub-service Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service Connection: Copy of UAE ID Card

Trade license for companies Service Procedures Submitting the required documents

Verifying and approving the application Limitation of Service All categories

Associated Service None Package Bills

Page 51: Service Guide - Etihad WE

Continue,,

Refund of

credit

balance in

the

account

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Service Fees: None

Time to provide

service

Average waiting time to provide the service Average time to get the service

10 Minutes 10 Minutes Period to execute the

service transaction 2 business days

Communicat

e with the

customer

during the

course of the

procedures

Communication

channels:

SMS

Obtaining the

Services

Tips and suggestions

about the service

Customer shall make sure of receiving the monthly bills and to ensure that the information contained therein is correct.

In order to facilitate access to services, please register in the FEWA App, which is a platform for tracking and payment of invoices and obtaining other services available on the Authority's website.

Notes

Please read this notice to avoid delay in service connection:

The customer may refund the credit balance if he pays the invoice of estimated cost for connecting the service (if the final invoice value is lower) and the amount will be returned to the customer according to the following:

Up to AED 5,000 at the Customer Happiness Center

Over AED 5000 by cheque through FEWA head office.

Page 52: Service Guide - Etihad WE

Customer Service Package:

Receive

and

respond to

customer

feedback

Service Info

Service

Description Inquiries, notes, and suggestions received from customers in relation to FEWA services

Service Category: Information

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories Requirements for

Service

Connection:

Customer account number

Mobile number

Service

Procedures Submitting the application through the service channels

Limitation of

Service All categories

Associated Service None Package Customer relationship

Application

Submission

Service Delivery

Channels:

Customer Happiness Centers

FEWA Website

Call Center

Smart Apps

Social Networking Channels

Email Service Fees: None

Time to provide

service

Average waiting time to provide the service Average time to get the service

None None Period to execute

the service

transaction

5 business days to respond the feedback 14 business days to respond the suggestions

Communicate

with the

customer during

the course of the

procedures

Communication

channels: Email

Phone calls

SMS

Obtaining the

Services

Tips and

suggestions about

the service

Customer shall make sure of receiving the reference number related to the feedback or suggestion.

Customer shall submit the following information:

Customer’s Name

Phone Number

Details of Feedback or Suggestion

Page 53: Service Guide - Etihad WE

Service

Activation

Service Info

Service

Description

An application submitted by the landlord or the tenant to reactivate the electricity / water service in the facility after paying all due amounts by the previous tenant, for the purpose of using the facility again.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories

Requirements for

Service

Connection:

Reactivation Application signed by the customer/ stamped in case of trade licenses

Copy of UAE ID Card

Duly attested lease contract

Trade license for companies attached with the Partners’ Appendix.

Service

Procedures

Submitting the application through the customer service centers or FEWA Website

Verifying the application and paying the fees and reactivate the service.

The service will be reactivated within 24 hours Limitation of

Service All categories

Associated Service None Package Customer relationship

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

FEWA Website Service Fees: AED 50/- in addition the deposit

Time to provide

service

Average waiting time to provide the service Average time to get the service

10 Minutes 10 Minutes Period to execute

the service

transaction

Within 24 hours

Page 54: Service Guide - Etihad WE

Continue,,

Service

Activation

Communicate

with the

customer during

the course of the

procedures

Communication

channels:

Phone calls

SMS

Obtaining the

Services

Tips and

suggestions about

the service

Customer shall make sure of receiving the monthly bills and to ensure that the information contained therein is correct

In order to facilitate access to services, please register in the FEWA App.

Notes

Please read this notice to avoid delay in service connection:

Signatures in the application must be identical to the signatures in UAE ID Card and passport.

The application and lease contract must be signed and stamped by the company for holders of trade licenses

Changing

the

owner’s

name

Service Info

Service Description An application submitted by customer to change the name of the facility’s owner to his name under a title deed.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories

Requirements for

Service Connection:

Title Deed/ NOC issued by the municipality.

Land Plan

New Owner UAE ID Card

Signing the application and undertakings

Service Procedures Submitting the application to the Front Office

Verifying and creating the application,

Paying the applicable fees. Limitation of

Service All categories

Associated Service None Package Customer relationship

Page 55: Service Guide - Etihad WE

Continue,,

Changing

the

owner’s

name

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Service Fees: AED 50/- in addition the deposit (if any)

Time to provide

service

Average waiting time to provide the service Average time to get the service

10 Minutes 10 Minutes Period to execute

the service

transaction

3 business days

Communicate

with the

customer

during the

course of the

procedures

Communication

channels:

SMS

Obtaining the

Services

Tips and

suggestions about

the service

Customer shall make sure of receiving the monthly bills and to ensure that the information contained therein is correct

In order to facilitate access to services, please register in the FEWA App.

