    “OISD Standards on Design &

    Operation Safety” 

    18.4.2015 

    Dy. General Manager (H,S E))

     

    Pipelines Head Office , Noida

    18.4.2015PLHO,HSE

    Industry- Academia Workshop on

    “S,H&E management in Oil Refinery &

    Pipeline Transportation” 

    1

  • 8/19/2019 SK Nandy-OISD Standards

    2/29

    Presentation Outline

    1. Recent Incident in Pipeline

    2. Regulations 

    3. About OISD

    4. OISD Standard – 117 /116

    5. OISD Standard - 118

    6. OISD Standard - 141

    18.4.2015PLHO,HSE 2

  • 8/19/2019 SK Nandy-OISD Standards

    3/29

    18.4.2015PLHO,HSE 3

    http://localhost/var/www/apps/conversion/tmp/scratch_5/Mumbai_%20Gas%20pipeline%20leakage%20causes%20fire%20at%20BPCL%20colony%20in%20Kurla.mp4

  • 8/19/2019 SK Nandy-OISD Standards

    4/29

    18.4.2015PLHO,HSE 4

  • 8/19/2019 SK Nandy-OISD Standards

    5/29

    Indian Regulatory System- Pipelines

    Offshore Pipelines:

    Single Points Mooring System and connected

    Pipelines from / to onshore.

    Pipelines from Field to platforms / onshorelocation.

    On shore Pipeline system:

    On land pipelines from the boundary limit of

    installations including installations with orwithout storage facilities.

    18.4.2015PLHO,HSE 5

  • 8/19/2019 SK Nandy-OISD Standards

    6/29

    Regulatory Frame Work – OffshorePipelines

    Petroleum and Natural GasRules, 1959

    (PNG Rules)

    Petroleum and Natural Gas(Safety in Offshore Operations)

    Rules, 2008

    Oilfields (Regulation and

    Development) Act,1948(ORDA)

    18.4.2015

    MoP& NG assisted

    by Director General

    Hydrocarbons (DGH).OISD

    PLHO,HSE 6

  • 8/19/2019 SK Nandy-OISD Standards

    7/29

    1. Petroleum & Minerals Pipelines (Acquisition of Right ofUser in Land) Amendment Act’2011 (P&MP)

    2. The Petroleum Act, 1934   The Petroleum Rules (Amendment), 2011

    3. The Explosives Act,1884 Static & Mobile Pressure Vessels (Unfired) Rules, 1981

    Gas Cylinder Rules, 2003

    For 2 & 3- Chief Controller of Explosives, Petroleum & Explosives andSafety Organisation (PESO) is empowered to ensure compliance with theprovisions of these Rules.

    4. The Electricity Act, 1910 Electricity Rules, 1976- compliance by CEA

    5. Petroleum & Natural Gas Regulatory Act,2006

    Compliance enforcement by PNGRB

    18.4.2015PLHO,HSE 7

  • 8/19/2019 SK Nandy-OISD Standards

    8/29

    Factories Act’1948. 

    DG, Factory Advisory & Labour InstituteChief Inspector of Factories

    Contract Labour Act’1970. State Lab. Commissioner

    The Environment (Protection) Act, 1986The Environment (Protection) Rules, 1986Manufacturing, Storage & Import of Hazardous Chemical

    Rules(MSIHC), 1989Hazardous Waste (Management and Handling) Rules,

    1989The Chemical Accidents (Emergency Planning,

    Preparedness and Response) Rules, 1996Respective State Pollution Control Boards are empowered

    to ensure compliance with the provisions of these Rules.

    18.4.2015PLHO,HSE 8

  • 8/19/2019 SK Nandy-OISD Standards

    9/2918.4.2015PLHO,HSE 9

  • 8/19/2019 SK Nandy-OISD Standards

    10/2918.4.2015

    OISD Standards OISD has so far developed and issued 117

    standards for implementations by the industry.

