singapore northeast linetsdtemp.turnlav.net/cbtc/projects/sig_singapore_automaticmetro_en.pdf ·...

12
Singapore Northeast Line: will soon be the largest, fully automatic metro system in the world Transport Project Story

Upload: others

Post on 27-Jan-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Singapore Northeast Line:will soon be the largest, fully automatic metro system in the world

    TransportProject Story

  • In seeking its new metro system, theLTA would go far beyond the traditional.Singapore’s new automatic metro wasto represent the new Singapore: modern,innovative and sophisticated. Naturally,the new metro system had to have morethan just good looks and fast cars: it had tomove great numbers of people in comfortand be fully automatic, utterly safe andreliable. While taking advantage of themost advanced technology, the new“dream metro” also had to be cost-effectiveboth in the initial investment and inlong-term operations costs. And it had tobe built, and up and running in the shortesttime possible.

    The island of Singapore is denselypopulated and highly urban, with some4 million inhabitants. Much of itsdevelopment has come within the last twodecades, the result of an economic boom.Singapore’s need to improve publictransport infrastructure rapidly intensified,becoming a pressing issue. To meet thesurge in demand while improving overallland transport infrastructure, theSingaporean government set up the LandTransport Authority (LTA) in September1995. The LTA’s mission is to provide thepeople of Singapore with a highly efficient,comfortable, safe and convenient transportsystem at an acceptable price.

    Singapore seeks its idealtransport system

    A SPECIFIC NEED

    [ Systems integration

    [ Rolling stock

    [ Control and information

    [ Testing prior to commissioning

    2/12ALSTOM Transpor t Pro jec t S tor y

    ContentsA specific need

    Singapore seeks its ideal p. 02transport system

    A fully automatic metro p. 03

    The Northeast Line p. 04

    Customized solutions

    Systems integration p. 05

    Rolling stock p. 06

    Control and information p. 08

    Testing prior to commissioning p. 09

    Technical details

    For experts: rolling stock p. 10

    For experts: p. 11control and information

  • In response to its February 1997 internationalcall for tenders, the LTA received proposalsfrom many world-leading transport suppliers;it retained the most outstanding, ALSTOM’sMETROPOLIS fully automatic metro.The reasons were clear: the ALSTOM systemfulfilled every aspect of the LTA’s technicaland aesthetic requirements, offered the mostattractive price as well as rapid time-to-deliveryand commissioning with guaranteedservice-performance levels.

    responsibility for defining the metro system’soperating modes and principles as wellas performing core-system integration tests,at our dedicated test center in Valenciennes,France.

    Today, the new 20-kilometer undergroundNortheast Mass Rapid Transit Line hasbecome reality. A showcase for the mostmodern metro technology, it is the world’sfirst fully automatic heavy-rail metroand the highest-capacity automatic metro.In December 2002, the LTA handedover operation of the line to the operator,SBS Transit.

    A fully automatic metro

    A SPECIFIC NEED

    [ Systems integration

    [ Rolling stock

    [ Control and information

    [ Testing prior to commissioning

    3/12ALSTOM Transpor t Pro jec t S tor y

    METROPOLIS Northeast Line,the ultra-modern metro

    Line length: 20 km, all in tunnel

    Number of stations: 16, withplatform screen doors

    Number of trainsets: 25 of six cars

    Route: from Punggol (Northeast)to Harbor Front (South)

    Depot: trains operate in fullautomatic mode

    Maximum design speed: 100 km/hCapacity: 1,920 passengers pertrain (6 passengers/m2)

    Extra trains can be injected asrequired, with headway of only 90 seconds

    Highest safety and reliabilityguaranteed: high redundancy withproven components

    Beginning of a long-termrelationship

    In July 1997 and January 1998, 2 contractsfor Singapore’s Northeast Line were signedbetween the LTA and ALSTOM, marking thebeginning of a long and successfulrelationship. With great pleasure, we assumedresponsibility for the supply, delivery, testingand commissioning of 25 six-car METROPOLIStrainsets as well as associated services,signaling and automatic train control.

