ZXMW NR8250Digital Microwave SystemCommissioning Guide

Version 1.00

ZTE CORPORATIONNO. 55, Hi-tech Road South, ShenZhen, P.R.ChinaPostcode: 518057Tel: (86) 755 26771900Fax: (86) 755 26770801URL: http://ensupport.zte.com.cnE-mail: [email protected]

LEGAL INFORMATION

Copyright © 2010 ZTE CORPORATION.

The contents of this document are protected by copyright laws and international treaties. Any reproduction or distribution ofthis document or any portion of this document, in any form by any means, without the prior written consent of ZTE CORPO-RATION is prohibited. Additionally, the contents of this document are protected by contractual confidentiality obligations.

All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE CORPORATIONor of their respective owners.

This document is provided “as is”, and all express, implied, or statutory warranties, representations or conditions are dis-claimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose, title or non-in-fringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the use of or reliance on theinformation contained herein.

ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications covering the subjectmatter of this document. Except as expressly provided in any written license between ZTE CORPORATION and its licensee,the user of this document shall not acquire any license to the subject matter herein.

ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.

Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.

The ultimate right to interpret this product resides in ZTE CORPORATION.

Revision History

Revision No. Revision Date Revision Reason

R1.0 20100530 First edition

Serial Number: SJ-20100528084554-006

Contents

About This Manual............................................. I

Commissioning Preparation...............................1Preparing Documents...................................................... 1

Preparing Tools and Software ........................................... 1

Checking Configuration Conditions .................................... 2

Single Site Commissioning ................................3Testing Power Supply ...................................................... 3

Logging in to WEB CIT .................................................... 4

Configuration Data Query ................................................ 5

Querying Version Information....................................... 5

Querying Radio Link Configuration ................................ 5

Querying IP Information .............................................. 6

Querying Protection Information ................................... 7

Testing E1 Cable Connection ............................................ 7

Checking Transmission Power and Transmission

Frequency ............................................................. 8

Inter-Site Commissioning..................................9Adjusting Antennas at Both Ends ...................................... 9

Testing Inter-Site STM-1/4 Service ..................................10

Testing Inter-Site E1 Service...........................................11

Testing Inter-Site ETH Service.........................................11

Testing Inter-Site EOW Service........................................12

Testing 1+1 Changeover.................................................12

Testing SNCP Changeover ...............................................13

Testing 24-Hour Bit Error................................................13

Figures ............................................................15

Glossary ..........................................................17

Confidential and Proprietary Information of ZTE CORPORATION I

ZXMW NR8250 Commissioning Guide

This page is intentionally blank.

II Confidential and Proprietary Information of ZTE CORPORATION

About This Manual

Purpose This manual gives the commissioning instructions of ZXMWNR8250.

IntendedAudience

� System Engineer

� Planning Engineer

What Is in ThisManual

This manual contains the following chapters.

Chapter Description

Chapter 1 CommissioningPreparation

Introduces necessary preparationsbefore the commissioning ofNR8250.

Chapter 2 Single SiteCommissioning

Introduces the commissioninginstructions of NR8250 at one site.

Chapter 3 Inter-SiteCommissioning

Introduces the commissioninginstructions of NR8250 betweentwo sites.

Confidential and Proprietary Information of ZTE CORPORATION I

ZXMW NR8250 Commissioning Guide

This page is intentionally blank.

II Confidential and Proprietary Information of ZTE CORPORATION

C h a p t e r 1

CommissioningPreparation

Table of ContentsPreparing Documents.......................................................... 1Preparing Tools and Software ............................................... 1Checking Configuration Conditions ........................................ 2

Preparing DocumentsTechnical documents needed include project design documentsand commissioning guide documents.

Project design documents, such as,

� XX Network Planning Solution

� XX Project Design Solution

Commissioning guide documents, such as,

� ZXMW NR8250 Commissioning Guide

� ZXMW NR8250 Microwave Acceptance Test Record

Preparing Tools andSoftware

Tools andInstrumentsPreparation

Tools and instruments for system commissioning must pass autho-rized validity check and be prepared ahead of time. The followinglists tools and instruments commonly used.

