Construction Traffic Management Plan – Waterloo Site Establishment
Project: Sydney Metro City & Southwest – TSE Works
Document No: SMCSWTSE‐JCG‐SWL‐TM‐PLN‐002296
DOCUMENT APPROVAL REVISION DATE PREPARED
BY REVIEWED BY
APPROVED BY
REMARKS
A 21/10/17 Sue Lewis .
B 28/10/17 S Lewis T Ferrero For external review
C 22/11/17 S Lewis T Ferrero For approval
D 27/11/17 S Lewis T Ferrero For approval – minor amendment to driveway location
E 28/11/17 S Lewis T Ferrero For approval – amendments due to RSA
F 1/12/17 S Lewis J Julius T Ferrero For approval post RMS comments
REVISION DATE PREPARED BY
REVIEWED BY
APPROVED BY
REMARKS
Signature:
Waterloo Site Establishment CTMP for Approval
Tino / Sue / DeclanIn accordance with Schedule C1 Appendix A.9 Section 2.1 ( c ) and 2.2 ( c ) of the Principal’s General Specifications G10 – Traffic and Transport Management and Minister’s Condition of Approval E82 for the Sydney Metro City & South West the Roads and Maritime Service of NSW and the Sydney Coordination Office approve the Sydney Metro City & South West Construction Traffic Management Plan – Waterloo Site Establishment - TSE Works Rev F SMCSWTSE-JCG-SWL-TM-PLN-002296 for site establishment subject to the following requirements:
• Obtaining Road Occupancy Licences (ROLs) from the Transport Management Centre(TMC) as required;
• Obtaining an approved hoarding installation certificate from city of Sydney Council;• Complying with haulage routes as approved by SCO/RMS and described in Appendix 4 of
the CTMP;• Addressing any issues raised by Council, STA, Taxi Council, residents/businesses,
Emergency Services in the CTMP approval process;• Addressing any safety issues identified in the Road Safety Audit review of this CTMP;
The Construction Traffic Management Plan being updated as required prior toconstruction commencing to ensure consistency with the final Construction Traffic Management Framework when it is approved
• Promptly addressing any CBD Taskforce and/or TMC and/or RMS issue that eventuatesduring the works
Regards
Giovanny RamirezAssociate Director Operations CBD & EastCBD Transport Taskforce | Sydney Coordination Office Transport for NSW
www.transport.nsw.gov.au
Transport for NSWSydney Coordination Office
RAMIREZ GiovannyThu 14/12/2017 1:23 PM
To:Tino Ferrero ; Sue Lewis Declan Mc Garry
Cc:BERRY Adam ISSA Steven C MELLA Carl
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 3 of 20
Table of Contents 1. Introduction ................................................................................................................. 5
1.1. Project Overview ......................................................................................................... 5
1.2. Purpose of this Plan .................................................................................................... 5
2. Locality and existing conditions ............................................................................... 6
2.2. Site Establishment ....................................................................................................... 8
3. Fleet Management ..................................................................................................... 10
3.1. Haulage Routes ......................................................................................................... 10
3.2. Permits/ Over Dimensional Vehicles ......................................................................... 10
3.3. Drivers and Operators ............................................................................................... 10
4. Other Considerations ............................................................................................... 10
4.1. Road Safety Audits .................................................................................................... 10
4.2. Weekly Traffic Forecast ............................................................................................. 11
4.3. Police and Emergency Services ................................................................................ 11
4.4. Communications and the community ........................................................................ 11
4.5. Inspections and monitoring ....................................................................................... 12
4.6. Environmental Maintenance ...................................................................................... 12
4.7. Site Contacts ............................................................................................................. 13
Appendix 1 Existing operations ........................................................................................ 14
Appendix 2 Proposed site operations ............................................................................... 15
Appendix 3 Traffic control plans ....................................................................................... 16
Appendix 4 Haulage routes ................................................................................................ 18
Appendix 5 Road safety audit ............................................................................................ 19
Appendix 6 Review comments .......................................................................................... 20
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 4 of 20
Figures Figure 1: Sydney Metro Project ................................................................................................ 5
Figure 2: Waterloo station site .................................................................................................. 6
Tables Table 1 Average vehicle movements per hour ......................................................................... 8
Table 2 Proposed Communications ....................................................................................... 11
Table 3: Stakeholder consultation .......................................................................................... 11
Table 4: Site contacts ............................................................................................................. 13
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 5 of 20
1. Introduction
1.1. Project Overview
The Sydney Metro is Australia’s biggest public transport project. The metro project currently consists of:
Stage one is the Sydney Metro Northwest, formerly the North West Rail Link, connecting the north western suburbs of Sydney, through to Chatswood.
Stage two is the City & South West project linking Chatswood through to Sydenham. Stage three includes the upgrade of the existing rail line between Sydenham and
Bankstown.
Figure 1 shows the proposed Sydney Metro project and stages.
Figure 1: Sydney Metro Project
1.2. Purpose of this Plan
The purpose of this Construction Traffic Management Plan (CTMP): WATERLOO SITE ESTABLISHMENT is to detail the site operations for the site establishment phase of the Sydney Metro City & South West project. This plan will set out the traffic management initiative that will be deployed to minimise disruption to, and ensure the safety of the wide range of stakeholders potentially affected by the works, including but not limited to: motorists, pedestrians; cyclists; public transport users, local residents and property owners; business owners; and workers/staff engaged on the Project.
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 6 of 20
2. Locality and existing conditions
The Waterloo station site is bounded by Botany Road to the west, Raglan Street to the north, Cope Street to the east and Wellington Street to the south. The site is shown in Figure 2 below in red. The existing parking restrictions at the site are detailed below and are also included in Appendix 1.
Figure 2: Waterloo station site
2.1.1. Botany Road
Botany Road is classified as a State road. It commences at Redfern Street and ends at Port Botany. The section of Botany Road north of the site is one way southbound. At the site location, Botany Road is four lane two way road. The speed limit on Botany Road is 50km/hr.
A bus stop exists on Botany Road southbound carriageway, north of the Wellington Street intersection. No Stopping Wedding, Funeral Vehicles excepted (10AM-3PM and 7PM-8PM Monday to Friday) is in place outside of the Church, which is the only building to be retained on the subject site. Clearways are in operation during the AM and PM peak hours (6AM-10AM and 3PM-7PM).
Designated loading zones (10AM-3PM M-F) exist at the southern end of the site, south of the bus stop. Outside of these hours the parking is unrestricted. 1P parking is available at all other locations between 10AM-3PM Monday to Friday).
A heritage mail box is located on Botany Road at its intersection with Raglan Street – a mail zone exists at this location.
There is no on road cycling facility. The footpaths are typically 3.8m wide with an effective pedestrian width of 2.6m due to the location of street furniture including the mail boxes. There
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 7 of 20
are a number of driveways crossing the footpath. Signalised pedestrian crossings exist on all legs at the intersections with Wellington Street and Raglan Street/ Henderson Road.
2.1.2. Wellington Street
Wellington Street is classified as a local road and is under the control of Council. Wellington Street commences in Waterloo to the east and ends at Botany Road. To the west of Botany Road Wellington Street is renamed Buckland Street. The speed limit on Wellington Street is 50km/hr. Roundabout control exist at the Cope Street intersection and traffic signals are installed at the Botany Road intersection.
Unrestricted parking exists on the northern side of Wellington Street between Botany Road and Cope Street.
The existing footpaths are approximately 3.7m wide and have numerous driveways crossing the northern path. There are no cycling facilities on this section of Wellington Street.
2.1.3. Cope Street
Cope Street is a local road which connects Turner Street, Redfern to north of McEvoy Street, Waterloo. A speed limit of 50 km/hr is in place. Roundabouts are installed at intersections with Raglan Street and Wellington Street.
Unrestricted parking exists on both sides of Cope Street between Raglan and Wellington Streets.
The existing footpaths are approximately 3.7m wide but with an effective width for pedestrian usage of 2.8m. There are numerous driveways crossing the western path. There are no cycling facilities on this section of Cope Street.
A bus stop exists on the eastern side of Cope Street, immediately north of Wellington Street. This bus stop services route 355 – Bondi Junction to Marrickville Metro. Another bus stop exists on the eastern side of Cope Street immediately south of Raglan Street which also services the route 355 – Bondi Junction to Marrickville Metro.
2.1.4. Raglan Street
Raglan Street is a local road which connects Elizabeth Street, Waterloo to Henderson Road, Alexandria. A speed limit of 50 km/hr is in place.
1P parking is available for the site’s frontage. There is roundabout control at the intersection with Cope Street.
The existing footpaths are approximately 3.7m wide with an effective pedestrian width of 2.8m. There is 1 driveway on the southern side. There are no cycling facilities on this section of Raglan Street. Signalised pedestrian crossings exist on all legs at the intersections with Botany Road/ Henderson Road/ Raglan Street.
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 8 of 20
2.2. Site Establishment
Duration: 5 months Timing: November 2017 to April 2018
2.2.1. Works Required
The existing scaffolding and hoarding will remain in place from the DELTA demolition works. The current parking restrictions will be retained along the site frontages.
Access and egress is proposed from Botany Road. This access/ egress will utilise the previously approved access/ egress points. Between approval and March 2018 the current access arrangement will be used for both access/ egress as the demolition works are still continuing. The use of the local surrounding streets is not proposed due to the possible impact on the community as this would require routing of trucks on local roads with significant changes required to existing infrastructure. The use of Botany Road would ensure that the trucks used at the site would be maintained on the arterial road system.
Site establishment works will occur during normal construction hours of 0700-1800 Monday to Friday and 0800-1300 on Saturday. Site establishment works include:
Piling works Internal site set up including office facilities Noise wall construction including pile cap
Sewer works are required on Botany Road and will be undertaken at night using contra flow arrangements. Works are anticipated to take approximately 2-3 nights. These works are associated with the relocation of the church sewer from Cope Street to Botany Road.
2.2.2. Operating Conditions
The access/ egress is proposed on Botany Road using existing driveway locations, that previously serviced industrial uses at the site and were approved for use for the DELTA Group demolition works. There will be approximately 520 truck movements per month, averaging 27 truck movements per full workday. There will be minimal truck numbers during the peak periods (AM and PM), refer to Table 1.
2.2.3. Impact on Traffic Flows
The operation of the site will have minimal impact on existing traffic conditions as the traffic generation is typically low and vehicles will be restricted to left in/ left out. Post the arrival of drill rigs on site, traffic generation at this site will typically be in the order of 520 truck movements per month. Piling rigs and pile cages will be delivered outside of peak periods.
Table 1 provides a comparison of the EIS and TSE traffic movements at the site.
Table 1 Average vehicle movements per hour
TIME EIS LIGHT VEHICLES
TSE LIGHT VEHICLES
EIS HEAVY VEHICLES
TSE HEAVY VEHICLES
0700-1000 2 2 6 1
1000-1200 10 4 12 3
1200-1400 10 4 12 4
1400-1600 10 4 8 4
1600-1800 2 1 6 1
1800-0700 0-2 0 0-6 0
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 9 of 20
2.2.4. Impact on Public Transport
The existing bus stop on Botany Road will be retained for the site establishment works. There will be disruptions to bus stop operations during the sewer works at night with the southbound bus stop being closed. This will be discussed and agreed with Sydney Buses prior to the works.
2.2.5. Impact on Pedestrians and Cyclists
Pedestrian management will be in place at the site entry/ exit points. During the implementation of lane closures there may be a requirement to divert pedestrians onto the opposite side of the road due to the proximity of the work areas. Where this occurs, pedestrians will be directed to use existing pedestrian facilities including signalised pedestrian crossings, where available or existing splitter islands associated with the roundabouts at the intersections of Wellington/ Cope and Cope/ Raglan streets.
2.2.6. Staff parking and transportation to site
During the site establishment works, it is anticipated that there will be 15-20 personnel on site. There will be limited car parking spaces (12#) on site during site establishment and the use of these spaces will be limited to essential staff or subcontractor vehicles. The workforce will be encouraged to arrive by site using public transport, with most likely to use Redfern Station, a 9 minute walk (650m) from site. All personnel will be informed that no parking is available within the local street system or on site.
2.2.7. Cumulative impacts
City of Sydney Council website does not have any major developments near the site. The Green Square redevelopment is approximately 1km south of the subject site.
2.2.8. Special Events
In reviewing City of Sydney Council’s website for special events near the site, there are no special events listed, which would be impacted by the works.
2.2.9. Traffic Control Plan (TCP) / Road Occupancy License (ROL) Identified Works
Works that have been identified as requiring a Traffic Control Plan are detailed below. Appendix 3 provides details on expected durations, timing for implementation, the works being undertaken and the expected traffic impacts.