Notes Please read this notice to avoid delay in service connection:

The customer shall close the account if there is no tenant in the facility.

To Whom

It May

Concern

Certificate

Service Info

Service Description An application submitted by customer to obtain To Whom It May Concern Certificate in respect of payment of all outstanding amounts to date without disconnection of service or closing the account.

Service Category: Procedural

Sub-service

Service Type: From Government to Government

From Government to Individuals

From Government to Business Sector Target Customers All categories

Requirements for

Service Connection:

Customer UAE ID Card if the customer holds an account with FEWA

Proving the current place of residence if the customer does not hold an account with FEWA

Page 56: Service Guide - Etihad WE

To Whom

It May

Concern

Certificate

Service Info

Service Procedures

Submitting the application and required documents to Customer Happiness Center

Verifying the documents and creating the application,

Paying the applicable fees.

Application Approval and issuing the Certificate Limitation of

Service All categories

Associated Service None Package Customer relationship

Application

Submission

Service Delivery

Channels: Customer Happiness Centers

Service Fees: AED 50/-

Time to provide

service

Average waiting time to provide the service Average time to get the service

10 Minutes 10 Minutes Period to execute

the service

transaction

3 business days

Communicat

e with the

customer

during the

course of the

procedures

Communication

channels:

SMS

Obtaining the

Services

Tips and

suggestions about

the service

Customer shall make sure of payment the last bill if he holds an account with FEWA Proving the current place of residence if the customer does not hold an account with FEWA (electricity bill or lease contract)

Notes To obtain this service, the customer’s data shall be updated in the system

Page 57: Service Guide - Etihad WE

Meters Fees

Monthly rental fee of the meter

Electricity Service

Meter Type Fees \ AED

Single Phase Meter 5

3 Phases Meter (25-100 Ampere) 10

3 Phases Meter (5/200-400 Ampere) 20

3 Phases Meter (5/200-400 Ampere and above) 50

Meter with current transformer on 11 KV 100

Meter with current transformer on 33 KV 200

Meter with high current transformer on 132 KV 300

Water Service

Meter Type Fees \ AED

Meter 15 mm 2

Meter 25 mm 5

Meter 50 mm & above 20

Meter 80 mm & above 50

Deposits:

The amount paid by the customer to FEWA against the consumption of electricity and water,

which is equivalent to part of the pre-determined consumption value according to the type of

meter or tariff price.

(The Deposits may be accepted by cash or cheques, provided that it shall not be postdated

cheque or by credit cards)

Page 58: Service Guide - Etihad WE

Deposits for Permanent Connections

Electricity Service

Meter Type Fees \ AED

Single Phase Meter 1000

3 Phases Meter (25-100 Ampere) 1500

3 Phases Meter (5/200-400 Ampere) 15000

3 Phases Meter (5/400 Ampere and above) 50000

Meter with current transformer on 11 KV 75000

Meter with current transformer on 33 KV 120000

Meter with high current transformer on 132 KV 150000

Water Service

Meter Type Fees \ AED

Meter 15 mm 500

Meter 25 mm 2000

Meter 50 mm & above 10000

Meter 80 mm & above 20000

Deposits for Temporary Connections

Electricity Service

Meter Type Fees \ AED

Single Phase Meter 2000

3 Phases Meter (25-100 Ampere) 3000

3 Phases Meter (5/200-400 Ampere) 15000

3 Phases Meter (5/200-400 Ampere and above) 50000

Meter with current transformer on 11 KV 75000

Meter with current transformer on 33 KV 120000

Meter with high current transformer on 132 KV 150000

Water Service

Meter Type Fees \ AED

Meter 15 mm 5000

Meter 25 mm 10000

Meter 50 mm & above 15000

Meter 80 mm & above 25000

Page 59: Service Guide - Etihad WE

Call Center (Customer Service Department)

The Call Center provides the best services through the use of latest technologies in order to

meet the needs of customers and provide the best services in accordance with the highest

standards of quality, efficiency and effectiveness.

