sgp+m iii presentation amm and amr · pdf file · 2010-05-14sgp+m iii presentation...
TRANSCRIPT
SGP+M Market figures (Main Utilities)
May-10 2 - Landis+Gyr -
Source ANEEL – 2007
Main Utilities in Brazil
Brazilian Market figures
Source ANEEL – 13/03/08
Class of Consumers – Number of consumers
May-10 3 - Landis+Gyr -
Brazilian Market figures
May-10 4 - Landis+Gyr -
Source ANEEL – 13/03/08
Class of Consumers – Electricity energy
Brazilian Market figures
May-10 5 - Landis+Gyr -
Source ANEEL – 13/03/08
Class of Consumers – Figures consolidation
Consolidation Brazil
Class of Consumption Energy consumption (MWh) Number of consumers
Residential 75.431.556,00 51.380.036
Industry 60.762.516,00 521.799
Commercial, Services & Others 47.850.799,00 4.477.066
Rural 11.445.602,00 3.322.458
Public Power 9.192.543,00 56.741
Public Ilumination 9.225.294,00 450.808
Public Services 8.760.115,00 53.961
Self Suficient 594.620,00 207
Rural farmer 51.337,00 45.157
Rural irrigant 2.843.034,00 7.836
Total 226.157.416,00 60.316.069
Brazilian Market figures (Losses per Utilities)
May-10 6 - Landis+Gyr -
Source ABRADE – 2008
Main Utilities Losses
20082007
The culture of the electricity losses
+ Free electricity through a clandestine cable
May-10 7 - Landis+Gyr -
�“Cirque du Soleil” theft�“Cirque du Soleil” theft�Meter tampering V.2.0�Meter tampering V.2.0�Meter tampering V.1.0�Meter tampering V.1.0�Direct connection to the low voltage grid�Direct connection to the low voltage grid
The culture of the electricity theft
+ Stealing electricity directly from the LV network
May-10 8 - Landis+Gyr -
�“Cirque du Soleil” theft�“Cirque du Soleil” theft�Meter tampering V.2.0�Meter tampering V.2.0�Meter tampering V.1.0�Meter tampering V.1.0�Direct connection to the low voltage grid�Direct connection to the low voltage grid
The culture of the electricity theft
+ Free electricity by stopping the meter wheel…
May-10 9 - Landis+Gyr -
�“Cirque du Soleil” theft�“Cirque du Soleil” theft�Meter tampering V.2.0�Meter tampering V.2.0�Meter tampering V.1.0�Meter tampering V.1.0�Direct connection to the low voltage grid�Direct connection to the low voltage grid
… or by getting the meter to sleep
The culture of the electricity theft
+ Stealing all the energy by changing meter gears…
May-10 10 - Landis+Gyr -
�“Cirque du Soleil” theft�“Cirque du Soleil” theft�Meter tampering V.2.0�Meter tampering V.2.0�Meter tampering V.1.0�Meter tampering V.1.0�Direct connection to the low voltage grid�Direct connection to the low voltage grid
… or just part of it by smoothing gears over
The culture of the electricity theft
May-10 11 - Landis+Gyr -
�“Cirque du Soleil” theft�“Cirque du Soleil” theft�Meter tampering V.2.0�Meter tampering V.2.0�Meter tampering V.1.0�Meter tampering V.1.0�Direct connection to the low voltage grid�Direct connection to the low voltage grid
SGP+M – AMM and AMR SYSTEM
+ Project started in 1994 (13 years ago)
+ More than 400.000 customers already connected
+ Main Utilities:
– Light, Copel, Celpa, Celesc, Bandeirante, CPFL, Cemat, Escelsa, Saelpa, Celb, Ampla, among others utilities in Brazil, South America and Central America
+ First Project Review (SGP+M II) finished end of December/05
+ SGP+M II regularized by Inmetro in 2009 – Decree
+ SGP+M III – new generation – under Inmetro analysis for approval