1. Pedestrian management during access/ egress
2. Sewer works on Botany Road
2.2.10. Sydney City Council required approvals
Works that have been identified as requiring Council approval include:
1. Oversize and over mass vehicle movements (delivery of piling rigs)
2.2.11. Roads and Maritime required approvals
Works that have been identified as requiring specific RMS approval include:
1. Oversize and over mass vehicle movements (delivery of piling rigs)
2. Road opening on Botany Road (RMS Asset branch)
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 10 of 20
3. Fleet Management
Trucks to be used on the project will be compliant with NSW legislation and standards including the Heavy Vehicle National Legislation. All heavy vehicle operations will be conducted in accordance with the Chain of Responsibility (CoR) Management Plan (SMCSWTSE-JCG-TPW-HS-PLN-002164).
A combination of truck types will be used during the site establishment works. These trucks may be truck and dogs, bin trucks and 5t tippers
3.1. Haulage Routes
Generally, the haulage routes will be via arterial roads/ freeway or Tollway. Where possible the routes have taken into account the requirements of the Environmental Impact Statement (EIS). It is noted that the EIS for this site access shows access via Botany Road with egress onto Botany Road, as one of the Primary Inbound, Primary Outbound routes. The routes within this CTMP are in accordance with the EIS.
Material will be removed from site using a combination of vehicles. These trucks will range in size from 5.5m to 19.0m and taken to authorised disposal sites around Sydney. Refer to Appendix 4 for details on the proposed routes.
3.2. Permits/ Over Dimensional Vehicles
Permit issue for vehicles greater than 45.5 tonnes is through the National Heavy Vehicle Regulator (NHVR). This applies to particular special purpose vehicles (SPV) such as mobile cranes and other oversize/over mass vehicles (OSOM). At present, RMS is currently undertaking this permit issue.
For over dimensional vehicles, generally vehicles that are greater than 25m length or 3.5m width require a pilot(s). Extremely long or wide vehicles will require an escort (fee payable). Permits will be applied for by the transport operator.
Oversize vehicles will be required at this site for the delivery and removal of piling rigs. These deliveries will occur outside of peak hours and where required a lane closure on Botany Road will be implemented.
3.3. Drivers and Operators
Operator selection will be based on safety performance criteria. Operators and drivers will be required to have general construction industry induction cards and will be required to attend ongoing general project and site-specific inductions.
All operators will be comprehensively trained with regard to community expectations and impacts from haulage operations. The induction will have a particular focus on operator behaviour. Operator competency and standards of behaviour will be continually assessed, and discipline procedures will be put in place to maintain compliance.
Queuing of trucks in local streets around the sites will not occur as there will be sufficient designated area within site for trucks to wait. Trucks will arrive post the site start times.
4. Other Considerations
4.1. Road Safety Audits
Road safety audits will be undertaken during the development of the CTMP and upon implementation of the long-term work site. Refer to Appendix 5 for the audit report.
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 11 of 20
4.2. Weekly Traffic Forecast
A weekly traffic forecast is provided to local councils, RMS, Emergency Services, TfNSW, SCO and other stakeholders as requested. This forecast details the up and coming works and details of timings including hours of the day and dates of works that will impact traffic- road, public transport, pedestrians and cyclist.
4.3. Police and Emergency Services
The Police and relevant Emergency Services will be informed in a timely manner of relevant activities proposed within this CTMP. The initial communication to these stakeholders will be via the Traffic and Transport Liaison Group (TTLG). Regular updates will be provided to emergency services, including changes to road network configurations, changes to road conditions and worksite access locations, through emails and face to face discussions.
4.4. Communications and the community
The TSE will be responsible for the dissemination of information to the community including affected residents, relevant Councils, businesses and the public. Refer to Sydney Metro Community Consultation Strategy – Early Works.
Any enquiries, complaints and/ or compliments are to be directed to the TfNSW’s Sydney Metro Project Information line - 1800 171 386 or via email to: [email protected] or Sydney Metro City & Southwest, PO Box K659, Haymarket, NSW 1240 or Sydney Metro City & Southwest Website.
Table 2 provides the proposed communications to be implemented for this CTMP
Table 2 Proposed Communications
NOTIFICATION APPLICABLE
Community notice YES
Precinct update/ e-update YES
Email YES
Internet YES
On site briefings YES
Print advertising YES – Quarterly newsletter only
4.4.1. Travelling public
Where our works will impact on the travelling public we will undertake the following:
Public transport interruptions will be communicated via on site signage Motoring public will be forewarned of any changes, including road closures, road changes
and lane closures well in advance using appropriate signage, including variable messagesigns (VMS), where identified on the plans.
Pedestrians and cyclists will be provided with advance warning signs
4.4.2. Stakeholders consulted
Table 3 identifies the stakeholders consulted during the development of this CTMP:
Table 3: Stakeholder consultation
STAKEHOLDER DATE CONSULTATION MAIN CONTACT PEOPLE
TCG 24 Oct 2017 Meeting RMS/ CoS/ SCO/ TfNSW
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 12 of 20
STAKEHOLDER DATE CONSULTATION MAIN CONTACT PEOPLE
TTLG 26 Oct 2017 All members SCO/ TfNSW/ Councils/ ES/ RMS
RMS 28 Oct 2017 Submission of CTMP Shane Schneider
City of Sydney 28 Oct 2017 Submission of CTMP Mark Hannan
SCO 28 Oct 2017 Submission of CTMP Giovanny Ramirez/ Aaron Gale
TfNSW 28 Oct 2017 Submission of CTMP Berin Gordon
Centre for Road Safety 28 Oct 2017 Submission of CTMP Luke Wilby
TCG 14 Nov 2017 Meeting RMS/ CoS/ SCO/ TfNSW
RMS 22 Nov 17 Resubmission of CTMP Shane Schneider
City of Sydney 22 Nov 17 Resubmission of CTMP Mark Hannan
SCO 22 Nov 17 Resubmission of CTMP Giovanny Ramirez/ Aaron Gale
TfNSW 23 Nov 17 Resubmission of CTMP Berin Gordon
RMS 27 Nov 17 Resubmission of CTMP Shane Schneider
City of Sydney 27 Nov 17 Resubmission of CTMP Mark Hannan
SCO 27 Nov 17 Resubmission of CTMP Giovanny Ramirez/ Aaron Gale
TfNSW 27 Nov 17 Resubmission of CTMP Berin Gordon
RMS 1 Dec 17 Resubmission of CTMP Shane Schneider
City of Sydney 1 Dec 17 Resubmission of CTMP Mark Hannan/ Tony Ly
SCO 1 Dec 17 Resubmission of CTMP Giovanny Ramirez/ Aaron Gale
TfNSW 1 Dec 17 Resubmission of CTMP Berin Gordon
4.5. Inspections and monitoring
The site will be monitored by the site supervisor. Any changes as noted in this CTMP, to signs/ lines that impact on the public will be monitored daily during site operating hours.
Traffic control used for pedestrian management, lane closures etc will need to provide records of the traffic control implemented. Any changes required to the traffic control set up will be authorised by a holder of an RMS “Prepare a Work Zone Traffic Management Plan” or equivalent.
4.6. Environmental Maintenance
All works will be undertaken in accordance with the TSE Construction Environmental Management Plan (SMCTSE-JCG-TPW-EM-PLN-002010) and associated sub plans including the Construction Noise and Vibration Management Plan (SMCSTSE-JCG-TPW-EM-PLN-002012). The TSE Works are also regulated by the NSW Environment Protection Authority and works to be undertaken outside of standard construction hours will need to comply with the requirements of the Environment Protection License.
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 13 of 20
4.7. Site Contacts
Table 4: Site contacts
NAME POSITION CONTACT #
Tino Ferrero Construction Manager
Jason Julius Project Manager
Cameron Butcher Site Superintendent
Tim Marsh Safety Manager
Robert Muir Environment Operations
4.8. References
The following documents were used in the development of this CTMP:
Construction Traffic Management Framework – Tender version Principal’s General Specification G10 Traffic and Transport Management, v2.0 Roads and Maritime Service Traffic Control at Worksites Manual v 4.0 Relevant AustRoads Guides and RMS Supplements Sydney Metro Principal Contractor Health and Safety Standard
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 14 of 20
Appendix 1 Existing operations
DRAWING NUMBER DESCRIPTION
JCG-SWL-TM-DRG-002296-0002 Locality Plan
DD-SYDM-DWG-0005-01 Existing parking restrictions
5 DP876514
5 DP876514
DP869022
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1198150
DP1204454
DP1204454
DP1204454
DP1204454DP1143690DP1155119
DP1155119
DP1199181
DP1199181
DP1155120DP1155120
DP869022
DP823998
DP773848
DP432710
DP869
022
DP1155127
DP1155127
DP1155127
DP1129795
DP877598
DP1155126
DP1155126
DP1155126
DP1155126
DP1155126
DP1152861
DP1063868
DP739194
DP1198150
DP1163733
DP86217
DP1198150
DP1198150
DP1198150
DP1198150DP1198150
DP1198150
DP1057496
DP1204454DP1155119
DP1155119
DP1199181
DP1199181
DP739194
DP1155120
DP739194
DP838323
DP869022
DP773848
DP737194
DP838849
DP869022
DP876514
DP873158
DP863317
DP869022
DP43776
DP737194
DP43741
DP877598
DP773847
DP1155127
DP1129795
DP843179
DP1176314
DP912271
DP737193
DP739194
DP1155126
DP1155126
DP1155126
DP1135126
DP1065410
DP737194
DP739194
SP76902
DP739194
DP738
240
DP869022
DP1063867
DP739194
2
76
60
64
67
72
8385
134
100
30
43 41
2
13
1
7
103
49 48
2
75
74
7003
1
59 58
71
70
6869
66 65
63
62
61
73
7778
79
808182
84
4
1
135136
133 132
38
37
40
39
33
32
31
42
4 42
16
11
14
10
5
100
3
13
15
17
2
101
2
4
1
1
1
6
7
3
5
2
22
54
53
55
52
102
10
3
86
5
2
7
1
51
50
47
46
45
44
181
100
10