FEWA provided an additional channel for customers by launching the Call Center 800-3392

on 10/10/2010. The Call Center is equipped with the latest technical systems to meet the

needs of customers and provide a distinctive experience for them.

The Call Center operates on all days of the week and during public holidays from 7:00 am to

5:00 pm. The Call Center receives all customer inquiries, suggestions and feedback as well

as complaints through several channels including:

- Phone calls

- Live Chat

- FEWA Email

The Call Center is committed to providing the highest standards of quality and

professionalism in responding to customers through a qualified staff and through applying

the best practices in evaluating employees to achieve outstanding performance to reflect the

positive image of the Authority, and to meet the directives of the government.

The Call Center receives all inquiries and observations from customers about all the services

of FEWA in addition to recording suggestions and complaints. Moreover, the staff of the Call

Center receives the requests for reconnecting the disconnected service after paying the fees

by following the relevant procedures.

Key functions of the Call Center include:

Receiving and responding to customer inquiries about all the services of FEWA

Receiving and responding to customer feedback

Registering customer suggestions

Receiving and registering electricity and water emergency calls

Handling the requests for reconnecting services due to non-payment.

Page 60: Service Guide - Etihad WE

Rules & Regulations for Contractual Relationship

First: General Conditions of the Contractual Relationship

1. The contractual relationship between FEWA and the owners or tenants of the

premises shall be established from the date of submitting the application for supplying

/ activating the electricity and water services and issuing the initial approval by

FEWA according to the forms prepared for this purpose.

2. The contractual relationship between both parties shall be subject to the provision of

electricity and/or water service to the customer in accordance with the applicable

regulations of FEWA, in a manner not inconsistent with the applicable laws and

regulations in the United Arab Emirates.

3. The terms and conditions described herein apply to the contractual relationship

between both parties in order to provide or continue to provide the customer with

electricity and/or water services.

4. The contractual relationship shall remain in force until terminated by either or both

parties in accordance with the terms and conditions of the contractual relationship.

Second: Obligations of FEWA against the owners or tenants of premises:

1. The service provided by FEWA to the owners and tenants conforms to the minimum

with the applicable rules and regulations of FEWA in respect of providing of

electricity and water services through the network of FEWA or any of its branches.

2. Providing electricity and water services of high quality to meet all customer

requirements.

3. Reading the meters regularly every month.

4. Sending monthly bills to all customers at their addresses according to the updated

database in the system.

5. Providing multiple channels for payment of monthly bills, and to inform customers

of these channels through the Authority's website, the Call Center and all Authority's

offices in the United Arab Emirates.

Third: Customer participation in the service under the contractual relationship is

classified into two categories:

First Category: If the customer is the owner of the premises

Second Category: if the customer is the tenant of the premises

First Category: If the customer is the owner of the premises

Page 61: Service Guide - Etihad WE

1. The customer undertakes to fill the form approved by FEWA, under which the

contractual relationship between the customer and FEWA is established to provide

the customer with electricity and/or water services.

2. The customer shall provide FEWA with the necessary information and documents in

order to update the data.

3. The customer shall comply with all applicable laws and regulations of FEWA in

relation to the provision of water and electricity services and subsequent procedures

for the delivery of the service.

4. The customer shall pay all applicable fees before the delivery of the service.

5. The customer undertakes to ensure safe access for FEWA employees for meter

readings, and for any other visits, if necessary.

6. The customer undertakes to pay the monthly bills on regular basis in accordance with

the applicable regulations in this regard.

7. If the customer failed to pay the bills on regular basis, the service will be disconnected

according to the applicable regulations.

8. In the event of any difficulties in the payment process, the customer shall notify the

Authority to request assistance. In the event of failure to notify the Authority, any

amounts due in the customer's account will be considered as overdue and the service

will be disconnected.

9. If the employee couldn’t read the meter for two consecutive months, the service will

be disconnected.

10. The customer shall notify the Authority of any changes to the data of the accounts

registered in his name with the Authority.

11. The service will be disconnected if the account is transferred to another person

without the Authority's approval.

12. In case of failure to issue a clearance certificate, all due amounts will be charged in

addition to any other damages incurred by the Authority during and before the

evacuation of the premises.

13. If the premises was sold/ leased to any other person, the customer shall:

13-1 notifies the Authority of the sale/ lease transaction within 48 hours from the date

of the transaction.

