Page 1: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

SIP POU cooler Installation Guide

Page 2: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Getting Started

The SIP 2000 can be easily installed in

most POU coolers in just a few minutes.

The tools needed are a drill, a 3/16” and a ¼” drill bit, a screw driver or nut

driver to remove the cabinet screws, and a small pair of diagonal

cutting pliers.

Page 3: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Unpacking the SIP 2000

The SIP 2000 comes packaged like this.

And inside you will find the SIP 2000 and

everything needed for a professional installation.

Page 4: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Here is what comes in the package

Test Button and Harness Air Pump Cooler Patch Cord Power Cord External Indicator Light Zip Ties Spare Fuse

Air Filter Air diffuser Air Hose Insulation Foam Down Tube Main Unit

Note: not all parts are used in many installations and included parts may vary in appearance.

Page 5: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Optional Feature (if not using skip to slide 10)

Install the Service LightIn order to install the external indicator light the cabinet must be removed

After removing the cabinet locate where you want to install the service light. We are going to

install our light in the front, top, center of the cabinet

Drill a 3/16” hole where the External indicator light will be installed

Page 6: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

External Indicator Light Installation

Be sure to remove any burrs from the hole. Press light into hole being careful not to break the wires

The installed light should look like this

Make sure the light is firmly inserted and protrudes from the front of the cabinet

Page 7: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Now is the time to install the Service Light guide label. Place over the External Indicator Light on the outside of the cabinet.

The external indicator light goes here

Page 8: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Now replace the cabinet. Be careful not to pinch the external indicator light wire.

Page 9: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

• The finished look

Page 10: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Locating the Down Rod

Most POU coolers have an in-reservoir float system that is covered with a bonnet like this model.

Careful thought must be given to the placement of the downrod. The downrod must not interfere with the float action and must fit under the bonnet. Additionally the baffle may need to be notched in order to accommodate the downrod reaching the bottom of the reservoir.

Our placement will be at the back of the float plate.

Be certain that the Downrod will not interfere with float.

The manufacturer has already notched the baffle for us.

Page 11: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Installing the Downrod

Locate the spot where the downrod will enter the reservoir.

Drill a 3/16” hole and remove any burrs that the drill left behind.

Insert silicone grommet from the top of the float plate into the new hole.

Make sure the silicone grommet is fully inserted into the hole.

Page 12: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Installing the Downrod

Insert Downrod through Grommet Push Downrod 90° elbow meets Grommet

The completed Downrod should look like this

Attach Air Diffuser to Downrod using a 1” section of Tubing.

Page 13: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Installing the Downrod

Install finished assembly into reservoir making sure to line up

Downrod in baffle

Downrod may need to be adjusted up or down in order to position air diffuser near

bottom of reservoir.

Downrod installed

Page 14: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Installing Check Valve & Air Filter

The check valve must be installed with the air flow pointing away from the main unit and toward the reservoir.

Cut a 5” section of hose and attach it to downrod as shown.

Attach other end of downrod hose to the top of the check valve

Attach the remaining long section of hose to the bottom of the check valve.

The air filter can be placed in-line between the air pump and the SIP unit or it can be positioned in-line between the SIP unit and the check valve . (servicing convenience would determine location)

Page 15: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Finishing Up

Now it’s time to mount the Main Control Box. Us the supplied zip ties to secure unit to the condenser. Remember to leave access to other cooler components such as the hot tank on / off switch and the cold thermostat.

Attach the loose hose from the check valve to the top outlet of the Main Control Box.

Attach hose from Air Pump outlet to bottom inlet of Main Control Box.

Mount Air Pump above or below the Main Control Box using zip ties provided.

Air filter can be located in-line between air pump and Main Control Box

Page 16: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Finishing Up

Use this diagram to connect all cords and plugs

Page 17: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

Finishing Up

Use remaining zip ties to secure hoses and cords.

One last check to make sure everything is properly connected.

Now is a good time to use the test button to make sure all components are operational.

Page 18: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

The Finished SIP 2000 Installation

Page 19: SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are

For More Information Contact

SIP Technologies LLC72070 Hwy 1077

Covington, LA 70433-0851(800) 655-4635(302) 655-6300

www.siptechnologies.com