� Tools: Philips screwdriver, flathead screwdriver, diagonal plier,sharp nose plier, adjustable spanner, electric iron, solder wire,soldering flux, insulating tape, horizontal ruler, coaxial self-loop cable, cable stripper, and cable crimper.

� Instruments: Error bit tester, multimeter, and compass.

� Others: Notebook PC, straight Ethernet cable or cross-connectEthernet cable.

Confidential and Proprietary Information of ZTE CORPORATION 1

ZXMW NR8250 Commissioning Guide

SoftwarePreparation

According to actual function requirement and performance infor-mation, if it is necessary to upgrade IDU software, prepare ap-propriate software version to ensure normal commissioning andnormal running of the microwave equipment. All software ver-sions used actually must be the release versions that have passedtest.

Checking ConfigurationConditions

Short Description Before single-site commissioning and inter-site commissioning, itis necessary to check whether the equipment satisfies the com-missioning conditions.

CheckingSingle-Site

CommissioningConditions

The checking items involve the microwave equipment as well asthe notebook PC. The single-site commissioning conditions arelisted as below:

� The hardware installation for the equipment is completed andpasses the installation check.

� The power supply of the equipment is ready.

� Service signal cables connecting other equipments are laid incorrect positions.

2 Confidential and Proprietary Information of ZTE CORPORATION

C h a p t e r 2

Single Site Commissioning

Table of ContentsTesting Power Supply .......................................................... 3Logging in to WEB CIT ........................................................ 4Configuration Data Query .................................................... 5Testing E1 Cable Connection ................................................ 7Checking Transmission Power and Transmission Fre-quency.............................................................................. 8

Testing Power SupplyPrerequisites � The hardware installation for the equipment is completed and

passes the installation check.

� The power supply is available, and the fuse capacity satisfiesthe requirement.

� The power supply is turned off.

Context Power supply test includes checking before power-on and afterpower-on.

Steps 1. Before the equipment is powered on, make sure that the powersupply's voltage is normal and the electrodes are correct.

2. Check whether the switch of the equipment's power supply isin OFF status.

3. Check whether the antenna feeder is installed correctly.

4. Check whether the cabinet, the antenna feeder, and the light-ning protector are grounded correctly.

5. Make the equipment power on: Firstly, make sure that thepower supply of all modules are turned off; secondly, put thepower supply's switch of the power supply cabinet to "ON", andput the power supply's switch of IDU to "ON".

6. Check the power supply of IDU: After the equipment is poweredon, check the power supply of IDU by observing whether IDU'spower supply indicator is in normal working status (i.e. greenand constantly ON).

7. Check the power supply of fan module: After the equipment ispowered on, the fan module of IDU should automatically start.

Confidential and Proprietary Information of ZTE CORPORATION 3

ZXMW NR8250 Commissioning Guide

Put a small strip of paper at the fan's wind outlet. If the paperflaps, it indicates that the fan is working normally.

END OF STEPS

Logging in to WEB CITPrerequisites The equipment is powered on.

Context The notebook PC is accessed to WEB CIT through Ethernet cable.Check whether the notebook PC can be accessed to WEB CIT nor-mally. Such checking guarantees subsequent data configurationand other commissioning items that use WEB CIT.

Steps 1. Obtain the IP address of IDU. The DHCP service is enabled forIDU upon delivery, and user can obtain the IP address of IDUwith that feature. Perform the following operations to obtainthe IP address of IDU.

i. Use straight Ethernet cable or cross-connect Ethernet ca-ble to connect the notebook PC with IDU. Right-click MyNetwork Places on the desktop of the notebook PC, andclick Properties from the pop-up menu. The network con-nection window appears.

ii. Double-click the local connection icon, and the local con-nection state window appears. In the Local Area Connec-tion Properties dialog box, select the radio button Obtainan IP address automatically.

iii. Open the command line window, and input the ipconfig/renew command. This command is used to get a newIP address from DHCP server. Press Enter key, as shownin Figure 1. Now, the notebook PC successfully gets theIP address allocated by IDU, and can access the IDU, asshown in Figure 1.