13-2 provides the Authority with the contract of sale / lease and any other

documents required by the Authority.

13-3 Upon the termination of lease contract or evacuation the premise, the

customer (tenant) must obtain a clearance certificate from the Authority as of the date

of evacuation.

13-4 The owner shall not hold responsible before the authority if he:

Notified the Authority of all changes or updates made to the premises’

account.

Page 62: Service Guide - Etihad WE

Notified the Authority of the evacuation of premises by the customer (tenant)

without obtaining clearance certificate.

The owner will be held responsible for any dues or fines on the account, in

case of failure to notify the Authority.

14. The owner may not leave the account registered in his/her name on the premises that

have been leased or sold to others, without informing the Authority, and in such case

the owner shall be liable for any fees and fines due on the account and any other

damages that may be caused to the Authority’ equipment.

15. The owner may not request disconnection of service in the leased premises, if the

tenant (customer) holds a valid tenancy contract, updates his/her data in the system,

pays monthly bills on regular bases, and there are no violations on the account.

16. If there is an agreement between the owner and tenant (customer) under the lease

contract, that the owner shall be responsible for the payment of electricity and water

bills; in this case, the Authority shall terminate the service for the leased premise in

case of the failure to pay the bills on regular basis regardless of the agreement between

the owner and the tenant.

Second Category: If the customer is the tenant of the premises:

1. The customer shall provide FEWA with the necessary information and documents in

order to update the data and register the customer in the system.

2. The Tenant undertakes to maintain the properties of the Authority (meters and

equipment) and all other installations within the premises.

3. The tenant must allow FEWA’s employees to enter into the premises to take the meter

readings. The Tenant shall hold full responsibility if the employees were not able to

read the meter.

4. The tenant undertakes to pay the monthly invoices in addition to any fines imposed

during the contract period.

5. If the tenant is a company or a commercial establishment, the tenant shall provide the

Authority with a copy of the trade license and the name of the licensee to update the

data in the system.

6. The tenant may not evacuate the leased premises without obtaining clearance

certificate from the Authority.

7. In case of failure to obtain the clearance certificate, the Authority will take all legal

proceedings against the tenant.

Fourth: Termination of Contractual Relationship:

1. Either or both parties may terminate the contractual relationship in accordance with

the terms and conditions set forth herein.

Page 63: Service Guide - Etihad WE

2. The Authority may terminate the contractual relationship if the customer violates any

of the terms and conditions of contractual relationship.

3. The Authority may terminate the contractual relationship in order to preserve safety

and security of the public and its staff, if there are any risks in continuing the service,

or exigent circumstances such as natural disasters which are beyond the Authority’s

control.

4. The customer has the right to terminate the contractual relationship if he does not

need the service provided that all the due amounts are paid to the Authority.

5. The contractual relationship shall be terminated upon issuance of a final judgment

from competent courts, for which the Authority is bound to implement.

6. In case of any dispute between the Authority and the customer (Owner/Tenant), such

dispute shall be resolved amicably. In case of failure to resolve the dispute, the

Authority will have the final authority in resolving the dispute and terminate the

contractual relationship.

7. The Authority may change, modify, redraft, add or delete any of the terms and

conditions of the contractual relationship without notice to the customer. Such change

or modification shall take effect from the date of issue, without prejudice to

the rights conferred to the customer or causing any serious damages to the customer

as a result of such change or modification as the Authority deems fit in each case.

8. In all abovementioned cases which result in the termination of contractual

relationship, the owner/tenant liability to pay all due fees and bills, which are not fully

collected or subsequently issued as fines for violations despite the termination of the

contractual relationship, shall continue and the Authority shall have the right over

(owner/tenant) to withhold deposit amount till the settlement of all dues. Moreover,

the customer must allow the Authority’s employees to enter into the premises to take

final readings and remove meters and other equipment.

Page 64: Service Guide - Etihad WE

The Violations

Breach of the terms & conditions of connection:

Description of Violation Penalty Amount /AED

Electricity Water

- Breach of the terms & conditions of

connection except for the terms of

connection for consumption categories,

freehold and expatriates, which will be

mentioned later.

- Loss of meter, or transferring the meter by

the customer, etc.

2000 1000

Illegal Additional Loads

Description of Violation Loads Penalty Amount /AED

- The customer adds an

illegal load by

penetrating the meter

without following the

approved procedures or

without obtaining prior

permission from the

Authority.

