significant investment opportunities in partnership with ...€¦ · t balneology complex in the...
TRANSCRIPT
From Nature - to People, from People - to Nature!
Significant investment opportunities in partnership with the Assarel Medet Group
1680 Sofia, 102 Bulgaria Blvd.Belissimo Business Center, floor 6, PO 41Telephone: +359 2 808 25 10, Fax: +359 2 808 25 29E-mail: [email protected]
www.asarel-investment.com
4500 PanagyurishteTelephone: (0357) 602 10Fax: (0357) 602 50, 640 85E-mail: [email protected]
www.asarel.com
1/12
I. BULGARIA - INVESTMENT ENVIRONMENT
II. ASSAREL - MEDET MINING AND PROCESSING COMPLEX, PANAGYURISHTE
III. SIGNIFICANT INVESTMENT OPPORTUNITIES IN PARTNERSHIP WITH THE ASSAREL-
MEDET GROUP
1. New Mining Projects in the Country and Abroad
2. Projects Related to Mining Production
t On the exit level: Manufacture of products with higher added value
t Rolled wire production and manufacture of end products of copper cathode
t Manufacture of clay product and ceramic articles
t Extraction of metals and inert materials from mining waste
t On the entry level- Logistic activities
t Steel grinding balls production
t Lime production
t Logistics of people and freight
t Repair and spare parts
t Construction
t Other logistic activities
3. Ecological Energy
t Wind parks
t Photovoltaics
t Biomass utilization
t Gasification of the company and the municipality
4. Tourism and Sport
t Hotel activity expansion in the municipality and abroad
t Holiday village and golf complex in the mountain resort “Panagyurski kolonii”
t Balneology complex in the village of Banya, Panagyurishte municipality
t Multifunctional Gymnasium
5. Infrastructure Projects in Culture, Education and Health Care
t Modern medical center in Panagyurishte
t European model of education for the municipality of Panagyurishte
t College or affiliate of an institution for higher education in Panagyurishte
6. Projects in real estate, financial instruments and utilization of vacant land, buildings
and other assets
Investment opportunities in partnership with the Assarel - Medet Group
2/12 Investment opportunities in partnership with the Assarel - Medet Group
From Nature - to People, from People - to Nature!
3/12
Significant Investment Opportunities In Partnership With The Assarel-Medet Group
I. BULGARIA- INVESTMENT ENVIRONMENT
1. Political Stability:
t A member of NATO
t A member of EU
2. Macroeconomic and Financial Stability
t Real GDP growth rate: 0.8% (2012)
t Inflation; year on year basis: 3.0% (2012)
t Unemployment level: 12.3% (2012)
t No exchange rate risk; BGN fixed exchange rate to EUR
t Budget deficit of 592 million leva: 0.8% of GDP (2012)
t Gross public debt of 14 388 million leva: 18.5% of GDP (2012)
t Investment grade credit rating by the three major credit rating agencies: Moody’s
– Baa2; S&P- BBB; Fitch- BBB-
3. Most favorable tax levels in the European Union
t Corporate tax rate: 10%; corporate tax rate of 0% in regions with high unemploy-
ment levels
t Tax rate on personal income: 10%
t A 2-year import VAT exemption of equipment for investment projects of more than
EUR 5 million which create at least 50 job positions
t Depreciation period for computers and new manufacturing equipment: 2 years
t Possibility for deducting research and development costs
t Withholding tax rate on dividends and liquidation quotas: 5% (0% for EU compa-
nies)
4. Strategic geographic location bridging Europe and Asia
5. Work force
t Highly qualified and multilingual work force
t Most competitive labor costs in Europe
t 45 000 Bulgarian students in Europe
6. Lowest operating costs in Europe;
7. Free movement of capital;
8. Minimum wage and social and health insurance payment provided by the Em-
ployment Service Directorate for a period of up to one year for activities con-
ducted by young people and people from disadvantaged groups;
9. Government financial aid for priority investment projects
10. Excellent Climate, Nature, Food and Hospitability
11. Stimulus provided by the Investment Promotion Law
11.1. In accordance with the Investment Promotion Law projects that are certified as
class A or class B projects make use of the following encouraging measures:
t Information services and shorter wait times for administrative processing; per-
sonal administration services
Investment opportunities in partnership with the Assarel - Medet Group
From Nature - to People, from People - to Nature!
t Possibility for acquiring Property Rights and Restricted Real Rights upon both
private public properties and private municipal properties without auction
t Financial aid for professional training of people to satisfy the needs of the invest-
ment project
t Financial aid for infrastructure development up to the borders of the investment
project
t Financial aid for partial reimbursement of the compulsory social contributions paid
by the investor to newly recruited workers and employees
11.2. The Investment Promotion Law considers support for priority investment projects
from all economic sectors when one or more of the following requirements are
satisfied:
t The investment amount shall be at least three times larger than the minimum
required for class A certification
t The investment project shall create new job positions in less favored areas or in
high tech areas
t The investment projects shall promote development of industrial zones or techno-
logical parks
11.3. Priority investment projects are encouraged through a package of measures includ-
ing not only class A and class B measures but also the following:
t Institutional support and public-private partnership
t Grant funding available when particular requirements are fulfilled: for investments
in education and research the maximum grant intensity is up to 50%; for invest-
ments in the processing industry the maximum grant intensity is up to 10%.
4/12
From Nature - to People, from People - to Nature!
Investment opportunities in partnership with the Assarel - Medet Group
5/12
II . “ASSAREL-MEDET” MINING AND PROCESSING COMPLEX
is the first, largest and leading Bulgarian mining company for open pit mining and copper
ore processing providing more than 50% of national copper production. The company is
a major factor which contributes for the social and economic development of the mu-
nicipality of Panagyurishte and the district of Pazardzhik and shapes the public image of
the region. Being one of the leading industrial companies which contributes significantly
to the gross domestic product of the country it is of great importance for the Bulgarian
economy. The company produces and offers high quality copper concentrate and copper
cathodes to the domestic and foreign markets.
“Assarel-Medet” JSC
annually processes around 13 million tons of copper ore ensuring sustainable and stable
development and production through maximum utilization of the available mineral re-
sources of the “Asarel” deposit.