    In February 1999, following contractsfor signaling and rolling stock, we wereawarded a contract for system integration.The contract assigns ALSTOM the

  • A strong commitment

    Our expertise in mass transit benefits manyof the major networks of the world: Paris,London, Hong Kong, Mexico and SaoPaulo, to name but a few. One in four metrocars in operation worldwide was designedand built by ALSTOM. Few companies canmatch our experience and resources, builtover a century.

    Some 300 ALSTOM employees situatedin seven industrial sites were dedicatedto the Northeast Line project. By successfullyfulfilling complex undertakings such asthis one, ALSTOM continuously reinforcesits reputation for excellence in projectmanagement.

    Construction of the Northeast Line beganin January 1996 with the aim of startingcommercial operation by 2003. Today,we are proud to see this goal achieved.The 20-kilometer line stretches from Punggolin the Northeast to the Harbor Front inthe South. The fully underground routepasses through the central business district,following the transport corridors ofSerangoon Road and Upper SerangoonRoad to the new towns of Hougang,Sengkang and Punggol. The line consistsof 16 stations with platform screen doors.Trains operate in full automatic mode onboth the line and in the depot.

    The Northeast Line

    A SPECIFIC NEED

    [ Systems integration

    [ Rolling stock

    [ Control and information

    [ Testing prior to commissioning

    4/12ALSTOM Transpor t Pro jec t S tor y

    Also in the works: the Circle LineThe Northeast Line is an importantpart of the development of masstransit in Singapore, but the LTAhas also set in motion a project tobuild another, longer line based onthe same ALSTOM rolling stock,signaling and control systems.

    The Circle Line is set to become thelongest fully automated metro line,35 kilometers long, at completion.ALSTOM is carrying out overallproject management, systemengineering and integration, and issupplying rolling stock, signalingequipment, automatic train controland supervision, the power supplysystem and trackwork.

    Circle Line factsLength: 35 kilometersNumber of stations: 35Number of trainsets:40 trainsets of 3 carsTrain length: 70 mTrain width: 3.2 mPassengers per train: 960

    Singapore’s metro network

  • Only an exceptionally highly skilled teamcan manage the complexity of integratinga complete rail transport system. ALSTOM personnel are among the mostexperienced in the rail industry, withexpertise in structuring, financing, designing,constructing, testing and commissioningintegrated rail systems.

    Our Systems team has orchestrated railwaysystem projects all over the world, usingour own products as well as coordinatingwith third-party suppliers.

    AXONIS is our fully automatic metrosolution, a combination of METROPOLISrolling stock and URBALIS train control.Flexible and cost-effective, this solution takesinto account rail owners’ needs: ensuringadequate and smooth operation of all partsof a fully automatic metro system, deliveringthe best performances in terms of safety,reliability and quality and, of course,keeping both service-operation costs andlife-cycle costs to a minimum.

    Systems integration

    CUSTOMIZED SOLUTIONS

    [ Systems integration

    [ Rolling stock

    [ Control and information

    [ Testing prior to commissioning

    5/12ALSTOM Transpor t Pro jec t S tor y

    The Northeast Line challenge“To build a metro system that canoperate under normal conditions isquite common. To build one thatcan cope with any event that mayoccur during the course of revenueservice - and without mannedintervention - that’s the challenge.Fully automatic operation is strictlyfor top experts. All the componentsthat make up the system must beable to react to any event, and in a coordinated manner.’’

    K.K. Tan,Managing Director, ALSTOM in Singapore

    The importance of testing

    Singapore’s Northeast Line is the world’sfirst fully automatic heavy-rail system.While riders are bound to notice that thetrain doesn’t require a driver, they travelin full confidence, and for good reason.We verify the safety, reliability andefficiency of individual trains and theirintegrated systems through an extensiveseries of tests.

    Project management and systems integration skills are key to turnkey projects

  • Many of the world’s metro systems havebenefited from our experience andexpertise. In more than 40 cities, a fullquarter of all metro cars in operation areALSTOM vehicles, some 25,000 ALSTOMcars in all. Our engineers drew on thisexperience in the development of themodular metro train METROPOLIS, whichwas born of our own patented OPTIONICDESIGN methodology.