- The amount of penalty

shall be determined

according to the

additional illegal loads

(for electricity only)

- Increase loads by 50

KVA or lower on

low pressure

- Increase loads by

more than 50 KVA

or less on low

pressure

- Increase loads by

100 KVA or less on

average pressure

- Increase loads by

more than 100 KVA

on medium pressure

3000

4000

5000

6000

Providing service to others through customer’s own meter:

Description of Violation Penalty Amount /AED

Electricity Water

The customer provides the service to others through

the customer’s meter. The period and amount of

penalty shall be determined according to the type of

meter.

2000 1000

Illegal Connection of Service:

Description of Violation Penalty Amount /AED

Page 65: Service Guide - Etihad WE

Electricity Water

Any person or entity connect the electricity to the

premises from the Authority's network without

passing the approved meter by the Authority or

without obtaining prior permission from the

Authority.

10000 5000

Restoring service disconnected by FEWA:

Description of Violation Penalty Amount /AED

Electricity Water

The customer, either by himself or through another

party, restores the service disconcerted by the

Authority for any reason without the prior

permission of the Authority

3000 1000

Meter / connection tampering in an attempt to change the reading:

Description of

Violation

Amount of Penalty/

AED

Penalty Period & Consumption

Difference

Electricity Water

Customer tampers the

Meter / connection in

an attempt to change

the reading

2000 1000 - If the period of consumption

reduction is determined, the

consumption difference is

calculated by the percentage of

consumption reduction

resulting from meter

tampering.

- If the period of consumption

reduction cannot be

determined, the depreciation

difference is calculated on the

basis of the monthly

consumption rate recorded in

the customer's account after

the technical adjustment.

Page 66: Service Guide - Etihad WE

Meter tampering without affecting the reading:

Description of Violation Penalty Amount /AED

Electricity Water

The customer tampers the meter without affecting

the reading

1000 500

Violation the rules of connection to a citizen’s accommodation (Electricity/ Water) Electricity Required Procedure

Type 1: The customer exploits the

establishment for commercial, investment,

industrial or agricultural purposes, freehold,

or any other activities, or to sell or lease the

establishment or to another citizen.

- Payment the difference of delivery fees

according to the new category

- Changing of the consumer category from

citizen accommodation to the relevant

category

Type 2: If the activity is transferred to

according to one of the above mentioned

cases and the additional connections

stipulated in the list of revenues and

operations of customer services

The new connection / activation of the new

account for the customer is executed on the

basis of a citizen's accommodation

Type 3: The citizen sells or leases the

premises to another citizen for the first time

for the purpose of citizen accommodation.

There is no difference in the connection fees

or consumption if the sold / leased premises

are not the first accommodation for the

buyer / tenant. The difference in connection

or consumption fees (if any) shall be paid

according to the category to which the

account was transferred.

Description of Violation Required Procedure

Farms/ Citizen Rest Houses

The citizen leases/sells the premises to

which the service is connected on

agricultural/ rest house basis to another

citizen to practice different activity

(commercial / investment / selling / leasing

/ freehold)

- The difference in connection fees (if

any) shall be paid according to the

category to which the account was

transferred.

- The difference in consumption (if

any) shall be paid, and the period is

determined by competent section.

Resident Accommodation

Page 67: Service Guide - Etihad WE

The customer sells / leases the premises to

which the electricity / water service is

connected to on the basis of resident

accommodation to:

- Freehold Category

- Commercial / Industrial / Agricultural /

Investment Category

- The difference in connection fees

shall be paid on the basis of freehold

for all cases.

- The difference in consumption shall

be paid, and the period is determined

by competent section on the basis of

new category.

Freehold/ Expatriates

The Violations

1. In case of connection to the citizen

on commercial, industrial, and

investment basis, and the citizen

sells the premises to an expatriate,

and classification of the consumer

category changed to freehold and

expatriate

2. In the event that the premise are

found to be under the category of

freehold, joint ownership or

expatriate ownership at the date of

connection.

3. Activation of account for the new

tenant

- The price tariff shall be changed

directly to 45 fils

- The difference in connection fees (if

any) shall be paid

- The difference in consumption (if

any) shall be paid retroactively.

- Providing the Authority with a lease

contract duly attested by the

municipality to verify the owner's

name and verify that there is no

violation of the connection rules to

the category of freehold and

expatriate ownership.