The history of the leader
in the mining industry dates back to December, the 29th, 1964 when the “Medet” min-
ing and processing complex was officially launched. The technological mining and pro-
cessing plant of “Assarel-Medet” was founded in 1986 when the complex of “Medet”
(1964-1994) was combined with the capacities of the newly established mining pit and
processing plant of “Asarel” and was officially launched on 6th of December, 1989. Since
1991 Assarel-Medet has been operating as a joint company with main activities focused
on open pit mining and copper pyrite ore processing, biochemical copper extraction and
adjacent operations. Based on the old production workshops and facilities a state com-
mercial company “Eco Medet” JSC was established in 1997 to eliminate old ecological
damage and to work for recultivation of the region.
The chronicles of the company
contain the first exploitation concession for natural resources in the country dating back
From Nature - to People, from People - to Nature!
Investment opportunities in partnership with the Assarel - Medet Group
Processing Plant “Assarel”
to 23rd of December, 1998 and the first privatization in the mining industry from 15th of
June, 1999. The privatization is carried out by Assarel Invest JSC, a joint company, with
the majority participation of VA Copper Invest ltd which is an affiliate of the strategic for-
eign partner Voest Alpine Intertrading Austria, and by 2756 ex and current employees and
managers of the company. The shareholdings disclosure up to 31.12.2012 reveals the
following figures: VA Copper Invest: 68.58%; natural persons: 2 434 people representing
30.16% and “Assarel-Medet” JSC: 1.36% of repurchased shares.
Assarel-Medet JSC is certified
and operates in compliance with the three major international standards: for quality man-
agement, environmental management and occupational health and safety management.
In 1999 the company acquired the first ISO 9001 quality management certificate in the
mining industry; in 2002 it obtained the first ISO 14001 environmental management cer-
tificate in the country. In 2003 it became the first company in the mining industry to
be provided a certificate to OHSAS 18001 occupational health and safety management
standard.
Assarel-Medet JSC is the first Bulgarian company
in the heavy industry which in 2003 introduced an Integrated Management System com-
bining the three major international standards- for quality, environmental issues and labor
conditions.
Assarel-Medet JSC has been traditionally a pioneer
in implementing leading techniques and new technologies in the Bulgarian mining sector.
The first corporate environmental control system in the country developed in partnership
between Assarel-Medet and the Bulgarian Academy of Sciences and other institutes has
been functioning on the territory of the complex since 1988. The company has success-
fully completed a program financed by the government and based on an agreement with
the World Bank whose objective is remediation of old ecological damage caused in the
period preceding the company’s privatization. Assarel-Medet makes significant annual
investments in new technologies, ecological projects, human resources development and
measures to guarantee high quality occupational health and safety conditions. For the
period 1999-2013 the investments made in these areas amount to more than 700 million
leva as the total investment amount in realized and new ecological projects is more than
70 million leva. The company has three treatment plants, one of which has been built built
after the company’s privatization.
Assarel-Medet JSC is the first Bulgarian company
which was awarded in 2005 an Investor Class A Certificate by InvestBulgaria Agency for
its large-scale project for modernization of production. The company implemented unique
for the country mining equipment and advanced flotation equipment produced by world
leading manufacturers. Automation systems for technological process management and
control that guarantee high efficiency, environmental sustainability and top operational
results were implemented in the mining pit and processing plant of “Assarel”.
Token of high prestige for Assarel-Medet JSC
are the numerous national and international awards during the past years whose number
is more than 50 after the company was privatized. In 2003, after a public opinion poll
6/12
From Nature - to People, from People - to Nature!
Investment opportunities in partnership with the Assarel - Medet Group
7/12
conducted by the National Convent of Experts, Assarel-Medet was awarded the status
of an institution with high prestige and contribution to the prosperity of Bulgaria. The
company’s employees are laureates of the first honorary sign for merits to Panagyurishte
awarded to them in 2005 for their considerable and enduring contribution to the develop-
ment of the municipality.
In 2006 Assarel-Medet was conferred the Ikar award by the Bulgarian Industrial Associa-
tion for innovative technologies and equipment. In 2007 the company won Investor of the
Year award in the Mining Industry organized by InvestBulgaria Agency and was acknowl-
edged for its environmentally responsible policy in the Investor in the Environment com-
petition by the Bulgarian Business Leaders Forum. In 2007 Assarel-Medet was declared
one of the “Best Employers in Bulgaria” in a national employee opinion and engagement
study conducted by the international organization Hewitt and the Capital newspaper, and
in 2008 the company was acknowledged as one of the best employers in a regional sur-
vey for Central and Eastern Europe.
In 2009 the company was acknowledged in the category “Investor in Community” by
the Bulgarian Business Leaders Forum for its socially responsible policy and large-scale
sponsorship program “Support for the hometown-2008”. Assarel-Medet JSC also won
the CITUB Prometea award for its best practices in Occupational health and safety. In
2009, 2012 and 2013 the company was conferred its first branch award by the Bulgarian
Chamber of Mining and Geology for a socially responsible campaign carried out by a min-
ing company; and in a national contest organized by the Money newspaper (Capital Daily)
the company was once again acknowledged being conferred the major award “Socially
Responsible Business of the Year”. The Executive Director, Dr. Eng. Lachezar Tsotsorkov,
won the “Manager of the Year- 2009” award in a prestigious contest organized by the
“Manager” magazine and Deloitte Bulgaria. In January, 2012 the company was once
again acknowledged as “Investor of the Year” in the 2011 Green Investment category.
In June, 2012 Assarel Medet was recognized as top “Green Business” under Green Bul-
garia campaign. In 2012 the company was also acknowledged by the National Associa-
tion of Municipalities in the Republic of Bulgaria with the “Benefactor of the Year” prize.
In the end of the same year it also won first prize in the category “Large enterprises” of
the national occupational health and safety contest.
As a representative of the Bulgarian socially responsible business Assarel-Medet JSC
performs its business activities governed by the principle of transparency and in a dia-
logue with all interested parties. It is an active member of the Bulgarian Industrial Asso-
ciation- the Union of the Bulgarian Business, the Confederation of the Industrialists and
Employers in Bulgaria, the Bulgarian Chamber of Mining and Geology of which it is one of
the founders, the Bulgarian Chamber of Commerce and Industry, the Bulgarian Business
Leaders Forum, the European Business Congress and the UN Global Compact Network
in Bulgaria. The company is among the founders of the Association of Entrepreneurs in
Panagyurishte whose goal is to unify the representatives of the local business and help
the realization of projects of mutual interest. Being the initiator of the idea for gasification
of the Srednogorie region, Assarel-Medet is among the founders of “Srednogorie Cop-
per” industry cluster.
