Page 1: SGN 2011 Ad-hoc Tender Interruption Requirements... · Ad-hoc Interruption Requirements November 2011 • Scotia Gas Networks have published itʼs Interruption Requirements, details

SGN 2011 Ad-hoc Tender Interruption Requirements

24th November 2011

Page 2: SGN 2011 Ad-hoc Tender Interruption Requirements... · Ad-hoc Interruption Requirements November 2011 • Scotia Gas Networks have published itʼs Interruption Requirements, details

2

2011 Ad-hoc Interruption Process •  Scotia Gas Networks publish Interruption

Requirements 24th November 2011

•  Tender window opens Monday 12th December 2011

•  Tender window closes 5pm Friday 16th December 2011

•  On or before 20th January 2012 SGN publish results of the Ad-hoc tender

Page 3: SGN 2011 Ad-hoc Tender Interruption Requirements... · Ad-hoc Interruption Requirements November 2011 • Scotia Gas Networks have published itʼs Interruption Requirements, details

3

Ad-hoc Interruption Requirements November 2011

•  Scotia Gas Networks have published it’s Interruption Requirements, details are summarised below or on the SGN website; www.sgn.co.uk

•  or contact for assistance

Steven Howells tel 07773 284161 Scott Duncan tel 01293 818256

Email [email protected]

2011 Ad-hoc Tender Process Interruption Website

Page 4: SGN 2011 Ad-hoc Tender Interruption Requirements... · Ad-hoc Interruption Requirements November 2011 • Scotia Gas Networks have published itʼs Interruption Requirements, details

4

Scotland Zones -figures

•  Interruption Requirements

Zone Requirements 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019SOQ Volume (GWh/Day) 0.7 0.7 0.7 0.7 0.7 0.7Min No Int Days 30 30 30 30 30 30Max No Int Days 53 59 62 69 69 69

Zone Requirements 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019SOQ Volume (GWh/Day) 1.9 2.1 2.1 2.2 2.2 2.2Min No Int Days 30 30 30 30 30 30Max No Int Days 33 37 37 40 40 42

Zone Requirements 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019SOQ Volume (GWh/Day) 0.35 0.35 0.35 0.35 0.35Min No Int Days 5 5 5 5 5Max No Int Days 15 20 20 34 38

Scotland Zone; (Kilmarnock-Darvel

Scotland Zone; Angus

Scotland Zone; Moray

Page 5: SGN 2011 Ad-hoc Tender Interruption Requirements... · Ad-hoc Interruption Requirements November 2011 • Scotia Gas Networks have published itʼs Interruption Requirements, details

5

South Zones -figures

•  Interruption Requirements

Zone Requirements 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019SOQ Volume (GWh/Day) 1.04 1.04 1.04 1.04 1.04 1.04Min No Int Days 5 5 5 5 5 5Max No Int Days 38 38 38 40 40 40

South Zone; Milton Keynes