Violations due to faulty connection

The cases resulting from a technical error in

the connection either by the Authority’s

employee or the customer due to error or

negligence. In such cases it is not possible

to determine if the meter was tampered to

reduce the consumption of electricity/

water.

Electricity:

- The difference in consumption shall

be calculated according to the

percentage of consumption

reduction resulting from the faulty

connection.

- If the relevant period is not

specified, difference in consumption

shall be calculated on the basis of a

period of one year for the old cases

Page 68: Service Guide - Etihad WE

or based on the date of connection

for the new cases, provided that the

period is not less than one year.

Water:

- The difference in consumption shall

be calculated for the period

preceding the discovery of the error

based on the classification of the

facility and the type of meter.

- If the relevant period is not

specified, difference in consumption

shall be calculated on the basis of a

period of one year for the old cases

or based on the date of connection

for the new cases, provided that the

period is not less than one year.

Electronic Services

FEWA offers many electronic services to customers to facilitate the required service. There

are 12 services available through the smart phone application and another 12 services

available through the FEWA Website.

List of services provided through the Smart App

No Service Name

1 Accounts & Payments

2 Clearance Certificate

3 Drawings Approval (Electricity)

4 Drawings Approval (Water)

5 Land Clearance Certificate (Electricity)

6 Land Clearance Certificate (Water)

7 Request New Connection (Electricity)

8 Request New Connection (Water)

9 Request to activate the service for the new customer

10 Reconnection of Disconnected Service

11 Complaints & Suggestions

12 Report Emergency Faults (Ablighna)

Price Tariff:

Page 69: Service Guide - Etihad WE

Price Tariff for Electricity Service Price Tariff for Water

Service

Category Monthly

Consumption

KW/H

Tariff

(Fils)

per

KW

Fees

(Fils)

Total

Tariff

(Fils)

Monthly

Consumption

(m3)

Tariff

(AED)

Citizen

Accommodation

One Group 7.5 - 7.5 One Group 3.3

Farms & Rest Houses One Group 7.5 - 7.5 Up to 45 4.4

More than 45 6.6

Resident

Accommodation

Up to 2000 23

(+5)

28 Up to 27 7.7

2001-4000 28 33 27-55 8.8

4001-6000 32 37 More than 55 10.12

More than

6000

38 43

Commercial Up to 2000 23 28 Up to 45 7.7

2001-4000 28 33 45-91 8.8

4001-6000 32 37 More than 91 10.12

More than

6000

38 43

Government Up to 10000 23 28 Up to 45 7.7

More than

10000

38 43 45-91 8.8

More than 91 10.12

Industrial One group 40 (+4) 44 Up to 45 7.7

45-91 8.8

More than 91 10.12

Freehold &

Expatriates

One group 45 - 45 According to

each

consumption

category

As per the

current

tariff for

every group

Temporary

Connection

One group 50 - 50 One group 11.00

Page 70: Service Guide - Etihad WE

Bills Payment Channels

FEWA provides the customers with multiple options for payment wherever they are and at

any time.

Green Bill:

Payment the bill through different channels:

Customer can register in Green Bill via

Electronic services

Customer Happiness Centers

Smart phone application

The customer may easily log in through the website of the Authority by entering the customer

code and ID / Passport Number.

Advantages of Green Bill

Environment- friendly in line with sustainability goals and vision

Receive your bill in short time

Easy to save the bill in e-mail to return to it at any time

Reduce the risk of transferring personal information

Conservation of Electricity and Water Consumption

UAE has high water consumption level more than twice the global average.

Therefore, the Authority launched the conservation initiative to reduce the

consumption of electricity and water. Customers can participate in

Conservation Award by visiting the Authority website. Conservation Department established in 2014 under FEWA Board of

Directors Decision No. 6/2014 dated 20 March 2014 to assume the following

responsibilities:

Prepare, lead and manage the FEWA Strategy of Electricity and Water

Conservation.

Participation in public awareness campaigns and educational activities.

Communicate and cooperate with the regulatory authorities concerned with

the conservation of electricity and water in UAE.

Representing the FEWA in local and regional conferences on the conservation

of electricity and water.

Encouraging partnership with leading technology and energy companies

working in the water and electricity rationalization technologies.

Setting rules and regulations for water and electricity conservation.

