sk nandy-oisd standards
TRANSCRIPT
-
8/19/2019 SK Nandy-OISD Standards
1/29
Ind
“OISD Standards on Design &
Operation Safety”
18.4.2015
Dy. General Manager (H,S E))
Pipelines Head Office , Noida
18.4.2015PLHO,HSE
Industry- Academia Workshop on
“S,H&E management in Oil Refinery &
Pipeline Transportation”
1
-
8/19/2019 SK Nandy-OISD Standards
2/29
Presentation Outline
1. Recent Incident in Pipeline
2. Regulations
3. About OISD
4. OISD Standard – 117 /116
5. OISD Standard - 118
6. OISD Standard - 141
18.4.2015PLHO,HSE 2
-
8/19/2019 SK Nandy-OISD Standards
3/29
18.4.2015PLHO,HSE 3
http://localhost/var/www/apps/conversion/tmp/scratch_5/Mumbai_%20Gas%20pipeline%20leakage%20causes%20fire%20at%20BPCL%20colony%20in%20Kurla.mp4
-
8/19/2019 SK Nandy-OISD Standards
4/29
18.4.2015PLHO,HSE 4
-
8/19/2019 SK Nandy-OISD Standards
5/29
Indian Regulatory System- Pipelines
Offshore Pipelines:
Single Points Mooring System and connected
Pipelines from / to onshore.
Pipelines from Field to platforms / onshorelocation.
On shore Pipeline system:
On land pipelines from the boundary limit of
installations including installations with orwithout storage facilities.
18.4.2015PLHO,HSE 5
-
8/19/2019 SK Nandy-OISD Standards
6/29
Regulatory Frame Work – OffshorePipelines
Petroleum and Natural GasRules, 1959
(PNG Rules)
Petroleum and Natural Gas(Safety in Offshore Operations)
Rules, 2008
Oilfields (Regulation and
Development) Act,1948(ORDA)
18.4.2015
MoP& NG assisted
by Director General
Hydrocarbons (DGH).OISD
PLHO,HSE 6
-
8/19/2019 SK Nandy-OISD Standards
7/29
1. Petroleum & Minerals Pipelines (Acquisition of Right ofUser in Land) Amendment Act’2011 (P&MP)
2. The Petroleum Act, 1934 The Petroleum Rules (Amendment), 2011
3. The Explosives Act,1884 Static & Mobile Pressure Vessels (Unfired) Rules, 1981
Gas Cylinder Rules, 2003
For 2 & 3- Chief Controller of Explosives, Petroleum & Explosives andSafety Organisation (PESO) is empowered to ensure compliance with theprovisions of these Rules.
4. The Electricity Act, 1910 Electricity Rules, 1976- compliance by CEA
5. Petroleum & Natural Gas Regulatory Act,2006
Compliance enforcement by PNGRB
18.4.2015PLHO,HSE 7
-
8/19/2019 SK Nandy-OISD Standards
8/29
Factories Act’1948.
DG, Factory Advisory & Labour InstituteChief Inspector of Factories
Contract Labour Act’1970. State Lab. Commissioner
The Environment (Protection) Act, 1986The Environment (Protection) Rules, 1986Manufacturing, Storage & Import of Hazardous Chemical
Rules(MSIHC), 1989Hazardous Waste (Management and Handling) Rules,
1989The Chemical Accidents (Emergency Planning,
Preparedness and Response) Rules, 1996Respective State Pollution Control Boards are empowered
to ensure compliance with the provisions of these Rules.
18.4.2015PLHO,HSE 8
-
8/19/2019 SK Nandy-OISD Standards
9/2918.4.2015PLHO,HSE 9
-
8/19/2019 SK Nandy-OISD Standards
10/2918.4.2015
OISD Standards OISD has so far developed and issued 117
standards for implementations by the industry.
This include 5 new standards approved in
recent safety council meeting of MoP&NG on
9.12.2014 (234,235,236 ,237 and 244)
Out of 117, more than 30 Standards are
related to pipelines. Out of the 117 Standards, 11 Standards are
Statutory in nature
Out of the 11 statutory Standards, 6 standards
form part of Petroleum Rule 2002 (Amended in2011): OISD-std-105,116,117,118,141 and 156
5 Standards are included in Gas Cylinder
Rules OISD-Std-144, 150, 169, 179 & 210
PLHO,HSE 10
-
8/19/2019 SK Nandy-OISD Standards
11/2918.4.2015
OISD Standards116 : Fire protections facilities for Petroleum Refineries
and Gas Processing Plants.
117: Fire protections facilities for Petroleum Depots,
Terminal, Pipeline Installations and Lube Oil
Insulations
118 : Layout for Oil and Gas Installation.
141 : Design & Const. & Inspection requirements for liquid
hydrocarbon pipelines .
156 : Fire protection for Port Terminals
192 : Safety Practices during construction
207 : Contractor Safety
214 : LPG Pipelines
226 : Natural Gas Transmission Pipelines and City
Gas Distribution Networks.
