skanska commercial development nordic · estonia romania revenue by geographic areas nordic...
TRANSCRIPT
1
Energy efficient office buildings Skanska Commercial Development Nordic
Jonas Gräslund 2013 05 16
United States
Brazil
Argentina
Chile
Peru
Venezuela
Colombia
Sweden Finland Norway
Denmark United Kingdom Poland
Slovakia
Hungary Czech Republic
Estonia
Romania
Revenue by geographic areas
Nordic countries 44% Other European countries 21% The Americas 35%
We are active in selected home markets
Jonas Gräslund 2013 05 16 2
− Initiates, develops, leases and divests commercial property projects
− Focus on office buildings, shopping centers and logistics properties
− Presence in Sweden, Finland, Norway, Denmark, Poland, Czech Republic, Hungary, Romania and USA
− 270 employees
Commercial Property Development
Green Towers, Wrocław, Poland
Jonas Gräslund 2013 05 16 3
4
Skanska CDN Markets
Helsinki Stockholm
Malmö Copenhagen
Gothenburg
Oslo
• Skanska Fastigheter Stockholm • Skanska Fastigheter Göteborg • Skanska Öresund, Malmö • Skanska Öresund, Copenhagen • Skanska Commercial Dev. Helsinki • Skanska Commercial Dev. Norway
Stavanger New!
Jonas Gräslund 2013 05 16
Track record 1996-2010 Skanska CDN
117 projects 1,3 million sqm
Jonas Gräslund 2013 05 16 5
Jonas Gräslund 2013 05 16 6
Helicopterview on energy consumption
Jonas Gräslund 2013 05 16 7
Frame Program based on strategy regarding mechanical installations
− Low environmental impact
− Low life cycle cost
− Flexibility
− Non complex solutions
Jonas Gräslund 2013 05 16 8
VAV (variable air volume) Many motors, sensors, AHUs , COMPLICATED
Jonas Gräslund 2013 05 16 9
CAV (constant air volume) + chilled beams , SIMPLE
Jonas Gräslund 2013 05 16 10
+5o
Supply Air Handling Unit Outdoor air
+20o
Supply air
+22o
Exhaust air
Exhaust Air Handling Unit
Traditional 2,3 m/s 40 kWh/m2
Jonas Gräslund 2013 05 16 11
Supply Air Handling Unit
Exhaust Air Handling Unit
1,6 m/s and no sound attenuators 22 kWh/m2
Slow air
Jonas Gräslund 2013 05 16 12
Supply Air Handling Unit
Exhaust Air Handling Unit
Low speed 1,0 m/s and double heat exchangers 11 kWh/m2
Slow air
Jonas Gräslund 2013 05 16 13
Air Handling Units, from 2,3 m/s to 1,0 m/s
Sundbypark ”Trad alt” Choosen alt 1,6 m/s 28 kWh/m2 22 kWh/m2 operation 1.900´ 1.510´ investment 650´ 850´ (+200´) TOTAL 2.6 milj SEK 2.4 milj SEK
HagaPorten I ”Trad alt” Choosen alt 2,3 m/s 40 kWh/m2 32 kWh/m2 operation 4.240´ 3.300´ investment 1.115´ 1.175´ (+60´) TOTAL 5.3 milj SEK 4.5 milj SEK
Lustgården 14, prel ”Trad alt” Choosen alt 1,0 m/s 20 kWh/m2 11 kWh/m2 operation 2.140´ 1.040´ investment 890´ 1.740´ (+850´) TOTAL 3.0 milj SEK 2.8 milj SEK
Jonas Gräslund 2013 05 16 14
Free cooling preheats supply air
Jonas Gräslund 2013 05 16 15
Skanska Self regulating cooling beams,
+5o
Chilled Beam Supply Air Handling Unit Outdoor air
+22o C
KB2 +16/+19o C
Free cooling coil increase the outdoor air temp With approx 3o C (from +5o to ca +8o C), with 2 pipe coil KB2-SV21 is closed all winter
Temperature in KB2 system is controlled by by variable speed of circulation pump in glycol circuit, in sequence with control valve for KB2.
KB1 +8/+18o C
0%
+16o C
Jonas Gräslund 2013 05 16 16
Ventilation in two steps
Supply
Office
Garage
Exhaust
Traditional Chiller
Building
Chiller
Chilled water system 6o – 12o C
COP = approx 3 (cooling)
17 Jonas Gräslund 2013 05 16
Traditional Ground Source heating and cooling system
Building
Heat pump
Ground storage Ground temperature approx 5o C
Chilled water system 10o – 15o C
COP = approx 4 - 5 (heat + cool)
18 Jonas Gräslund 2013 05 16
Skanska Deep Green Cooling
Building
Circulation pump
Ground storage Ground temperature approx 12o C
Chilled water system 17o – 23o C
COP = 25 - 30 (cooling)
19 Jonas Gräslund 2013 05 16
Deep Green cooling
Ground bore hole storage operates in normal ground temperature.
