shenouda fetyan cv

16
Full Name: Shenouda Fetyan Keleny Data Personal Date of birth : 10-Jun-1981 Nationality : Egyptian Place of Birth : Cairo Marital Status : Married Military status : Finished Contact Information: Address : Nozha 2 – Gesr Al suez- Tower Friends- Cairo, Egypt Mob. : +2 012 21517537 E-mail : Eng_ [email protected] Skype : shenouda.fetyan Objectives I'm seeking a long-term career and a challenging position in the field of Electrical distribution, Electrical control Or Electrical Protection in a great company which encourages continuous education and development of its employees, where I can develop and utilize my educational background, and through which I can interact and work efficiently in dynamic environment to prove myself senior Electrical engineer : current position . Education B.Sc. degree of Electrical engineering, Faculty of engineering, Cairo University 2006. Graduation grade: Good Graduation project: Electric Installations for an administrative Building. Graduation Project Grade: "Excellent”. Page 1

Upload: shenouda-fetyan-keleny

Post on 13-Apr-2017

80 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: shenouda fetyan CV

Full Name: Shenouda Fetyan Keleny

DataPersonal

Date of birth : 10-Jun-1981

Nationality : Egyptian

Place of Birth : Cairo

Marital Status : Married

Military status : Finished

Contact Information: Address : Nozha 2 – Gesr Al suez- Tower Friends- Cairo, Egypt

Mob. : +2 012 21517537

E-mail : Eng_ [email protected]

Skype : shenouda.fetyan

Objectives • I'm seeking a long-term career and a challenging position in the field of Electrical distribution, Electrical control Or Electrical Protection in a great company which encourages continuous education and development of its employees, where I can develop and utilize my educational background, and through which I can interact and work efficiently in dynamic environment to prove myself

senior Electrical engineer: current position.

Education • B.Sc. degree of Electrical engineering, Faculty of engineering, Cairo University 2006.

• Graduation grade: Good

• Graduation project: Electric Installations for an administrative Building.

• Graduation Project Grade: "Excellent”.

Page 1

Page 2: shenouda fetyan CV

Shenouda Fetyan Keleny Technical Courses

• PLC • AutoCAD 2010

• Mat lab

• Relux

• Dialux4.4

Roles and responsibilities•

1- lighting, sockets, all light systems as Fire, Foam Alarm and public address system 2- Electrical distribution, electrical control systems, Generators and dousing system. 3- HVAC system (package unit, supply and exhaust Fans system). 4- Electric installation for administrative steel structure building 5- Medium voltage work (transformer 15kv), I have knowledge for all electrical test

(insulation/HI –pot tester) and transformer ratio with the tap changer test. 6- Surveying the electrical materials conduit, cable Tray, electrical panel boards. 7- Coordinate the electric activity with other construction, architect & mechanical

activity. 8- In the site oversee the implementation of the power and light current work makes

RFI 9- Communicate with the consultant and get solution for the problem 10- Operation and maintenance of AC motors 11- Inspect electrical systems, equipment, and components to identify hazards,

defects, and the need for adjustment or repair, and to ensure compliance with codes.

12- Test electrical systems and continuity of circuits in electrical wiring, equipment, and fixtures, using testing devices such as ohmmeters, voltmeters, and oscilloscopes, to ensure compatibility and safety of system.

13- Plan layout and installation of electrical wiring, equipment and fixtures, based on job specifications and international codes.

14- Install ground leads and connect power cables to equipment, such as motors. 15- Place conduit (pipes or tubing) inside designated partitions, walls, or other concealed

areas, and pull insulated wires or cables through the conduit to complete circuits between boxes.

16- Diagnose malfunctioning systems, apparatus, and components, using test equipment and hand tools, to locate the cause of a breakdown and correct the problem.

17- Confirms systems and components' capabilities by designing testing methods; testing properties.

18- Evaluates electrical systems, products, components, and applications by designing and conducting research programs; applying knowledge of electricity and materials.