May-10 13 - Landis+Gyr -
History
SGP+M – AMM and AMR SYSTEM
May-10 14 - Landis+Gyr -
Secondary Concentrator
RF Mesh Communication
Customers
Association Utility
Primary Concentrator
GPRS / Digital Radio / Ethernet Communication
SGP+M – AMM and AMR SYSTEM
May-10 15 - Landis+Gyr -
Low voltage distribution network
Secondary ConcentratorElectronic Meters
Communication RF Mesh
SGP+M – AMM and AMR SYSTEM
May-10 16 - Landis+Gyr -
Ampla’s Solution (Rio de Janeiro) for losses combat
Secondary Concentrator
Medium voltage
Low voltage
Remote Display
Network Architecture
May-10 17 - Landis+Gyr -
CP
CS
CS
CS
CS
CSMED
MED
MEDMED
MED
MED
MED
MEDMED
MED
MED
MED
MEDMED
MED
MED
MED
MEDMED
MED
MED
MED
MED
MED
MED
SGP+M – AMM and AMR SYSTEM
May-10 18 - Landis+Gyr -
Radio Frequency Communication
CP1 CS1/1 CS1/2 CS1/3
Medium Voltage
Low Voltage
Utility
SGP+M – AMM and AMR SYSTEM
+ Digital Radio: 900-915MHz 1W Spread Spectrum Mesh Network
May-10 19 - Landis+Gyr -
Concept of SGP+M System with Radio Frequency communication:
CS
CP
CS CS
CS
CSCS
CS
ARange TBD
SGP+M – AMM and AMR SYSTEM
+ Operation as a Smart Gateway
+ Multiples medias for communication with the Central Office
+ Capacity for the management of a large quantity of CSs (256 to 512)
+ Based on industrial PC, manages “unlimited” customers (3,000 to 6,000 initial estimate).
+ Communicates with the secondary concentrators by Radio using encrypted proprietary protocol and private keys.
May-10 20 - Landis+Gyr -
Primary concentrator (reading and invoicing)
SGP+M – AMM and AMR SYSTEM
+ Local Smart Concentrator for up to up to 12 single phase customers or a mix of single and polyphase customers up to a total of 12 “phases”
+ Output directly connected to the customers
+ Linked to the Individual Remote Displays through Radio Frequency (one display per customer) with encrypted proprietary protocol and private keys.
+ Remote metering, Active and Reactive Energy, Active Demand
+ Remote disconnection and reconnection
+ Upgradeble to TOU, pre-payment, load and demand control among other smart metering features
May-10 21 - Landis+Gyr -
Secondary concentrator
SGP+M – AMM and AMR SYSTEM
Includes:
+ Electronic Meters – up to 12 Smart Meters, factory configured for single, bi or three phase customers
+ Internal clock for TOU applications
+ Latching relays (part of Meter Module) for disconnection and reconnection, load and demand control, pre-payment, etc
+ Anti-tampering device (door opening), operates even with no power
+ Potential return sensor (neighbor energy “borrowing”)
May-10 22 - Landis+Gyr -
Secondary concentrator
SGP+M – AMM and AMR SYSTEM
+ Meters can be easily inserted and removed for maintenance
+ EEPROM for the storage of the non volatile information.
+ FLASH for the storage of the current firmware (upgradable).
+ Optical serial communication to the Meter Modules through plastic fiber.
May-10 23 - Landis+Gyr -
Secondary concentrator – New Features
SGP+M – AMM and AMR SYSTEM
+ “Plug&Play” interface with the meters – auto-detection of newly inserted meters or removed meters - self reporting for meter serial number and meter type / status.
+ Pending alarms and events are uploaded to Main Concentrator (CP) during polling process (pushing is under analysis)
+ New concept for the detection of cabinet opening.