    This include 5 new standards approved in

    recent safety council meeting of MoP&NG on

    9.12.2014 (234,235,236 ,237 and 244)

    Out of 117, more than 30 Standards are

    related to pipelines. Out of the 117 Standards, 11 Standards are

    Statutory in nature

    Out of the 11 statutory Standards, 6 standards

    form part of Petroleum Rule 2002 (Amended in2011): OISD-std-105,116,117,118,141 and 156

    5 Standards are included in Gas Cylinder

    Rules OISD-Std-144, 150, 169, 179 & 210 

    PLHO,HSE 10

  • 8/19/2019 SK Nandy-OISD Standards

    11/2918.4.2015

    OISD Standards116 : Fire protections facilities for Petroleum Refineries

    and Gas Processing Plants. 

    117: Fire protections facilities for Petroleum Depots,

    Terminal, Pipeline Installations and Lube Oil

    Insulations

    118 : Layout for Oil and Gas Installation.

    141 : Design & Const. & Inspection requirements for liquid

    hydrocarbon pipelines .

    156 : Fire protection for Port Terminals

    192 : Safety Practices during construction

    207 : Contractor Safety

    214 : LPG Pipelines

    226 : Natural Gas Transmission Pipelines and City

    Gas Distribution Networks. 

    PLHO,HSE 11

  • 8/19/2019 SK Nandy-OISD Standards

    12/2918.4.2015

    105 : Work Permit system

    119-122: Pumps, compressors, prime movers129 : Inspection of Storage Tanks

    130 : Inspection of Pipes, valves and fittings

    135 : Inspection of loading and unloading Hoses.

    139 : Offshore Pipelines & SPMs

    140 : Inspection of Jetty Pipelines.

    144 : LPG Installations

    149 : Safety In Electrical System.150 :Design & Safety Requirement for LPG mounded

    storage

    169 : Guideline for small LPG botling plan 

    OISD Standards

    PLHO,HSE 12

  • 8/19/2019 SK Nandy-OISD Standards

    13/2918.4.2015

    179 : Safety requirement on compression, storage,

    handling and refueling of Natural Gas foruse in automotive sector.

    188 : Corrosion Monitoring of offshore & onshore

    pipelines

    195 : Gas Compressor stations & Terminal. 

    210 : Storage, handling and refueling of LPG for

    automotive use.

    233 : Non Piggable Pipeline

    244 : Storage and handling of Petroleum products

    at Depots and terminals including standalone

    crude oil storage facilities. 

    OISD Standards

    PLHO,HSE 13

  • 8/19/2019 SK Nandy-OISD Standards

    14/29

     

    OISD –STD-116 :

    Fire protections facilities for PetroleumRefineries and Gas Processing Plants.

    OISD –STD-117 :Fire protections facilities for Petroleum

    Depots, Terminal, Pipeline Installations

    and Lube Oil Installations.

    18.4.2015PLHO,HSE 14

  • 8/19/2019 SK Nandy-OISD Standards

    15/29

    OISD-Std-117

    Latest revised in July 2012

    Minimum requirement of fire protection facilities

    Fire water system, foam system, clean agent system,first aid, CO2, DCP, fire detection, alarm and

    communication

    Fire water system design- 2 major fire in case storage

    is more than 30,000 kl(A+B+C), no requirement ifstorage is less than 1000 kl except AFS and Pipeline

    installation

    Fixed water spray system not required in case total

    storage is less than 5000 kl and tank dia is upto 9 m

    Rim seal fire protection system for all class ‘A’ floating

    roof tanks

    Cooling rate is 3 LPM / 1 LPM / m2 of tank shell area.