FIGURE 1 OBTAINING IP ADDRESS OF IDU

iv. Input the ipconfig /all command and press Enter key.The IP address of the notebook PC is displayed, as shownin Figure 2. For example, the notebook PC's IP addressin this example is 10.61.121.120, and IDU's IP address is10.61.121.249, as shown in Figure 2.

4 Confidential and Proprietary Information of ZTE CORPORATION

Chapter 2 Single Site Commissioning

FIGURE 2 DISPLAYING IP ADDRESS

2. Perform the following operations to log in to WEB CIT.

i. Open Internet Explorer, and input the IP address of IDU.

ii. Upon delivery, a default user "admin" with the password"admin" is set in the user right setting of WEB CIT. Inputadmin in User Name, and input admin in Password.

iii. Click the LOGON button to log in to the WEB CIT system.

END OF STEPS

Configuration Data QueryQuerying Version Information

Prerequisites Documents that data configuration requires are available.

Steps 1. In System Maintain > VMP Maintain, check the softwareversion.

2. Make sure that the software version is the release version.

END OF STEPS

Querying Radio Link Configuration

Steps 1. Click Configure > Link Configure in the left menu bar, andselect the transmission unit on the right, as shown in Figure 3.

Confidential and Proprietary Information of ZTE CORPORATION 5

ZXMW NR8250 Commissioning Guide

FIGURE 3 QUERYING RADIO LINK CONFIGURATION

2. Query the working mode of each transmission unit of radio link.

END OF STEPS

Querying IP Information

Prerequisites Documents that data configuration requires are available.

Steps 1. Click Configure > System Configure in the left menu bar, asshown in Figure 4.

FIGURE 4 QUERYING IP INFORMATION

2. Query the equipment's IP address, subnet mask, and defaultgateway in the right pane.

3. Make sure that Device Status is Open State.

END OF STEPS

6 Confidential and Proprietary Information of ZTE CORPORATION

Chapter 2 Single Site Commissioning

Querying Protection Information

Prerequisites Documents that data configuration requires are available.

Context The system supports the following protection configurations: noprotection, hot backup + space diversity, and frequency diversity.

Steps 1. Click Configure > Link Configure in the left menu bar, andselect Protect Type in Set Protect Parameter on the right,as shown in Figure 5.

FIGURE 5 CONFIGURING PROTECTION TYPE

END OF STEPS

Testing E1 CableConnection

Short Description Whether the equipment and E1 cables are connected correctly canbe decided by testing E1 cable connection. Also, this test helpsfind out whether the E1 cable is normal.

Prerequisites � The equipment is configured with E1 interface board.

� The service data configuration is completed.

Steps 1. Connect E1 interface with the error bit tester. The error bittester displays the AIS alarm.

2. Set the corresponding E1 interface as terminal loopbackthrough WEB CIT.

3. Observe the error bit tester, and the AIS alarm should disap-pear.

4. Cancel the setting of E1 interface's terminal loopback throughWEB CIT.

Confidential and Proprietary Information of ZTE CORPORATION 7

ZXMW NR8250 Commissioning Guide

5. Observe the error bit tester, and the AIS alarm should be re-ported.

6. Repeat Step 1 ~ Step 5 to test other E1 interfaces.

END OF STEPS

Checking TransmissionPower and TransmissionFrequency

Short Description This operation checks whether ODU's transmission power andtransmission frequency are within specified range.

Prerequisites The service data configuration is completed.

Steps 1. Click Configure > Link Configure in the left menu bar, asshown in Figure 6.

FIGURE 6 CHECKING RADIO LINK CONFIGURATION

2. If ODU's transmission power and transmission frequency arewithin specified range, then continue subsequent operations;otherwise, reconfigure the data to ensure that ODU's trans-mission power and transmission frequency are within specifiedrange.

END OF STEPS

8 Confidential and Proprietary Information of ZTE CORPORATION

C h a p t e r 3

Inter-Site Commissioning

Table of ContentsAdjusting Antennas at Both Ends .......................................... 9Testing Inter-Site STM-1/4 Service ......................................10Testing Inter-Site E1 Service...............................................11Testing Inter-Site ETH Service.............................................11Testing Inter-Site EOW Service............................................12Testing 1+1 Changeover.....................................................12Testing SNCP Changeover...................................................13Testing 24-Hour Bit Error....................................................13

Adjusting Antennas at BothEnds

Short Description Adjusting antennas at both ends is the most important testing itemin inter-site commissioning. This adjustment directly influencesthe microwave link's performance.