May-10 24 - Landis+Gyr -
Secondary concentrator – New Features
SGP+M – AMM and AMR SYSTEM
May-10 25 - Landis+Gyr -
Secondary concentrator
Electronic Meters with the latching relays
CPU + Power Supply Module
Area for Circuit Breaker
MainsConnection
Area for RF or future comm. boards
Feed for the Consumers
SGP+M – AMM and AMR SYSTEM
+ Microcontroller: Zilog Z8F6421 20MHz, Z8 microprocessor core
– 64KB Flash program memory, 2KB RAM, 8-channel 10-bit A/D converter
– Three 16-bit timers with PWMs and capture and compare, Watch-Dog Timer
– 29-31 general-purpose I/Os, 23 vectored interrupts
– Power-on reset and voltage brown-out
– Full-duplex SPI, I2C, and 2 UART ports with IrDA encoder/decoder
– 3-channel DMA controller
– On-chip debug with break and trap capability, Single-pin Flash programming
– 3.0 to 3.6V operating voltage
– Standard (0 to 70) or extended (-40 to 105) temperature range
– 40-pin PDIP and 44-pin PLCC/LQFP packages
May-10 27 - Landis+Gyr -
Secondary concentrator – Technical Details
SGP+M – AMM and AMR SYSTEM
+ Nominal Voltage: 120V or 240V
+ Nominal Frequency: 50Hz or 60Hz
+ Nominal Current: 15A
+ Maximum Current: 100A (heat test limited)
+ Active and Reactive energy measurement and registration
+ Fulfils NBR standards requirements for Class B (1%) electronic meters and INMETRO 371
+ Latching Relay to connect / disconnect customers and for demand / load control / pre-payment (performed by Concentrator commands)
+ Single phase and poly phase customers (using 2 or 3 Meters)
May-10 28 - Landis+Gyr -
CompMeter
Latching Relay
Shunt
SGP+M – AMM and AMR SYSTEM
+ “Plug&Play” Smart Meter
+ Remote FW upgrade (future)
+ Designed for easy field servicing
+ Calibration by dedicated software
+ Storage of registers for energy, calibration data with date and time, manufacturing information on non volatile memory.
+ Communication with the CS through encrypted proprietary protocol and private keys.
May-10 29 - Landis+Gyr -
CompMeter – New Features
SGP+M – AMM and AMR SYSTEM
+ Autonomy for charge/discharge contactor's activating capacitor
+ Contactor's activation for disconnection / reconnection through command
+ Shunt + MMI3 metering sensor
+ Possibility of automatic downloading managed by CS
+ Communication with CS by a isolated channel (plastic fiber)
May-10 30 - Landis+Gyr -
CompMeter – New Features
SGP+M – SISTEMA DE GESTÃO DE PERDAS E MEDIÇÃO
+ Measurement of the distribution power transformer
+ Poly phase
+ Rated Current: - / 5A, 15A / 120A
+ Radio Frequency communication
+ SGP+M protocol
+ Active energy meter (KWh)
May-10 31 - Landis+Gyr -
Energy Balance
SGP+M – AMM and AMR SYSTEM
May-10 32 - Landis+Gyr -
Electronic reading concentrator or reduced CP (CPr) – Not in use for SGP+M III
CPr
Secondary ConcentratorCS
Energy cable
Communicationcable
SGP+M – AMM and AMR SYSTEM
Main Features:
+ Reading device closer to the customer
+ Low cost
+ Easy to use
+ Can be installed right below the secondary concentrator CS
+ Around 50 consumers per each CPr
May-10 33 - Landis+Gyr -
Electronic reading concentrator or reduced CP (CPr) – Not in use for SGP+M III
SGP+M – AMM and AMR SYSTEM
Main Features:
+ Possibility to read the consumption at home
+ Radio frequency / PLC communication
+ Power supply 120V or 240V
May-10 34 - Landis+Gyr -
Reading display (In house display)
Main software and applicatives tools
GRIDSTREAM SOLUTION CENTER
+ AMR Tool Embedded
– Data Delivery Server
+ AMR Tool
– Data Collect Server
+ DLL – COMM
– Communication library between AMR Tool and “Front End”
+ SMC-Manager V7.0.0
– AMM management tool
+ WDV7 – Web Data Viewer
– SGP+M web data viewer
May-10 35 - Landis+Gyr -
May-10 36 - Landis+Gyr -
SMC7SMC7
AMRTool EmbeddedAMRTool Embedded
AMRToolAMRTool
WDV7WDV7
CPCP
Easy2WorkEasy2Work
Programador RF
Programador RF
BDSMC7
BDSMC7
BDE2W
BDE2W
EQUIPAMENTOS EM CAMPO
E-AnalisysE-Analisys
SOLUÇÃO COMPLETAInício do desenvolvimento após a portaria
E2CWebService
de integração
E2CWebService
de integração
SGP+M SOFTWARE SOLUTION
+ BD
+ AMRTool
+ Easy2Work
+ SMC8
+ WDV8
+ Monitor
May-10 37 - Landis+Gyr - Insert name of presentation and author at Insert ribbon (Header&Footer)
BD
+ Solution compatible with SQLServer 2005;
+ Under development the compatibility with Oracle 10g;
+ Massive use of Stored Procedures, Triggers and Jobs;
+ Structured to DW;
+ Unique & centralized Database;
