six sigma right projects…right people…right structure...right results

10
Six Sigma Right Projects…Right People…Right structure...Right Results

Upload: tracy

Post on 11-Jan-2016

21 views

Category:

Documents


0 download

DESCRIPTION

Six Sigma Right Projects…Right People…Right structure...Right Results. What Is Six Sigma?. Distinction Between Measurement and Methodology: “Sigma” is a measurement scale upon which improvements can be gauged. “Six Sigma” is an overall methodology that drives business improvement. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Six Sigma  Right Projects…Right People…Right structure...Right Results

Six Sigma Right Projects…Right People…Right structure...Right Results

Page 2: Six Sigma  Right Projects…Right People…Right structure...Right Results

2

What Is Six Sigma?

Distinction Between Measurement and Methodology:

“Sigma”

is a measurement scale upon which improvements can be gauged.

“Six Sigma”

is an overall methodology that drives business improvement.

Page 3: Six Sigma  Right Projects…Right People…Right structure...Right Results

3

. . . a measure of “goodness”, using a universal measurement scale.

34

56

7

66810

6210

233

3.4

.02

Sigma

DPMO (Defects Per

Million Opportunitie

s)

Measurement

Page 4: Six Sigma  Right Projects…Right People…Right structure...Right Results

4

Six Sigma Methodology Is . . .

• An overall methodology that drives business improvement.

• A proven tool set for driving and achieving transformational change within an organization.

• A Continuous Improvement Process that focuses an organization on

Customer requirements,Process alignment,Analytical rigor,Timely execution.

Page 5: Six Sigma  Right Projects…Right People…Right structure...Right Results

5

DMAIC: Process Improvement Roadmap

1.0 Define

Opportunities

2.0 Measure

Performance

3.0 Analyze

Opportunity

4.0 Improve

Performance

5.0 Control

Performance

What is important

?

How are we

doing?

What is wrong?

What needs to be done?

How do we guarantee

performance?

The 6 Way

Page 6: Six Sigma  Right Projects…Right People…Right structure...Right Results

6

Structure to support Six Sigma

Master Black Belts

Team membersProcess owners

Finance

Executive sponsors

Green BeltsBlack Belts

Champions

Projects

Page 7: Six Sigma  Right Projects…Right People…Right structure...Right Results

7

• Pilot Program started in April 2003 Initiated by Head of Global Manufacturing.

• Mfg rollout started October 2003.

• Implemented in Sales & Marketing 1st Quarter 2004, with first BB / GB training in July 2004.

• Global Six Sigma Organization completed Mid 2004

Director of Quality & Continuous Improvement

Master Black Belt Americas

Manufacturing

Master Black Belt Asia Manufacturing

Master Black Belt Europe Sales &

Marketing

Master Black Belt Americas Sales &

Marketing

Six Sigma Backround in Ansell

Page 8: Six Sigma  Right Projects…Right People…Right structure...Right Results

8

Six Sigma in Europe this is…

“A Team of Project Leader”

Certified

Certified CertifiedCertified

Certified

Page 9: Six Sigma  Right Projects…Right People…Right structure...Right Results

9

Six Sigma in Europe this is…

17 open projects…

… + 6 projects closed successfully

4 Green belt certified…

…+ 1 Black Belt & 1 Master Black Belt

22 Peoples Green Belt Trained (including 7 Champion)

16 Peoples Trained to Basic Continuous improvement Tools

Every Division & Function involved or impacted by Six Sigma improvement project

A full alignment of projects with Balanced Scorecard…

Page 10: Six Sigma  Right Projects…Right People…Right structure...Right Results

10

Testimonial

Listen to a testimonial from

Stefan Vanderhasselt

Six Sigma Black Belt

http://www.anselleurope.com/ansell/media/Stefaan.mpg