smart grid analytics - siemens global website · energy system renewable and distributed ......

24
Schutzvermerk / Copyright-Vermerk Smart Grid Analytics Aaron DeYonker VP of Products @ eMeter, a Siemens Business

Upload: phungquynh

Post on 15-Jul-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Schutzvermerk / Copyright-Vermerk

Smart Grid Analytics Aaron DeYonker VP of Products @ eMeter, a Siemens Business

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 1

The Challenge

Challenges in changing

energy system

Renewable and distributed

generation

Limited generation and

grid capacity

Aging and/or weak

infrastructure

Cost and emissions of

energy supply

Revenue losses, e.g. non-

technical losses

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 2

Smart Grids Solve Critical Problems

Generation

Balancing Renewables Customer Operations Peak Management

Efficiency Outage Prevention / Restoration

Reduction of System Losses

RENEWABLES PROSUMERS

kWh $, €

Generation

Load

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 3

IT/OT Convergence

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 4

Utilities Access to Data

Most

Utilities

Finance

Industry

Retail

Industry

Is this the Grid of the Future?

eMeter Corporate Logo

To ensure the integrity of the eMeter brand it is necessary to understand how to use

the logos.

Minimum Clear Area

A minimum clear area has been created around each logo. This area should always be

kept free of any graphic elements and/or messages. The gray lines in these illustrations

show how the minimum clear area is calculated. In all cases, an area equal to the cap

height of eMeter “r” must remain clear on all sides of the logo. The gray bars in these

illustrations indicate the visual height, width, vertical center and horizontal center of

the logo.

(see the next slide)

Slide 5 Copyright © 2011 eMeter Corp. All rights reserved.

Who stole $6 Billion Last Year?

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 6

Identifying Theft Patterns

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 7

Energy Diversion Dashboard

Is this the Grid of the Future?

eMeter Corporate Logo

To ensure the integrity of the eMeter brand it is necessary to understand how to use

the logos.

Minimum Clear Area

A minimum clear area has been created around each logo. This area should always be

kept free of any graphic elements and/or messages. The gray lines in these illustrations

show how the minimum clear area is calculated. In all cases, an area equal to the cap

height of eMeter “r” must remain clear on all sides of the logo. The gray bars in these

illustrations indicate the visual height, width, vertical center and horizontal center of

the logo.

(see the next slide)

Slide 8 Copyright © 2011 eMeter Corp. All rights reserved.

Who am I lending to?

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 9

Unbilled Usage Summary

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 10

Unbilled Usage by Billing Cycle

Is this the Grid of the Future?

eMeter Corporate Logo

To ensure the integrity of the eMeter brand it is necessary to understand how to use

the logos.

Minimum Clear Area

A minimum clear area has been created around each logo. This area should always be

kept free of any graphic elements and/or messages. The gray lines in these illustrations

show how the minimum clear area is calculated. In all cases, an area equal to the cap

height of eMeter “r” must remain clear on all sides of the logo. The gray bars in these

illustrations indicate the visual height, width, vertical center and horizontal center of

the logo.

(see the next slide)

Slide 11 Copyright © 2011 eMeter Corp. All rights reserved.

$360 Million Stolen Each Year in US Transformers Fail. But Why?

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 12

Applications for Grid Operations

SDP ID

Meter ID

Substation

Transformer

120/2

40V

12 kV Circuit

Segment

Low Voltage

Distribution

Transformer

Low Voltage

Secondary

Drops

Substation

Bus

B-C

Recloser (N.C.)

Un-metered

Service, e.g.

street lighting

Virtual

Meter

Circuit

Section

Virtual

Meter

Virtual

Meter

Virtual

Meter

Virtual

Meter

IDR Meters

Primary

Customers

Substation

Meter

Sectionalizing

Switch (N.O.)

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 13

Service Point Metering

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 14

Virtual Metered Transformer

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 15

Centerpoint Load Calculation

Manual: 2 People analyze 30 transformers in 2 weeks

eMeter Analytics: Automatically analyze 400,000 transformers in 5

minutes

Power Factor

• Required since kVa is not recorded on a 15 minute basis

• Created only for non-residential customers

• Validation check performed and recorded to “qualify” each power factor

• There are approximately 5 – 8 power factors calculated by each meter for each month

Interval kVa Calculation

• Calculated for each 15 minute interval by ESIID

• Only uses valid power factors for non-residential and .9 for residential

• Validation check performed and recorded to “qualify” each load calculation

Transformer Aggregation

• Aggregated and stored by transformer over the last hour

• Validation check performed and recorded to determine if all expected intervals utilized and also if any of the intervals failed validation

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 16

Transformers Load Monitoring

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 17

Outage Details by Distribution Node

http://earthdaytolucalake.wordpress.com/

15% of infrastructure is used 1% of time. What can we do about it?

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 19

System Load

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 20

Individual Peak Loads

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 21

Targeted Demand Response

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 22

Time of Use Analysis

Sector Infrastructures & Cities – Smart Grid Division

© Siemens AG 2012. All rights reserved.

October 2012 Page 23

The Possibilities Are Endless…

Grid Loss Identification

Pricing Analysis

Customer Profiling & Segmentation

Load Modeling & Forecasting

Demand Response Evaluation

Distribution Planning