Patrick James Shaw Project/ Program Manager EDUCATION: High School Graduate – 1992 U.S. Navy Airman Apprentice Training School - 1992 GENERAL EXPERIENCE: Over seventeen years’ experience in the fields of communications systems and/or U.S. Navy C4I systems installations. Over nineteen years’ experience in electronic installations. Over ten years’ experience in project coordination and management. Hold general to extensive knowledge of the principles of electricity and electronics, including shipboard and shore practices and installation techniques. Demonstrate the ability to work from/ interpret blueprints, drawings, manuals and technical specs. Over eleven years’ experience in project management of C4I installations onboard US Naval vessels. SPECIALIZED EXPERIENCE: October 2013 - Present Serco Inc. Project/ Program Manager Project Manager for shipboard system installations on multiple large projects simultaneously, such as SSEE Inc. F, NMT and CANES under the SEA Enterprise II contract. These duties have included tracking the status of subcontracting and materials in support of multiple communications installations on going concurrently. I initiate and track status of RFQ’s, SOW’s, Fabrication Requests and schedule/ coordinate the efforts of subcontracted services and communicate directly with Task Leaders to ensure they solve any issues that may arise during installations, as well as, assist in any emergent requirements. I hold the ability

Upload: patrick-shaw

Post on 24-Jan-2017

105 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Shaw Resume 2015

Patrick James ShawProject/ Program Manager

EDUCATION:

High School Graduate – 1992U.S. Navy Airman Apprentice Training School - 1992

GENERAL EXPERIENCE:

Over seventeen years’ experience in the fields of communications systems and/or U.S. Navy C4I systems installations. Over nineteen years’ experience in electronic installations. Over ten years’ experience in project coordination and management. Hold general to extensive knowledge of the principles of electricity and electronics, including shipboard and shore practices and installation techniques. Demonstrate the ability to work from/ interpret blueprints, drawings, manuals and technical specs. Over eleven years’ experience in project management of C4I installations onboard US Naval vessels.

SPECIALIZED EXPERIENCE:

October 2013 - Present Serco Inc. Project/ Program Manager

Project Manager for shipboard system installations on multiple large projects simultaneously, such as SSEE Inc. F, NMT and CANES under the SEA Enterprise II contract. These duties have included tracking the status of subcontracting and materials in support of multiple communications installations on going concurrently. I initiate and track status of RFQ’s, SOW’s, Fabrication Requests and schedule/ coordinate the efforts of subcontracted services and communicate directly with Task Leaders to ensure they solve any issues that may arise during installations, as well as, assist in any emergent requirements. I hold the ability to and am proficient in estimating installations of most ALL types and can create and provide input for EVM, WBS, CDR’s/ CORNs and POAM (Microsoft Project) development. I play an intricate role in tracking and managing cost on several delivery orders simultaneously, addressing/ adjusting issues as they present themselves and make appropriate corrections. In addition, I am capable of inputting this data into Government databases such as IMO and SPIDER. I continuously strive to provide outstanding office support and communicate well with all.

December 2004 – October 2013 Milcom Systems/VT Milcom

Page 2: Shaw Resume 2015

Project Manager

I served as a Project Manager for shipboard system installations on multiple large projects simultaneously, such as SSEE Inc. E & F, SHF-WSC6 (V)9 and “E” variant, ISNS/ GIG-E LAN and CANES. These duties have included tracking the status of subcontracting and materials in support of multiple communications installations on going concurrently. Also, I am involved in the research and resolution of drawing discrepancies and hard to obtain materials/equipment. In addition, I am a liaison between the Project Team, SPAWAR, MARMC, vendors, government and military entities, as necessary. I initiate and track status of RFQ’s, SOW’s, Fabrication Requests and schedule/ coordinate the efforts of pickup and delivery of various installation materials and government property from vendors to installation locations. I ensure that the proper documentation accompanying the material is signed, filed or forwarded to the appropriate parties. I am superior at coordinating resources needed to complete a project. I communicate directly with Task Leaders to ensure they solve any issues that may arise during installations, as well as, assist in any emergent requirements. I hold the ability to and am proficient in estimating installations of most ALL types and can create and provide input for Earned Value Management, Work Breakdown Structure, CDR’s/ CORNs and POAM (Microsoft Project) development. I play an intricate role in tracking and managing cost on several delivery orders simultaneously, addressing/ adjusting issues as they present themselves and make appropriate corrections. In addition, I am capable of inputting this data into Government databases such as IMO. I continuously strive to provide outstanding office support and communicate well with all. I have gained confidence in my knowledge and continue to improvement in my ability to accurately, effectively and clearly communicate project information to gain a common understanding. Furthermore, I handle all personnel issues such as evaluations, injury reporting, jobsite safety inspections and employee disciplinary actions when required.