The system of values of the company is based on the principles of the market economy,
sustainable development and ethical norms.
From Nature - to People, from People - to Nature!
Investment opportunities in partnership with the Assarel - Medet Group
Mission and Strategic Goal of the Company:
To achieve high quality product at a low cost per unit of copper metal produced and
respectively of copper concentrates, by-products and services while maintaining
the principles of maximum utilization of mineral resources and long-term sustainable
environmentally friendly healthy and safe mining production in compliance with the
highest standards and best practices.
Vision of the Company:
In the long term Assarel-Medet JSC strives for dynamic, successful and sustainable
corporate development which focuses on good traditions, initiativeness, innovations and
environment.
The company will keep its good reputation and leadership positions in the mining sector
in the country and abroad by implementing and establishing the best production and
management practices.
Guideline of the company:
From Nature- to people, from people-to Nature!
Motto of the company:
To start first means to be on time!
III. MAIN AREAS IN THE CORPORATE DEVELOPMENT STRATEGY OF THE “ASSAREL-
MEDET” GROUP*
*The “Assarel-Medet” Group includes “Assarel-Medet” JSC, “Assarel-Investment”
JSC and all the other subsidiaries and joint ventures.
In 2010 the Board of Directors in Assarel-Medet JSC verified a new corporate
development strategy which covers the following eight areas:
The first strategic area which is also of highest priority is “Assarel- sustainable
mining industry and environment” and it comprises more than 80% of the Group’s
financial and material resources. Investment in technology innovation, maximum
complex and in-depth utilization of resources and reserve and resource growth through
exploration and annual acquisitions of an average amount of 100 million leva have a
main role in this area. Priority projects include local and international projects focused
on production efficiency enhancement and long-term mining production sustainability
which is environmentally friendly and ensures occupational health and safety.
In 2011 four new investment objects were opened with a total investment cost of 150
million leva. Innovation and technology replacement are of high priority in the “Assarel-
sustainable mining industry and environment” strategic area. High growth of investment
in this area will remain stable in the coming years as well.
Investment projects in the other strategic areas should be realized in partnership with
other strategic investors such as producers of goods and services with good reputation,
know-how and good market positions. The Assarel-Medet Group should have at least
40% participation in such projects allocating up to 20% of its unrestricted capital and
assets (including investments as well) to them. Shareholders of the Assarel-Medet Group
are also invited to participate in these projects.
8/12
From Nature - to People, from People - to Nature!
Investment opportunities in partnership with the Assarel - Medet Group
9/12
The second strategic area in the Corporate Development plan is “Assarel-Logistics”.
It covers investments in projects which are vertically integrated with the mining produc-
tion and sustainable development of the subsidiaries and joint ventures i.e Dino Nitro
Med, Assarel-Trans, Assarel-Remont, Assarel-Food Complex, Amlog, Assarel-Trade, Dati-
cum and others. In the future other subsidiaries and joint ventures with main activities fo-
cused on engineering and entrepreneurship, copper products manufacturing, steel balls
and lime production, food processing and production, waste recycling and other related
productions may also join this group.
Detailed information about any preliminary research conducted within this area can be
provided upon request.
The third strategic area identified in the Strategy for Corporate Development is
“Assarel- Ecological Energy”.
This strategic area includes investments made in Kaleto mini water power plant,
feasibility study for solar stations, wind generators, biomass energy, and regional gasi-
fication projects. Detailed information about any preliminary research conducted within
this area can be provided upon request.
An economic assessment of the gasification of Panagyurishte municipality has been
made and is ready for implementation in collaboration with the Municipality and the in-
dustrial cluster “Srednogorie-Med”. Until the project gives any results, however, the pos-
sibility for the construction of gas distribution network to address the needs of potential
consumers like the Assarel Medet Group, other local companies and municipal objects is
also actively considered.
The fourth strategic area is “Assarel-Tourism and Sport”.
Through its subsidiary Thracian hoteliers ltd this strategic area will cover projects which
aim to promote the development of the national and international hunting tourism and to
Treatment Plant for drainage waters is included in the large-scale environmental program of Assarel-Medet
From Nature - to People, from People - to Nature!
Investment opportunities in partnership with the Assarel - Medet Group
restore the red deer population in the region of Sredna Gora.
Expansion of the hotel and tourism facilities in the municipality of Panagyurishte and in
the country as a whole has been planned. Kamengrad Hotel Complex 4 stars has been
reconstructed and currently offers to its guests enhanced accommodation capacity, two
swimming pools- one indoor pool and one outdoor pool, tennis court, SPA center, confer-
ence rooms, underground parking and other facilities.
Feasibility studies regarding other investment projects in this area have also been con-
ducted. These projects shall be realized through a public-private partnership with the
municipality of Panagyurishte and in cooperation with other strategic co-investors from
the tourism sector in the country and abroad. Investment projects in the tourism sector
include the construction of a “Panorama” holiday village and a golf course with a bed
capacity of 460 beds and a Spa complex with mineral water with a bed capacity of 360
beds in the village of Banya.
In 2013 the construction of a multifunctional gymnasium in Panagyurishte was initiated
which is supported by a private-public Partnership Agreement between the company and
the municipality.
Detailed information about any preliminary research conducted within this area can be
provided upon request.
The fifth strategic area “Assarel- Education” includes investigation of opportunities
and realization of different initiatives through public-private partnerships which aim to
enhance the quality of education in the municipality and the region of central Sredna Gora
Mountain, and consider a joint foundation of a college or an affiliate of the University of
Mining and Geology-“St. Ivan Rilksi” for preparation of professionals together with Leo-
ben University for mining and metallurgy, Austria.
The sixth strategic area is “Assarel- Culture”.
A project for treasury hall construction and conduction of annual exhibitions of the Pa-
nagyurishte Gold Treasure in the Museum of History, Panagyurishte, has already been
completed within this strategic area.
A major overhaul of St. George’s Church in Panagyurishte is also considered. Prepara-
tion and realization of other projects and initiatives by “Videlina-1865” community center
and the Museum of History which include establishment of a museum of Todor Dimitrov,
preparation of theme exhibitions, archeological inquiries, creation of a new botanic gar-
den, exhibition of mineral samples from the region and a number of other projects which
will contribute to the development of the cultural tourism in the municipality should also
take place.
A part of these projects will be financed through donations by the Group and its share-
holders; another part will be realized in a public-private partnership with the municipality
of Panagyurishte.