PLHO,HSE 11
-
8/19/2019 SK Nandy-OISD Standards
12/2918.4.2015
105 : Work Permit system
119-122: Pumps, compressors, prime movers129 : Inspection of Storage Tanks
130 : Inspection of Pipes, valves and fittings
135 : Inspection of loading and unloading Hoses.
139 : Offshore Pipelines & SPMs
140 : Inspection of Jetty Pipelines.
144 : LPG Installations
149 : Safety In Electrical System.150 :Design & Safety Requirement for LPG mounded
storage
169 : Guideline for small LPG botling plan
OISD Standards
PLHO,HSE 12
-
8/19/2019 SK Nandy-OISD Standards
13/2918.4.2015
179 : Safety requirement on compression, storage,
handling and refueling of Natural Gas foruse in automotive sector.
188 : Corrosion Monitoring of offshore & onshore
pipelines
195 : Gas Compressor stations & Terminal.
210 : Storage, handling and refueling of LPG for
automotive use.
233 : Non Piggable Pipeline
244 : Storage and handling of Petroleum products
at Depots and terminals including standalone
crude oil storage facilities.
OISD Standards
PLHO,HSE 13
-
8/19/2019 SK Nandy-OISD Standards
14/29
OISD –STD-116 :
Fire protections facilities for PetroleumRefineries and Gas Processing Plants.
OISD –STD-117 :Fire protections facilities for Petroleum
Depots, Terminal, Pipeline Installations
and Lube Oil Installations.
18.4.2015PLHO,HSE 14
-
8/19/2019 SK Nandy-OISD Standards
15/29
OISD-Std-117
Latest revised in July 2012
Minimum requirement of fire protection facilities
Fire water system, foam system, clean agent system,first aid, CO2, DCP, fire detection, alarm and
communication
Fire water system design- 2 major fire in case storage
is more than 30,000 kl(A+B+C), no requirement ifstorage is less than 1000 kl except AFS and Pipeline
installation
Fixed water spray system not required in case total
storage is less than 5000 kl and tank dia is upto 9 m
Rim seal fire protection system for all class ‘A’ floating
roof tanks
Cooling rate is 3 LPM / 1 LPM / m2 of tank shell area.
Pipeline pump station 10.2 LPM / m2 plus 144 kl/hr
18.4.2015PLHO,HSE 15
-
8/19/2019 SK Nandy-OISD Standards
16/29
OISD –STD-118
Layout for Oil & Gas Installation
18.4.2015PLHO,HSE 16
-
8/19/2019 SK Nandy-OISD Standards
17/29
OISD-Std-118
Latest revised in July 2008
Minimum requirement of layout within the plant
boundary for refineries, Oil & gas production andprocessing plants, LPG facilities, Petroleum storage,
pipeline installation, Marketing depots and terminals,
Aviation storage facilities
Control room should be located in non hazardous area
Minimum separation distance specified and given in
Table form
In a dyke aggregate capacity for group of tanks (fixed
roof) should not be more than 60,000 KL
In a dyke aggregate capacity for group of tanks
(floating roof) should not be more than 1,20,000 KL
18.4.2015PLHO,HSE 17
-
8/19/2019 SK Nandy-OISD Standards
18/29
OISD –STD-141 :
Design, Construction and inspection
requirements for Cross country Liquid
Hydrocarbon Pipelines.
Standard is Statutory as per Petroleum Rule ‘2002.
18.4.2015PLHO,HSE 18
-
8/19/2019 SK Nandy-OISD Standards
19/29
DOES NOT COVER WELL FLOW PIPELINES.
18.4.2015PLHO,HSE 19
-
8/19/2019 SK Nandy-OISD Standards
20/29
Design Factor
(i) Main Pipelines: : 0.72
(ii) Road Xing Crossings : 0.72 #
without casing
(iii) Rail : 0.60
(iv) Pipelines on bridges : 0.50
(v) River Crossings : 0.72 #
(Vi) Stations piping . : 0.72
# At these locations, pipes of heavier wall thicknessshall be used.
Min. Pipe Dia – 4” NB / Wall thickness- 0.219” (5.5 mm)
Max . D / t Ratio : 100.
18.4.2015PLHO,HSE 20
-
8/19/2019 SK Nandy-OISD Standards
21/29
# - Safety distances as per OISD-STD-118.
* For other station facilities not covered in the above shall be governed byOISD- STD- 118.
X - Any distance suitable for constructional and operation convenience.
- At pipeline’s loop line terminal location, distance between scraper barrel
and compound wall shall not be less than 5 meter.
