single-phase transformer pad for 25-167 kva...single-phase transformer pad for 25 - 167 kva plan...
TRANSCRIPT
24.00-00A
DWG.
ABSORPTION BED FOR TRANSFORMER PADS 24.01-01
SECTION 24 - PADS, PULL BOXES
TABLE OF CONTENTS
24.01-07SINGLE-PHASE TRANSFORMER PAD FOR 25-167 KVA
24.01-09THREE-PHASE TRANSFORMER PAD FOR 75-300 KVA
THREE-PHASE TRANSFORMER PAD FOR 500-3000 KVA
24.01-13ADAPTER PLATE FOR THREE-PHASE TRANSFORMER PAD FOR 500-3000KVA
0
3
2
APPR.REVISED BY CK'D
1
24.01-11AND PAD-MOUNTED CAPACITOR
THREE-PHASE SECONDARY ENCLOSURE PAD 24.03-01
THREE-PHASE SECONDARY ENCLOSURE MOUNTING BOX
24.03-03(SMALL SPLICE BOX) (24" X 43" X 18")
MOUNTING BOX FOR PME 9, 10, 11 & AUTO TRANSFER 24.05-01
24.05-03MOUNTING BOX FOR PME 4 (200 & 600 AMP)
24.05-05MOUNTING BOX PMH 9, 10 & 11, AUTO TRANSFER & TRAYER 9, 10 & 11
24.05-07MOUNTING BOX FOR COOPER 15KV VFI-5
24.05-09MOUNTING BOX FOR 15 KV, 12.5 KA, VISTA AND NEXT GENERATION VISTA
SMALL PULL & SPLICE BOX (30" X 48" X 24")
24.07-03
24.07-07
LIDS FOR SMALL PULL & SPLICE BOX
24.07-09
LARGE PULL BOX, BOTTOM HALF (6.5' X 4' X 2')
24.07-11
LARGE PULL BOX, TOP HALF (6.5' X 4' X 3')
STEEL LIDS FOR LARGE PULL BOX
24.07-13
24.07-15
CONCRETE LIDS FOR LARGE PULL BOX
LARGE PULL BOX ASSEMBLY
24.07-01
10/4/10
CECCONI GUINN ELKINS
24.05-11CABLE AND CONDUIT PLACEMENT FOR TRAYER ATS VFI
5/24/12
KATIGBAK BURLISON ELKINS
24.01 TRANSFORMERS
24.03 ENCLOSURES
24.05 SWITCHGEAR
24.07 PULL BOXES
4"
4"
TRANSFORMER
PAD
PLAN VIEW
3Ø 500-3000 28" 82" 87"
TRANSFORMER
KVA
ALL
75-300
PHASE
1Ø
3Ø
A
12"
18"
45"
60"
B
APPROXIMATE
WEIGHT/LBS
C
40"
75" 2150
3000
470
24.01-01
DWG.
10/4/10
DANNA GUINN ELKINS
A
A C A
A
B
CONTINUOUS
CONCRETE CURB OR
EDGE OF ASPHALT
CURBING AND ABSORPTION BED ARE REQUIRED WHEN TRANSFORMER IS LOCATED IN OR IMMEDIATELY ADJACENT
TO PAVEMENT, NEAR BODIES OR WATER, STORM DRAINS, RETENTION AREAS, OR LOCATIONS WHERE OIL RUNOFF
IS LIKELY TO ENTER WATER, STORM OR SEWER SYSTEMS.
CRUSHED STONE
(1/2" MIN. DIA.)
AROUND PAD
CUSTOMER PROVIDE
AND INSTALLED
CONCRETE CURB
AROUND PAD
FINISHED GRADE
4"
4"12" MIN. 4"
2"
CRUSHED STONES
TRAFFIC BARRIERS
NOTES:
1. ALL UNDERGROUND FACILITIES MUST BE LOCATED PRIOR TO INSTALLATION OF TRAFFIC BARRIERS.
ABSORPTION BED FOR TRANSFORMER PADS
FOR TRAFFIC BARRIER DETAILS.
R
0
3
2
1
APPR.REVISED BY CK'D
TRAFFIC BARRIERS ARE TO BE USED WHEN TRANSFORMER IS EXPOSED TO VEHICLE TRAFFIC. SEE DWG. 27.06-06
DWG.