The seventh strategic area is “Assarel- Health”.
A public-private project which will be conducted jointly with the municipality of Panagy-
urishte shall address the following issues: building and development of a modern radio-
therapy center, delivery of a linear accelerator for treatment of a wide range of diseases
and overall restructuring of the municipal hospital aiming at turning it into a modern and
competitive European health institution. Potential opportunities in other related fields
such as building and development of a residential home for elderly people and a hospice
10/12
From Nature - to People, from People - to Nature!
Investment opportunities in partnership with the Assarel - Medet Group
11/12
are also being investigated.
All Group’s investments in real estate and financial instruments will be covered by the
eighth strategic area “Assarel- Real Estate and Finance”.
The Foundation “Assarel” was established to manage and conduct the traditionally
significant amount of charitable activities of the company.
The idea that modern business should be socially responsible is reflected in all the
aspects of the new corporate strategy for long-term development of the Group which
aims to establish Assarel-Medet as a leading organization, largest employer and a driv-
ing factor for positive development in the municipality of Panagyurishte, the district of
Pazardzhik and in the country as a whole.
An important result of the new strategy implementation will be the on-time creation
of hundreds of new permanent job positions on top of the existing ones in the mother
company and its subsidiaries long time before the mining activities in the region are over.
Potential projects identified in the Strategy for Corporate Development of the Group are
given different priorities depending on their geographical location. Starting from projects
with highest priority they are graded as follows:
1. Geographic area of the company and the municipality of Panagyurishte
2. The country
3. Neighbor countries
4. Other countries
Over the past years “Assarel-Medet” JSC has provided medical equipment of more than 1 million leva to the hospital and the diagnostic and consultation center and financial aid of hundreds of thousands
leva to the hospital
From Nature - to People, from People - to Nature!
Investment opportunities in partnership with the Assarel - Medet Group
In 2009 “Assarel-Medet” was conferred first prize for socially responsible company of the year in the national contest of Money Newspaper
12/12
From Nature - to People, from People - to Nature!
Investment opportunities in partnership with the Assarel - Medet Group
From Nature - to People, from People - to Nature!
Significant investment opportunities in partnership with the Assarel Medet Group
1680 Sofia, 102 Bulgaria Blvd.Belissimo Business Center, floor 6, PO 41Telephone: +359 2 808 25 10, Fax: +359 2 808 25 29E-mail: [email protected]
www.asarel-investment.com
4500 PanagyurishteTelephone: (0357) 602 10Fax: (0357) 602 50, 640 85E-mail: [email protected]
www.asarel.com
To start first means to be on time!
Realization of Pyrite Concentrate or Building an Installation for its Processing on the Terri-tory of the Firm or in Bulgaria
Aiming at maximum utilization of the mineral resources and manufacturing of new
products the Assarel-Medet Group is investigating the possiblities for both the realization
of the pyrite concentrate which may be produced on the territory of the complex and
building of an installation for its processing.
In this regard, a program for development of environmentally friendly technologies for
optimal extraction of the useful components from the pyrite concentrate has been launched.
It includes various scientific and research activities among which are the following:
Improving the processes of ore dressing;
Determining the contents of useful elements in the pyrite concentrate;
Developing technological schemes for mining and extraction of metals.
As a result of the optimization and the improvement of the processes described above
the total extraction of useful components from the Assarel ore is expected to rise several
times.
PROJECT №. 1
Projects Related to Mining Production
To start first means to be on time!
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
Preferably, the project shall be realized in cooperation with a strategic partner.
CERTIFICATE IN QUALITY
PYRITE CONCENTRATE
S 41 %
Fe 35-37 %
SiO2 10-12 %
Cu 0.4-0.8 %
Pb <0.03 %
Zn <0.02 %
As <0.02 %
Sb <0.01 %
CaO 0.3-0.5 %
Al2O3 2.5-3.5 %
MgO 0.15-0.25 %
K2O 0.2-0.3 %
Na2O 0.2-0.25 %
Au 0.7-1.5 g/t
Co 90 g/t
Ni NIL
Cd NIL
Mo 40 g/t
U NIL
Rb NIL
Th NIL
H2O <10 %
Size: <0.08 80-90%
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
To start first means to be on time!
Investigation of the potential of new technologies to enhance the complex and in-depth extraction of useful components from the ore and the waste
During the period 2012-2013 products from flotation and mining pit were tested in
order to determine if they contain rare elements and useful metals. Based on the obtained
results it was decided that further analyses of base metal flotation and waste of 5th order
according to the Roentgen - fluorescent analysis (RFA) should be carried out.
In order to collect reliable information for the content and distribution of Molybdenum
Mo in these products more than 2000 samples were taken and analysed in 2013 and the
first two months of 2014. On the grounds of the obtained results it was determined that
a project for the realization of final molybdenum concentrate should be considered.
Different actions were taken to investigate the potential for extraction of useful
elements from the final waste of the Processing Plant which include drilling on the wall
of the tailings pond of “Lyulyakovitsa” and laboratory analyses of the taken samples.
At this very moment new technologies for mining of the useful elements from the final
waste of the Processing plant are being investigated and developed.
Preferably, the project shall be realized in cooperation with a strategic partner.
PROJECT № 2
Projects Related to Mining Production
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 3 Extraction of metals and inert materials from mining waste
In order to find an application of the mining waste and to optimize its utilization process
some part of the generated volumes of mining waste shall be utilized keeping to the
basic principles identified in the National Program for waste management and the Plan
for mining waste management of Assarel-Medet JSC. Different analyses are currently
being carried out to investigate the potential some part of it to be utilized in different
areas of industry and construction and for initiation of new productions such as facing
tiles and others.
Preferably, the project shall be realized in cooperation with a strategic partner.
Projects Related to Mining Production
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
Manufacture of Clay Product
In order to realize synergies the Assarel - Medet Group considers the possibility for
mining and utlization of clay as a by-product obtained during the process of ore dressing.
A study of the possibilities of using clay for manufacturing of various ceramics is also
being carried out.
The clay product in the Assarel deposit has a size of 40 microns and contains more than
25% of AL2O3, less than 2% of Fe2O3 and 50-60% of SiO2. Due to its grain structure and
mineral content the clay product mined in the Assarel deposit meets the requirements
for production of ceramic articles, and due to its whiteness it can be used in productions
of other articles as well: such as rubber, paper, paints, etc.