    Pipeline pump station 10.2 LPM / m2 plus 144 kl/hr  

    18.4.2015PLHO,HSE 15

  • 8/19/2019 SK Nandy-OISD Standards

    16/29

     

    OISD –STD-118

    Layout for Oil & Gas Installation

    18.4.2015PLHO,HSE 16

  • 8/19/2019 SK Nandy-OISD Standards

    17/29

    OISD-Std-118

    Latest revised in July 2008

    Minimum requirement of layout within the plant

    boundary for refineries, Oil & gas production andprocessing plants, LPG facilities, Petroleum storage,

    pipeline installation, Marketing depots and terminals,

    Aviation storage facilities

    Control room should be located in non hazardous area

    Minimum separation distance specified and given in

    Table form

    In a dyke aggregate capacity for group of tanks (fixed

    roof) should not be more than 60,000 KL

    In a dyke aggregate capacity for group of tanks

    (floating roof) should not be more than 1,20,000 KL

    18.4.2015PLHO,HSE 17

  • 8/19/2019 SK Nandy-OISD Standards

    18/29

     

    OISD –STD-141 :

    Design, Construction and inspection

    requirements for Cross country Liquid

    Hydrocarbon Pipelines.

    Standard is Statutory as per Petroleum Rule ‘2002. 

    18.4.2015PLHO,HSE 18

  • 8/19/2019 SK Nandy-OISD Standards

    19/29

    DOES NOT COVER WELL FLOW PIPELINES.

    18.4.2015PLHO,HSE 19

  • 8/19/2019 SK Nandy-OISD Standards

    20/29

    Design Factor

    (i) Main Pipelines: : 0.72

    (ii) Road Xing Crossings : 0.72 # 

    without casing

    (iii) Rail : 0.60

    (iv) Pipelines on bridges : 0.50

    (v) River Crossings : 0.72 # 

    (Vi) Stations piping . : 0.72

    # At these locations, pipes of heavier wall thicknessshall be used.

     Min. Pipe Dia –  4” NB / Wall thickness- 0.219” (5.5 mm) 

      Max . D / t Ratio : 100. 

    18.4.2015PLHO,HSE 20

  • 8/19/2019 SK Nandy-OISD Standards

    21/29

    # - Safety distances as per OISD-STD-118.

    *  For other station facilities not covered in the above shall be governed byOISD- STD- 118.

    X - Any distance suitable for constructional and operation convenience.

    - At pipeline’s loop line terminal location, distance between scraper barrel

    and compound wall shall not be less than 5 meter. 

    S. No  From / To  1  2  3  4  5  6  7  8  9  10  11  12  13  14 

    1  Booster/Mainl Pump shed x  16  x  16  30  30  30  16  30  30  x  x  x  x 

    2  SL / SR Receiver   16  x  x  16  30  16  16  16  30  16  x  x  x  x 

    3  Filtrs / Meter / Sampling

    point / Sump Tanks 

    16 

    30 

    16 

    30 

    16 

    30 

    16 

    4  CRoom UPS / SCADA-

    Telecom/ Office building16  16  16  x  16  16  x  x  30  x  16  16  16  16 

    5  Fire Pump House/ Fire

    water storage tanks. 30  30  30  16  x  12  x  16  60  x  x  30  30  30 

    6  Compound wall  30  16  16  16  12  x  x  6  16  x  5  16  16  16 

    7  Elect Substation,/ Switch

     Yard / Transformers 30 16  30 x  x  x  x  x  #  #  16  30  30  30 

    8  MC / PC Centre/VFD  16  16  16  x  16  6  x  x  #  #  16  16  30  30 

    9  API Oil Water Separators

    (open type) 

    30 

    30 

    30 

    30 

    60 

    16 

    30 

    30 

    10  Service Building(Stores /

    Amenities) 30  16  16  x  x  x  #  #  #  x  16  16  16  16 

    11  Station Block Valves  x  x  x  16  x  5  16  16  x  16  x  x  x  x 

    12  Metering System  x  x  x  16  30  16  30  16  30  16  x  x  x  x 

    13  Sump tank (U/G)  x  x  x  16  30  16  30  30  30  16  x  x  x  x 

    14  API Separator (closed type)  x  x  x  16  30  16  30  30  x  16  x  x  x  x 

    18.4.2015PLHO,HSE 21

  • 8/19/2019 SK Nandy-OISD Standards

    22/29

    SCADA including leak detection system for pipeline length

    of 50 km and above or pipeline having line fill 5000 kl and

    above (CL 5.3.5)

     3 m + 0.6 m CC high compound wall for all installation.