Prerequisites � The single site commissioning for microwave equipments atboth ends of the microwave link has been completed.

� During the commissioning process, the weather is fine betweenthe two sites, without rain, snow, or fog.

� The actual conditions and antenna commissioning personnel allsatisfy the requirement for working at high altitudes.

Steps 1. If the distance between the two sites is long (larger than 2km), then set antennas at both ends horizontally. If the dis-tance between the two sites is short, then adjust the antenna'sdowntilt within a small range according to actual condition.

2. Connect the multimeter with the local ODU's BNC port cor-rectly.

3. Adjust the antenna's horizontal position: Fix the remote an-tenna, measure the voltage at BNC port with the multimeter;rotate the antenna within a large range in horizontal direc-tion, and make sure that at least three peak signals of BNC arescanned within the rotating range, of which the middle one hasthe highest voltage.

Confidential and Proprietary Information of ZTE CORPORATION 9

ZXMW NR8250 Commissioning Guide

4. Adjust the antenna's downtilt: Adjust the antenna's downtilt ateach position when BNC port has the peak volage to make thevoltage at BNC port reach the highest value within the scanningrange. Adjust the antenna to the position when BNC port hasthe highest voltage, and fix the local antenna. When tighteningthe antenna, keep the voltage at BNC port to be the highestvalue.

5. Adjust the remote antenna. Make the receiving level at theremote end to have the largest value, and fix the remote an-tenna.

6. Repeat the above steps for 2 ~ 4 times to make the receivinglevel at both the local end and the remote end have the largestvalue. Fix antennas at both ends.

7. Use the multimeter to test voltage at BNC port at both ends.Read the current receiving power according to voltage at BNCport of ODU at both ends and the Received Signal Level (RS)curve.

8. Fasten all screws of the antenna.

END OF STEPS

Testing Inter-Site STM-1/4Service

Short Description If there is STM-1/4 service between two sites, the service avail-ability can be verified by testing STM-1 service.

Prerequisites � The task of adjusting antennas at both ends is completed.

� There is STM-1/4 service between two sites.

Steps 1. At the local equipment side, set one STM-1/4 port as innerloopback. Use the error bit tester to test whether the port isnormal. Cancel the setting of terminal loopback after the testis completed.

2. At the opposite equipment side, set one STM-1/4 port as innerloopback. Use the error bit tester to test whether the port isnormal. Cancel the setting of terminal loopback after the testis completed.

3. Repeat the above steps to test other STM-1/R ports at the localend and the opposite end respectively.

END OF STEPS

10 Confidential and Proprietary Information of ZTE CORPORATION

Chapter 3 Inter-Site Commissioning

Testing Inter-Site E1 ServiceShort Description If there is E1 service between two sites, the service availability can

be verified by testing E1 service.

Prerequisites � The task of adjusting antennas at both ends is completed.

� There is E1 service between two sites.

Steps 1. At the local equipment side, set one E1 port as inner loopback.Use the error bit tester to test whether the port is normal. Can-cel the setting of terminal loopback after the test is completed.

2. At the opposite equipment side, set one E1 port as inner loop-back. Use the error bit tester to test whether the port is nor-mal. Cancel the setting of terminal loopback after the test iscompleted.

3. Repeat the above steps to test other E1 ports at the local endand the opposite end respectively.

END OF STEPS

Testing Inter-Site ETHService

Short Description If there is Ethernet service between two sites, the service avail-ability can be verified by testing Ethernet service.

Prerequisites The Ethernet service is configured between two sites.

Steps 1. Use cross-connect Ethernet cable to connect a port of Ethernetservice at the local end with a notebook PC A.

2. Use cross-connect Ethernet cable to connect a port of Ethernetservice at the opposite end with a notebook PC B.

3. Set the IP address for notebook PC A and notebook PC B, andmake sure that the two IP addresses are in the same networksegment.