The Group examines the possbilities of producing ceramic articles from clay product as
the project shall preferably be realized in cooperaton with a strategic partner.
“Asarel“ Processing Plant
PROJECT № 4
Projects Related to Mining Production
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 5 Project for rolled wire production and manufacturing of high-added value final products of copper
One of the areas considered highly important by the Assarel-Medet Group is broadening
the range of the manufactured end products. Therefore, the company is exploring the
opportunity of building an installation for rolled wire production from copper cathodes.
The company produces copper cathodes using methods of extraction and electrolytic
recovery of copper from mining waters, realizing an annual capacity of up to 2000 tons of
copper during the first stage of the process implementation. The technology for copper
cathodes production is innovative and is developed by one of the world leading producers
of mining equipment.
The realization of the project for rolled wire production would add value to the copper
The first copper cathode sheet was produced at the end of 2010 applying innovative technology
ore mining and processing activities. Additionally, it would enable margin optimization at
the different stages of the production chain.
The Group has long-term interests in the production of copper end products as well
such as cables, conductors, nano-products, etc.
Preferably, the investment shall be realized in cooperation with a strategic partner.
Projects Related to Mining Production
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 6 Project for Steel Grinding Balls Production
Reduction in production costs through innovation is a key element in the corporate
policy of the Assarel – Medet Group. The company has been exploring the investment
opportunities for production of steel grinding balls. Based on preliminary calculations,
the annual production will be around 30,000 tonnes and the cost of the investment will
be about €8 million.
The Group is currently working on an innovative technology for production of new
grinding units. They have a unique tetrahedral shape.
If the new technology proves to be effective in industrial conditions, it will significantly
enhance grinding efficiency during ore processing. The new grinding unit was patented
by Assarel-Medet JSC and was awarded a gold medal for invention during the 39th World
Exhibition of Inventions in Geneva, which took place between the 6th and the 10th of
April, 2011.
Preferably, the project shall be realized in cooperation with a strategic partner.
The new steel grinding unit is patented by Assarel-Medet and was awarded a gold medal at the International Exhibition of Inventions in Geneva in 2011.
The author of the invention is Dr. Eng. Peter Bodurov.
Projects Related to Mining Production
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 7 Project for Lime Production
One of the most important objectives of the corporate policy of the Assarel-Medet
Group is achieving reduction in main activities costs. Therefore, the group is planning
to start its own lime production with a minimum capacity of 150 tonnes per day or to
acquire a share in an existing lime production company.
The investment can be made individually or in partnership with a strategic partner.
Lime Production Station at “Asarel” Processing Plant
Projects Related to Mining Production
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 8 Construction of Wind Farms
In relation to Bulgaria’s accession to the European Union our country harmonized its
policies with those of the member-states and transposed the European Union law. A
main priority in the energy policy of the European Union is promoting the use of energy
from renewable sources. As a result, a large number of directives and measures have
been developed and implemented within the European Union to encourage construction
and development of renewable energy installations and to promote any investment in
this area.
Since the beginning of 2005 the Assarel - Medet Group has started investigating
the potential of building a wind farm in the region of the Sashtinska Sredna Gora
Mountain. Preliminary studies were performed to determine appropriate areas with good
Lisetz Peak in the Sredna Gora Mountain
perspectives and wind characteristics. In the period from 2005 to 2008 terrains of the
main peaks region of the Sashtinska Sredna Gora Mountain were explored and evaluated
on a summarized indices basis. The study covered about 200 square kilometers.
In order to achieve the goals of the study the following tasks had to be performed:
• Selection of areas with presumably high wind potential;
• Obtaining the geographic coordinates and elevations of the terrains;
• Exploration of the peculiarities of the adjacent landscape and vegetation;
• Investigation of power distribution and power supply network in the considered
region;
• Examination of transportation infrastructure;
• Clarification of ownership and land statute.
Projects Related to Ecological Energy
To start first means to be on time!
The above described activities let Lisets Peak be determined in March 2008 as the most
perspective region that most fully fulfills the goals of the study. Its geographic location
is a prerequisite for favorable wind conditions. The peak is located at an altitude of 1,372
meters and the Sub-Balkan Valley is located to the north of it. Thus, winds descending
along the southern slopes of the Stara Planina Mountain accelerate in the valleys that
surround the Sredna Gora Mountain and this ensures favorable wind conditions on the
peak. Being 1 250 meter long, the ridge of Lisetz peak is also opencast and flat which
provides a sufficient area for the construction of wind farm facilities.
Moreover, the lack of high vegetation reduces future initial costs for wind generators
sites formation and provides better conditions for wind energy production.
The state of the electric network and transport infrastructure in the region is also crucial
for the future investment efficiency. At the moment it can be reached via a dirt road
which can be adapted for heavy facilities transportation after some small investment is
made. Lisetz peak provides also favorable conditions for electricity network connection.
There is a 110 kV power line passing 2 km away from the peak which currently addresses
the needs of Assarel-Medet JSC but may also be used as a connection between the wind
farm and the electricity distribution network.
In the period after March, 2008 measurement of wind capacity was conducted at
five different points via wind monitoring met masts. Its purpose was to verify or reject
the appropriateness of the explored terrains. The results of the modeling process
demonstrate that the explored region is appropriate for the construction of a wind farm
with capacities in the range of 10-20 MW.
The construction of a wind farm will result in environmentally friendly production
and enhancement of the competitive advantages of the local economy. In addition, the
project shall contribute to the optimal utilization of the capacities of the local renewable
power sources.
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 9 Construction of a Photovoltaic Station- 2MW
Projects related to energy production from renewable sources play an important role
in the strategy for corporate development of the Assarel-Medet Group. Therefore, a
preliminary study of the investment potential of a 42-acre terrain situated in the Mulei
area is being carried out. The terrain comprises real estate, land and buildings which
are owned by “Assarel-Medet” JSC. It is located outside the borders of the settlement
of the municipality of Panagyurishte, in a landed property 047366 of the territory of
Panagyurishte with unified classification of administrative-territorial and territorial units
55302. The project is at a stage of a feasibility study and development of a concept.
In order to implement the program for utilization of energy from renewable energy
sources the “Corporate Development” Department of “Assarel-Medet” JSC conducted
preliminary studies on the territory of the municipalities of Panagyurishte and Strelcha
aiming at selecting terrains which are appropriate for the construction of photovoltaic
station compatible with the terrain’s common physical and geographical conditions. As
a result of the conducted studies a 42-acre terrain was selected which is situated in the
Mulei area near the town of Panagyurishte. The terrain is appropriate for the construction
of a 2 MW photovoltaic plant and complies with all physical and geographical requirements
for maximum utilization of sun radiation.