1
1
2
1
9
93
1
4
92
8
11
1/16/ DP 3175
2/16/ DP 3175
21/8/ DP 2872
22/8/ DP 2872
23/8/ DP 2872
24/8/ DP 2872
Y
9/3/ DP2872
18
2
5
1
DP 901161
DP 570425
DP 221674
DP 414984
SP 62905
DP 573543
DP 455153
DP 442804
DP 600579
DP 25009
DP 663560
SP 71539
DP 374468
5/32/ DP 4320
DP 747672
SP 54033
DP 655677
SP 52547
SP 72806
DP 705550
DP 577047
DP 575046
DP 393260
DP 439822
SP90263
DP 1079490
3/16/ DP 3175
DP 1096359
DP 577601
SP 80874
12/33/ DP 4320
DP 101100
DP 393414
DP 402972
DP 177051
DP 222601
SP 72954
DP 377538
DP 656454
SP 65272
DP 610792
DP 665482
1
2
2
3
2
1
100
6
5
1
C
3 2
14
6
5
4
D
C
B
A
1
C
B
A
C
1
101
A
2
1
3
3
2
1
4
1
B
A
1
1
4
101
1
4
1
NO. 4
NO. 6-8
NO. 10-12
NO. 20
NO. 22-26
NO. 28-34
NO. 38
NO. 545-553
NO. 521
NO. 511
NO. 507
NO. 503
NO. 501
NO. 497
NO. 495
NO. 479
NO. 477
NO. 473
NO. 471
NO. 469ANO. 469NO. 467NO. 465A
NO. 463NO. 457
NO. 455
NO. 449A
NO. 342
NO. 328
NO. 330
NO. 332
NO. 334
NO. 336
NO. 338
NO. 340
NO. 348
NO. 366
NO. 368
NO. 370
NO. 372
NO. 374
NO. 376
NO. 360
NO. 378
NO. 382
NO. 388
NO. 390
NO. 400
NO. 402-420
NO. 448
DP 724946
SP 2083
DP 509677
SP 50723
DP 178530
SP 70713
DP 123553
DP 229365
DP 539918
DP 816173
DP 217112
DP 52572
DP 88992
DP 176768
DP 588128
DP 66428
DP 667918
DP 448986
DP 772736
DP 159005
SP 18382
DP 187361
DP 788467
DP 441587
SP 58859
DP 771360
DP 1039996
DP 1039996
DP 528233
DP 34160
DP 596474
DP 538208
DP 57617
DP 66258
DP 183113
DP 879538
DP 879538
DP 9703
DP 552279
DP 74367
DP 179745
SP 67212
DP 597228
DP 919932
DP 827813
SP 6119
DP 436359
DP 182023
DP 66541
DP 61607
DP 233816
SP 30234
DP 915091
DP 857070
DP 66194
DP 70702
DP 448971
DP 600465
SP 64606
DP 115628
DP 613678
DP 875336
DP 55847
DP 536538
DP 90016
DP 66011
SP 21017
DP 929277
DP 87319
SP 10878
SP 57348
DP 184968
DP 217745
DP 397823
DP 828419
SP 56725
SP 7985
DP 75550
DP 733797
DP 59101
SP 58208
DP 222356
DP 792149
SP 9314
DP 804108
DP 173027
SP 51487
SP 51487
DP 775581
DP 74913
DP 1026069
DP 218728
DP 854342
SP 70938
DP 945729
DP 128971
SP 34794
DP 789171
DP 172068
DP 800413
SP 51054
DP 1005181
SP 51077
DP 665268
DP 714272
DP 61187
DP 59928
DP 66402
DP 180188
DP 185691
DP 870244
DP 799594
DP 57459
DP 77642
SP 596
DP 585334
DP 215627
SP 55932
DP 781871
SP 56443
SP 57346
DP 181397
DP 606211
SP 55468
DP 749873
SP 50276
DP 131917
SP 55792
DP 121507
DP 580910
DP 984182
DP 108276
DP 882436
SP 22232
DP 628553
DP 816869
DP 1003818
DP 131110
DP 706240
SP 13171
DP 59871
DP 584896
DP 746830
DP 74923
DP 819301
SP 72056
DP 225060
DP 630190
DP 69787
DP 72928
DP 80969
DP 795723
DP 212027
SP 44910
DP 752059
DP 230025
DP 548142
DP 74797
SP 50853
DP 552568
DP 55318
DP 56190
DP 442348
DP 214560
DP 87527
DP 173075
DP 79775
DP 527289
DP 622968
SP 17914
DP 814858
SP 40301
DP 219857
DP 219857
DP 598704
DP 56723
DP 587198
DP 816746
DP 633736
DP 93666
SP 19316
DP 2885
DP 626651
DP 526161
DP 516988
DP 67940
DP 186799
DP 59754
DP 629101
DP 34837
DP 60293
DP 79095
DP 573094
DP 439550
DP 78245
DP 81535
DP 60489
DP 63968
DP 789940
DP 937618
DP 74609
SP 68274
DP 752057
DP 51645
DP 871183
DP 865713
DP 168168
DP 109825
SP 47076
DP 538917
SP 46528
DP 59753
DP 623821
SP 57347
DP 1067328
DP 901185
DP 59088
DP 60488
DP 61495
DP 115117
DP 260232
DP 215950
DP 853331
DP 853331
DP 853331
DP 221701
DP 184770
DP 982663
DP 134866
SP 67754
DP 826455
DP 171401
DP 440232
SP 42730
DP 548675
DP 69955
DP 68635DP 1044304
SP 6412
DP 67172
DP 407286
DP 747874
SP 42724
SP 3397
DP 34666
DP 114699
DP 192236
DP 869573
DP 547459
DP 107021
DP 907270
DP 571986
DP 129926
DP 588804
DP 588804
DP 51711
DP 124246
DP 83642
DP 107010
SP 57556
DP 635509
DP 78062
SP 16687
DP 341987
SP 21574
DP 749589
DP 1047949
DP 835715
DP 183853
DP 819086
DP 796742
SP 60693
DP 524978
DP 537459
DP 547423
DP 62668
DP 59260
DP 100586
DP 33579
DP 74952
DP 180017
DP 1047646
DP 181756
DP 55841
DP 724114
DP 43756
SP 63932
SP 12981
SP 22674
SP 12322
DP 211120
DP 621404
DP 595978
DP 132358
DP 1087916
SP 74556
DP 1084537
DP 571303
DP 1086866
SP 74745
DP 231095
SP 73569
SP 73146
DP 1066859
DP 1069259
DP 959522
DP 1059553
DP 900055
DP 187103
DP 1006059
DP 793906
DP 80276
SP 62822
SP 69888
DP 131178
SP 71068
SP 71068
DP 34060
DP 1121706
DP 438188
SP 65054
SP 65054
SP 65054
DP 1124741
DP 1111166
DP 1064467
DP 1123751
SP 80022
DP 1104058
DP 1119247
DP 1119291DP 1120957
DP 1120403
DP 1107981
DP 456820
DP 868008
DP 1111875
SP 50276
SP 70031
DP 1027838
DP 113509
DP 1102608
DP 1103195
DP 780001
SP 76907
DP 1095869
DP 865655
DP 865655
DP 865655
DP 865655
DP 1157183
DP 1157183
DP 1159509
SP 22081
DP 1158482
SP 83567
SP 40414
DP 535299
DP 1048658
DP 1014769
DP 1014769
DP 1048563
DP 1048563
DP 82761
DP 1147227
DP 185621
SP 46628
DP 780000
DP 69997
DP 1087249
DP 780004DP 68747
DP 203829
SP 75520
SP 75520
DP 1134880
SP 60341
DP 1027638
DP 1122122
DP 1122122
DP 1115272
SP 81141
DP 771360
DP 853331
DP 853331DP 853331
DP 853331
DP 1112871
DP 182960
DP 182960
DP 1126282
DP 1148542
DP 1165851
DP 847746
DP 909451
DP 1165853
DP 1085830
SP 85269
SP 85269
SP 85269
SP 85263
DP 596634
DP 1164920
1
1
1
1
11
1
1
1
2
Y
7020
2
1
2
2
11
1
1
1
2
4
3
1
1
1
2
2
1
1
2
4
3
1
12322
10
100
1
A
1
1
1
1
12
112
1
11
5
1
100
1
1
2
1
CB
1
2
11
1
1
2
1
1
1
1
1
2
1
23
2
1
2
1
1
11
1
1
1
1
111
1
3
13
1
1
1
B
A1
1
103EFG
1
21
1
PT1
11
1
1
11
1
1
1
1
1
11
1
1
100
1101
1
1
12
2
2
1
1B
1
113
121112
2
1
1
1
1
3
100
1
11
1
1
1
1
10
1
1
21
2223
24
ABKJ
GE
7
8
6
50
1
5
6
11
21
3
2
711
2
1
1
1
12
21
1
1
2311
1
1
1
1
1
21
1
1
1
13
1
1
1
11
1
B
1
C
B
A
1
1
2
6
132PT1
1
1
20
1
B1
A
1
C
B
A
1
1
1
PT1
1
2
1
1
10
1
2
101
10
1
43 5
12
11
1
1
10
10
1
2
1
120
13
27
2212 20
21
4
18
6
3
9
2
14
1
10
5
8
8
19112324
25
15
1
3
1
1
13
1
1
1
1
1
1
10
PT2
1
2
12
26
PT6
21
103
2
185
10
2
12
1
2
10
101
50
1
1
4
3
1
6
7
8
10
11
1
152
1
11
2
1
1
2
2
2
2
2
11112
22
2
1
1
100
12111
22
22
22
22
1
1
3
11
12
1
1
102
1
1
52
12
1
1
17
1
1
2
3
3
1
2
2
2
2
1
11
1
100
12
13
1114
1
1
27
2825
25
26
26
3
PT13PT13
PT6PT6
PT6
PT6
1
2
3
4
100
1
3702
2
1
104
103
1
7005
1
1
2
11
1
12
1
7301
230
231
231
231
231
3
1
2
A
B
8
1
1203
10
1
2
3
11
10
2
1
1
2
CBA
155
1
8
1
1
7
10
1
9
22
2
1
1
4
11
9
6
10
1
11
8
5
1
1
2
1 2
4 5
3
2
1
2
115
1
1
6
1
1
1
41
7
2 11
12
3
7002
DP371
192
DP371
192
DP181957
DP511129
DP979
505
DP511
129
DP558707
DP5030
DP103
9211
DP323435
DP5030
DP996
381
DP996
381
DP567027
DP237745
DP100
8019
DP383735
DP780
403
DP734
946
DP237745DP567027
DP262534
DP506425
DP123
056
SP47529
DP752067
DP550948
DP1190933
DP1201690
DP792740
DP1101874
DP1170557
DP1170557
DP218407
DP322560
DP781576
DP734946
DP371
192
DP701192
DP103
9211
DP1042467
DP5030
DP5030
DP633088
DP103
9211
DP809571 DP262534
DP706146
SP49696
DP5030
DP5030
DP5030
DP339358
DP583735
SP54070
DP5030
DP561413
SP35644
DP629449
DP1042467
DP123
056
DP708306
DP262534
SP11322
DP262534
DP237745DP237745
DP693
45
DP550167
DP536008
DP262534
DP708306
SP56005
DP262534
SP47495
DP1130656
DP608746 DP262534 DP262534
DP1075452
NO. 18
7
NO. 29
NO. 31
NO. 196A
NO. 196NO. 194
NO. 39
NO. 237NO. 231
NO. 229
NO. 225
NO. 221
NO. 213-219
NO. 201
NO. 128
NO. 199
NO. 50
NO. 56
NO. 66
NO. 65-69
NO. 189
NO. 181
NO. 155-167
NO. 100
NO. 53NO. 116
NO. 105-153
DP4569241//995959
1//135586
30//668991
1//996765
SP75492
SP67508
2//659166
11//135914
2//136012
SP71198
SP53973
1//660843
SP87195
1//533762
SP79210
B//105916
C//105916
A//105916
8//1147179
6//10721
5//107214//107213//10721
14//10721
15//10721
7//10721
9//10721
11//10721
10//10721
3//217386
2//217386
1//217386
100//1112199
1//577429
1//847471
4//1145989
3//1145989
2//1145989
1//1145989
5//1145989
4//248753
3//248753
2//248753
1//248753
5//24875311//590852
10//590852
SP67076
1//1157595
SP78698
7//212786//21278
5//21278
8//21278
2//21278
81//232118
80//232118
12//1186738
11//1186738
6//33293
5//33293 4//33293 3//332932//33293
1//33293
7//33293
1//436831
2//205942
1//205942
A//408116
31//805384
32//805384
1//738891
1//433969
B//108312
C//108312
D//108312
E//108312
A//108312
12//399757
2//228641
1//228641
1//814205
5//215751
4//215751
1//537045
1//842429
2//842429
101//1017959
100//1017959
11//219505
1//186677
100//1182099
3//802775
1//738593
1//88581
1//532605
1//89067
2//784927
1//784927
1//996789
3//83367
2//83365
1//89926
1//77645
33//548507
1//233910
682//752011
1//27454
2//27454
NO. 7 - NO. 35
NO. 6
8
NO. 3 - NO. 9
NO. 74 - NO. 80
NO. 38 - NO. 72
NO. 37
NO. 2 - NO. 36
NO. 2 - NO. 36
NO. 7NO. 5
NO. 3
NO. 1
NO. 25
NO. 35
-37
NO. 18
-20
NO. 10
NO. 8
NO. 6
NO. 19
NO. 1-17
NO. 8
NO. 1
NO. 41-45NO. 19
NO. 19-29
NO. 108-120
NO. 1NO. 5
NO. 55
NO. 32-36NO. 38-46
NO. 17
NO. 15NO. 9
NO. 33-39
NO. 1-7
NO. 55
NO. 7NO. 5
NO. 8a - 12
NO. 9-19
NO. 50
NO. 37-51
NO. 44-62
NO. 165 NO. 60-70
NO. 53-63
NO. 52-56
NO. 8-12
NO. 2
NO. 68-96
NO. 4-6
NO. 66
NO. 20-26
NO. 50-58
NO. 44-48
NO. 28-34
NO. 343 - 357
NO. 238-240
NO. 251-253
NO. 229-249
NO. 308NO. 302
NO. 211-217
NO. 300
NO. 209
NO. 137-139NO. 131-135
NO. 125-129
NO. 294
NO. 115-119
NO. 329NO. 327 NO. 325
NO. 315-321
NO. 309-313 NO. 307
NO. 303-305NO. 295-301
NO. 5-7
NO. 532-540
NO. 258-260
NO. 262-264
NO. 266-274NO. 276-278NO. 280-282
NO. 110
NO. 284-292
NO. 112-118
NO. 203 NO. 201A
NO. 201
NO. 197-199
NO. 27
NO. 219-227
NO. 201-217
NO. 183-187
NO. 187A
NO. 60
NO. 189-195
NO. 50-52
NO. 169-173NO. 175-183
NO. 48
NO. 46
NO. 44
NO. 42
NO. 40
NO. 248-250NO. 252-254NO. 256
NO. 275
3//705730 11//790753
6//7155605//715560
SP10913
52//1059651
51//1059651
7//771790
6//771790
SP30607
1//6165
1//1065311
2//4434361//443436
A//438302
Lane//1073691
SP44485
SP73221
C//172499SP90738
27/27/4241
7//18709
21//712127
RW//710424
1//1042838
2//976769
700//822296
1//630174
1//441922
1//88442
1//6335
A//39927
1//172151
4//1078059
SP89054
17//7738123//790997
37//773813
38//773813
32//773813
22//773812
21//773812
23//773812
20//773812
36//773813
2//790997
1//790997
2005//788428
2001//7884282007//788428
2006//788428
2003//788428
1//614251
2//1178736
21//787906
1//1178736
23//787906
14//787934
3//787934
15//787934
4//787934
6//787934
2//7879352//787935
2//7879352//787935
2//7879352//787935
2//787935
2//7879352//787935
2//7879352//787935
2//7879352//787935
2//787935
2//787935
2//787935
2//787935
31//848244
2//787935
2//787935
2//787935
2//787935
2//787935
23//83169531//848244
31//84824433//848244
31//848244
32//848244
25//773812