    Rolling stock

    CUSTOMIZED SOLUTIONS

    [ Systems integration

    [ Rolling stock

    [ Control and information

    [ Testing prior to commissioning

    6/12ALSTOM Transpor t Pro jec t S tor y

    METROPOLIS for Singapore NEL, before commissioning

    Customer-tailored solution

    OPTIONIC DESIGN allows our customersto “customize” the proven METROPOLISmetro-train design. They may specify anycar dimension (height, width and length)within a broad range of parameters, andthey may select technical modules andinterior amenities from a rich portfolio.Service-proven technology and componentsassure the most competitive price, deliverytimes and performance. In this way,

    municipalities looking to place smallerorders of rolling stock can obtain the world-class value that ALSTOM provides to theworld’s largest networks.

    Consequently, the LTA was able to specifyprecisely what form they wanted theirSingapore METROPOLIS to take in termsof width, length, axle load, ventilationor air conditioning, and traction system aswell as the interior and exterior design. (for more details, go to page 10)

    METROPOLIS, a success around the world

    More than 1,300 cars soldSingapore Northeast Line**Singapore Circle LineWarsaw Line 1*Shanghai Line 3*Shanghai Xin Min LineNanjing Line 1Buenos Aires Line A*Sao Paulo Line 5Santiago Line 4Barcelona Line 9

    *already in revenue service **handed over to operator

  • Future passengers contributeto their metro’s interior designIn July 1999, a one-to-one scalemodel of the Northeast Linewas delivered for interior-designapproval. LTA presented it tothe general public and invitedprospective riders to give theiropinion. The results were takeninto account and the LTA modifiedthe seat color and floor carpetingas well as the design and layoutof the passenger poles, finallysettling on tri-poles.

    Reliability is a key factor when choosing atraction system for a fully automatic metro.The fully automatic metro for the NortheastLine is equipped with our ONIX system.ONIX is a compact drive system thatintegrates the technology of the AC motor,advanced control electronics and an IGBT(Insulated Gate Bipolar Transistor) inverter.ONIX is lightweight, reliable and also veryeasy to maintain. Since the traction systemis discretely located and operates at lownoise levels, passenger comfort is respected.With its standard modular design, theservice-proven ONIX system ensures costeffectiveness while maintaining safety,reliability, high availability and flexibility.

    Northeast Line rolling stock features

    For passenger comfort:

    Air-conditioningPassenger information systemClosed circuit television(video-surveillance)Public address system

    For guaranteed safety:

    Under-frame fire barrier (one-hourendurance)Wide gangway access throughout trainset Front-end detrainment doorGood acoustic ergonomicsFully equipped driver desk for manualoperation at full speedFire and smoke detection systemAll-train status informationData managed by control centerEvery major component doubledto ensure seamless passenger operationsin automatic operation

    Traction designed and built for reliability

    ONIX traction system prior to installation

    CUSTOMIZED SOLUTIONS

    [ Systems integration

    [ Rolling stock

    [ Control and information

    [ Testing prior to commissioning

    7/12ALSTOM Transpor t Pro jec t S tor y

    A modern, spacious interior

  • URBALIS 300

    The Northeast Line’s fully automaticoperation requires the highest level ofsafety, reliability and availability. To meetthe stringent safety and efficiencyrequirements, ALSTOM’s URBALIS 300 fullyAutomatic Train Control system was selected.

    The state-of-the-art Moving-Block AutomaticTrain Control (ATC) of URBALIS 300optimizes headway (the separation of trainson the line). URBALIS 300 also enablesextra trains to be injected automatically intothe system at rush hour to increasepassenger capacity and reduce congestion.In the depot, trains are also operated in fullautomatic mode.

    Communication between the trainand the fixed signaling equipment hasbeen dramatically improved by thehigh-performance continuous and securedtransmission (IAGO). Microwave slots, partof IAGO system, are placed along the track.Station-based automatic train supervisionensures a greater degree of availability.Built-in test equipment has also beenincluded, and Eurobalise standards havebeen adopted for spot transmission.