Within the borders of the terrain technical infrastructure including a distribution line
layout and a transformer substation has been built. The procedure for land use change
has been completed and the conducted feasibility study proves the profitability of the
investment.
The project includes building of an installation with a capacity of 2 MW. The choice of a
technical solution and an executor will be made in such a way to ensure both the highest
possible correlation between productivity and investment cost and cash flows for twenty
years in accordance with the new law in Bulgaria for renewable energy sources.
There are also possibilities for building a photovoltaic station on the roof construction
of the “Assarel” Processing plant.
The company is interested in investing in completed projects for photovoltaic stations
as well.
Projects Related to Ecological Energy
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 10 Construction of a Biomass Station
As a part of its strategy for utilization of the available renewable energy sources the
Assarel - Medet Group is conducting a pre-investment study which aims to evaluate the
potential of building an electric and/or heat power station to utilize wood waste from
logging and initial wood processing in the region of Panagyurishte. Various technologies
and different options for the facility location are being analyzed.
The realization of this project will contribute to the reduction of the amount of carbon
emissions released as a result of local economy activities and will create new jobs.
Preferably, the project shall be realized in cooperation with a strategic partner.
The region of the Sredna Gora Mountain is a traditional center for logging and wood processing
Projects Related to Ecological Energy
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 11 Project for Hotel Activities Expansion
Investment in tourism is a part of the corporate strategy of the Assarel-Medet Group.The Group has already realized some large-scale projects in this area. All tourism assets
of the Group are managed by its affiliate operating under the brand of Thracian Hoteliers. Its asset portfolio consists of hotels suitable for every season: summer holiday hotels
Hotel in the town of Panagyurishte
Coral Hotel in the town of Sozopol
located in the seaside resorts Sozopol and Kiten, a winter hotel located in Borovets ski resort and a SPA hotel located in the center of Panagyurishte.
The Group invests significant resources for development of its tourism assets. Being
Projects Related to Tourism And Sport
To start first means to be on time!
completely renovated Kamengrad Hotel & SPA 4* is a magnet for tourists who search for high quality SPA, wellness and conference services. In addition to the tourist objects mentioned the Group owns a number of other assets located in the area of Panagyurishte and in Kiten sea resort which are suitable for development of different types of tourism- recreational, balneology, SPA, rehabilitation, medical, golf, hunting, etc.
The Assarel-Medet Group also considers a number of other investment opportunities in the tourism sector such as acquisition of hotels and cooperation with successful companies from the industry.
Preferably, such investment projects shall be realized in partnerships with strategic investors who shall acquire a majority state in new individual projects and/or in the Thracian Hoteliers affiliate.
Sokol Hotel in Borovets
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
Thracian Hoteliers ltd1680, Sofia102 Bulgaria Blvd.Belissimo Business Center, floor 6, PO 41Telephone: +359 2 808 25 10, Fax: +359 2 808 25 29E-mail: [email protected]: www.thracian-hoteliers.com
Coral Hotel***8130 Sozopol5 ”Lazuren briag” StrTel.: +359 550 / 2 62 66Fax: +359 550 / 2 62 41E-mail: [email protected]: www.coral.thracian-hoteliers.com
Kamengrad Hotel&SPA****4500 Panagyurishte - Bulgaria2 P. Bobekov streetTel: +359 357 628 77Mobile: +359 879 801 901Fax: +359 357 671 90E-mail: [email protected]: www.kamengrad.thracian-hoteliers.com
Sokol Hotel***2010 Borovets - Bulgaria Tel: +359 750 334 34 Fax: +359 750 334 44 E-mail: [email protected]: www.sokol.thracian-hoteliers.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 12 Structural Design, Construction and Operation Management of “Golf Treasure Resort” /Holi-day Resort and Golf Complex/
Investment in attractive and promising projects related to the core business activities
of the company is a part of the corporate strategy of the Assarel - Medet Group. The
company is working on a large-scale investment project of a complex for professional
and amateur golf which will also offer recreation, tourism and sports activities all year
long and will be located in the village of Panagyurski kolonii in the region of Srednia giol.
The golf course itself will provide excellent conditions for international professional
tournaments and amateur golf activities amongst the beautiful hills in the region. The
building of the golf club will be constructed on a privately owned area located in close
proximity to the golf course and will be an integral part of the whole complex. The complex
shall be designed and built in such a way to graciously fit the surrounding landscape and
to turn it into an excellent place for active relaxation in nature. The future complex will
offer various entertainment opportunities and a huge array of different outdoor activities
like tennis, mountain biking, beach volleyball, petanka and others. Construction of a hotel
and a holiday village with a capacity of around 476 beds offering SPA, swimming pool,
conference halls, picnic-areas, treks, etc. has been also planned.
Preferably, the project shall be realized in cooperation with a strategic partner.
Projects Related to Tourism And Sport
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 13 Project for Modernization of the Vishna Balneology Complex in the village of Banya
In the recent years the Assarel-Medet Group has realized several successful projects
in the area of tourism. The next step in this direction is related to the renovation of one
of the balneology complexes in the village of Banya nearby the town of Panagyurishte.
The Vishna Complex is located in the village of Banya and is 10 kilometers south-east
of the town of Panagyurishte and 45 kilometers north-west of the city of Pazardzhik. Its
location in rugged landscape creates a prerequisite for mild climate and clean and fresh
air.
The complex is provided with mineral water for which it has a use permit. The water
is slightly mineralized and has temperature of 42°С which makes it appropriate for
treatment of cardio-vascular diseases and various other diseases of the digestive system,
the locomotion system, the nervous system, etc.
The Vishna Complex was built in 1989 and is owned by the Group Assarel-Medet. The
area of the terrain is 16,586 square meters including two parks. The built-up area is 4, 895
square meters and the total floor area is 9,000 square meters.
The Group is planning an overall reconstruction of the complex for which two different
concepts have been prepared. Both projects foresee delivery of health restorative
procedures and a limited scope of disease treatment services. The investor’s purpose
is to build a modern rehabilitation center with a capacity of 150 beds which is modernly
equipped and provides adequate medical care.
Vishna Balneology Sanatorium, the Village of Banya
Projects Related to Tourism And Sport
To start first means to be on time!