SP64939
30//3713
25//3713
27//3713
26//3713
1//172481
1//936013
1//11637771//82938
1//76714
1//222085
2//2380934//2380935//230893
6//2380937//238093
9//238093
1//238093
8//2380933//238093
342//714413
341//714413A//106010 B//106010
C//106010
1//921200
1//921200
1//909051
2//48224
2//705730
SP21762
1//544018
2//802222
1//802222
9//802222
8//802222
SP36729
4//802222
3//802222
6//109056
1//109056
2//109056
3//109056
4//109056
5//109056
1//748831
2//748831
SP2760SP16010
1//209345
1//581992
SP10140
SP67217
SP35584
100//1103512
1//206431
SP12852
B//921770
4//508557
3//508557
1//245768
1//795592
1//120268
3&4/5/111171
1//198403
7//741891
3//449826
8//953345
26//910868 9//953345
1//1098250
6//659448
7/B/8
1//111600
1//783167A//202869 B//202869
2//304448
7352//1157191
1//48224
SP6123
SP6123
CONV//553749
1//194596
7/C/8
9/C/8
8/C/8
1/1146537
2//1146537
14/D/8
1//9029331//1159898
15/D/8
SP50787
SP44569
1//DP230954
2'//DP230954
SP192711//DP613575
12//DP613575
5//DP6002
A//DP338032 B//DP338032C//DP338032
D//DP338032
7//DP6002
C//DP344700
Y//DP438679X//DP438679
X//DP442802
Y//DP442802
101//731853
100//731853
1//568575
2//568575
1//709759
1//567686
1//83597
1//74786
1//2236572//223657 3//223657 4//223657
5//223657
1//1018682
12//223657
11//223657
10//223657
9//223657
7//223657 6//223657
C//33654
B//33654
A//33654
1//659415
6/A/8
1//1120215
SP17160
13//923025
1//745924
2//745924
8//223657
MountSt//814848
BlueSt//332248
WilliamSt//79359
Path//202766
61//1048377
12//1138931
63//1048377
SP69906
62//1048377
9//1018716
SP64174
SP69997
12//1138931
1//1120251
15//737191
16//737191
101//864440
100/864440
1//786985
3//7869852//786985
1//218242
2//2182421//5439802//543980
2//897231//87984
1//1171728
2//1171728
7//973015
1//971537
6//971955
81//830386
82//830386
11//60635912//606359
1//8352649//620259
1//68536
1//8018922//8018921//702307
1//7357142//735714
1//707320 2//7073203//707320
1//869851
1//797053
18//615703
1//81204
20//58858621//83827
1//85190
10//577609
1//449826
4//449826
101//600122 1//801648 1//781223
A//72829B//72829
1//70313
17//1007270
2//557873
1//557873
1//606946
2//606946
4//16870
7//16870
6//16870
5//16870
SP62542
11//1005133
2//449826
1//16870
1//517226
2//517226
22//3713
1//594268 2//594268
D//401307
C//401307
2//587254
1//587254
B//436568
A//436568
B//101474
A//101474
B//436595
A//436595
B//443759
A//443759
1//316004
13//3713
280//1051585
1//362642
2//362642
10//749713
1//332248
SP32127
SP36050
SP33375
1//610432
1//225258
3//89521
1//66955
6//84347
1//175784B//175244
1//190523
6//190774
1//539853
1//187252//18725
3//18725 4//187255//18725
6//187257//18725
3//570829
A//110517
G//110517F//110517
E//110517D//110517
C//110517B//110517
4//570827
2//5708251//57339
C//975970B//975970
D//975970
1//229912
3//75717
1//570826
1//60719
101//1180608
10//873855
21//869266
102//1183298
104//1185623103//1185623
1//1173501
2//618296
3//285439
2//285439
1//285439
1//7749932//774993
3//774993
B//400809A//400809
1//715560
3//715560
2//715560
8//7155607//715560
42//718963
41//718963
SP13001
1//565890
SP47382
B//388442
1//851031//63515
SP89107SP20530
SP15363
A//442921
1//595948
2//5959481//251743
3//251743
2//251743
Hickson Rd//737191
4//1057496SP73724
101//1048376
103//1048376
102//1048376
54//1097482
42//1199181
32//788672
1//1157216
12//1167405
41//1199181
40//1199181
39//1199181
38//1199181
35//1199181
34//1199181
36//119918137//1199181
15//1155117
2//11528633//1152863
4//115286359//1155116
94//1073576
21//1169304
20//1169304
1//777656
3//261775
5//261775
9//261775
7//261775
108//264104
1//776315
2//775889
1//7758894//736890
1//7368902//736890
3//736890
1//740303
2//740301 1//740301
5//778140
4//778140
1//777033
1//812782
90//1169318
2//235317
3//235317
5//773812
7//773812 3//773812
2//773812
27//77381226//773812
8//773812
4//773812
6//773812
9//773812
1//773812
10//773812
14//773812
16//773812
12//773812
13//773812
24//773812
30//773812
29//773812
28//773812
11//773812
15//773812
18//773812
19//77381219//773812
SP84632SP83104
SP83424
SP834242//109422
4/2/1649
1//716494
SP49574
SP80569
SP56120
A//436219
B//436219 6//16402
1//16402
2//164023//16402
4//16402
5//16402
10//29672
11//29672
3//29672
2//296721//29672
4//29672
5//29672
6//29672
7//29672
9//29672
8//29672
1//562966
1//434184
B//308231
3//660967
1//338760
1//24071
5//24071
4//24071
3//24071
2//24071
80//702618
1//314750
1//1040301//104029
1//4558693//455869
2//455869
13/4/1265
12/4/1265
11/4/1265
10/4/1265
8/2/1265
1//10818201//185720
SP45318
SP20419
SP63940
5//662064
1//3002491//8353212//835321
1//308866
1//1052258
2//1052258
21/3/172019/3/1720
10/3/17209/3/1720
8/3/1720
25/3/172026/3/1720
32/3/172033/3/1720
39/3/1720
41/3/172042/3/1720
48/3/1720
SP3798117/2/1720
16/2/1720
SP21042
41/2/172039/2/1720
SP12799
3/1/1720
4/1/172014/1/1720
201//582541202//5825411//4157402//4157401//11752232//11752231//511205
2//511205A//437984B//43798410//106413611//1064136SP71320
SP34304
A//377050X//407774
Y//407774
SP71227
SP65840
101//867508
SP11301SP38240
1//5828124//582812
3//5828122//582812
4//656453
2//181976
1//1819761//616439
503//771943504//771943
505//771943
111//635634112//6356341//2025302//202530
501//613178502//61317810//62090511//6209051//201129
3//2011292//201129
381//632239383//632239
382//632239401//574942
402//5749421//5946202//594620
1//776026
4//7760263//776026
2//776026A//330848
D//330848C//330848
B//3308481//221950
2//221950A//318370B//3183701//230039
1//5215402//521540X//107582Z//107582
Y//107582
SP58351
221//516953222//5169532//2177271//217727
45//866379
44//866379
2//815673
1//815673
151//629361152//6293611//5131372//513137A//397124B//3971241//915642
1//915572B//445111
A//44511193//501080
91//50108092//501080
1//5960182//596018
A//445243B//445243A//356451B//356451
37A//43743737B//43743736//661121
1//9218671//922414
1//2285432//2285431//231321
2//2313211//210988
2//21098831//656300
1//91945910//56813311//568133
1//594043
2//594043
2//1113719
1//1113719
A//372277
2//705601
1//705601
B//973362
1//1140976
2//1140976
1//548950
3//548950
2//548950
34//9957031//742738
111//997902
12//7205213//995181
1//770574
1//1112821
2//1112821
4//205720
3//205720
2//205720
2//216072
3//216072
1//527448
3//527448
2//527448
A//440237
B//440237
2//510455
1//510455
SP347334//74598
1//5755382//5755381//598626
2//5986262//2346231//234623
1//5787072//578707
1//2348992//2348991//101066
4//1010663//101066
2//1010661//105126
2//105126
1//503944
2//503944
1//441022
1//573482//57348
1//1214666//1129
1//182051
A//440323B//440323
1//182669
D//180999
C//180999
1//181780
1//1135841
2//218816
1//218816
SP85239
SP63942
D//307138
A//307138
B//307138
C//307138
A//406857
B//406857
A2//366562
A1//366562
2//564057
1//564057
4//606324
SP198202//603668
1//603668
3//561243
2//5612431//561243
1//935629
SP53817
A//72990
C//72990
B//72990
1//72033
1//86012 1//747691
1//3103261//1110805
SP79877
SP43402
1//181800
1//574642
SP57221SP15588
SP47817SP50202
A//908867B//908867103//1043814
104//1043814100//1034902
101//10349021//626796
6//64401
6//1860
5//1860
4//1860
2//1860
1//1860
8//1860
10&11//DP838852
3//DP772072
1//DP776500
1//Dp776500
3//DP776500
23//DP843043
2//DP1015776
PT2//DP1015776
12//DP1003022
9// DP1003022
11//DP1003022
221//DP842970
222//DP842970
13//DP1003022
2//DP1015776
101//DP1140538
51//DP1050018
51//DP1140538
100//DP1140538
35//DP1140476
34//DP1140476
15//DP842945
16//DP842945
A//DP413328B//DP413328
SP333
SP32354
SP2567
SP16820
SP10500
643//752067
1//DP900805
SP54359
SP10091
A//DP960169
SP88326
2//DP565891
1//DP565891
3//DP565891
1//DP187538
21//DP826371
22//DP826371
ROAD//DP1015776
SP51339
6//DP1080001
1//DP1059504
100//DP1059485
100//DP1030970
1//DP325314
1//DP441581
1//DP1161375
2//DP513812
25/B/DP4048
23/B/DP4048
22/B/DP4048
24/B/DP4048
100//DP882760
100//DP1156157
1//DP221896
2//DP221896
1//DP1004920
A//DP377659
B//DP377659
33//DP4138
22/DP4138
32//DP4138
6//DP76687
2//DP1009363
1//dp1009363
1//DP1055517
2//DP861346
1//DP1152647
B//DP321917
100//DP1135891
81//DP62997882//DP629978
7119//DP93907
SP 56520
7//DP4622
8//DP4622
17//DP4622
9/A/DP4622
8/A/DP4622
101//DP845909
6//581403
200//DP852554
1//DP801097
1//DP1049703
1//1052026
833//5424-2030
832//5424-2030
834//5424-2030
835//5426-2030
843//5426-2030
841//5426-2030
842//5426-2030
840//3967-2030
14//DP17470713//DP174707
12//DP17470711//DP174707
15//DP174707B//DP421262
A//DP421262
230//DP1133468
230//DP1133503
1-5//DP85482
3-4/B/DP4048
A//DP938823
8//656251
1//DP900402
1//DP944843
17/2/DP3559
DP85456
1//DP981478
836//5425-2030837//5425-2030838//5872-2030839//5872-2030
1//dp714678
Road
RailwayLand
Talus ST
Dalleys RD
Ella ST
Park RD
Station ST
Chelmsford AV
Francis ST
1//DP117515
1//DP115614
2//DP115614
6//DP879307
Road//DP879307
51//DP1014756
50//DP101475652//DP1014756
Marshall AVE
Marshall LN
Canberra AVE
Lithgow ST
Pacific HWY
Railway Land3
Christie LN
16//DP7259
SP69806
Elizabeth ST
Wilkes AVE
Federation lN
Valetta LN
Brand ST
Hampden LNGarage LN
Francis RD
Broughton RD
Jersey RD
Muttama RD
Artarmon RD
Bridge ST
Cameron AVE
Elizabeth ST
Mowbray RD
Nelson ST
SP3827
SP70673
SP76
Ella ST
Punch ST
Lambs RD
Herbert ST
Herbert ST
1//DP115615
Herbert ST
Railway Land
Cleland Rd
Hampden Rd
A//325013
SP12544
SP20719
SP25
1//3008052//300805
10/5/3489
11/5/3489
SP35865
7/5/3489
SP84067
SP13667
SP13687D//124856
2//1161375
3//1161375
23//819565
SP63561
3/29/838950 4/29/838950
2/29/838950
SP51276
1//746018
1//801523
2//801523
15/28/4241SP60114
6/28/4241
5/28/4241
4/28/42413/28/4241
2/28/4241
1/28/4241
2//900827
10/28/4241
9/28/4241
8/28/4241
7/28/4241
1//17814
2//17814
2//11092
1//11092
7340//1142941
1//926289
2//110095
2//804113
4//804113
30//877478
14//1062447
13//1062447
12//1062447
16//1062447
17//1062447
15//1062447
15//1062447
14//1062447
16/13//1062447
16/13//106244713/16//1026447
116//1078271
116//1078271
1//874757
2/874757
24/637261
1/235433
21/594873
22/594873
8/821649
1/797484
SP81132
1/523736
SP71871
1/100281
10/512094
1/76176
1/862513
1/224852
2/224852
3/224852
4/224852
5/224852
6/224852
7/2248528/224852
9/224852
10/224852
118//1078271
2//1002775
1//1002775
100//629032
4//802920
5//802920
2//802920
6//802920
4//802920
SP34104
7//802920
1//802920
4//802920
103//630403
1//613757
4//613757
