Page 1: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Enni Laine

Skanska Finland

1 Enni Laine 19.9.2012

SKANSKA BIM

Page 2: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Contents

− Skanska – Who are we?

− BIM Implementation in Skanska Globally

− openBIM in Finland – Example Skanska HQ, integrated design and construction − Managing BIM based design process

− BIM in production planning

− Why is openBIM important for Skanska?

2 19.9.2012 Enni Laine

Page 3: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Skanska in short

− Founded 1887 in Sweden

− International business since

1897

− Listed on the Stockholm Stock

Exchange

− 2010 revenues: SEK 122 billion

− 2011 revenues: SEK 123 billion

− 10 000 ongoing projects

− 53,000 employees

•Älvsborgsbron, Gothenburg, Sweden

Skanska – Who are we?

3 Enni Laine 19.9.2012

Page 4: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Local presence – global strength

Sweden

Norway

Finland

Denmark

United Kingdom

Estonia

Poland

Czech Republic

Slovakia

Hungary

Romania

United States

Latin America

4 Enni Laine 19.9.2012

Page 5: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Residential

Development (RD)

Infrastructure

Development (ID)

Commercial

Development (CD)

Construction

5 Enni Laine 19.9.2012

Page 6: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Five zeros – values that matter

Loss-making

projects Defects Accidents Environmental

incidents Ethical breaches

Enni Laine 6

19.9.2012

Page 7: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

”BIM in all design/build projects 2009”

Johan Karlström, Management Meeting, Orlando, October 2008

Enni Laine

BIM Implementation in Skanska Globally

7 19.9.2012

Page 8: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

BIM applications

Quantity take-

off, Costing

Facilities Mgt.

4D-Scheduling Simulations

Energy, fire etc

LCC optioneering

and Green analyses

Safety Planning Visualizations

Supply Chain

Management

Procurement

Site planning–

Production BIM

Intelligent

3D-Modeling Clash

Detection

Support for implementing

applications in Skanska

= level 1

= level 2

= level 3

Enni Laine 8

19.9.2012

Page 9: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Marienborgtunnelen, Trondheim, Norway

Mäntylinna project, Finland New Meadowlands Stadium, New Jersey, USA

Refap Sulfur Plant – Skanska LA

Different expertise areas in Skanska Worldwide

Enni Laine 9

19.9.2012

Page 10: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

BIM at site: visualizations, scheduling (4D),

details, quantities Safety planning

Visualizations – New Skanska Building

All DB projects use BIM in Finland

• All Skanska´s DB-projects are modeled:

architecture, structures, M&E, geotechnical

• Model information is utilized in many

processes: quantity take-off, costing,

construction, etc.

• More than 100 BIM projects

10 Enni Laine

Examples of openBIM in Finland

19.9.2012

Page 11: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

BIM enables five zeros in construction process

Results a better productivity!

0 errors in design

0 errors in quantity- and cost estimations

and scheduling

0 errors in procurement and logistics

0 errors in production

0 errors in hand-over

11 Enni Laine 19.9.2012

Page 12: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Visualization facilitates decision making in all phases

12 Enni Laine 19.9.2012

Supplied

In storagge

Casting completed

In production

Page 13: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

BIM based design process

− Scope

− Content

− BIM milestones

− Quality control

− Model utilization

19.9.2012 Enni Laine

Page 14: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Integrated model is used in Design Meetings

14 Enni Laine 19.9.2012

Page 15: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Model auditing & clash detection of IFC-models are the basis for a successful BIM-project

Enni Laine 15

19.9.2012

Page 16: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

1. Check the compliance with the project’s BIM Strategy

21.9.2012

BIM Auditing is used to…

16 Enni Laine 19.9.2012

Page 17: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

17 Enni Laine 19.9.2012

Page 18: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

BIM Auditing in construction project - Process is based on checking rounds before each checking point - Checking points are design milestones, like applying for the building permit

Supporting databases

Programming Design Detailed

design Maintenance Construction

Intelligent

3D-Modeling

BIM

Auditing

BIM

Auditing

1 2

18 Enni Laine 19.9.2012

Page 19: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Added Value from BIM to Production

New Skanska

Headquarter

Helsinki, Finland

19 Enni Laine 19.9.2012

Page 20: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

MagiCAD EXCEL

M&E Design

TEKLA Construction Management

Solibri

(MagiCAD)

Bill Of Materials (BOM)

CONTROL (Dyna)

Production Control

Person-hour

IFC-file

Tender Calculation

Example of BIM process: M&E From a design to production phase

Schedule

20 Enni Laine 19.9.2012

Page 21: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Quantity take off by locations

Enni Laine 21

19.9.2012

Page 22: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Site planning

and safety

Structural

HVAC-models

Electrical

Geotechnical

Architectural

Production model

Production model based on IFC

Enni Laine 22

19.9.2012

Page 23: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Arch + M&E (Tekla CM)

Struc + M&E (Tekla CM)

Model Checker (Solibri)

Different model combinations are used on site

23 Enni Laine 19.9.2012

Page 24: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Scheduling (4D)

Purchase

packages

Supply chain

management,

Logistics

Drawings, Reports,

measurements, co-

ordinations,

Details: ARC,

Structural, MEP

Site planning

and safety

Prefabrication

information

Production model – source of construction information

Enni Laine 24

19.9.2012

Page 25: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

MagiCAD

on Revit

MEP

CQTools

on Revit

MEP

Revit

MEP

Octaga

Enterprise

CAD-Duct

Solidworks

Allplan

Engineering

Novapoint

Terrain

Novapoint

Tekla

Structures

Bentley

Architecture Bentley ProConcrete/

ProSteel Autocad

Architecture

Tekla

CM

Synchro

Nemetschek

IFC-

Viewer

BIM

Tools

Autodesk

Navisworks

Bentley

Projectwise

-Navigator

Solibri

Model

Checker DDS

IFC-

Viewer

Solibri

Model

Viewer Virtual

Building

Explorer*

Autodesk

Design

Review

Free-of-

charge

Viewers

Vico

Office

Other

ArchiCAD

Revit

Architecture

Architectural

Design

Revit

Structures

Structural

Engineering

AutoCAD

Civil-3D

Bentley

InRoads

Bentley

InRoads

AutoCAD

Civil-3D

Novapoint

Virtual

Map*

Civil

Geotechnical

Design

MagiCAD

CADPIPE

Allplan

Engineering

MEP

Design

CADS

planner

Bentley MX

Enni Laine 25

19.9.2012

Why is openBIM important for Skanska?

Page 26: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

BIM is used at the sites daily

26 Enni Laine 19.9.2012

− Checking quantities

− Reviewing designs

− Visualizing the forthcoming tasks

− Visualizing dependencies between different tasks

− Synchronizing tasks

− Planning deliveries and logistics

Page 27: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

The biggest chance is not the new technology, but the new way of working

- Drawings are always produced from models

- Models are correct, not only for visualizations

- Transparency of the design, no shortcuts possible

The new way of working improves the

process - Less data loss from design to production

- The design can really be checked for errors in 3D

- The design is clear for everyone – everybody

understands things similarly

27

Enni Laine 19.9.2012

Page 28: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Build it first virtually!

Enni Laine 28

19.9.2012

Page 29: SKANSKA BIM - BIM Aarhus Terrain Novapoint Tekla Structures Bentley ... Why is openBIM important for Skanska? BIM is used at the sites daily 26 19.9.2012 Enni Laine

Thank you!

Enni Laine 29

19.9.2012