24.01-07
SINGLE-PHASE TRANSFORMER PAD
FOR 25 - 167 KVA
PLAN VIEW
SIDE VIEW
3/4" LIFTING
INSERT
5/8" INSERT
NOTES:
1. THE GROUND SHALL BE LEVELED AND THOROUGHLY COMPACTED BEFORE PAD IS INSTALLED.
4. CUT OFF ALL CONDUITS FLUSH WITH TOP OF PAD AND CAP CONDUIT.
5. SOD MAY BE REQUIRED AROUND PAD TO PREVENT SOIL EROSION.
3. MAINTAIN CLEARANCES PER DWG. 27.06-05.
R
2. USE FIRE ANT CONTROL UNDER ENTIRE PAD INCLUDING PAD OPENINGS.
0
2
1
APPR.REVISED BY CK'D
3
10/4/10
ELKINSDANNA GUINN
40"
45"
6-3/8"
1-5/8" 12"12" 1-5/8"
6-3/8"27-1/4"
6"
14"
6-1/2"
13-1/2"
1"
1"
4"
2"
PRIMARY
D8.0 X D8.0
(TYP. 2 LOCATIONS)
WELDED WIRE MESH
SECONDARY
1 PAD1P40X45CF
BILL OF MATERIALS
CATALOG
327703 25 - 167 KVA SINGLE-PHASE PAD
DESCRIPTION
1
QTY
1
PER
CU
NUMBER
MACRO UNIT
-
CU
ITEM
NO.
COMPATIBLE
UNIT
QTY
REQ'D
1
DWG.
24.01-09
THREE-PHASE TRANSFORMER
PAD FOR 75-300 KVA
NOTES:
1. THE GROUND SHALL BE LEVELED AND THOROUGHLY COMPACTED BEFORE PAD IS INSTALLED.
2. USE GENEROUS AMOUNT OF FIRE ANT KILLER UNDER ENTIRE PAD.
4. CUT OFF ALL CONDUITS FLUSH WITH TOP OF PAD AND CAP CONDUIT.
5. SOD MAY BE REQUIRED AROUND PAD TO PREVENT SOIL EROSION.
3. MAINTAIN CLEARANCES PER DWG. 27.06-05.
PLAN VIEW
3/4" LIFTING
INSERT
0
3
2
1
APPR.REVISED BY CK'D
SIDE VIEW
60"
33-1/2"
3"
16" 4" 4@7-1/2"=30" 4"
75"
4-1/2"
8@8-1/4"=66"
4-1/2"
PRIMARY
SECONDARY
3/4" LIFTING
INSERT
3"
TRADEMARK
1"
1"
7"
3-1/2"
12-3/4"
13-1/2"
48"
12-3/4"
10/4/10
ELKINSDANNA GUINN
1 PAD3P60X75CF
BILL OF MATERIALS
CATALOG
327707 60" X 75" 75 - 300 KVA THREE-PHASE PAD
DESCRIPTION
1
QTY
1
PER
CU
NUMBER
MACRO UNIT
-
CU
ITEM
NO.
COMPATIBLE
UNIT
QTY
REQ'D
1
7/9/13
ADCOCKKATIGBAK GUINN
DWG.
24.01-11
10/4/10
DANNA GUINN ELKINS
THREE-PHASE TRANSFORMER
PAD FOR 500-3000 KVA
AND PAD-MOUNTED CAPACITOR
NOTES:
1. THE GROUND SHALL BE LEVELED AND THOROUGHLY COMPACTED BEFORE PAD IS INSTALLED.
4. CUT OFF ALL CONDUITS FLUSH WITH TOP OF PAD AND CAP CONDUIT.
5. SOD MAY BE REQUIRED AROUND PAD TO PREVENT SOIL EROSION.
3. MAINTAIN CLEARANCES PER DWG. 27.06-05.
PLAN VIEW
GALVANIZED COIL INSERT
(TYPICAL 2 LOCATIONS)
PAD3P82X87CF
R
0
3
2
1
APPR.REVISED BY CK'D
SIDE VIEW
OPENING
1"
1"
7"
3-1/2"
87"
82"
6@6-5/8"=39-3/4"
3@7-1/2"=22-1/2"
5@7=35"
3@7-1/2"=22-1/2"
60"13-1/2"
2. USE FIRE ANT CONTROL UNDER ENTIRE PAD INCLUDING PAD OPENINGS.
327712
32"
4"
2"
4"
13-1/2"
26"
4 - #4 BARS @ 24" LONG
(TYPICAL 4 LOCATIONS)
#4 BAR REINFORCING
TYPICAL
1 - EXTRA #4 BAR BETWEEN
EDGE OF PAD AND WINDOW
OPENING (TYPICAL EACH SIDE)
1
BILL OF MATERIALS
CATALOG
82" X 87" 500 - 3000 KVA 3 PH. PAD
DESCRIPTION
1
QTY
1
PER
CU
NUMBER
MACRO UNIT
-
CU
ITEM
NO.
COMPATIBLE
UNIT
QTY
REQ'D
1
3-1/2" 3-1/2"
DWG.
24.01-13
10/4/10DANNA GUINN ELKINS
ADAPTER PLATE FOR THREE-PHASE
TRANSFORMER PAD FOR 500-3000 KVA
NOTES:
R
59"
1"
12"
12"
64"
2"
1/2-13 BONDING PAD WITH
ANDERSON GROUND LUG
MOUNTED ON BOTTOM OF
THE PLATE
1/4-1X59 BACKSTOP BAR
CENTERED ON PLATE BOTTOM
DESIGNS WITH THE LARGE 500-3000KVA PADMOUNT CONCRETE PAD.
12 GAUGE 304L SS PLATE IS TO BE USED AS AN ADAPTER PLATE FOR USE WITH 18" DEEP CABINET TRANSFORMER
1. USE ADAPTER PLATE TO REDUCE PAD OPENING AS NEEDED WHEN INSTALLING TRANSFORMER WITH 18" DEEP
CABINET.
2. GROUND ADAPTER PLATE WITH #4 BC USING GROUND LUG INSTALLED ON BOTTOM.
3. PLACE ADAPTER PLATE IN PAD OPENING WITH BACKSTOP AGAINST THE REAR OF THE OPENING AS SHOWN.
0
3
2
1
APPR.REVISED BY CK'D
1 PADADAPTERLTF
BILL OF MATERIALS
CATALOG
9220119264 64" X 12" TRANSFORMER PAD ADAPTER PLATE
DESCRIPTION
1
QTY
1
PER
CU
NUMBER
MACRO UNIT
-
CU
ITEM
NO.
COMPATIBLE
UNIT
QTY
REQ'D
1
DWG.
24.03-01
10/4/10
DANNA GUINN ELKINS
THREE-PHASE SECONDARY ENCLOSURE PAD
NOTES:
1. THE GROUND SHALL BE LEVELED AND THOROUGHLY COMPACTED BEFORE PAD IS INSTALLED.
PLAN VIEW
SIDE VIEW
3. MAINTAIN 8' CLEARANCE FROM FRONT AND REAR DOORS AND 3' FROM SIDES.
4. CUT OFF ALL CONDUITS FLUSH WITH TOP OF PAD AND CAP CONDUIT.
5. SOD MAY BE REQUIRED AROUND PAD TO PREVENT SOIL EROSION.
29"
56"
5"
1/2" CHAMFER
18"
50" 23"
1/2"
THREADED
INSERTS
SECONDARY ENCLOSURE
OUTLINE OF 3 PHASE
3/4" LIFTING
INSERTS
1/2"
TRADEMARK
1/2"
R
0
3
2
1
APPR.REVISED BY CK'D
2. USE FIRE ANT CONTROL UNDER ENTIRE PAD INCLUDING PAD OPENINGS.
1
1 PADS50X56CF
BILL OF MATERIALS
CATALOG
327704 50" X 56" SECONDARY ENCLOSURE PAD
DESCRIPTION
1
QTY
1
PER
CU
NUMBER
MACRO UNIT
-
CU
ITEM
NO.
COMPATIBLE
UNIT
QTY
REQ'D
2. WHEN USED AS A SPLICE BOX, USE 1/0 PRIMARY CONDUCTOR MAXIMUM.
1. BELOW GRADE INSTALLATION REQUIRES ELECTRONIC POWER MARKER.
NOTES:
24.03-03
DWG.
3. CAN BE USED AS THREE-PHASE SECONDARY ENCLOSURE MOUNTING BOX. SEE DWG. 25.03-01.
4. CAN BE USED AS A SINGLE-PHASE TRANSFORMER MOUNTING BOX.
THREE-PHASE SECONDARY ENCLOSURE
MOUNTING BOX (SMALL SPLICE BOX)
(24" X 43" X 18")
5. CUT OFF CONDUITS (IF PRESENT) 6" ABOVE BOTTOM OF BOX AND CAP.
6. DO NOT FILL INTERIOR OF BOX WITH SOIL.
24"
12"
20-1/2"
2-1/2"
2-1/2"
29"
24"
18"
32"
2-1/2"
48"
11 7/8"
R
7. USE FIRE ANT CONTROL UNDER ENTIRE PAD INCLUDING PAD OPENINGS.
0
3
2
1
APPR.REVISED BY CK'D
1
BILL OF MATERIALS
CATALOG
320154
24" X 32" LID
BOX
12.875" X 32" LID
DESCRIPTION
PADTMT48X32CF 320162
320166
1
QTY
1
1
1
PER
CU
NUMBER
MACRO UNIT
-
CU
ITEM
NO.
COMPATIBLE
UNIT
QTY
REQ'D
1
8/10/10DANNA GUINN ELKINS
1. THE GROUND SHALL BE LEVELED AND THOROUGHLY COMPACTED BEFORE PAD IS INSTALLED.
NOTES:
24.05-01
DWG.
4. CUT OFF ALL CONDUITS 6" ABOVE BOTTOM OF BOX AND CAP.
MOUNTING BOX FOR PME 9, 10, 11
& AUTO TRANSFER
10/4/10DANNA GUINN ELKINS
5. DO NOT FILL INTERIOR OF BOX WITH SOIL.
6. SOD MAY BE REQUIRED AROUND PAD TO PREVENT SOIL EROSION.
SIDE VIEW
PLAN VIEW
6'-5"
LOCATION OF
49 1/2"
INSERT FOR
PME 9
LOCATION OF
PME 10 & 11
INSERT FOR
55 1/2"
5/8"
THREADED
INSERTS
6'-3"
69 1/2"
(LOCATION OF INSERT)
6"
5" 5"
6"
13/16" HOLE FOR LIFTING BOLT.
ONE ON EACH SIDE
6"
GROUND
12"
LINE
1/2" X 1/2"
CHAMFER
3. MAINTAIN 10' CLEARANCE FROM FRONT AND REAR DOORS AND 3' FROM SIDES.
7. TO DEFER SWITCH INSTALLATION, USE LID ( CN 327375).
FOR PME 9
OUTLINE OF CABINET
24"
R
0
3
2
1
APPR.REVISED BY CK'D
2. USE FIRE ANT CONTROL UNDER ENTIRE PAD INCLUDING PAD OPENINGS.
1 PADSWGCPME9F
BILL OF MATERIALS
CATALOG
327723 BOX, FOR MOUNTING PME GEAR
DESCRIPTION
1
QTY
1
PER
CU
NUMBER
MACRO UNIT
-
CU
ITEM
NO.
COMPATIBLE
UNIT
QTY
REQ'D
1
DWG.
24.05-03
10/4/10
DANNA GUINN ELKINS
MOUNTING BOX FOR PME 4 (200 & 600 AMP)
PLAN VIEW
SIDE VIEW
12"
24"
5"
5"
5"
5"
48"
43"
LOCATION OF INSERT
LOCATION OF INSERT
40 1/2"
65"
ONE ON EACH SIDE
13/16" HOLE FOR LIFTING BOLT.
CHAMFER
1/2' X 1/2"
GROUND
LINE
3. MAINTAIN 10' CLEARANCE FROM FRONT AND REAR DOORS AND 3' FROM SIDES.
6. SOD MAY BE REQUIRED AROUND PAD TO PREVENT SOIL EROSION.
4. CUT OFF ALL CONDUITS 6" ABOVE BOTTOM OF BOX AND CAP.
1. THE GROUND SHALL BE LEVELED AND THOROUGHLY COMPACTED BEFORE PAD IS INSTALLED.
5. DO NOT FILL INTERIOR OF BOX WITH SOIL.
NOTES:
6"
R
0
3
2
1
APPR.REVISED BY CK'D
2. USE FIRE ANT CONTROL UNDER ENTIRE PAD INCLUDING PAD OPENINGS.
1 PADSWGCPME4F
BILL OF MATERIALS
CATALOG
327724 BOX, MOUNTING ALL PME-4
DESCRIPTION
1
QTY
1
PER
CU
NUMBER
MACRO UNIT
-
CU
ITEM
NO.
COMPATIBLE
UNIT
QTY
REQ'D
1
5/8" X 2"
THREADED INSERT
DWG.
24.05-05
10/4/10
DANNA GUINN ELKINS
MOUNTING BOX PMH 9, 10 & 11,
AUTO TRANSFER & TRAYER 9, 10 & 11
5/8" X 2" THREADED INSERT
TRADEMARK
1/2" X 1/2" CHAMFER
69"
1-1/2"
71"
6"
6"
24"
HOLE IF NECESSARY
REINFORCING ROD
13/16" HOLE FOR
TO CLEAR BOLT
(ONE EACH SIDE)
LIFTING BOLT
OFFSET VERTICAL
PLAN VIEW
SIDE VIEW
13/16" HOLE FOR LIFTING
BOLT ONE ON EACH SIDE
6"
7. TO DEFER SWITCH INSTALLATION, USE LID ( CN 327381).
NOTES:
6. SOD MAY BE REQUIRED AROUND PAD TO PREVENT SOIL EROSION.
1. THE GROUND SHALL BE LEVELED AND THOROUGHLY COMPACTED BEFORE PAD IS INSTALLED.
5. DO NOT FILL INTERIOR OF BOX WITH SOIL.
4. CUT OFF ALL CONDUITS 6" ABOVE BOTTOM OF BOX AND CAP.
3. MAINTAIN 10' CLEARANCE FROM FRONT AND REAR DOORS AND 3' FROM SIDES.
8. OLD 70" X 62" PADS MAY BE USED.
9. APPROXIMATE WEIGHT IS 3150 LBS.
8"
R
0
3
2
1
APPR.REVISED BY CK'D
2. USE FIRE ANT CONTROL UNDER ENTIRE PAD INCLUDING PAD OPENINGS.
1 PADSWGCPMHF
BILL OF MATERIALS
CATALOG
152199 BOX, MOUNTING PMH SWITCHGEAR
DESCRIPTION
1
QTY
1
PER
CU
NUMBER
MACRO UNIT
-
CU
ITEM
NO.
COMPATIBLE
UNIT
QTY
REQ'D
1
DWG.
24.05-07
10/4/10
DANNA GUINN ELKINS
MOUNTING BOX FOR
COOPER 15KV VFI-5
28"
C
L L
C
12"
GROUND LINE
24"
6"
FRONT VIEW
PLAN VIEW
5"W X 6-1/4"D X 3"L
BEAM POCKET
1/2" X 1/2"
CHAMFER (TYP.)
C
L
L
C
5"
75"
14"
5"
37-3/4"
68"
13/16"Ø HOLE
FOR LIFTING
BOLT (TYP.)
W6 X 16 X 37"L
GALV. STEEL BEAM
5/8" X 3" THREADED
INSERT (4 TYP.)
COMPATIBLE UNITITEM NO.
1 PADSWGCVFIF
BILL OF MATERIALS
QUANTITYCATALOG NUMBER
9220109880 1 MOUNTING BOX
DESCRIPTION
NOTES:
1. THE GROUND SHALL BE LEVELED AND COMPACTED TO THAT OF UNDISTURBED EARTH BEFORE MOUNTING
BOX IS INSTALLED. SOIL AROUND THE MOUNTING BOX IS TO BE FREE OF ROOTS AND CONSTRUCTION
DEBRIS TO PREVENT SETTLING.
3. MAINTAIN 8' CLEARANCE FROM THE FRONT AND REAR DOORS AND 3' FROM THE SIDES.
4. CUT OFF ALL CONDUITS 6" ABOVE THE BOTTOM OF BOX AND CAP.
5. DO NOT FILL INTERIOR OF THE BOX WITH SOIL.
6. SOD MAY BE REQUIRED AROUND THE PAD TO PREVENT SOIL EROSION.
7. OTHER UTILITIES ARE NOT TO BE INSTALLED UNDER THE BOX PAD.
8. APPROXIMATE WEIGHT IS 2275 LBS.
9. SEE DWG. 28.06-07A AND 28.06-07B FOR COOPER 15KV VFI-5.
2. USE FIRE ANT CONTROL UNDER ENTIRE PAD INCLUDING PAD OPENINGS.
42"
R
0
3
2
1
APPR.REVISED BY CK'D
NOTES:
24.05-09
DWG.
MOUNTING BOX FOR 15 KV, 12.5 KA,
VISTA AND NEXT GENERATION VISTA
10/4/10
DANNA GUINN ELKINS
SIDE VIEW
13/16" HOLE FOR LIFTING BOLT
6"
GROUND
12"
LINE
1/2" X 1/2"
CHAMFER
24"
R
74"
58"
37"
47" 63"
8"
BOTTOM EDGE
OF BOX
FOR CABINET
5/8" THREADED INSERT
OUTLINE OF
CABINET
PADSWGCVISTAF
PLAN VIEW
SEE DETAIL 'A'
DETAIL 'A'
8"
8-1/2"
6-1/16"
3-3/4" TYP.
2" TYP.
2" TYP.
1" TYP.
6" TYP.
OUTLINE OF CABINET
FOR CABINET
5/8" THREADED INSERT
5/8" THREADED INSERT
FOR SWITCHGEAR
13/16" HOLE
FOR LIFTING BOLT
CN 9220130615
6"
TERMINATION SIDE
OPERATION SIDE
0
3
2
1
APPR.REVISED BY CK'D
7. WEIGHT IS APPROXIMATELY 3500 LBS.
3. MAINTAIN 10' CLEARANCE FROM FRONT AND REAR DOORS AND 3' FROM SIDES.
6. SOD MAY BE REQUIRED AROUND PAD TO PREVENT SOIL EROSION.
5. DO NOT FILL INTERIOR OF BOX WITH SOIL.
4. CUT OFF ALL CONDUITS 6" ABOVE BOTTOM OF BOX AND CAP.
1. THE GROUND SHALL BE LEVELED AND THOROUGHLY COMPACTED BEFORE BOX IS INSTALLED.
INSTALL TIE DOWN PLATE
TO HOLD BOTH TANK
AND SHELL.
MAY NEED TO DRILL
AND INSTALL RED HEAD
2. USE FIRE ANT CONTROL UNDER ENTIRE PAD INCLUDING PAD OPENINGS.
DWG.
24.05-11
5/24/12
DANNA BURLISON ELKINS
CABLE AND CONDUIT PLACEMENT
FOR TRAYER ATS VFI
PLAN VIEW
GALVANIZED COIL INSERT
(TYPICAL 2 LOCATIONS)
R
0
3
2
1
APPR.REVISED BY CK'D
SIDE VIEW
OPENING
1"
1"
7"
3-1/2"
87"
82"
6@6-5/8"=39-3/4"
3-1/2"
3@7-1/2"=22-1/2"
5@7=35"
3@7-1/2"=22-1/2"
3-1/2"
60"13-1/2"
32"
4"
2"
4"
13-1/2"
26"
4 - #4 BARS @ 24" LONG
(TYPICAL 4 LOCATIONS)
#4 BAR REINFORCING
TYPICAL
1 - EXTRA #4 BAR BETWEEN
EDGE OF PAD AND WINDOW
OPENING (TYPICAL EACH SIDE)
4"
2" 17" 11" 2"17"11"
4"
1. THE GROUND SHALL BE LEVELED AND THOROUGHLY COMPACTED BEFORE PAD IS INSTALLED.
NOTES:
4. SOD MAY BE REQUIRED AROUND PAD TO PREVENT SOIL EROSION.
3. MAINTAIN 10' CLEARANCE FROM FRONT AND REAR DOORS AND 3' FROM SIDES.
2. USE FIRE ANT CONTROL UNDER ENTIRE PAD INCLUDING PAD OPENINGS.
3. NO PULLING EYES.
2. USE 1/0 PRIMARY - THREE-PHASE CONDUCTOR MAXIMUM.
NOTES:
4. NO BOTTOM.
5. FOUR (4) HOLES (2 ON EACH SIDE) FOR LIFTING BOX.
6. BELOW GRADE INSTALLATION REQUIRES ELECTRONIC POWER MARKER.
24.07-01
DWG.