    CCTV camera / Intrusion alarm.

    Max. spacing between SV station- 50 km

    Pigging facilities for 10 km and above .

    Safety Instrumentation system for Pump, Motor & Engines.

    Clause 6.2.5.1

    Low suction / High Discharge Pressure

    Tripping of Pump at No flow / less than MCF

    High Casing temp/ bearing temp

    Emergency Exit gate at all Station. 

    18.4.2015PLHO,HSE 22

  • 8/19/2019 SK Nandy-OISD Standards

    23/29

    • PSV setting Operating pressure + 10or MAOP+ 2 Kg/cm2.

    • Corrosion Control Requirements

    • Cathdic Protection system.

    • Requirement of Electrical bonding. 

    •  Pressure limiting device TRVs / SRVs

    • Dedicated communication system.

    18.4.2015PLHO,HSE 23

  • 8/19/2019 SK Nandy-OISD Standards

    24/29

    Storage Tanks at delivery terminals . 

     High, High-High level alarm in PLC

    The audio visual alarm at local panel

    and the pipeline control room.

    Pipeline delivery MOV / ROVs shall

    close on actuation of High-High level

    alarm.

    Low Pressure Protection System

    18.4.2015PLHO,HSE 24

  • 8/19/2019 SK Nandy-OISD Standards

    25/29

    • No dwelling with 15 m of pipeline.

    • No blasting activity allowed within 15 m ofpipeline.

    • 15 m from edge of highway when laid parallel tohighway.

    • 5 Mtr. Horizontal Sep. Distance between HTcable and pipeline. 3 Mtr for Transmission Tower

    footings.

    • Pipeline laid through populated area shall havehigher wall thickness. In high consequence area

    opr pr. not more than 40 SMYS. 

    18.4.2015PLHO,HSE 25

  • 8/19/2019 SK Nandy-OISD Standards

    26/29

     

    S.N. Locations Minimum

    Cover (m)

    i)  Agricultural, limited or no humanactivity, Industrial, commercial and

    residential area 

    1.2

    1.0(Rocky) 

    ii)  Minor Water Crossing  1.5

    1.0 (

    Rocky) 

    iii)  HDD Below scour  2.5 

    iv)  HDD Canal below bed  4.0 

    v)  Major river crossings (below scour )  2.5 

    vi)  River with rocky bed (below scour )  1.0 

    vii)  Marshy Land / Creek area  1.5 

    viii)  Cased/Uncased road crossing  1.2 

    ix)  Railway crossing  1.7 

  • 8/19/2019 SK Nandy-OISD Standards

    27/29

    • Pipe Cut piece of not less than 2 m not permitted.

    • Allowed dent size in pipe 5 mm (for 12” and 2for more than 12” OD

    • Hydro testing - 1.25 x Design Pr for 24 Hrs.

    • Station piping 1.25 x Design Pr. For 4 Hrs.

    • Acceptable criteria for Pr testing

    • Leak Test for station piping.

    • EGP for Pipeline after Hyd. Testing.

    • Preservation of pipeline in case commissioningdelayed beyond 6 months.

    • Post Commissioning Coating surveys. 

    18.4.2015PLHO,HSE 27

  • 8/19/2019 SK Nandy-OISD Standards

    28/29

    • Line Patrolling 2 times a week, 1 in a year byofficers.

    • Pigging Crude Oil 1 in qtr, ATF- 1 in Year,Other 1 in 6 months.

    • IPS 1 in 10 Years.

    • Coating Survey 1 in 5 Years.

    • Non Piggable Pipeline Hydro testing 1 in 5years for 24 hrs.

    • UT measurement Sour crude / product lineevery 3 years. Sweet Crude / product- every 4

    years.