    Finally, URBALIS 300, provides a very highlevel of flexibility that allows to deal withany events during the automatic operation.(for more details, go to page 11)

    Control and information

    MASTRIA,ATC on-board equipment

    CUSTOMIZED SOLUTIONS

    [ Systems integration

    [ Rolling stock

    [ Control and information

    [ Testing prior to commissioning

    8/12ALSTOM Transpor t Pro jec t S tor y

  • Fully tested before delivery

    Testing is a critical element in reducing riskfor the operator. The METROPOLIS trainsand the URBALIS train-control system forthe Northeast Line were put through anextensive battery of tests to ensure theirquality, safety and reliability. Thanks tothis comprehensive series of tests, we wereable to deliver fully qualified rolling stockand systems, ready for operation.

    The train-testing center, adjacent to ourmetro-building factory in Valenciennes,France, enables us to perform tests withoutthe inconvenience of monopolizing acustomer’s track.

    Systems integration tests were carried outat the Valenciennes test center over a periodof 18 months, from October 2000 toFebruary 2002. For three months, fromNovember 2001 to January 2002, rollingstock endurance tests were performed.

    Thus the integration and validation of thetrains, the signaling, the communicationsand the control system were processed atthe earliest stages, before Singaporecommissioning.

    The tests included running the trains for 12-hour days over two months at a stretch,running them at top speed and without adriver. The tests covered 1,500 scenariosinvolving 30,000 test steps and rangedfrom the failure of a simple component toa major breakdown.

    Testing prior to commissioning

    CUSTOMIZED SOLUTIONS

    [ Systems integration

    [ Rolling stock

    [ Control and information

    [ Testing prior to commissioning

    9/12ALSTOM Transpor t Pro jec t S tor y

    Fact file: Valenciennes test centerThe performance test circuitis a linear track 2.75 kilometerslong, on which one test trainmay run at a maximum speedof 100 km/h.

    The endurance test circuit isa loop 1.83 kilometers long, on which one test train runs at a maximum speed of 70 km/h.

    The fully automatic test circuitis a loop 1.8 kilometers long on which two test trains run ata speed of 65 km/h.

    Power supply for the threetest tracks varies:

    DC (600, 750,1200,1500, 3000V)AC (25 kV 50 Hz, 25 kV 60 Hz, 15 kV 16 2/3 Hz)

    Technical diagram of the capabilities of the test center

    The test center at Valenciennes, France

  • Passenger safety

    The METROPOLIS trains for the NortheastLine are made of fire-resistant materials andhave many anti-fire safety features. The carfloors themselves serve as a fire barrier,proven capable of withstandingtemperatures of 1,000 degrees Celsius forone hour without collapse. This one-hoursafety margin is largely sufficient; trains canreach the next station or be evacuatedwithin minutes.

    With the push of a button found at bothends of the train, ramps with handrailsdescend and passengers can evacuate.

    For experts: rolling stock

    Front-end emergency exit

    TECHNICAL DETAILS

    [ Systems integration

    [ Rolling stock

    [ Control and information

    [ Testing prior to commissioning

    10/12ALSTOM Transpor t Pro jec t S tor y

    Technical features

    Type of operation Fully automatic

    6 cars per train Tc + M + M + M + M + TcPower supply 1,500 V catenaryCar-body material Welded aluminumTrain length 138.5 m (23,65 m)Train width 3.2 mGangway 1.4 m wideFloor height 1,110 mmElectric doors per side of car 4Door width 1,400 mmType of door External slidingNumber of seats/train 296 + 2 wheel chair spacesTotal capacity/train 1,920 persons (6 pass/m2)Train weight 337 t (6 pass/m2)Bogies 16 t per axleMotor bogie wheel diameter 850 mmInstalled power 16 x 150 kWMaximum design speed 100 km/hAcceleration 1.1 m/s2

    Deceleration rate 1.4 m/s2 in emergency braking modeStopping accuracy ±300 mm

  • The Northeast Line’s fully automatic system,URBALIS 300, includes:

    MASTRIA Automatic Train Control system

    SMARTLOCK interlocking system

    ICONIS Data Management System

    IAGO waveguide communications

    IAGO

    For the Northeast Line, the two-waycontinuous transmission system uses awaveguide information network for fail safeoperation of ATC, maintenance dispatchingand diffusion of passenger information.Its wide bandwidth provides the capabilityto transmit video. Direct-sequence spread-spectrum technology protectscommunications against interference.The transmission medium is a rugged, leakywaveguide laid along the track. Active basestations are designed to be located withinthe signaling equipment room. The systemrequires very little maintenance.