October 2000 – December 2004 Milcom Systems

Electronic Technician I, II & III

Assisted in the installation of SHF (WSC-6) onboard USS Leyte Gulf and SHF (WSC-6(V)9) onboard USS Ramage. Assistant Task Leader onboard USS Leyte Gulf as well as Task Leader for close out while the original Task Leader transferred to another ship. Responsibilities included tasking team members to various jobs around the ship and overseeing all aspects of the installation process. Waveguide installation Team Leader onboard USS Ramage. Responsibilities included overseeing and assisting in the design, fabrication and installation of the waveguide run as well as connectorization. Assisted in the installation of SHF and INMARSAT onboard USNS Bold. Assistant Task Leader in the installation of TV-DTS and CENTRIXS onboard USS LaSalle in Gaeta, Italy. Assistant Task Leader onboard USS Gunston Hall during the installation of SINGARS and TSS. Served

Page 3: Shaw Resume 2015

as Team Leader of Communication Center (Radio) installing SHF (WSC-6) onboard USS Gunston Hall. Served as Assistant Task Leader onboard USS Ashland installing GIG-E LAN as well as Task Leader for the power mod that goes along with it. My basic responsibilities included overseeing personnel and tasking numerous crews on a daily basis. Served as Assistant Task Leader onboard USS Saipan installing EPLRS and MAGTF. Served as Task Leader relocating OE-82 onboard USS Stout as part of a SHF install. Other duties included team leader of a multitude of tasks.

May 1998 – October 2000 Milcom Systems

ASSEMBLER I & II

Assisted in installation of Comm. Suites and EHF onboard various USS and USNS Navy Ships. Performed as a Task Leader onboard USS NICHOLAS and USS NICHOLSON installing BFEM, March 2001. Multi-pin and Coaxial Connector certified. Shipyard LAN experienced. Possess the ability to build and test telephone and fiber connectors.

June 1995 - May 1998, N.K.L. Industries

Electronic wiring, installing and assembly work, CNC laser operator, worked with grinder, sander, needle gun, metal finishing, painting, sheet metal work and various other required power tools.

August 1992 – February 1994, United States Navy

Airman Apprentice: Electrical/Electronics Repairman

Duties included: Performed electrical repair, cable running, wiring, installing and testing electrical equipment within Comm. Spaces. Extensive work in grinding, needle gun, and other metal finishing in overhauling spaces onboard USS DWIGHT D. EISENHOWER. Honorably discharged.

EQUIPMENT EXPERIENCE:

KWR-46, KYV-5, ANDVT, WSC-SATCOM, DAMA, WSC-LOS, HFRG, GPS, R-2363, Red SAS, Black SAS, RDS, KG-84C, KG-194 Bulk Encryption, NAVMACS II, NAVMACS II SMS, OE-82, Naval Order Wire (NOW) Computers, SA-2112, SA-211A, EHF(MDR, LDR, Thinline & FOT), SHF (WSC-6, 6(V)9, 6(V)9E & 8), 4124 Multi Circuit Patch Panels, UHF SINCGARS, GRC-211, NIPRNET, SIPRNET Communication

Page 4: Shaw Resume 2015

Systems, EMS, CDLMS, Hydraulic test stand, CASS, ADNS, INMARSAT B, Dual INMARSAT, Taclane, Battle Force E-Mail, RD-674, CISCO Router, DNMFL, LAN, DWTS, NITES 2000, TSS, ADNS-SCI, 5KHZ, FCC-100, CENTRIX (Cowan Lite), NAVSSI NAVSSI LITE, TV-DTS, GIG-E Lan, MAGTF, NECC, EPLRS, S.S.E.E.(INC. E & F), SLVR, HFRG, IT21, ISNS GIG-E LAN, NMT, JTT, GBS, GCCS and CANES.

TRAINING CERTIFICATIONS Shipboard Electrical/Electronic/Multi-pin/Coaxial/Fiber Optic Connector Assembly and Repair (NAVSEA certified)Project Management Fundamentals.Microsoft Project 2003 level 1 & 2

SECURITY CLEARANCE AND CURRENT STATUS:

Full Time Employee, Serco Inc.Secret Security Clearance, 2012.Active CAC Badge (1/2019 experation)