sid forward region tom markiewicz/slac kilc’12, taegu, korea 24 april 2012

22
SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Upload: audrey-mcdonald

Post on 11-Jan-2016

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

SiD Forward Region

Tom Markiewicz/SLAC

KILC’12, Taegu, Korea

24 April 2012

Page 2: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Granada LCWS’11 Engineering Model of SiD Forward “R25cm” Region

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

G. Anzalone/SLAC

2 of 22

Page 3: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Post Granada Progress

Work:• Bill Sporre (BNL)

– QD0 & FCAL Support & Adjustment System

• Marco Oriunno & Gene Anzalone (SLAC)– Beampipe assembly and VXD Support

• Sasha Novokhatski (SLAC)– HOM & Beam Heating Calculations

• Mike Sullivan (SLAC)– Vacuum Calculations

Progress:– Layout of area between QD0 and QF1

• Valves, Kicker, QD0 service line, Support tube design

– Agreement as to stay clears and QD0-Tracker Interface

– 3D model of IP-QD0 region

– HOM heating at QD0 Bellows & beamline vacuum profile

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC 3 of 22

Page 4: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

BNL Design of QD0 Support and Alignment System

• ANSYS analysis of QD0 outer can in either original 0.25” or suggested 1” thickness shows unacceptable deformation of cold mass support structure

• BNL designing an external support tube and a compact mover system

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

Bill Sporre/BNL

Bolt Hole Rotation Pt.

4 of 22

Page 5: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Support Tube/QD0 Radial Clearances

6.00

R211.00

*

R216.00

Tracker inner radius increased from 200mm 216mm so it can slide over support tube to allow access to VXD

QD0 OD reduced from 390mm (4.5m L* design) by 2 x 0.007 x 1m = 14mm

Cryostat Thickness = ¼”

R216mm Hole in Ø620mm Fe Cylinder at center of Endcap Doors

2012.04.24 SiD Fwd-KILC’12

Page 6: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Support Tube Analysis Weight Distribution

Support Tube 980 kg

QD0908 kg

M. Oriunno/SLAC2012.04.24 SiD Fwd-KILC’12

Page 7: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Displacements (mm)VM Stresses (Kgf/mm2)

Door Closed: 100um deflection

Supports

M. Oriunno/SLAC

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC 7 of 22

Page 8: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

2 m

Displacements (mm)VM Stresses (Kgf/mm2)

Door Open 2m: 2.2mm deflection

VXD Tracker Supports

M. Oriunno/SLAC

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC 8 of 22

Page 9: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Displacements (mm)VM Stresses (Kgf/mm2)

2.8 m

Door Open 2.8m: 6mm deflection

VXD Tracker Supports

M. Oriunno/SLAC

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC 9 of 22

Page 10: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Evolution of QD0-QF1 region

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

•Valve/Pump Out/RGA assemblies near QF1 end•QD0 Service Line to 2K chiller extended maximally to rear•Support tube behind QD0 extends to allow 2.8m door opening transitioning to a half-cylinder for access

Door plates Door Ring QD0 Service Line

Wedge Alignment System in Pockets in Door Ring

Back end of QD0

Back end of Support Tube

Valve AssemblyFB KickerFB BPM

G. Anzalone/SLAC

10 of 22

Page 11: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Partially Complete 3D Model of Forward Region

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC 11 of 22

Page 12: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Plan & Elevation Views of Disconnect & Pumpout Valves

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

1-1/2” Gate Valves

Formed Bellows & Disconnect

Flanges

Angle Valve for Roughout Pump

G. Anzalone/SLAC

Ion Pumps

All Vacuum Parts from MDC Catalog

12 of 22

Page 13: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Elevation View at 2.8m Door Opening

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

Semicircular plate and strut at end of support tube

Kicker with Electrodes

Support tube cut to semi-cylinder at rear

Alignment Wedge

G. Anzalone/SLAC13 of 22

Page 14: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

QD0 Wedge Design Concept

Total Pad Travel as is = .475in

Height of pad and distance of displacement will be changed pending analysis on sagging of beam line.

Conceptual design only at this point

Limit Switches

Potentiometer

Bill Sporre/BNL2012.04.24 SiD Fwd-KILC’12

Page 15: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

QD0 Wedge Design Concept

Bill Sporre/BNL

2012.04.24 SiD Fwd-KILC’12

Page 16: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Wedge Alignment Mover

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

Motor & Drive Rod system not yet done

Bill Sporre/BNL

16 of 22

Page 17: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

IP Vacuum

• VACCALC: “ A Method for Calculating Pressure Profiles in Vacuum Pipes”, SLAC-PEP-II-APNOTE-6-94– The outgassing rate is taken to be 0.1 nTorr•l/s/cm2.

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

If cryo-pump only 136 nTorr• If add 10 l/s pump 69 nTorr• If add 20 l/s pump 46 nTorr

M. Sullivan/SLAC

17 of 22

Page 18: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Vacuum Between QD0 and QF1No Problem!

Assume the cryostat beam pipes have a total pumping of 500 l/s per cryostat

One 100 l/s ion pump for each pipe between the cryostats as drawn

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

M. Sullivan/SLAC

Incoming Beam Pipe Outgoing Beam Pipe

18 of 22

Page 19: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Vacuum Upstream of FF QuadsNeeds a Design!

Assume a 50 l/s ion pump every 2 m

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

20mm diameter beampipe <p> ~ 23 nTorr

And/or: Larger diameter beampipes, heater tapes to lower outgassing rates, etc.

Add distributed pumpingAntechamber, pumpscreen, NEG, …

M. Sullivan/SLAC19 of 22

Page 20: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Beam-Beampipe Interactionat the IP and in QD0

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

Sasha Novokhatski/SLAC

Wakefields and Bunch field as beam passes BEAMCAL and LUMICAL

Beam-induced wakefields result in power loss due to trapped higher order modes and resistive wall heatingThese have been calculated by A. Novokhatski for the current IR geometry using MAFIA and NOVO codes:See: http://ilcagenda.linearcollider.org/materialDisplay.py?contribId=2&materialId=slides&confId=5596

Effects are very dependent on exact geometries, materials, shielding schemes and contact resistance

20 of 22

Page 21: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

Summary of HOM Heating at IP

• Average power of the wake fields excited in IR is around 30 W for nominal parameters (6 kW pulsed)– 90% from modes excited in pipe (geometry (R/Q) & frequency

dependent)

– 10% from resistive wall heating

• In the QD0 region there is an additional ~4W from resistive losses in the pipes and wakefields, excited by pipe diameter changes, due to the shielded bellows– Flange edge size, contact resistance, coatings important

• Heating from BPMs and kickers must be added

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

Full 3D LOI Beam Pipe(no bellows, flanges, or pump ports included)

Sasha Novokhatski/SLAC 21 of 22

Page 22: SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012

2012.04.24 SiD Fwd-KILC’12 T. Markiewicz/SLAC

Summary of SiD Forward Status

• The 2009 LOI conceptual design of the SiD Forward Region has been improved to an appropriate level for the DBD.

• Much more work needed

22 of 22