CHARACTERISTICS OF THE MINERAL WATER
Capacity 1.83 l/sec
Temperature 42°C
Mineralization 0.63 g/l
Ph 7.8
Radon 0.7 mg/l
Carbon Dioxide -
Hydrogen Sulfide 0.5 mg/l
Metasalicylic acid 44 mg/l
Metabornic acid 1 mg/l
Metaarsenic acid -
Nitrites -
Ammonium -
ANIONES mg/1 mval%
Fluoride 5.4 3.42
Chloride 21 7.42
Bromide – –
Iodine – –
Sulfate 280 69.81
Carbonate – –
Hydrogen Carbonate 98 19.16
Hydrosilicate – –
Hydrosulfate 1.4 0.4
Nitrate – –
CATIONS mg/1 mval%Litium – –
Sodium 135 70.41
Potassium – –
Calcium 47 28.03
Magnesium 1 1.41
Ferrum 0.5 0.15
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
PROJECT № 14 Project for Multifunctional Gymnasium
A project for multifunctional gymnasium with a capacity of around 2000 seats has been
launched. The investor of the project is “Sport Invest Panagyurishte” Ltd established as
a partnership between the municipality of Panagyurishte and the Assarel-Medet Group.
The new gymnasium is expected to be one of the most modern facilities in Bulgaria.
For the preliminary preparation of the project advantage was taken of the skills and
knowledge of the specialists who have realized and are currently managing “Arena
Armeets” gymnasium in Sofia and “Arena Samokov” gymnasium in Samokov. The
specific requirements of different international federations for various types of sports have
been investigated and implemented in the project for the gymnasium of Panagyurishte
which grants the town the possibility to host even European and World championships
in the future.
The project foresees the built-up area of the multifunctional gymnasium to be 5 147
square meters and the playground itself to be of a size of 25x44 meters. Two tribunes
will be built around the playground- northern and southern, with a total capacity of 1562
seats. If it’s needed additional 400 seats can be assembled to the tribunes. All of this
will make the organization of concerts, exhibitions and other forums in the gymnasium
also possible. In compliance with the international requirements there will be a separate
entrance to the boxes, commentators booths and technical offices. The visitors will be
able to reach their places through six separete entrances, one of which will be duplicated
with an elevator as well. A platform will be provided to ensure access to the hall to people
with mobility problems. Below the northern tribune the project foresees construction of
eight changing rooms, two of which will have a capacity of 30 sportsmen. Two saunas
and a doctor’s office will be attached to them. The entrance for the sportsmen will be
Infrastructure Projects in Culture, Education and Health Care
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
orientated towards a special bus parking lot.
In the lobby of the building a ticket office and an information center, a cloak room and
a cafe with 40 seats will be separated. The project foresees equipping a restaurant with
100 seats. The restaurant will have also a terrace with a view towards the lake of the city
park of Pnagyurishte where there will be places for 50 visitors. The facility will have also
a conference hall which can be used for press conferences and seminars.
In addition to the main hall there will be also a smaller one which will be used for
trainings by the sportsmen and warming up before competition. The playground in the
small hall will have the same size as the one in the main hall but there will be no tribunes
around it. A gym and a shop for sport goods have also been planned to be opened. A
separete parking lot for visitors with a capacity of 50 cars and 5 buses will also be built.
The exterior appearance of the building will be consistent with the traditional
architecture in Panagyurishte and will visually and functionally fit the area of the city
park. The space around the gymnasium will be additionally cultivated and planted. One of
the attractions of the complex will be the improvement of the park lake. A unique singing
fountain which will be working during the summer months has been planned to be built
in it. During the winter a modern installation will maintain an ice slide.
The realization, exploitation and management of the project require other partners and
coinvestors from the municipality and the country also to be attracted.
To start first means to be on time!
PROJECT № 15 Project for a Modern Medical Complex in Panagyurishte
The project for construction of a modern medical complex in Panagyurishte is realized
in a public-private partnership. It is conducted by “Assarel-Panagyurishte-Health” Ltd
where major partners are “Assarel-Medet” JSC, “Business Sustainable Development
06” Ltd and the municipality of Panagyurishte. Up to this moment more than 100
physical persons- mostly entrepreneurs, doctors and medical workers- have a stake in
the company.
The project foresees extension of the building of the “Sabo Nikolov” hospital with a
new building which will accommodate a modern oncological center, equipped with the
latest technologies in this area enabling not only early diagnostics of the oncological
deseases but also initiation of the treatment within several days after the disease is found.
For this purpose the complex will have two linear accelerators and an apparatus for X-ray
therapy at its disposal. Innovative treatment methods will be applied as the main idea will
be closing the cycle “diagnostics-treatment-physiotherapy-control”. In addition to the
departments for medical oncology and radiation therapy, departments for hemodialysis,
invasive cardiology and specialized surgery- urological, thoracic, endocrinological and
plastic surgery, have also been planned to be developed.
Realization, exploitation and management of the project require the participation of
strategic partners from the municipality, the country and abroad.
Infrastructure Projects in Culture, Education and Health Care
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
Project for Construction and Management of a College or an Affiliate of an Institution for
Higher Education in the Municipality of Panagyurishte
The purpose of this project is to create qualified specialists for the development of
mining industry and the sustainable development of the municipality of Panagyurishte
and the region. The project is at a conceptual phase and foresees development and
management of a college or an affiliate of an acknowledged Bulgarian or foreign
institution for higher education. The project will be realized in a public-private partnership
on the territory of the town of Panagyurishte.
The Assarel-Medet Group is searching for partners and co-investors from the
municipality, the country and abroad for the implementation of the phases of design,
construction, organization and management of the Institution for higher education.
Preferably, the project shall be realized in cooperation with a strategic partner.
PROJECT № 16
Infrastructure Projects in Culture, Education and Health Care
To start first means to be on time!
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at:
To start first means to be on time!
ASSAREL-MEDET JSC
Information about real estate owned by the Group which is offered for joint projects imple-mentation or for rent
I. Buildings situated on an industrially zoned site “Medet”1. Iron-reinforced concrete building-Auto Repair Shop, investment № 24870. It was
launched in 1965. It constitutes a massive single-floor building with a built up area of
3165 m2 and construction volume of 34100 m3. A single dome structure made of steel
lattice pillars and frames. The enclosure is done using steel concrete panels and panels
type SEP. It is in a satisfactory condition. Not in use. Carrying value: 4396.28 leva;
Acquisition cost: 10240.76 leva.