3//613757
10//874363
92//4991
1//16575953//66755338//4991
618//720786
620//720786
1//622660
100//1162506
31//70908132//709081
1//623945SP38356
1//838682
2//838682
1//613757
1//986504
1//186276
21//736182
1//201468
40//153
29//153
34//153
35//153
41//153
46//153
1//1022910
2//862287
SP73349
A//442032
SP38998
1//412220
2//412220
1//559626
6//13481
2//13481
11//13481
10//13481
9//13481
8//13481
7//13481
2//315895
1//3158951//930954
1//4388091//791278
1//9003531//948637
1//120456
11//1038730
12//1038730
2//2084
3//2084
4//2084
5//2084
6//2084
1//171612//171961
3//17161
281//627581
1//598577
178//816976
100//825604 101//825604
1//587857
1//511792
2//511792
10//17161
4//171615//17161
6//17161
7//17161
8//17161
9//17161
B//191097
110//135511
A//372370
B//372370
1//938929
1//913081
2//913081
1//658547
1//996309
1//932277
1//974773
1//126278
1//782184
2//1055541//105554
1//1081780
1//1027948
2//913060
1//1007789
A//333549
1//332354
100//858922
8//2084
6//2084 7//2084
9//2084
14//2084 15//2084 16//2084 17//2084 18//2084 19//2084
25//2084
26//2084
27//2084
31//2084 32//2084
37//2804 38//2084
49//2084
50//20841//300532
2//168976 33//168976
1//917799 1//913127
120//137008
1//125318
394//800911
1//622463
1//933553
2//613419
1//613419
13//90884
101//1073657
3//1078059
1//616083
1//120414
1//105372
B//399267B//440195A//440195
A//436418
B//4364186//63355//63354//63353//63352//6335
5//63268
1//73397
A//110240
B//110240
7//1105751
A//439140B//439140
2//63235
1//63235
1//961798
2//630174
A//436670B//436670A//442872B//442872C//171569
D//171569
1//962384
1//448295
A//30481
B//30481
C//30481
D//30481
E//30481
4//59076
1//224416
2//224416
1976//1106298
29//1044120
1//1039552
A//439236B//439236
1//68704
1//85162
1//85405
1 & 2//1089396
1//8663252//866325
42//1173799
43//1173799
1//174940
1//935274
11/1089852
1//9495021//176710
B//176710
4//1012678
1//82797
100/1089847
1//722986
1//936945
1//9353541//1055011//937338
1//937499
1//104093
A//966194
B//966194
1//938346
1&2 //DP1026735
1//1094417
30//611905
SP13501
53//622628
52//622628
1//805700
3//805700
2//805700
B//412065
1//5949731//811526
A//337474
51//190531
1//531016
1//1180059
40//3884 39//3884
47//3884
46//3884
44//3884
2//224810
1//224810
21/1/1465
15/1/1465
16/1/1465
17/1/1465
18/1/1465
19/1/1465
31/1/1465
37/1/1465
36/1/1465
34/1/1465
33/1/1465
32/1/1465
1/1/1465
6/1/14655/1/1465
4/1/14653/1/1465
2/1/1465
14/1/1465
13/1/146512/1/1465
7//654771
1//910653
1//948848
1//982297
1//948847
1//776196
A//959470
B//959470
45//658552
1//659017
1//935543
1//900779
1//188066
SP40509
A//900314
1//182542
1//744955 2//744995
1//9182432//918243
1//1022853
1//10014591//1012673
1//921280
1//182543
4//901125
3//901125
2//901125
1//935272
38//153
45//153
Lane//73397
5//7432584//743258
1//976769
1//721689
40-41//1173799
3//913060
1//913060
27/2/34204
26/2/34204
25/2/34204
24/2/34204
16/2/34204
15/2/34204
14/2/34204
8/2/34204
9/2/34204
unidentified
1//1169227
SP98961
1//524995
SP63448
A//100166B//100166
3//32581//131774
1//707358
1//529532
1//564064
2//564064
4//974075
13//925246
12//925246
27/A//2979
26/A//2979
25/A//2979
24/A//2979
23/A//2979
22/A//2979
121/135072
23/B//2979
22/B//2979
21/B//2979
20/B//2979
19/B//2979
18/B//2979
17/B//2979
16/B//2979
15/B//2979
14/B//2979
13/B//2979
12/B//2979
11/B//2979
1//961234
1//900106
1//1081282//108128
3//108128
B//437594
A//437594
28//766
27//766
24//766
14//766
1//1111896
13//667280
251//818994
252//818994 2//556993
1//5569931//103654
2//103654
1//589620123//1971124//1971
125//1971126//1971127//1971
128/1971129//1971130//1971
133//1971134//1971
501//816264
1//170918
1//301018
1//300827
5//26724
402//1117049401//11170491//11166202//1116620
SP87380
237//2012
236//2012
235//2012 233//2012
234//2012 232//2012
231//2012
230//2012
229//2012
2//774207
3//774207
4//774207
2//604715
C//319277
B//319277
A//319277
1//621985
2//1136683
1//995008
B//1061791//196797
1//734230451//617045
47//547400
1//195836
50//87215
1//605019
1//195450
1//83527
53//10198
54//10198 55//10198 56//10198 57//10198
58//10198
59//1019825//10198
24//1019823//10198
22//1019821//10198
20//1019819//10198
18//1019817//10198
16//1019815//10198
14//1019813//10198
12//1019811//10198
10//10198
2//10198 SP79123 B//399118
A//399118
11//746611
10//710424
517//752049
18//75967
11//978678
28//653340
6//1031434
5//1031434
4//1031434
3//1031434
2//1031434
1//1031434
46//975184
1//782060
1//743869
54//137174
1//935184
1//743946
1//1016234
OharaRd//108128
44//975184
53//975184
52//975184
49//975184
67//975184
65//975184
42//975184
41//975184
RoadWidening//1190823
CavetSt//1042838
1//513506
1//742034
1//1942862//876901
1//876901 2//224368
1//224368
1//73708
B//110448
A//110448 C//110448 D//110448E//110448
F//110448G//110448
EMT//110448
1//63112
3//232614
SP9729
SP10240
SP22639
SP3243
SP3244
SP3005
A//395551
B//395551
A//436276
B//436276
4//210560
1//210560
2//2105603//210560
1//530496
2//530496
1623//747151
SP21075
20//712127
6//18709
4//18709
3//18709
A//347517
B//347517
1//500873
2//500873
A//407247
B//407247
1//1329283//132928
2//132928
A//947655
D//947655
1//1054192//105419
B//443212A//443212
1//725200
19//4595
16//459515//4595
10//45959//4595
8//45957//4595
6//4595
4//4595
3//45952//4595
1//4595
20//4595DRAINAGE//4595
18//11112401//1119027
17//4595
1//1019111
1//9507402//504762
1//504762
1//949057
1//102855
12//5148
11/5148
10//5148
1//5148
2//5148
RoW//751561//75156
1//781003
B//441994A//441994
1//181431
103//709548104//709548
1//310693
1//310693
CREEK//310693
1//1130929
7/1/866
6/1/866
1//430454
1//960747
2//960747
55//660240
1a//181269
1//181269
54//2191
lane//5148
con//446540
con2//446540
CON3//446540
210//1172133
211//1172133
SP67702
6//879307
2//879307
5//879307
10//1083469
1//917989
3//733528
2//733528RW//733528
1//1079151
SP74480
15//1017606
SP62272SP61518
1//778425
2//778425
SP19462
SP49886
SP9784
3/C/4048
1/C/4048
2/C/4048
6/C/4048
5/C/4048
4/C/4048
4A/C/4048
SP87721
SP89763
C//401303
23//882435
2//222317
13//230974
12//230974
ROAD3//230974
ROAD//230974
ROAD2//230974
2//515918
1//515918
225//802970
1//18533
4//18533
3//18533
2//18533
231//735044
1//629988
1//599188
A//306221
B//306221
1//923620
1//923621
151//868438
152//868438
11//739468
12//739468
4/2/364
3/2/364
1//603389
1//983725
1//948856
78//701181
8//957019
8//946933
1//168319
2//168319
102//790473
SP62970
ROAD//858277
100//631290
1//702402
1//605751
1//594170
101//838921
9//806092
5//806092
15//833059
ROAD//833059
30//805818
14//805818
29//805818
7//805818
8//8058189//805818
10//805818
11//805818
33//805818
32//805818
31//805818
SP44078
12//8541
16//8541
15//8541
14//8541
13//8541
A//364802
B//364802
15//4639
SP55909
2//838696
1//241433
10//241433
9//241433
8//241433
6//241433
5//241433
2//575785
1//575785
100//1035334
100//708371
SP9122
1//574553
2//558401
SP6667
7/F/4101
8/F/4101
9/F/4101
SP6962
SP9555
15/C/4101
SP12194 2//5900411//590041
1//876562
SP61037
2//519358
SP33949
SP81541
1//167766
SP87873
SP63082
SP2447
1//921883
201//10918221//66874
1//66061
27/11/4088
26/11/4088
24/11/4088
23/11/4088
21/11/4088
22/11/4088
20/11/4088
6/11/4088
7/11/4088
8/11/4088
9/11/4088
10/11/4088
11/11/4088
12/11/4088
13/11/4088
14/11/4088
15/11/4088
16/11/4088
17/11/4088
18/11/4088 25/11/4088
19/11/4088
34/9/4088
33/9/4088
32/9/4088
31/9/4088
30/9/4088
29/9/4088
26/9/4088
25/9/4088
24/9/4088
4/9/4088
5/9/4088
6/9/4088
7/9/4088
8/9/4088
9/9/4088
10/9/4088
11/9/4088
12/9/4088
13/9/4088
14/9/4088
19/7/4088
17/7/4088
13/7/4088
1//917217
8/7/4088
ROAD2//4088
ROAD//4088
LANE//4088
1//591747
1//418152
2//965133
SP81490
SP35330
433//752067
434//752067
436//752067
440//752067
B//358256
A//358256
ROAD//358256
B//939656
A//939656
1//1088625
1//1022490
3//1022490
2//1022490
SP54779
SP18981
SP11059
SP12063
SP17523
SP52012
SP42490
SP18794
SP36589
SP21672
SP69432
SP31792
SP46392
SP44122
SP13013
3//668846
SP15342
SP56666
SP22973
SP9263
SP79280
SP517403//1149313
2//11493134//1149313
SP20020
1//1149313
1//951806
2//951806
2//216145
1//216145
23/27/4241
24/27/4241
22/27/4241
14/27/42419/27/4241
10/27/4241
11/27/4241
12/27/4241
13/27/4241
1/27/4241
8/27/42417/27/4241
6/27/42415/27/4241
4/27/42413/27/4241
2/27/4241
34/27/4241
28/27/4241
33/27/4241
1//926579
2//926579D//390464
A//390464
B//390464
C//390464
42/26/4241
63/26/4241
62/26/4241
61/26/4241
60/26/4241
59/26/4241
58/26/4241
57/26/4241
56/26/4241
55/26/4241
54/26/4241
53/26/4241
52/26/4241
51/26/4241
50/26/4241
49/26/4241
48/26/4241
47/26/4241
46/26/4241
45/26/4241
44/26/4241
43/26/4241
41/26/4241
9/26/4241 10/26/4241
A//448962 B//448962
3/26/4241
6/26/4241
5/26/42414/26/4241
10//1151962
7//771311
8//771311
1//33991
6//339915//33991
4//339913//33991
2//33991
SP22997
19//660966
SP72241
1//564685
17/11/2872SP83145
1//9274071//104816
SP571191//900998
1//11558128//45593929//455939B//443166 A//443166
31/11/287232/11/2872
SP54438
1//1179956
SP72517
7/11/28726/11/2872
5/11/28724/11/2872
3/11/28722/11/2872
1//1029839
SP69051 SP690521//716374
6//7032755/13/2872
1//740017120//564606
1//228176
SP32797
12//229804
71//749690
1//5770701//1022881
SP88056
20/10/287219/10/2872
18/10/2872
17/10/2872
SP7001326/10/2872
27/10/287228/10/2872
29/10/287230/10/2872
31/10/2872321//566480SP62962
SP73656
SP77654
A//443072 B//443072C//443072
SP71980
SP82937
SP69455
1//1203289
7/17/31758/17/3175
9/17/3175
1//433297
B//377423
D//377423C//377423
A//377423
1//1179636
SP73071
1//628513
1//787390
26//65819327/16/3175
101//748012
SP45213
SP73937
2//131586
1//131586
1//1096026
1//772247
10//660453
A//431687
SP74218SP74218
SP74219
SP74219
2//4559371//455937
Con//243632
18//17947
17//17947
2//210074
1//210074
2//534102
1//534102
B//373374
A//373374D//414422
C//414422
12//17947
11//17947
B//397988A//397988
8//17947
2//219720
1//219720Y//420096
X//42009652//833019
51//833019
Y//401329
1//51160945//1371 46//1371
SP46716 40//1371
A//387618
B//387618
C//387618
A//313734
B//DP4300901//900304
E//313734
D//313734
C//313734
B//313734
38//1371
B//335009
A//335009 SP13072
D//369116
C\369116
1//329951B//369116
A//369116
64//1371
63//1371
23//1371
22//1371
1//223381
45//4897
46//4897
47//4897
29//489730//4897
33//4897
34//4897
35//4897
36//4897
37//4897
38//4897
39//4897
40//4897
41//667449
42//935160