    MASTRIA

    The Northeast Automatic Train Control(ATC) Line is based on our MASTRIA system,using Moving-Block technology withredundancy. The MASTRIA system uses two-way digital transmission by IAGOwaveguide with an Automatic TrainProtection system (ATP) that eliminates therisks of collisions and derailments,an Automatic Train Operation system (ATO)that drives the metro, and a train DataManagement System (DMS) thatconcentrates and dispatches rollingstock information with fixed equipment.

    SMARTLOCK

    The Computer-Based Interlocking (CBI)system for the Northeast Line is fromour SMARTLOCK product line. The CBIimplements the interlocking functions forthe main line and depot, and featuresthe ability to call routes and controlswitches. It interfaces with the AutomaticTrain Control system, the platform screendoors and the DMS.

    ICONIS

    The Data Management System usesprocessor-based equipment for station-based automatic train supervision. Itmonitors and controls signaling equipment,platform screen doors and trains.

    For experts: control and information

    IAGO waveguide

    SMARTLOCK interlocking system

    TECHNICAL DETAILS

    [ Systems integration

    [ Rolling stock

    [ Control and information

    [ Testing prior to commissioning

    11/12ALSTOM Transpor t Pro jec t S tor y

  • A L S T O M T r a n s p o r t - 48 rue Alber t Dhalenne - 93482 Sain t Ouen Cedex - F ranceTe l : +33 (0)1 41 66 90 00 - Fax: +33 (0)1 41 66 96 66

    www.transpor t .alstom.com

    To f i n d t h e A L S T O M Tr a n s p o r t c o n t a c t i n y o u r c o u n t r y, c o n s u l t :w w w. t r a n s p o r t . a l s t o m . c o m / w o r l d c o n t a c t

    ©A

    LSTO

    M -

    2003

    - A

    LSTO

    M, T

    HE

    LOG

    O A

    LSTO

    M A

    ND

    TH

    EIR

    FRA

    MEW

    ORK

    S A

    RE T

    RAD

    EMA

    RKS

    AN

    D S

    ERVI

    CE

    TRA

    DEM

    ARK

    APP

    LICAT

    ION

    S O

    F A

    LSTO

    M. T

    HE

    OTH

    ER N

    AM

    ES M

    ENTI

    ON

    ED, R

    EGIS

    TERE

    D O

    R N

    OT,

    ARE

    TH

    E PR

    OPE

    RTY

    OF

    THEI

    R RE

    SPEC

    TIVE

    CO

    MPA

    NIE

    S.

    (MET

    ROPO

    LIS, A

    XON

    IS, U

    RBA

    LIS, O

    PTIO

    NIC

    DES

    IGN

    , ON

    IX, M

    AST

    RIA

    , SM

    ART

    LOC

    K, IA

    GO

    , IC

    ON

    IS A

    RE A

    LSTO

    M T

    RAD

    E M

    ARK

    S).

    TRA

    NS/

    PJT

    S/SI

    NG

    -N.E

    .L/e

    ng/U

    RB/0

    2.0

    3/F

    R/4

    204 -

    3891

    9198

    2 RC

    S PA

    RIS

    - PRI

    NTE

    D IN

    FRA

    NC

    E - P

    HO

    TOS:

    D. D

    ESJA

    RDIN

    S - S

    . CA

    MBO

    N -

    G. L

    IESS

    E - O

    FFIC

    E N

    ATIO

    NA

    L D

    U T

    OU

    RISM

    E D

    E SI

    NG

    APO

    UR

    - ALS

    TOM

    - D

    R.A

    LL IN

    FORM

    ATIO

    N IS

    GIV

    EN F

    OR

    IND

    ICAT

    ION

    PU

    RPO

    SE O

    NLY

    AN

    D IS

    SU

    BJEC

    T TO

    CH

    AN

    GE

    WIT

    HO

    UT

    NO

    TIC

    E.