S. No From / To 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Booster/Mainl Pump shed x 16 x 16 30 30 30 16 30 30 x x x x
2 SL / SR Receiver 16 x x 16 30 16 16 16 30 16 x x x x
3 Filtrs / Meter / Sampling
point / Sump Tanks
x
x
x
16
30
16
30
16
30
16
x
x
x
x
4 CRoom UPS / SCADA-
Telecom/ Office building16 16 16 x 16 16 x x 30 x 16 16 16 16
5 Fire Pump House/ Fire
water storage tanks. 30 30 30 16 x 12 x 16 60 x x 30 30 30
6 Compound wall 30 16 16 16 12 x x 6 16 x 5 16 16 16
7 Elect Substation,/ Switch
Yard / Transformers 30 16 30 x x x x x # # 16 30 30 30
8 MC / PC Centre/VFD 16 16 16 x 16 6 x x # # 16 16 30 30
9 API Oil Water Separators
(open type)
30
30
30
30
60
16
#
#
x
#
x
30
30
x
10 Service Building(Stores /
Amenities) 30 16 16 x x x # # # x 16 16 16 16
11 Station Block Valves x x x 16 x 5 16 16 x 16 x x x x
12 Metering System x x x 16 30 16 30 16 30 16 x x x x
13 Sump tank (U/G) x x x 16 30 16 30 30 30 16 x x x x
14 API Separator (closed type) x x x 16 30 16 30 30 x 16 x x x x
18.4.2015PLHO,HSE 21
-
8/19/2019 SK Nandy-OISD Standards
22/29
SCADA including leak detection system for pipeline length
of 50 km and above or pipeline having line fill 5000 kl and
above (CL 5.3.5)
3 m + 0.6 m CC high compound wall for all installation.
CCTV camera / Intrusion alarm.
Max. spacing between SV station- 50 km
Pigging facilities for 10 km and above .
Safety Instrumentation system for Pump, Motor & Engines.
Clause 6.2.5.1
Low suction / High Discharge Pressure
Tripping of Pump at No flow / less than MCF
High Casing temp/ bearing temp
Emergency Exit gate at all Station.
18.4.2015PLHO,HSE 22
-
8/19/2019 SK Nandy-OISD Standards
23/29
• PSV setting Operating pressure + 10or MAOP+ 2 Kg/cm2.
• Corrosion Control Requirements
• Cathdic Protection system.
• Requirement of Electrical bonding.
• Pressure limiting device TRVs / SRVs
• Dedicated communication system.
18.4.2015PLHO,HSE 23
-
8/19/2019 SK Nandy-OISD Standards
24/29
Storage Tanks at delivery terminals .
High, High-High level alarm in PLC
The audio visual alarm at local panel
and the pipeline control room.
Pipeline delivery MOV / ROVs shall
close on actuation of High-High level
alarm.
Low Pressure Protection System
18.4.2015PLHO,HSE 24
-
8/19/2019 SK Nandy-OISD Standards
25/29
• No dwelling with 15 m of pipeline.
• No blasting activity allowed within 15 m ofpipeline.
• 15 m from edge of highway when laid parallel tohighway.
• 5 Mtr. Horizontal Sep. Distance between HTcable and pipeline. 3 Mtr for Transmission Tower
footings.
• Pipeline laid through populated area shall havehigher wall thickness. In high consequence area
opr pr. not more than 40 SMYS.
18.4.2015PLHO,HSE 25
-
8/19/2019 SK Nandy-OISD Standards
26/29
S.N. Locations Minimum
Cover (m)
i) Agricultural, limited or no humanactivity, Industrial, commercial and
residential area
1.2
1.0(Rocky)
ii) Minor Water Crossing 1.5
1.0 (
Rocky)
iii) HDD Below scour 2.5
iv) HDD Canal below bed 4.0
v) Major river crossings (below scour ) 2.5
vi) River with rocky bed (below scour ) 1.0
vii) Marshy Land / Creek area 1.5
viii) Cased/Uncased road crossing 1.2
ix) Railway crossing 1.7
-
8/19/2019 SK Nandy-OISD Standards
27/29
• Pipe Cut piece of not less than 2 m not permitted.
• Allowed dent size in pipe 5 mm (for 12” and 2for more than 12” OD
• Hydro testing - 1.25 x Design Pr for 24 Hrs.
• Station piping 1.25 x Design Pr. For 4 Hrs.
• Acceptable criteria for Pr testing
• Leak Test for station piping.
• EGP for Pipeline after Hyd. Testing.
• Preservation of pipeline in case commissioningdelayed beyond 6 months.
• Post Commissioning Coating surveys.
18.4.2015PLHO,HSE 27
-
8/19/2019 SK Nandy-OISD Standards
28/29
• Line Patrolling 2 times a week, 1 in a year byofficers.
• Pigging Crude Oil 1 in qtr, ATF- 1 in Year,Other 1 in 6 months.
• IPS 1 in 10 Years.
• Coating Survey 1 in 5 Years.
• Non Piggable Pipeline Hydro testing 1 in 5years for 24 hrs.
• UT measurement Sour crude / product lineevery 3 years. Sweet Crude / product- every 4
years.
18.4.2015PLHO,HSE 28
-
8/19/2019 SK Nandy-OISD Standards
29/29
THANK
YOU18 4 2015