4. In the MS-DOS window of notebook PC A, execute the follow-ing command: ping 192.168.1.102 -n 200 -l 2000. Here,192.168.1.102 is the IP address of notebook PC B.

5. After the ping command is executed, check the transceivingdata statistics. Normally, the statistics data should not indicateany packet loss. In other words, the following data should becontained: Lost = 0 (0% loss)

END OF STEPS

Confidential and Proprietary Information of ZTE CORPORATION 11

ZXMW NR8250 Commissioning Guide

Testing Inter-Site EOWService

Short Description This test is performed when the Engineering Order Wire (EOW)phone is installed at the site. It helps verify whether the EOWphone works normally.

Prerequisites � The task of adjusting antennas at both ends is completed.

� The EOW phone is installed correctly at the site.

� In WEB CIT system, make sure that the transmission unit isenabled in EOW service configuration.

Steps 1. Check whether the EOW phone is properly connected at theequipment at both ends.

2. Pick up the phone at the local end and dial the phone at theopposite end. Normally, the voice quality is good after the callis put through.

END OF STEPS

Testing 1+1 ChangeoverShort Description This test is performed when 1+1 protection is configured. It helps

verify whether the 1+1 changeover function is normal.

Prerequisites � The equipment is configured with Intermediate Frequency (IF)1+1 protection.

� The task of adjusting antennas at both ends is completed.

Steps 1. At the local equipment side, set one E1 port as inner loopback,and connect it with the error bit tester. The error bit testerdoes not have any alarm.

2. Make the active ODU power supply power off.

3. Check the bit error test result. The test result should be thatthe service is restored after being interrupted instantaneously.

4. After the changeover is completed, perform the bit error testfor 5 ~ 10 minutes. The test result should be that there is nobit error.

5. Make the active ODU power supply power on.

6. Cancel the setting of loopback.

END OF STEPS

12 Confidential and Proprietary Information of ZTE CORPORATION

Chapter 3 Inter-Site Commissioning

Testing SNCP ChangeoverShort Description This test is performed when SNCP protection is configured. It helps

verify whether the SNCP changeover function is normal.

Prerequisites � The equipment is configured with SNCP protection.

� The task of adjusting antennas at both ends is completed.

Steps 1. At the local equipment side, set one E1 port as inner loopback,and connect it with the error bit tester. The error bit testerdoes not have any alarm.

2. Disconnect the active transmission unit.

3. Check the bit error test result. The test result should be thatthe service is restored after being interrupted instantaneously.

4. After the changeover is completed, perform the bit error testfor another 5 ~ 10 minutes. The test result should be thatthere is no bit error.

5. Connect the active transmission unit.

6. Cancel the setting of loopback.

END OF STEPS

Testing 24-Hour Bit ErrorShort Description The test of 24-hour bit error helps verify whether the equipment

can assume a stable transmission service for a long term.

Prerequisites The task of adjusting antennas at both ends is completed.

Steps 1. At the local equipment side, set one E1 port as inner loopback,and connect it with the error bit tester.

2. Use the error bit tester to perform the 24-hour bit error test.

3. Record the test result. The test result should satisfy the designrequirement.

4. Cancel the setting of loopback.

5. Go on to test other E1 ports at the local end and the oppositeend.

END OF STEPS

Confidential and Proprietary Information of ZTE CORPORATION 13

ZXMW NR8250 Commissioning Guide

This page is intentionally blank.

14 Confidential and Proprietary Information of ZTE CORPORATION

Figures

Figure 1 Obtaining IP Address of IDU .................................... 4

Figure 2 Displaying IP Address ............................................. 5

Figure 3 Querying Radio Link Configuration ............................ 6

Figure 4 Querying IP Information.......................................... 6

Figure 5 Configuring Protection Type ..................................... 7

Figure 6 Checking Radio Link Configuration ............................ 8

Confidential and Proprietary Information of ZTE CORPORATION 15

ZXMW NR8250 Commissioning Guide

This page is intentionally blank.

16 Confidential and Proprietary Information of ZTE CORPORATION

Glossary

OSPF- Open Shortest Path First

Confidential and Proprietary Information of ZTE CORPORATION 17