Page 2

Page 3: shenouda fetyan CV

Shenouda Fetyan Keleny Working with contrack Inc, in camp bastion Lashkar gah

runway airfield Helmand Afghanistan under US air force in64 -ry apron, charli ramp , CH 47project (strategic apron ,rota

electrical site engineer .and marlin capillary ) as

Records Experience

Sidi -Marassi present)till May. 2014.From Orascom construction industries •BP#27(A&B) 265,000,000LE, 2.5years duration (in progress).-Abd El Rahman

Consultant: raafat miller consulting (R.M.C)

OWNER: Emarr Misr for devolpment S.A.E

Contrack International, Inc….From (Jun. 2010 till March2014) •

Company Scope

- All Civil, Construction, Mechanical, Electrical, Electromechanical activities in the project, mainly in military projects for United States Army under supervision of United States Army Corps Of Engineers “USACE”.

Projects:

63,000,000(ANA Transient and Base Additions at Qalat, Zabul Province Construct Strategic Airlift .Finishedyears duration ) 2, USD

Engineers (USACE) ofUnited States Army Corps Consultant:

Sates ArmyUnited Owner:

Apron & Connecting Taxiway Camp Bastion (Charlie Ramp). .Finished

Consultant: UK Works Group Royal Engineers British Army Owner: British Army

Page 3

Page 4: shenouda fetyan CV

Shenouda Fetyan Keleny 64 & -47, AH-JOINT HELICOPTER FORCE JHF (A) CH

.Finished. MERLIN CAPABILITY Camp Bastion, Afghanistan

Consultant: UK Works Group Royal Engineers British Army

Owner: British Army

Construct CAS Apron Expansion, ISR, Apron Camp Bastion AB Expeditionary Fighter Shelters, Afghanistan Aviation Operations and Maintenance Facilities, Phase IV. Finished.

Consultant: United States Army Corps Of Engineers (USACE)

Owner: United Sates Army

Strategic airlift apron, camp Bastion AB, Runway &Rotary wing parking &taxiway, phase I project with LES/CII. Finished.

Consultant: United States Army Corps of Engineers (USACE) Owner: United Sates Army

) 2010 .Juntill Feb. 2008( ministry of trade and industry Egyptian •

Worked as Production Manager.

• Operating , maintenance and solve boilers troubleshooting operation • Operating , maintenance herbs Sterilization equipment

) 2008 .Febtill 07(Dec. 20Petroleum Lifting Company •

• Worked as Inspection Engineer for Oil extraction equipment

Training

- The elec. Power Station training Center. (10-Jul-2004 till 28-Jul-2004)

- Operation and maintenance Of Ac motors in METRO. (16-Aug-2005 till 31-Aug-2005)

- Experience in boiler Systems in Kintting Company (10-Aug-2005 till 10-Sep-2005)

Computer Skills:

Page 4

Page 5: shenouda fetyan CV

Shenouda Fetyan Keleny Skill Experience Level

Internet Excellent

Windows, Microsoft office, Word, Excel & Access Excellent

Languages proficiency:

Arabic English German Native Very Good Good

References

• All references are upon request.

Page 5

Page 6: shenouda fetyan CV
Page 7: shenouda fetyan CV
Page 8: shenouda fetyan CV
Page 9: shenouda fetyan CV
Page 10: shenouda fetyan CV
Page 11: shenouda fetyan CV
Page 12: shenouda fetyan CV

j3 ii

FR

T II

j.

n 0 z -J n

oc in>

ci I I.1I

:

Page 13: shenouda fetyan CV
Page 14: shenouda fetyan CV

Corporate

 Employee

to compe

Code of Busines

 

e Opportuniti

es are not allo

te with the C

ss Conduct and Ethics Trai

es   

owed to take

ompany with

ining

This certifieConduct an

You have beeYou may printhis training

 personal adv

hout the cons

CT

es that shenond Ethics Trai

en automaticallynt this page in omodule.

vantage of an

ent of the Co

Code of Busiraining

shen

shencom

Tue

uda keleny hining on Tues

y registered as,order to have a

n opportunity

ompany's Boa

1

iness Condu

nouda kelen

nouda.kelenm

esday, July 1

as completedsday, July 10,

, "having compl printed record

y intended for

ard of Directo

100%

uct and Ethi

ny

ny@lakesho

10, 2012

d the Code of, 2012

eted this traininor click "Exit" b

r the Compan

ors. 

ics

oretoltest.

f Business

ng course." below to exit

ny, or 

Page 15: shenouda fetyan CV
Page 16: shenouda fetyan CV