+ Transactional volume of 25,000 readings / second, in a programmable frequency;
+ Transactional volume of 1,400,000 readings / day;
May-10 38 - Landis+Gyr - Insert name of presentation and author at Insert ribbon (Header&Footer)
AMRTool
+ Tool for managing connections with the modules in the field;
+ Responsable for handshaking the communication path with the modules in the field;
+ Validation of the packages received;
+ Ready to receive field data from various media of communication;
+ GPRS, Ethernet, RS232, Mobile, CSD;
+ Responsible for the data storage into the database;
+ Developed in. NET, Landis + Gyr framework (based on Framework 2.0);
+ It runs as a Windows service;
May-10 39 - Landis+Gyr -
Easy2Work
+ Tool to manage the equipments lifecycle as well as service orders from related installation and maintenance of them;
+ The system provides the traceability of equipments, from production to the obsolescence of all pieces and parts of the solution;
+ Based on algorithms of AI, triggers generation of service ordersautomatically based on previously registered in critical application (in progress);
+ Developed in. NET, Framework 3.5;
+ WEB interface, compatible with IE and Firefox;
May-10 40 - Landis+Gyr -
SMC8
+ Software responsible for the management of customers’ information, as well as their reading / consumption registers;
+ Generation of management reports and billing, and the detailed record of actions;
+ Responsible to start the actions of disconection, reconection, reading of alarms, reading of energy registers, among others;
+ Main user’s "Front-end" on the day-by-day;
+ Developed in. NET, Landis + Gyr framework (based on the framework 2.0);
+ Client-server topology, with the possibility of centralized access via Terminal Server;
May-10 41 - Landis+Gyr -
WDV8
+ Tool developed for managing / monitoring of installations in the field;
+ Generation of management reports, such as:
+ Energy Balance, readings of energy, effectiveness of data collections, alarms, etc;
+ Developed in Java, compatible with JVM1.5;
+ WEB interface, compatible with IE and Firefox, through the Apache server;
May-10 42 - Landis+Gyr - Insert name of presentation and author at Insert ribbon (Header&Footer)
Monitor
+ Application developed to provide a on-line status of the installations in the field;
+ Designed to be used in the operation center, provides information to the users about the effectiveness of data collection (eg GPRS), as well as information on effective communication among equipments in the field (eg RF network);
+ Developed in. NET, Framework 3.5;
+ WEB interface, compatible with IE and Firefox;
+ Application developed in Java, compatible with JVM1.5;
May-10 43 - Landis+Gyr - Insert name of presentation and author at Insert ribbon (Header&Footer)
May-10 56 - Landis+Gyr - Insert name of presentation and author at Insert ribbon (Header&Footer)
CP 802
SGP+M – AMM and AMR SYSTEM
May-10 60 - Landis+Gyr -
Success Cases
Campina Grande Public Market - CELB
SGP+M – AMM and AMR SYSTEM
EMELGUR
+ Site: El Recreo
+ Town: Guayaquil -Equador
+ Operational since: May/98
+ Remote disconnection and reconnection
+ Elimination of the Low voltage network
May-10 61 - Landis+Gyr -
Success Cases
SGP+M – AMM and AMR SYSTEM
CPFL
+ Site: Vila Gilda Baixada Santista
+ Town: Santos
+ Operational since: 2004
+ Remote disconnection and
+ reconnection
+ Loss Reduction
+ Perceptual of Losses: 100%
May-10 62 - Landis+Gyr -
Success Cases
SGP+M – AMM and AMR SYSTEM
May-10 65 - Landis+Gyr -
Success Cases
CPFL
CP – Primary Concentrator
Modem
SGP+M – AMM and AMR SYSTEM
May-10 66 - Landis+Gyr -
Success Cases
Centralized metering in buildings - Copel’s experience (Brazil)
SGP+M – AMM and AMR SYSTEM
May-10 67 - Landis+Gyr -
Success Cases
Centralized metering in buildings - Copel’s experience (Brazil)
SGP+M – AMM and AMR SYSTEM
May-10 68 - Landis+Gyr -
Success Cases
Secondary concentrator
Low voltage network + RS485 communication cable
Medium voltage network
AMPLA PROJECT
SGP+M – AMM and AMR SYSTEM
May-10 69 - Landis+Gyr -
Success Cases
Secondary Concentrator
AMPLA PROJECT
SGP+M – AMM and AMR SYSTEM
May-10 70 - Landis+Gyr -
Success Cases
Distribution transformer Medium
voltage network
Secondary concentrator
Low voltage network + RS485 communication cable
AMPLA PROJECT
SGP+M – AMM and AMR SYSTEM
May-10 71 - Landis+Gyr -
Success Cases
Lightning Arr.