Page 71: Service Guide - Etihad WE

Supervise research and development and identifying the applied economic

techniques and methods that can be introduced into society in order to

conserve electricity and water.

Review feasibility studies and cost estimates related to the rationalization of

electricity and water.

Review energy efficiency reports related to high energy consumption by

customers, and ensure implementation and promotion of energy efficiency

solutions.

Conduct research and analysis on the performance of equipment, methods,

and tools and issue the reports in this respect.

Launching initiatives.

Launching awareness campaigns on electricity and water rationalization for

different categories of customers.

Increasing the efficiency of water consumption for customers in different

sectors

Reducing electricity and water consumption in citizens' homes (Your Home

Care Initiative)

Develop strategic partnerships with public and private sectors to converse

electricity and water in the areas served by the Authority.

Promote the adoption of modern technologies to converse electricity and

water and encourage the use of clean energy.

Installing water saving devices for customers in the residential

accommodation category.

FEWA decided to install rationalization devices for all citizens in the category

of citizen accommodation in the light of high voluntary participation of

customers and the results achieved in the first round of Conservation Award.

FEWA has signed two contracts, with contractors specialized in the

installation of water-saving devices for at least 63,000 houses.

Installing water-saving devices in schools and mosques that consume water at

high rates.

FEWA installed water-saving devices in 60 mosques and 6 schools. Also,

FEWA installed water-saving devices for the strategic partners.

Developing and issuing the regulations and requirements for linking

Photovoltaic Power Systems (PV System) to the network of FEWA.

A committee has been formed to prepare the requirements and specifications

of connecting the PV panels with the FEWA electricity distribution network

in order to encourage customers to install PV panels and enable them to

contribute to the production of clean electric power to meet their daily needs,

and to export the surplus to the Authority's network to distribute electricity

according to the standards that ensure the safety and efficiency of the network.

Page 72: Service Guide - Etihad WE

What to do in the following situations:

1. Technical Faults

Call the emergency center on 991 for electricity technical faults and 992 for water technical

faults, call emergency centers on the numbers described herein.

Call the Call Center between 7:00 am and 5:00 pm on all days of the week.

2. Reconnection the Service after payment of bills:

If the service is disconnected due to non-payment of the bill:

Customers can pay the bill through one of the payment channels available in this Directory.

If the bill is paid through an external payment channel excluding Service Cementers or

ATMs, please contact the Call Center or Emergency Center to request the reconnection of

service.

If the service is not reconnected within 2 hours, please call the Call Center between 7:00 am

and 5:00 pm on all days of the week or call the emergency center.

FEWA will impose a penalty if the customer reconnected the service by himself without

paying the bill.

3. Evacuation of the premises (The tenant)

Customer shall visit the nearest service center to apply for the final bill and clearance

certificate

Customer must pay the final bill

Customer shall obtain clearance certificate from FEWA

Customer can access the service through the FEWA Website or smart phone application.

4. New Tenant

If you would like to rent a new facility, you must do the following:

Visit the nearest service center to apply for activation of service for a new tenant.

Pay the service fees and deposit.

Sign the undertakings and complete the documents.

Register and update the data

Customer can access the service through the FEWA Website or smart phone

application.

Reconnection of the service without complying with the above procedures is

considered a violation of applicable conditions of the Authority.

General Notes:

Page 73: Service Guide - Etihad WE

Please read the following notices to avoid delay in service connection:

Signatures in the application must be identical to the signatures in the valid

UAE ID Card.

Emirates ID Card is necessary to apply for services, and in case of renewal ID

Card, the customer shall submit the ID Card renewal form with the

application.

In case of powers of attorney, the customer shall submit the original copy of

the power of attorney duly attested by the Ministry of Justice in the United

Arab Emirates or the Ministry of Foreign Affairs in the UAE if the power of

attorney is issued outside the UAE.

In case of absence of the customer, the attorney must submit a copy of his

Emirates ID Card.

The customer shall pay the fees if he desires to change in the facility’s activity,

to which the electricity service was connected on the basis of citizen

accommodation.

FEWA discounts 40% of the fees in favor of citizens working in the private

sector carrying Absher Card, according to the following conditions:

o This discount applies only to the citizens who hold family book (Khulasat

Al Qaid) and working in private sector.

o The employer must be registered with the Ministry of Labor.

o The citizen must submit a certificate issued by the employer and attested

by the Ministry of Labor.

o The citizen must be employed in his current job in the private sector for