Summertime the building is cooled by the ground. Wintertime the building is partly heated by the ground, as the air for ventilation cools down the ground. The ground will be heated during summer and cooled to its original temperature during winter. Robust solution, no chiller or heat pump needed. The selv-regulated cooling beam system is operating In room temperature level.
Patent in Sweden, Pat pended in EU and US
20 Jonas Gräslund 2013 05 16
Jonas Gräslund 2013 05 16 21
Sequence control of cooling - heating
Chilled beam
radiator
Control unit
Chilled water Power 24 V
Temperature sensor
Motor valve
Jonas Gräslund 2013 05 16 22
radiator
Self regulating cooling
Cooling beam
Chilled water
Self regulation chilled beams
− P = k x A x dT P = cooling power
A = heat transfer area
dT = temp difference room and chilled water
Troom = 25o C, TCW = 14/18 o C
P = k x A x 9o C
Troom = 25o C, TCW = 20/24 o C
P = k x 3A x 3o C
Jonas Gräslund 2013 05 16
23
2 Jonas Gräslund 2013 05 16 24
25 Jonas Gräslund 2013 05 16
Bild från Lars-Ove Matsson, Sweco
26 Jonas Gräslund 2013 05 16
Bild Jonas Gräslund
Entré Lindhagen, Stockholm. Mounting of U-tubes in bore hole
27 Jonas Gräslund 2013 05 16
Bild Jonas Gräslund
Entré Lindhagen. Collector for pipes from bore holes
28 Jonas Gräslund 2013 05 16
Bild Jonas Gräslund
Entré Lindhagen. Collector
29 Jonas Gräslund 2013 05 16
Picture Jonas Gräslund
Entré Lindhagen. Site with bore holes
30 Jonas Gräslund 2013 05 16
Jonas Gräslund 2013 05 16 31
Stockholm, Lustgården 14
Lettable area: 55 000 m2 Parking in garage flexible ventilation chilled beams coil heat recovery free cooling AHU 1,0 m/s and double heat exch self regulation chilled beams Passive house windows U = 0,9 Deep Green Cooling Estimated energy consumption 49 kWh/m2
Jonas Gräslund 2013 05 16 32
Temperature out from ground during 5 years
Annual mean outdoor temperature in some cities
− Helsingfors +5,0o C
− Stockholm +6,6o C
− Göteborg +7,9o C
− München +7,9o C
− Malmö +8,0o C
− Warzawa +8,2o C
− Köpenhamn +8,5o C
− Chicago +9,7o C
− Paris +10,6o C
33 Jonas Gräslund 2013 05 16
Steps to Deep Green energy for CDN
Solution Heating Cooling* Power** Energy saving kWh/m2 ATemp kWh/m2 ATemp kWh/m2 ATemp kWh/m2 ATemp
CDN Standard office 45 26 17 -
Low Speed AHU - 9 - - 2 - 11
Better windows - 8 - - - 8
Deep Green Cooling: - 5 - 26 + 1 - 30 Solar Heating Seasonal Storage: - 23 - - - 23
Wind power: - - - 16 - 16 Total 0 0 0 - 88
Final energy consumption if all Green solutions are choosen is 0 kWh/m2 (88 – 88) *) Including process cooling **) Excluding tenant power
34
Jonas Gräslund 2013 05 16
Solar heating farm for district heating - Kungälv
35 Jonas Gräslund 2013 05 16
Typical district heating in Sweden, possible solar heating
-
100 000
200 000
300 000
400 000
500 000
600 000
700 000
JANUARI
FEBRUARI
MARSAPRIL
MAJJU
NIJU
LI
AUGUSTI
SEPTEMBER
OKTOBER
NOVEMBER
DECEMBER
El
Olja
Förädlad bio
Naturgas
Värmepump
Kol
Torv
Oförädlad bio
Hetvatten
Spil lvärme
Avfall
36 Jonas Gräslund 2013 05 16
Seasonal storage
37 Jonas Gräslund 2013 05 16
Energy efficient office buildings
nZEB has to take into concideration:
-Robust solutions
-Load matching
-Grid interaction
-Real addition
Jonas Gräslund 2013 05 16 38
− “We are determined to become the leading green project developer and constructor in our home markets”
− Johan Karlström, CEO Skanska
39 Jonas Gräslund 2013 05 16