2. Iron-reinforced concrete building: Crushing Plant 1, investment №24871. It was
launched in 1971. It constitutes a massive single-floor building with a built-up area of
2480 m2 and construction volume of 2100 m3. Its condition is satisfactory. Not in use.
Carrying value: 1285.84 leva; Acquisition cost: 3072.05 leva.
3. Auto Repair Shop Building- new, investment № 24873. It was put into operation
in 1980. It constitutes a massive single-floor building with a built up area of 3720 m2
and construction volume of 39 200 m3. Its condition is satisfactory. Not in use. Carrying
value: 17248.22 leva; Acquisition cost: 40 176.92 leva.
4. Shelter for Wheels and Machines- investment № 24874. It was put into operation
in 1981. It constitutes a massive single-floor building with a built up area of 420 m2 and
construction volume of 2200 m3. Its condition is bad. Not in use. Carrying value: 149.74
leva; Acquisition cost: 447.84 leva.
5. Drivers’ building- investment №27204. It was put into operation in 1976. It constitutes
a massive single-floor building, used for administrative-residential purposes, with a built
up area of 201 m2 and construction volume of 850 m3. Its condition is satisfactory. Not
in use.
6. Professional Training Center– investment № 27260. It was launched in 1971. It
constitutes a massive 2-floor building, used for administrative-residential purposes, with
a built-up area of 261 m2, total built-up area of 522 m2 and construction volume of 1458
m3. Its condition is good. Not in use. No carrying value; Acquisition cost: 690.87 leva.
7. Steam-Boiler Plant- investment №28235. It was launched in 1965. It constitutes a
massive single-floor building with a built up area of 713 m2 and construction volume of
7600 m3. Not in use. Its condition is bad. Carrying value: 4494.12 leva; Acquisition cost:
177 681.62 leva.
8. Storehouse- investment №28591. It was put into operation in 1971. It constitutes a
massive single-floor building with a built-up area of 225 m2 and construction volume of
750 m3. Its condition is good.
9. Health Center- investment №32800. It was put into operation in 1970. It constitutes
a massive single-floor building with built up area of 326 m2 and construction volume of
673 m3. Its condition is good. Not in use.
10. Garages behind the Health Center- 2, investment №32801 and 32802. They were
launched in 1976. They constitute massive single-floor buildings with a built up area of
22 m2 and construction volume of 66 m3 each. Their condition is good.
11. Room for the dispatcher and the mechanic- investment №25270. It was put into
operation in 1976. It constitutes a massive single-floor building with a built-up area of 90
m2 and construction volume of 270 m3. Its condition is bad.
PROJECT № 17
Information about real estate owned by the company which is not efficiently used
To start first means to be on time!
II. Buildings situated on an industrially zoned site “Asarel”1. Administrative Building which is not completed. It is situated in front of the
Administrative-Residential Complex “Processing Plant Asarel”. It constitutes a 6-floor
building made of steel-concrete elements. Not in use.
2. A Galley and Pantry Building which is not completed. It is situated in front of the
Administrative-Residential Building Complex “Processing Plant Asarel”. It constitutes a
massive 2-floor building. It is not used.
3. Steam-boiler station, investment № 20805. The building is half-destroyed. It was used
to heat the buildings of the former military camp. Not in use. There is a heating steam pipe
line passing inside it.
III. Buildings situated in the village of Panagyurski kolonii, the town of Pnagy-urishte and others
1. School providing Education till 8th Grade together with an adjacent Galley, investment
№ 31400 and 31401. They were launched in 1971. They constitute a massive 3-floor building
and a massive single-floor building with a built up area of 300 m2 and 200 m2 respectively,
total built up area of 900 m2 and 200 m2 respectively, and construction volume of 2700 m3
and 600 m3 respectively. Their condition is good. Not in use.
2. Kindergarten, investment № 33114. It was put into operation in 1970. It is in a good
condition. Partially used.
3. Factory House of Culture, investment №34060. It was put into operation in 1978. It
constitutes a massive 3-floor building with a built-up area of 1356 m2 and construction
volume of 10983 m3. Its condition is good. Two single halls (commercial objects) are being
rented.
4. Building of the Fire Brigade, investment № 27050. It was launched in 1971. It
constitutes a massive 2-floor building with a built-up area of 220 m2 and construction
volume of 1188 m3. Partially used.
5. Mechanical Building Including Adjacent Garages, investment № 33139. It was
launched in 1972. It constitutes a massive single-floor building with a built-up area of 136
m2 and construction volume of 510 m3.
6. Storehouse for Wheels (Former House of Culture), investment № 33116. It was put
into in 1967. It constitutes a massive 2-floor building with a built-up area of 687 m2 and
construction volume of 3130 m3. Part of the ground floor is rented to an auto repair shop.
7. Shop in block 42, investment №33179. It was put into operation in 1976. It comprises
a ground floor of a massive residential building and has a total area of 150 m2. Not in use.
8. Building “The Ghetto”, investment №51544. It constitutes a massive single-floor
building with a built-up area of 182 m2 and construction volume of 490 m3. Its condition is
not satisfactory. Not in use.
9. “CKS” Tourist Complex, investment №51717-24, 54786- it includes 6 two-floor villas,
a galley with adjacent administrative units and 2 single-floor maintenance buildings. One of
the villas is used for hunting purposes, the others are not used.
10. “Vishna” Tourist Complex in the village of Banya, investment №51396-400, 32530.
The complex includes a 5-floor building with a health center, a three-floor sanatorium, a
four-floor sanatorium, a medical center, a galley and a garage. Not in use.
11. Dairy Farm situated in Panagyurishte, investment №51129, 53478 and 53479. It
consists of a massive 2-floor building with a built-up area of 404 m2, a boiler room with a
built- up area of 404 m2 and a storehouse of 120 m2. Not in use.
1680 Sofia, 102 Bulgaria Blvd.
Belissimo Business Center, floor 6, PO 41
Telephone: +359 2 808 25 10
Fax: +359 2 808 25 29
E-mail: [email protected]
www.asarel-investment.com
4500 Panagyurishte
Telephone: (0357) 602 10
Fax: (0357) 602 50, 640 85
E-mail: [email protected]
www.asarel.com
For more information and to demonstrate interest in a potential partnership with Assarel-Medet JSC and Assarel-Investment JSC concerning the implementation of the project contact us at: