single vessel brewing system

8
Pre-Brew Day: RO Water Generation . Valve #9 Open. All others closed 19.75 in SS False Bottom (Fixed) 2.560 in Remove Cam-lock levels SS Mini Valve used to bleed Pump Trub Filter Temp Sensor SS Mini Flow Valve Temp. Sensor Warm Water out Plate Chiller Temp Sensor Enlarged view of V7 & V8 valve and plumbing mounted to Chiller RO Water Generator V8 controlled by Pressure Switch Tap Water In 4.5 Kw Water Heater Safety Pressure Relief Valve Strike Water & Sparge Water Htr 4.5 Kw Htg Element Temp Sensor To Fermenter Storage tank located across brewery from SVBS. V4 V6 V5 V9 V7 V8 V3 V1 V2

Upload: cotero5234

Post on 26-Nov-2015

101 views

Category:

Documents


0 download

DESCRIPTION

Beer Brewing

TRANSCRIPT

Pre-Brew Day:RO Water Generation. Valve #9 Open. All others closed

19.75 in

SSFalse Bottom(Fixed)

2.560 in Remove Cam-lock levels

SS Mini Valve usedto bleed Pump

Trub Filter

TempSensor

SS MiniFlow Valve

Temp. Sensor

Warm Water outPlate Chiller

Temp Sensor

Enlarged view of V7& V8 valve and

plumbing mountedto Chiller

RO Water Generator

V8 controlled byPressure Switch

Tap Water In

4.5 Kw Water Heater

Safety PressureRelief Valve

Strike Water & Sparge Water Htr4.5 Kw Htg Element Temp Sensor

To Fermenter

Storage tank locatedacross brewery from

SVBS.

V4V6

V5

V9

V7V8

V3 V1V2

Step 1: Heat Strike WaterValve #4 & #6 Open. All others closed. Strike Water Volumecontrolled by BT's Volume Measurement

19.75 in

SSFalse Bottom(Fixed)

2.560 in Remove Cam-lock levels

SS Mini Valve usedto bleed Pump

Trub Filter

TempSensor

SS MiniFlow Valve

Temp. Sensor

Warm Water outPlate Chiller

Temp Sensor

Enlarged view of V7& V8 valve and

plumbing mountedto Chiller

RO Water Generator

V8 controlled byPressure Switch

Tap Water In

4.5 Kw Water Heater

Safety PressureRelief Valve

Strike Water & Sparge Water Htr4.5 Kw Htg Element Temp Sensor

To Fermenter

Storage tank locatedacross brewery from

SVBS.

V4V6

V5

V9

V7V8

V3 V1V2

19 3/4 in

SSFalse Bottom(Fixed)

Remove Cam-lock levels

Trub Filter

Temp Sensor

Wort Returnfrom kettle

3 in

Temp. Sensor

Plate Chiller

V7V8

RO Water Generator

V9V8 controlled by Pressure Switch,

Tap Water In

4.5 Kw Water Heater

Safety Pressure Relief Valve

Strike Water & Sparge Water Htr

Temp Sensor

Step 2: Mash Infusion Steps -Valve #2 & #5 Open. All others closed.Wort circulated continously.

Whirlpool Nozzle Removble plugs to adjustWort overflow levels backto kettle for recirculation.

To Fermenter

V1V2V4 V3

Step 3: Lift Mash Tube & Start SpargeValve #4 & #6 Open. All others closed.Sparge volume controlled by BT's Volume Measurement

SS Mini Valve usedto bleed Pump

Trub Filter

TempSensor

SS MiniFlow Valve

Temp. Sensor

Warm Water outPlate Chiller

Temp Sensor

Enlarged view of V7& V8 valve and

plumbing mountedto Chiller

RO Water Generator

V8 controlled byPressure Switch

Tap Water In

4.5 Kw Water Heater

Safety PressureRelief Valve

Strike Water & Sparge Water Htr4.5 Kw Htg Element Temp Sensor

To Fermenter

Storage tank locatedacross brewery from

SVBS.

V4V6

V5

V9

V7V8

V3 V1V2

19 3/4 in

Whirlpool Nozzle

Step 4: Remove Mash Tube & Start BoilAll valves closed. Boil additions times controlled by BT.Alarm buzzer alerts for timing of additions.

Trub Filter

Temp Sensor

V1V2

Wort Returnfrom kettle

V6

V5

3.000 in

Temp. Sensor

Plate Chiller

V7V8

RO Water GeneratorV9

V8 controlled by Pressure Switch,

Tap Water In

4.5 Kw Water Heater

Safety Pressure Relief Valve

Strike Water & Sparge Water Htr

Temp Sensor

Whirlpool Nozzle

To Fermenter

Two - 3.5 Kw Heating Elements,controlled by BT.

SS Mini Valveused to bleedPump

V4 V3

Trub Filter

Temp Sensor

V1V2

Wort Returnfrom kettle

V6

V5

3 in

Temp. Sensor

Plate Chiller

V7V8

RO Water GeneratorV9

V8 controlled by Pressure Switch,

Tap Water In

4.5 Kw Water Heater

Safety Pressure Relief Valve

Strike Water & Sparge Water Htr

Temp Sensor

Whirlpool Nozzle

Step 5: Start Whirlpooling Hot WortValves V3 & V5 open. All others closed.Timed

To Fermenter

Two - 3.5 Kw Heating Elements,controlled by BT.

SS Mini Valveused to bleedPump

V4 V3

Trub Filter

Temp Sensor

V1V2

Wort Returnfrom kettle

V6

V5

3 inTemp. Sensor

Plate Chiller

V7V8

RO Water GeneratorV9

V8 controlled by Pressure Switch,

Tap Water In

4.5 Kw Water Heater

Safety Pressure Relief Valve

Strike Water & Sparge Water Htr

Temp Sensor

Whirlpool Nozzle

Step 6: Start Chilling & continue WhirlpoolingValves V1, V5 & V7 open. All others closed.Temp controlled, close all valves @ 75 degrees F.

To Fermenter

Two - 3.5 Kw Heating Elements,controlled by BT.

SS Mini Valveused to bleedPump

V4 V3

From Trub Filter to Plate Chiller to V7

Trub Filter

Temp Sensor

V1V2

Wort Returnfrom kettle

V6

V5

3 in

Temp. Sensor

Plate Chiller

Temp Sensor

V7V8

RO Water GeneratorV9

V8 controlled by Pressure Switch,

Tap Water In

4.5 Kw Water Heater

Safety Pressure Relief Valve

Strike Water & Sparge Water Htr

Temp Sensor

Whirlpool Nozzle

Step 7: Transfer to Fermenter.Valves V1, V5 & V8 open. All others closed.Manually stop transfer when sufficient Worthas been transferred.

To Fermenter

Two - 3.5 Kw Heating Elements,controlled by BT.

SS Mini Valveused to bleedPump

V4 V3

From Trub Filter to PlateChiller to V7 - V8 Header