HOLES FOR BOLTING
DIAMOND PLATE LIDS
13/16" HOLES
FOR LIFTING BOLTS
2 ON EACH SIDE
TOP VIEW
SIDE VIEW
SMALL PULL & SPLICE BOX
(30" X 48" X 24")
1. LIDS ARE DIAMOND PLATE ( CN 320189) OR CONCRETE (CN 320188).
24"
58"
40" 30"
5"
5"
58"
8. DO NOT FILL INTERIOR OF BOX.
48"
7. SEE DWG. 24.07-03 FOR LIDS.
R
0
3
2
1
APPR.REVISED BY CK'D
8/10/10DANNA GUINN ELKINS
CN 320185
APPROXIMATE WEIGHT - 1,780 LBS.
PBSPSMNOLID
24.07-03
DWG.
4 HOLES
(2) LID LIFTING INSERTS
CONCRETE LID
(2) 1" LID LIFTING HOLESHOLES FOR BOLTING TO BOX
10/4/10
GUINNDANNA ELKINS
HOLES FOR BOLTING
FOR 3/4"
LIFTING EYE BOLTS
TWO ON EACH SIDE
LIDS FOR SMALL PULL & SPLICE BOX
58"
40"
58"
58"
40"
4"
40"
28"
CN 320188
(INCLUDES TWO PIECES)
R
0
3
2
1
APPR.REVISED BY CK'D
TO BOX
NOTES:
1. LID MUST BE SECURED TO BOX USING 1/2" X 1" STAINLESS STEEL BOLTS.
CU LID30X48CF
CU LID30X48SF
(INCLUDES TWO PIECES)
CN 320189
GALVANIZED LID
DWG.
24.07-07
10/4/10DANNA GUINN ELKINS
LARGE PULL BOX, BOTTOM HALF
(6.5' X 4' X 2')
NOTES:
1. FOR ASSEMBLY, SEE DWG. 24.07-15.
PLAN VIEW
CN 320181
SIDE VIEW
12" 34" 12"
58"
88"
20-1/2"
20-1/2"
5" 48"
78"
1" THROUGH HOLE
FOR GROUND ROD
5" FROM SIDE WALL
7"
13"
24"
5"
6"
5"
11" DIAMETER ACCESS
FOR PUMP
DETAIL "A"
LIFTING EYE
R
SHIPLAP GROOVE
DETAIL 'B'
SEE DETAIL 'B'
3/4" PULLING EYE
3/4" PULLING EYE
SEE DETAIL "A"
2"
1/2"
2-1/2"
2"
0
3
2
1
APPR.REVISED BY CK'D
CU BOXSP6X4CBTMF
DWG.
24.07-09
10/4/10
DANNA GUINN ELKINS
LARGE PULL BOX, TOP HALF
(6.5' X 4' X 3')
HOLE TO
3/4" PULLING EYES
1/2" THREADED
5"
36"
ACCOMMODATE
A STAINLESS
STEEL BOLT
NOTES:
1. FOR ASSEMBLY, SEE DWG. 24.07-15.
2"
5"
2-1/4"
2-1/2" X 1/4"
ANGLE
1/2" X 3/4"
FLAT BAR
WELDED TO ANGLE
PLAN VIEW
SIDE VIEW
12"
CN 320182
3/4" PULLING EYES
1/2"
R
7"34"7"
58"
48"
5"
88"
28-1/4"
28-1/4"
C
L
5"
6"
7"
DETAIL 'A'
SEE DETAIL 'A'
SHIPLAP GROOVE
2-1/2"
2"
2"
1/2"
10-3/4" (TYP.)
78"
25"
25"
0
3
2
1
APPR.REVISED BY CK'D
CU BOXSP6X4CTOPF
DWG.
24.07-11
10/4/10
DANNA GUINN ELKINS
STEEL LIDS FOR LARGE PULL BOX
CN 320186
11"
1"
3" 11" 3"
1"
2 3/4"
52"
2 3/4"
MIDDLE
PLATE
(1 REQ'D)
1" LIFTING
HOLE
1" X 1 1/2"
SLOTTED HOLE
(2 REQ'D)
PLATE
END
3 1/2" 13 1/4" 9 3/4" 1"
3 1/2"
10 1/2" 8 1/2"
27"
13" 13"
1"
1/4"
46 1/2"
1/4"
R
0
3
2
1
APPR.REVISED BY CK'D
FOR BOLTING
LID TO BOX
1" X 1 1/2"
SLOTTED HOLE
FOR BOLTING
LID TO BOX
HOLE FOR
BOLTING
LID TO BOX
HOLE FOR
BOLTING
LID TO BOX
NOTES:
1. LID MUST BE SECURED TO BOX USING 1/2" X 1" STAINLESS STEEL BOLTS.
CU LID6X4SF
DWG.
24.07-13
CONCRETE LIDS FOR LARGE PULL BOX
3'-8"
4'-10"LIFTING INSERTS
1'-10"
12"
TYPICAL BOTH
HALVES
1"
5"
CONCRETE COVER
(2 REQUIRED)
CN 320187
6"
R
0
3
2
1
APPR.REVISED BY CK'D
CU LID6X4CF
8/10/10
DANNA GUINN ELKINS
PULLING EYE
LIFTING EYE
11" DIAMETER ACCESS
FOR PUMP
ENTRANCE FOR 6" PVC
FLARED DUCT
1. BOTTOM OF PULL BOX SHOULD BE LIFTED USING LIFTING EYES THAT ARE LOCATED ON THE FLOOR OF THE
BOTTOM SECTION.
NOTES:
2. WHEN SETTING TOP SECTION, USE PULLING EYES THAT ARE LOCATED ON THE END WALLS.
3. LISTED BELOW ARE OPTIONS REGARDING LID TYPES. THE 6.5 FT. X 4 FT. PULLBOX HAS THREE AVAILABLE LID
24.07-15
DWG.
LARGE PULL BOX ASSEMBLY
10/4/10DANNA GUINN ELKINS
88"
58"
34"
12"
13"
6"
24"
7"
36"
R
0
3
2
1
APPR.REVISED BY CK'D
4. NON-IMPACT TRAFFIC RATED IS FOR APPLICATIONS WHERE BOX AND LID WILL BE IN AREAS OF INCIDENTAL
OPTIONS.
CONCRETE FINISH AND CAN BE USED IN SIDEWALK APPLICATIONS. FOR USE WITH STANDARD TOP SECTION
3 - PIECE STEEL LID USED FOR NON-TRAFFIC RATED APPLICATION ( CN 320186). FOR USE WITH STANDARD
TOP SECTION (CN 320182) AND BOTTOM SECTION ( CN 320181).
3 - PIECE HEAVY DUTY NON-IMPACT TRAFFIC RATED STEEL LID ( CN 300406), WHICH MUST BE USED WITH
TOP SECTION (CN 320180) AND STANDARD BOTTOM SECTION ( CN 320181).
2 - PIECE HEAVY DUTY NON-IMPACT TRAFFIC RATED CONCRETE LID ( CN 320187). THIS LID HAS A BRUSHED
(CN 320182) AND BOTTOM SECTION ( CN 320181).
5. BELOW GRADE INSTALLATION REQUIRES ELECTRONIC POWER MARKER.
TRAFFIC ONLY (I.E. DRIVEWAYS, PARKING LOTS). IT IS NOT RATED FOR INSTALLATION IN ROADWAYS.
6. THE TOP AND BOTTOM SECTIONS SHALL BE INSTALLED FOR ALL INSTALLATIONS. THIS IS TO ENSURE THAT
THE INSTALLATION MEETS ALL TRAFFIC RATINGS, CONDUIT IS AT STANDARD DEPTH AND PULLING EYES ON
BOTTOM SECTION CAN BE USED FOR CABLE PULLING APPLICATIONS.
WHERE PHYSICAL CONSTRAINTS DO NOT ALLOW FOR THE ADDITIONAL SPACE OF THE BOTTOM SECTION.
EXCEPTION: TOP SECTIONS ONLY WITH LIDS CAN BE INSTALLED FOR NON-TRAFFIC RATED INSTALLATIONS
TOP HALF WEIGHT - 4100 LBS.
BOTTOM HALF WEIGHT - 5000 LBS.
SEE DWG. 24.07-09
SEE DWG. 24.07-07
TOP SECTION
BOTTOM SECTION