Cellular Antenna
Communication Cable RS 485
L V Network
Primary Concentrator
SecondaryConcentrator
AMPLA PROJECT
SGP+M – AMM and AMR SYSTEM
Site’s Characteristics
+ Site: Rio de Janeiro State - Brazil
+ Total number of customers: 200.000
+ Complete SGP+M solution
+ Quantity of metering modules (Shunt electronic meters): 240.000 (as minimum)
+ CS quantity: 24.000
+ CP quantity: 335
+ Contract duration: 24 months (March/06 to March/08)
May-10 72 - Landis+Gyr -
Ampla Project – Phase III
May-10 73 - Landis+Gyr - Insert name of presentation and author at Insert ribbon (Header&Footer)
Niterói
May-10 74 - Landis+Gyr - Insert name of presentation and author at Insert ribbon (Header&Footer)
Niterói
May-10 75 - Landis+Gyr - Insert name of presentation and author at Insert ribbon (Header&Footer)
Niterói
May-10 76 - Landis+Gyr - Insert name of presentation and author at Insert ribbon (Header&Footer)
Niterói
May-10 77 - Landis+Gyr - Insert name of presentation and author at Insert ribbon (Header&Footer)
Niterói
SGP+M – AMM and AMR SYSTEM
May-10 80 - Landis+Gyr -
Low Voltage
Conventional Network
CS
CP
CP-R
Low Voltage
Insulated cableNetwork
CS
CP
CP-R
Advantages of the implantation of the SGP+M System
Efficiency of the project:
+ Metering park modernization
+ Meters on the top of the pole
+ Automation of the commercial process
+ Data processing through systems
– Energy balance is possible
– Permanent auditing for tampering detection
– Remote disconnection and reconnection
May-10 82 - Landis+Gyr -
Advantages of the implantation of the SGP+M System
Reduction of the third parties services:
+ Measurement of the LV distribution transformers
+ Previous visits
+ Manual Readings, re-reading and reading confirmation
+ Commercial inspection
+ Inspection of the Customer (tampering and deviation)
+ Disconnection due to lack of payment (single and poly phase, Pole)
+ Customer reconnection (single and poly phase, Pole)
+ Emergency reconnection (single and poly phase)
+ Service and meter take away
+ Tampering identification
May-10 83 - Landis+Gyr -
Advantages of the implantation of the SGP+M System
Revenue enhancement with the implantation of SGP+M System:
+ Losses recovery
+ Regularization of customers without meters
+ Modernization of the metering park
+ Reduction of lack of payment
+ Income due to the normal reconnection
+ Extra income due to the emergency reconnection
May-10 84 - Landis+Gyr -
Advantages of the implantation of the SGP+M System
Extra costs avoided with the implantation of SGP+M System:
+ Manual readings
+ Impossibility of readings or reading errors
+ Reading confirmation
+ Manual disconnection and reconnection
+ Conventional inspection
+ New meters (reutilization of the meters replaced by the SGP+M system)
+ Reduction of required energy (energy bought from the generation company)
May-10 85 - Landis+Gyr -
Advantages of the implantation of the SGP+M System
Other incomes:
+ Operational costs reduction
+ Other third parties services
+ Taxes paid and not received from the customers
+ Recovery of ancient losses in consumers where tampering was found
+ Recovery of part of the debt stock
May-10 86 - Landis+Gyr -