43//4897
44//4897
312//602115
311//602115
322//713958
321//71395825//4897
1//966737
27//4897
26//4897
SP54440
1//1012210
2//1012210
4//443436
3//443436
13//6605
12//6605
11//6605
10//6605
9//6605
8//6605
7//6605
6//6605
5//6605
4//6605
3//6605
1//6605
2//4558552//660863
1//952751
18//6605
17//6605
16//6605
15//6605
34//66051//1081220
1//1319101//947617
1//959105
2//925577
21//1371
1//1371
4//1371
7//1371
8//1371
9//1371
15//137116//1371
17//1371
18//1371
19//1371
20//1371
A//435411
B//435411
1//1092152
55//645956//6459
42//6459
43//6459
44//6459
45//6459
46//6459
47//6459
48//6459
49//6459
50//6459
51//6459
52//6459
53//6459
54//6459
1//300468
2//300468
C//958987D//958987
1//4555471//961909
14//6619211//962719
2//209678
1//209678
B//107375
C//107375 A//107375
1//455542
2//1371
37//1098650
1//4558562//455856
1//984019
1//72476595A//915982
1//915653
65//1188320
48//4897
47//1104700
401//840404
402//840404
92//1001001
91//1001001
Road//6459
A//335894
C//393690B//393690
3//3830
B//387768
42//359943//3599
44//359945//3599
49//359950//3599
51//3599
55//3599
58//3599
59//3599
60//3599
B//349161
A//394161
2//511009
1//511009
A//338501
522//1061821
511//1061821
10//73608711//736087
2//984286
1//509544
2//509544
61//1127755
11//4488
12//4488
13//4488
14//4488
18//4488
5//301358
1//1098894
A//309678B//309678
//SP83803
1//173802
A//362853
2//513123
1//513123
SP10690
SP46713
50//3253
49//3253
//SP44463
//SP43905
41//3253
76//325375//3253
72//325371//3253
70//3253
67//325366//3253
65//325364//3253
63//3253
32//3253
33//3253 34//3253 35//3253 37//3253
38//3253
1//942338
21//3253
27//3253
30//3253
1//133563
20//165211
31//3253
17//666363
1//306943
8//32537//3253
6//3253
1//935996
1//567571
1//7113982//711398
1//1193341//312694
1//181697
1//184078
2//212916
101//634747
1//746407
1//871357
2//927620
1//927620
1//901053
2//901053
1//955709 A//954736
13//8233
12//8233
11//8233
10//8233
9//8233
8//8233
7//8233
6//8233
5//8233
4//8233
3//8233
1//82332//8233
A//376902
B//376902
1//949773
14//7949
13//7949
12//7949
1//7949
3//7949
4//7949
5//7949
6//7949
7//7949
8//7949
9//7949
10//7949
11//7949
B//110487A//110487
32//6605
31//6605
28//6605
27//6605
A//947025
29//656102
2//966581
1//966581
10//61659//6165
8//6165
5//6165
4//6165
3//61652//6165
2//201817
1//201817
C//938484
1//67363
3//67363
1//946252
1//980345
1//981749
15//10765
14//10765
13//10765
12//10765
11//10765
SP8697
26//4419
28//4419
SP11661
20//4419
19//4419
3//4419
4//4419
5//4419
6//4419SP81009
1//929029
2//929029
SP20242
SP14923
A//414050B//414050
21//1109858
22//1109858
78//1196334
B//443000
1//541093
2//541093
SP87985
1//318840
B//411063
1//559724
2//559724
2//512808
SP3558
2//928137
A//954414
SP43245
1//937693
1//937697
2//974570
1//974318
1//949121
1//949122
59//656103
A//300888
B//300888
99//4932
62//493263//4932
64//4932
65//4932
1//119819
46//659939
47//4932
48//4932
49//4932
//SP20280
51//4932
100//4932
52//4932
53//4932
54//4932
13//493212//4932
11//493210//4932
SP56089
8//4932
7//49326//4932
5//4932
4//4932
3//4932
2//4932
1//4932
B//311952
A//311952
1//955610
2//955610
B//315010
A//315010
1//449334
1//955615
1//956634
1//961704
1//957403
1//958683
1//959103
1//9640211//320681
SP31114
SP85504
62//108056661//1080566
2//1081380
1//1081380
B//9384842//301924
1//301924
25//663321
1&2//455549
19//130995
18//130995
1//1057483
2//1057473
25//667437
25//659941
A//963567
1//9005352//900535
SP39152
Lane//3253
SP79274
Road1//1115631
Road2//1065311
1//183258
A//178812
B//178811
C//178428
1//313328
1//124154
3//104286
3//10794902//656456
1//651865
6//333761
5//333761
82//719874
A//333866
B//333866F//436382
E//436382
D//436382
C//436382
B//436382
A//436382SP43751
1//936314
7//656452
1//940853
1//925872 1//724930
1//610792
100//1204946
101//838849
SP56911
SP49822
5//873158
4//876514
2//912271
1//912271
2//876514
RODENS//773848
12//773848
RW//43776
110//872752
1//1164047
3//732592
2//732592
4//7325925//732592
6//7325927//732592
9//732592
8//732592
1//732592
2//258013
3//258013
5//258013
1//258013
1//244444
2//244444
4//2334143//233414
SP53158
11//1065410
SP72797
12//1065410
SP77663
SP61897
SP61643
SP61643
1//225361
4//1158807
SP85579
SP85578SP85579
SP85578
1//75779
1//1052779
1//1030181
1//121922
3//778140
1//778140
2//778140
3//1053387
SP70672
2//1053387
A//74976
19//69475
3//69475
30//69475
29//69475
28//69475
27//69475
15//69475
16//69475
17//69475
187//69475 100//1076265
101//1076265
101//1165378
SP39994
SP39994SP404417
422//811583
SP39993
6//771884
5//771884
4//771884
2//771884
3//771884
1//771884
3//614251
4//614251
1//614251
SP67311
SP22784
SP62988
50//1038651
51//1038651
1//1019694
2//1019694
1//787946
A//104160
B//104160
501//714847
3/2/1092
2/2/10927//10046
20//1063401
21//1063401
1//75111
1//70970
1//107759
A//435746
B//435746
D//435746
C//435746
1//188061
1//1106071//913005
1//69466
4//57434
7//6296942//880891
2//880891
1//880891
182//606865
181//606865
1//217877
1//2208301//537286
180//606866
1//112602
1//1171358
RW//838849
101//1204946
11//116300813//116300812//1163008
1//724891
1//1130972 102//1165383
100//1165369
1//513109
4//524306
6//75338
1//11123082//1112308
1108//48839
30//112354529//1123545
28//1123545
2//10946741//1094674
12//1018493
SP75815
1//10421672//1042167
1//247451
2//247451
3//247451
4//247451
5//247451
6//247451
3//46574//4657
5//46576//4657
7//46578//4657
12//465713//4657
B//371103A//371103
7//950655
8//247451
1//587093
2//587093
B//82799
A//82799
9//73877
8//75847
1//930219
1//982731
2//580391
1//580391
D//439816
C//439816
A//436781
A//437400B//4374001//5218782//521878
25/4/1720
20/4/172021/4/1720
3//5639052//563905
1//5639053//509350
2//5093501//509350
B//377060A//377060
B//357126A//357126
2//748286
1//7482861//2221762//222176
3//222176
5//222176
SP13156
1//567141B//109402
1//1117305
1104//46990
1106//46990
1107//46990
1105//46990
SP22753
1//5076302//507630
1//793698
4//7936983//793698
2//7936981//2058432//205843
883//752067
D//439427
C//439427A//438015
1//115787
1//656298
1//115781
2//115781
2//905619
7321//1149783
1//115786
5/B/976767
1/B/976767
1//20528613//113983112//1139831
1//455872
B//87330
1//706155
A//437416D//437416
C//437416B//437416
1//839824
RW//839824
2//839824
Alexander//567141
7,8,9//1113783 & 1//709999
2//11224891//1122489
100/811996
1/200724
21/607271
1/224124
SP35644
22//809571
5//814848
10/70667
SP113221/8463233/552482
B/339358
1/104072
DP780400
2//1201690
SP54293
1//1201688
100//859495
RECT//814848
MS//814848
11//10916867//814848
38//868462
1//814292
40//877867
8//814848
5//814848
SP55570
5//181036//18103
4//18103
SP12328
SP16506
DP337854Y//441127
SP57165
11//7274
6//7274
7//7274
8//7274
B//1732234
10//979505
13//979505
12//979505
11//979505
SP40233
1//127595
ROW//865230 1//865230
72//731413
SP395782//831859
1//831859
1//771417
2//771417
1//1042467
2//62370
58//1107016
SP19824
5/C/8
B//359959
2//581992
SP125
SP4308
SP6454
6//802222
7//802222
Sp62225
9//1860
1//181153
7//176556
C//312439
A//312439
B//312439
3//1101874
1//1101874
2//1101874
SP19518
8//624861
4//263032
1//263032
2//263032
3//263032
101//1018645
1//119930610//627391
2//544711
1//544711
B//344156
SP1985
SP40558
B//34091SP80723
SP84779
SP48832
101//835078 SP63051
SP21394
17//2798
16//27982//218407
1//1150156
2//1150156
9//996381
8//996381
5//58706
SP3855
SP47192
1//63644
A//105757
1//786322
2//499721
1//499721
671//590876672//590876
1//231800
2//231800
3//431519
1//812322
1//9185441//656297
1//325522
1//112934
7//795249
13//448748
1//127150
1//919652
4//975388
1//997232
1//1033999
1//986829
1//797366
1//794607
A//973361
2//852829
1//852829
SP11470
13&14//1133414
7//113724790&10//1137247
8//1137247
1//782363
SP55939
A//1732234
MARRICKVILLEDIVE
WATERLOOPITT
STREETMARTINPLACE
BANGAROOBLUESPOINT
VICTORIACROSS
CROWSNEST
ARTARMONSUBSTATION
CHATSWOODDIVE
CHATSWOOD
SYDENHAM
SYDNEY
HARBOUR
SL/27.11.17ISSUED FOR INTERNAL REVIEW SL/27.11.27 SL/27.11.17A1
27.11.27SUE LEWIS
27.11.27SUE LEWIS
27.11.27SUE LEWIS
27.11.27SUE LEWIS
27.11.27SATURN RAMOS
-
-1
A1JCG-SWL-TM-DRG-002296-0002
1LOCALITY AND KEYPLANWATERLOO - BOTANY ROAD WORK SITETRAFFIC MANAGEMENTWATERLOO STATION EXCAVATION AND PRECINTSYDNEY METRO CITY & SOUTHWEST
SERVICEPROVIDERS
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR
CAMD DESCRIPTION DESIGNERSIGN./DATE
VERIFIEDSIGN./DATE
APPROVEDSIGN./DATE
SCALES
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
DF 801*554
Plot
Dat
e &
Tim
eFi
le P
lotte
d
CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE:DRG No.STATUS:FILE No.
DRAWN
DESIGNED
DRG CHECK
DESIGN CHECK
APPROVED
OFSHEET:
EDMS No.
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specificpurpose and may not be used for any purpose other than the purpose intended by Transport for NSW.Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or anyof the related information for any purpose other than the intended purpose. This drawing is protected by copyrightand no part of this drawing may be reproduced in any form without the express written permission of Transport for NSW.
CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE: Plot
ted
by11
/27/
2017
1:4
4 PM
SRAM
OS
NOT FOR CONSTRUCTION
CLIENTIC CERTIFIED - IC CERTIFICATEREVIEWED - APPROVED
COPE ST
RAGL
AN S
T
BOTANY RD
HEND
ERSO
N RD
WEL
LING
TON
ST
BUCK
LAND
ST
PARKINGNO STOPPINGBUS ZONEMAIL ZONELOADING ZONEUNRESTRICTED
SCALE:
OF
CLIENTPROJECT
Plot Date: Cad File No:2 April 2017 - 5:24 PM C:\Users\samue\OneDrive\FDConsulting\102-SUELEWISCONSULTING\10-DELTAGROUP\146-WATERLOOEXISTINGPARKINGRESTRICTIONS\102-10-146-A-00.dwg
DRAWN BY:
DRW CHECK:
APPROVED:
IND REVIEW:
DRAWING No:
SHEET
REVISIONHEIGHT DATUM:COORDINATE SYSTEM:
SYDNEY METRO
EXISTING PARKING RESTRICTIONS
DD-SYDM-DWG-0005-01
1 1A-00N/A
LS
SL
SS
WEDDING AND FUNERAL VEHICLES EXCEPTEDDURING NO STOPPING
NORTHBOUND AND SOUTHBOUND CLEARWAY06:00-10:00 & 15:00-19:00 MON - FRI
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 15 of 20
Appendix 2 Proposed site operations
DRAWING NUMBER DESCRIPTION
JCG-SWL-TM-DRG-002296-0003 Botany Road proposed access/egress arrangements including swept path (present to March 2018)
DD-SYDM-DWG-0005-02 Botany Road proposed access/ egress arrangements including swept path (March 2018 to March 2018)
??
?
?
?
?
REVIEWED - APPROVED0 2 8 10m64
SCALE 1:200 (A1)SCALE 1:400 (A3) SERVICE
PROVIDERS
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR
CAMD DESCRIPTION DESIGNERSIGN./DATE
VERIFIEDSIGN./DATE
APPROVEDSIGN./DATE
SCALES
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
DF 801*554
Plot
Dat
e &
Tim
eFi
le P
lotte
d
CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE:DRG No.STATUS:FILE No.
DRAWN
DESIGNED
DRG CHECK
DESIGN CHECK
APPROVED
OFSHEET:
EDMS No.
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specificpurpose and may not be used for any purpose other than the purpose intended by Transport for NSW.Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or anyof the related information for any purpose other than the intended purpose. This drawing is protected by copyrightand no part of this drawing may be reproduced in any form without the express written permission of Transport for NSW.
CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE: Plot
ted
by11
/27/
2017
1:3
6 PM
SRAM
OS
CLIENTIC CERTIFIED - IC CERTIFICATE
PRELIMINARY
SL/27.11.17ISSUED FOR INTERNAL REVIEW SL/27.11.27 SL/27.11.17A1
27.11.27SUE LEWIS
27.11.27SUE LEWIS
27.11.27SUE LEWIS
27.11.27SUE LEWIS
27.11.27SATURN RAMOS
-
-1
A1JCG-SWL-TM-DRG-002296-0003
1AUTOTURNWATERLOO - BOTANY ROAD WORK SITETRAFFIC MANAGEMENTWATERLOO STATION EXCAVATION AND PRECINTSYDNEY METRO CITY & SOUTHWEST
COPE ST
BOTANY RD
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT
SCALE:
OF
CLIENTPROJECT
Plot Date: Cad File No:20 June 2017 - 1:25 PM C:\Users\samue\OneDrive\FDConsulting\102-SUELEWISCONSULTING\10-DELTAGROUP\158-WATERLOOACCESS-EGRESS\102-10-158-D-00.dwg
DRAWN BY:
DRW CHECK:
APPROVED:
IND REVIEW:
DRAWING No:
SHEET
REVISIONHEIGHT DATUM:COORDINATE SYSTEM:
SYDNEY METROWATERLOO
PROPOSED SITE ACCESS & EGRESS
DD-SYDM-DWG-0005-02
1 1D-00N/A
LS
SL
SS
First Unit WidthTrailer WidthFirst Unit TrackTrailer Track
::
::
Steering AngleLock to Lock Time
::
metersTANDEM TIPPER + QUAD DOG
30.06.0
2.502.502.502.50
5.705.00
1.20
4.501.67 1.73
8.307.90
Articulating Angle 70.0:
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 16 of 20
Appendix 3 Traffic control plans
TCP # LOCATION FROM TO TIMING TRAFFIC CONTROL WORKS IMPACTS
0005-05 Raglan Street Botany Road
Cope Street Outside of peak periods
Kerbside lane closure including pedestrian detour to northern footpath
Service proving Parking lane to be used to separate traffic from the site. Existing parking restrictions will be temporarily removed during these works
0005-06 Cope Street Raglan Street
Wellington Street
Days/ nights
Kerbside lane closure including pedestrian detour to eastern footpath
Service proving
Noise wall construction
Parking lane to be used to separate traffic from the site. Existing unrestricted parking will be temporarily removed during these works
0005-07 Wellington Street
Botany Road
Cope Street Outside of peak periods
Kerbside lane closure including pedestrian detour to southern footpath
Service proving
Noise wall construction
Parking lane to be used to separate traffic from the site. Existing unrestricted parking will be temporarily removed during these works
TCP-SWL-BOT-SB-120003
Botany Road Raglan Street
Wellington Street
Outside of peak periods
Kerbside lane closure, maintaining bus stop and pedestrian movements
Plant delivery/ removal
Minimal impacts to traffic as taken outside of peak periods
Minimal impact to parking as the works occur at night, post the PM peak Clearway restrictions
TCP-SWL-BOT-SB-120005
Botany Road Raglan Street
Wellington Street
ALL Pedestrian management during site access/ egress
Truck access/ egress
Minimal impacts to traffic
Pedestrian activity low due to demolition of site
TCP-SWL-BOT-SB-120004
Botany Road Raglan Street
Wellington Street
Outside of peak periods
Kerbside (parking) lane closure adjusted to suit work area with pedestrian diversion in place
Plant delivery/ removal
Parking lane to be used to separate traffic from the site. Existing parking restrictions will be temporarily removed during these works. Pedestrian diversion, where required. Access to bus stop retained
JCG-SCN-TM-TCP-002296-0001-TCP
Botany Road Raglan Street
Wellington Street
Nights Contra flow Sewer works Southbound bus stop closed north of Wellington Street
Northbound bus stop to remain open
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 17 of 20
TCP # LOCATION FROM TO TIMING TRAFFIC CONTROL WORKS IMPACTS
Parking removed on both sides of Botany Road during the works.
JCG-SCN-TM-TCP-002296-0002-TCP
Botany Road Raglan Street
Wellington Street
Nights Contra flow Sewer works Southbound bus stop closed north of Wellington Street
Northbound bus stop to remain open
Parking removed on both sides of Botany Road during the works.
COPE ST
RAGLAN ST
BOTANY RD
HENDERSON RD
COOPER ST
YNDHAM ST
WYNDHAM
ST
SCALE:
OF
SCALEPROJECT
Plot Date: Cad File No:19 November 2017 - 8:31 PM C:\Users\samue\OneDrive\FDConsulting\102-SUELEWISCONSULTING\13-SYDNEYMETRO\0005-WATERLOO\DD-SYDM-DWG-0005-05-P2.dwg
DRAWN BY:
DRW CHECK:
APPROVED:
IND REVIEW:
DRAWING No:
SHEET
REVISIONHEIGHT DATUM:COORDINATE SYSTEM:
SYDNEY METRO
SYDNEY METRO
WATERLOOLANE CLOSURE
RAGLAN ST
1 1
P2N/A
LS
SL
SS 0 5 20 25m1510
SCALE 1:500 AT ORIGINAL SIZEP3
28 Nov
Ensure signs are visible
Maintain current lane widths
COPE ST
RAGL
AN S
T
BOTANY RD
COOPER ST
WEL
LING
TON
ST
BUCK
LAND
ST
SCALE:
OF
SCALEPROJECT
Plot Date: Cad File No:19 November 2017 - 8:32 PM C:\Users\samue\OneDrive\FDConsulting\102-SUELEWISCONSULTING\13-SYDNEYMETRO\0005-WATERLOO\DD-SYDM-DWG-0005-06-P2.dwg
DRAWN BY:
DRW CHECK:
APPROVED:
IND REVIEW:
DRAWING No:
SHEET
REVISIONHEIGHT DATUM:COORDINATE SYSTEM:
SYDNEY METRO
SYDNEY METRO
WATERLOOLANE CLOSURE
COPE ST
1 1
PN/A
LS
SL
SS 0 5 20 25m1510
SCALE 1:500 AT ORIGINAL SIZE
Maintain current lane widths
28 Nov 17
SCALE:
OF
SCALEPROJECT
Plot Date: Cad File No:19 November 2017 - 8:32 PM C:\Users\samue\OneDrive\FDConsulting\102-SUELEWISCONSULTING\13-SYDNEYMETRO\0005-WATERLOO\DD-SYDM-DWG-0005-07-P2.dwg
DRAWN BY:
DRW CHECK:
APPROVED:
IND REVIEW:
DRAWING No:
SHEET
REVISIONHEIGHT DATUM:COORDINATE SYSTEM:
SYDNEY METRO
SYDNEY METRO
WATERLOOLANE CLOSUREWELLINGTON ST
1 1
PN/A
LS
SL
SS 0 5 20 25m1510
SCALE 1:500 AT ORIGINAL SIZE
28 Nov 17
Maintain current lane widths
NOT TO SCALE
N
TRAFFIC CONTROLPLAN
DATE: 17/11/2017REV DATE: 01/12/2017
*Traffic control works shall be installed & maintained in accordance with A.S. 1742.3 (Traffic Control Devices for Works on Roads) & RTA Traffic controlat Work Sites Manual Version 4 June 2010.
*Local constraints may not allow sign and devices to be placed exactlyin accordance withthe TCP, therefore it may be necessary to place sign and devices as close as possible to the spacing indicated.
*Signs should generally placed 1 metre clear of the travelled path.
*Signs are to be Class 1 retro-reflective (day/night)
Install as per TCP and in accordance with any changes as shown on TCP
Team Leader (Onsite):
Signature:
Date:
Ticket: Orange/Red/Yellow (Circle Appropriate)
Ticket No:
Reasons for modification:
Email to: [email protected]
DRAWN BY:
CERTIFICATE NO:
SIGNATURE:
PLAN CHECKED BY:
CERTIFICATE NO:
SIGNATURE:
SAMANTH JADALA
0044399691
SUE LEWIS
0022818927
AREA:
LOCATION:
TCP NO:
SHEET NO:
WATERLOO
BOTANY RD, WATERLOO(SLOW LANE CLOSURE)
TCP-SWL-BOT-SB-120003
1 OF 1
WORK VEHICLE
WORK ZONE
AUTHORISED TRAFFICCONTROLLER
700 MM TRAFFIC CONESWITH REFLECTIVE NIGHT STRIP WITH 220 MM SPACING
LEGEND
RAGLAN ST
HENDERSON ROAD
BUCKLAND ST
WELLIN
GTON ST
BO
TAN
Y RO
AD
BO
TAN
Y RO
AD
ROAD WORK
AHEAD
T1-1
T1-5-2 *
45M
45M
45M
T5-5
40
ROAD
WORK
R4-212
END
ROAD WORK
T2-16
86, BOTANY RD
BUS STOP REMAINS OPEN
TRAFFIC CONTROLLERASSIST PEDESTRIANSTO BUS STOP
RO
AD
WO
RK
ON
SIDE R
OA
D
T1-25
T1-5-2 *
15M
15MR
OA
D W
OR
K
ON
SID
E R
OA
D
T1-2
5
T1-5
-2 *
15M
15M
www.invarion.com
NOT TO SCALE
N
TRAFFIC CONTROLPLAN
DATE: 17/11/2017
*Traffic control works shall be installed & maintained in accordance with A.S. 1742.3 (Traffic Control Devices for Works on Roads) & RTA Traffic controlat Work Sites Manual Version 4 June 2010.
*Local constraints may not allow sign and devices to be placed exactlyin accordance withthe TCP, therefore it may be necessary to place sign and devices as close as possible to the spacing indicated.
*Signs should generally placed 1 metre clear of the travelled path.
*Signs are to be Class 1 retro-reflective (day/night)
Install as per TCP and in accordance with any changes as shown on TCP
Team Leader (Onsite):
Signature:
Date:
Ticket: Orange/Red/Yellow (Circle Appropriate)
Ticket No:
Reasons for modification:
Email to: [email protected]
DRAWN BY:
CERTIFICATE NO:
SIGNATURE:
PLAN CHECKED BY:
CERTIFICATE NO:
SIGNATURE:
SAMANTH JADALA
0044399691
SUE LEWIS
0022818927
AREA:
LOCATION:
TCP NO:
SHEET NO:
WATERLOO
BOTANY RD, WATERLOO(TRUCKS ENTRY/EXIT)
TCP-SWL-BOT-SB-120005
1 OF 1
WORK VEHICLE
WORK ZONE
AUTHORISED TRAFFICCONTROLLER
700 MM TRAFFIC CONESWITH REFLECTIVE NIGHT STRIP WITH 220 MM SPACING
LEGEND
RAGLAN ST
HENDERSON ROAD
BUCKLAND ST
WELLIN
GTON ST
BO
TAN
Y RO
AD
BO
TAN
Y RO
AD
TRAFFIC CONTROLLERTO MANAGE PEDESTRIANSWHILE TRUCKS ENTRY/EXIT
GATE
TRUCKS INTRUCKS OUT
LEGEND
www.invarion.com
NOT TO SCALE
N
TRAFFIC CONTROLPLAN
DATE: 17/11/2017
*Traffic control works shall be installed & maintained in accordance with A.S. 1742.3 (Traffic Control Devices for Works on Roads) & RTA Traffic controlat Work Sites Manual Version 4 June 2010.
*Local constraints may not allow sign and devices to be placed exactlyin accordance withthe TCP, therefore it may be necessary to place sign and devices as close as possible to the spacing indicated.
*Signs should generally placed 1 metre clear of the travelled path.
*Signs are to be Class 1 retro-reflective (day/night)
Install as per TCP and in accordance with any changes as shown on TCP
Team Leader (Onsite):
Signature:
Date:
Ticket: Orange/Red/Yellow (Circle Appropriate)
Ticket No:
Reasons for modification:
Email to: [email protected]
DRAWN BY:
CERTIFICATE NO:
SIGNATURE:
PLAN CHECKED BY:
CERTIFICATE NO:
SIGNATURE:
SAMANTH JADALA
0044399691
SUE LEWIS
0022818927
AREA:
LOCATION:
TCP NO:
SHEET NO:
WATERLOO
BOTANY RD, WATERLOO(SLOW LANE CLOSURE& PEDESTRIAN MGT)
TCP-SWL-BOT-SB-120004
1 OF 1
WORK VEHICLE
WORK ZONE
AUTHORISED TRAFFICCONTROLLER
700 MM TRAFFIC CONESWITH REFLECTIVE NIGHT STRIP WITH 220 MM SPACING
LEGEND
RAGLAN ST
HENDERSON ROAD
BUCKLAND ST
WELLIN
GTON ST
BO
TAN
Y RO
AD
BO
TAN
Y RO
AD
ROAD WORK
AHEAD
T1-1
T1-5-2 *
45M
45M
45M
T5-5
40
ROAD
WORK
R4-212
END
ROAD WORK
T2-16
BUS STOP REMAINS OPEN
TRAFFIC CONTROLLERASSIST PEDESTRIANSTO BUS STOP
RO
AD
WO
RK
ON
SIDE R
OA
D
T1-25
T1-5-2 *
15M
15MR
OA
D W
OR
K
ON
SID
E R
OA
D
T1-2
5
T1-5
-2 *
15M
15M
PEDESTRIANS
FOOTPATH
CLOSED
T8-4
PEDESTRIANSFOOTPATH
CLOSED
86, BO
TAN
Y R
D
PEDESTRIANDIVERSION
ROUTE
www.invarion.com
1//996765
SP75492
11//1359142//136012
SP71198
1//228641
1//814
205
5//215751
4//215751
11//219505
1//186677
1//88581
1//532605 1//27454
2//27454
?
?
?
?
ROADWORKON SIDE ROAD
ROADWORKON SIDE ROAD
EN
DR
OA
DW
OR
K
ENDROADWORK
0 2 8 10m64
SCALE 1:200 (A1)SCALE 1:400 (A3)
REVIEWED - APPROVED
LEGEND
CONE
TRAFFIC CONTROLLER
WORK AREA
SERVICEPROVIDERS
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR
CAMD DESCRIPTION DESIGNERSIGN./DATE
VERIFIEDSIGN./DATE
APPROVEDSIGN./DATE
SCALES
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
DF 801*554
Plot
Dat
e &
Tim
eFi
le P
lotte
d
CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE:DRG No.STATUS:FILE No.
DRAWN
DESIGNED
DRG CHECK
DESIGN CHECK
APPROVED
OFSHEET:
EDMS No.
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specificpurpose and may not be used for any purpose other than the purpose intended by Transport for NSW.Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or anyof the related information for any purpose other than the intended purpose. This drawing is protected by copyrightand no part of this drawing may be reproduced in any form without the express written permission of Transport for NSW.
CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE: Plot
ted
by11
/28/
2017
11:
30 A
MPT
ULLY
1
CLIENTIC CERTIFIED - IC CERTIFICATE
PRELIMINARY
SLISSUED FOR INTERNAL REVIEW 20.11.17 PTA1
15.11.17SUE LEWIS
15.11.17SUE LEWIS
15.11.17SUE LEWIS
15.11.17SUE LEWIS
15.11.17PHIL TULLY
-
-2
A1JCG-SWL-TM-TCP-DRG-002296-0001
1TRAFFIC CONTROL PLANBOTANY ROADTRAFFIC MANAGEMENTWATERLOO STATION AND PRECINCTSYDNEY METRO CITY & SOUTHWEST
SERVICEPROVIDERSDRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR CAMDDESCRIPTION DESIGNERSIGN./DATEVERIFIEDSIGN./DATE APPROVEDSIGN./DATESCALES1 2 34 5 6 7 89 10 11 12
1 2 34 5 6 7 89 10 11 12A
B
C
DE
F
G
H
A
B
C
DE
F
G
HDF 801*554
Plot Date & TimeFile Plotted
CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE: DRG No.STATUS:FILE No.DRAWNDESIGNEDDRG CHECKDESIGN CHECKAPPROVED OFSHEET:EDMS No.This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specificpurpose and may not be used for any purpose other than the purpose intended by Transport for NSW.Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or anyof the related information for any purpose other than the intended purpose. This drawing is protected by copyrightand no part of this drawing may be reproduced in any form without the express written permission of Transport for NSW.CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE: Plotted by
11/28/2017 11:30 AM
PTULLY1CLIENTIC CERTIFIED - IC CERTIFICATE PRELIMINARY
25m
30//668991
1//996765
SP67508
2//659166
11//135914
8//21278
81//232118
80//232118
12//1186738
11//1186738
7//33293
1//436831
1//205942
A//408116
32//805384
1//433969
1//537045
1//842429
2//842429
101//1017959
100//1017959
2//27454
FL
PM
DH
DH?
ROADWORK ON SIDE ROAD
ROADWORKON SIDE ROAD
ENDROADWORK
EN
DR
OA
DW
OR
K
LEGEND
CONE
TRAFFIC CONTROLLER
WORK AREA
SERVICEPROVIDERS
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR
CAMD DESCRIPTION DESIGNERSIGN./DATE
VERIFIEDSIGN./DATE
APPROVEDSIGN./DATE
SCALES
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
DF 801*554
Plot
Dat
e &
Tim
eFi
le P
lotte
d
CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE:DRG No.STATUS:FILE No.
DRAWN
DESIGNED
DRG CHECK
DESIGN CHECK
APPROVED
OFSHEET:
EDMS No.
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specificpurpose and may not be used for any purpose other than the purpose intended by Transport for NSW.Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or anyof the related information for any purpose other than the intended purpose. This drawing is protected by copyrightand no part of this drawing may be reproduced in any form without the express written permission of Transport for NSW.
CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE: Plot
ted
by11
/28/
2017
11:
31 A
MPT
ULLY
1
CLIENTIC CERTIFIED - IC CERTIFICATE
PRELIMINARY
SL/20.11.17ISSUED FOR INTERNAL REVIEW SL/20.11.17 SL/20.11.17A1
12.11.17SUE LEWIS
12.11.17SUE LEWIS
12.11.17SUE LEWIS
12.11.17SUE LEWIS
12.11.17PHIL TULLY
-
-2
A1JCG-SWL-TM-TCP-DRG-002296-0002
2TRAFFIC CONTROL PLANBOTANY ROADTRAFFIC MANAGEMENTWATERLOO STATION AND PRECINCTSYDNEY METRO CITY & SOUTHWEST
SERVICEPROVIDERSDRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR CAMDDESCRIPTION DESIGNERSIGN./DATEVERIFIEDSIGN./DATE APPROVEDSIGN./DATESCALES1 2 34 5 6 7 89 10 11 12
1 2 34 5 6 7 89 10 11 12A
B
C
DE
F
G
H
A
B
C
DE
F
G
HDF 801*554
Plot Date & TimeFile Plotted
CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE: DRG No.STATUS:FILE No.DRAWNDESIGNEDDRG CHECKDESIGN CHECKAPPROVED OFSHEET:EDMS No.This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specificpurpose and may not be used for any purpose other than the purpose intended by Transport for NSW.Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or anyof the related information for any purpose other than the intended purpose. This drawing is protected by copyrightand no part of this drawing may be reproduced in any form without the express written permission of Transport for NSW.CO-ORDINATE SYSTEM: HEIGHT DATUM: SCALE: Plotted by
11/28/2017 11:31 AM
PTULLY1CLIENTIC CERTIFIED - IC CERTIFICATE PRELIMINARY
REVIEWED - APPROVED
25m
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 18 of 20
Appendix 4 Haulage routes
DRAWING NUMBER DESCRIPTION
SMCSWTSE-JCG-SWL-TM-DWG-002296-0001 Haulage route – Waterloo to Eastern Distributor/ South Dowling Street
SMCSWTSE-JCG-SWL-TM-DWG-002296-0002 Haulage route – Eastern Distributor/ South Dowling Street to Waterloo
SMCSWTSE-JCG-SWL-TM-DWG-002296-0003 Haulage route –Western Distributor to Waterloo
Map data ©2017 Google 200 m
450 m
800 m
88 m
400 m
SMCSWTSE-JCG-SWL-TM-DWG-002296-0001 Site to South Dowling Street
Map data ©2017 Google 200 m
Destination will be on the left
1.4 km
700 m
280 m
SMCSWTSE-JCG-SWL-TM-DWG-002296-0002 South Dowling ED to site
Map data ©2017 Google 200 m
Destination will be on the left
350 m
1.1 km
170 m
1.2 km
280 m
SMCSWTSE-JCG-SWL-TM-DWG-002296-0003 WD to Site
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 19 of 20
Appendix 5 Road safety audit
RSA-06409
Page 1 of 5 Sydney Metro City and South West
Road Safety Audit Report SHORT FORMAT
Title Sydney Metro City and South West RSA P/L Reference RSA-06409 Sub-Title / Work Package Construction Traffic Management Plan
Waterloo (Botany Rd) Report Date 30 October 2017
Audit Stage Desktop Lead (Senior) Auditor Secondary Auditor / Reviewer
Peter Harris Chris Keramidas, Anthea Jennings
Client John Holland CPB Ghella
TMP / Drawings Construction Traffic Management Plan:
Report Provider Road Safety Audits P/L DD-SYDM-DWG-0005-02 Rev A DD-SYDM-DWG-0005-04 Rev C DD-SYDM-DWG-0005-05 to 07 Rev B 2016-2412A Rev 1 2016-2412 Rev 1 2016-2526 Rev 0
Scope: The scope of the audit is to assess the construction traffic management plans on their merits and in the context of the road environment, not compliance-checking to standards and guidelines.
RSA-06409
Page 2 of 5 Sydney Metro City and South West
Sydney Metro City and South West T Audit Point Comment / Suggestion John Holland CPB Ghella Contact:
Response
x Status
y Headers*****
1. General Pedestrians through the site are advised by signage for the detours and closures. However, pedestrians on the other side of the road might not know they are crossing to a work zone (it probably won’t look like a work zone for the whole length).
Ensure pedestrians can’t easily gain access to the work site area.
Accept Drawings removed
RSA-06409
Page 3 of 5 Sydney Metro City and South West
Sydney Metro City and South West T Audit Point Comment / Suggestion John Holland CPB Ghella Contact:
Response
x Status
y Headers*****
2. 2016-2412A and 2016-2412 There is no buffer shown between the merge and the work zone.
It is acknowledged that the speed limit through the section is 40km/h. Consider providing a short buffer.
Accept Drawings removed
3. 2016-2526
The ‘trucks turning’ (worded) sign is non-standard and made redundant by the symbolic sign.
Install the ‘100m on left’ sign underneath the symbolic sign.
Accept Drawings removed
4. 2016-2526 ‘Pedestrians watch your step’ is unlikely to be the correct warning message here.
Use a relevant sign / message or none at all.
Accept Drawings removed
5. 2016-2412 It’s unclear why pedestrians are being advised to ‘watch their step’ if they are being detoured around the work zone.
Omit this sign and add ‘detour’ / similar. Accept Drawings removed
RSA-06409
Page 4 of 5 Sydney Metro City and South West
Sydney Metro City and South West T Audit Point Comment / Suggestion John Holland CPB Ghella Contact:
Response
x Status
y Headers*****
6. 2016-2412 ‘Roadwork Ahead’ signs are shown on Raglan Street. However, there is no roadwork on Raglan Street.
Omit signs or replace with ‘on side road…’ type signs.
Accept Drawings removed
7. 2016-2412 Similar to the above point, the ‘end roadwork’ signs on Raglan Street are very remote from the work zone and are not required.
Omit signs. Accept Drawings removed
RSA-06409
Page 5 of 5 Sydney Metro City and South West
Explanatory Notes
Short Format: This ‘short format’ report has been used by RSA P/L since 2008, initiated through requests by clients to assist their processes, for ease with stakeholders, and for timeliness. It is typically confined in use to construction traffic management and typically for discrete packages of plans / areas and often for large projects with repetitious small audit sections. The use of this format assumes that the reader/s know what a road safety audit is and how to respond to it. Projects: Audit points are often raised in projects in relation to: 1. specific themes (e.g. the use of a safety barrier type), or 2. the treatment of particular locations. Once key issues have been initially raised, they will not necessarily be re-raised in future audits. This will depend on the issue, the RSA’s perception of the client’s assessment and understanding of the issue, and other factors. Therefore, discrete audits as part of a project should be read and actioned by a project representative who is familiar with the audit history. Responding: Although the client receiving the report does not have to agree to the audit findings/suggestions, the issues and associated risks should be carefully considered. A written response should be made to all of the audit findings raised, then signed off by the responsible person from the project team. X
Response: The responder should fully or partially accept / reject the audit point and the comment / suggestion (i.e. not merely the suggestion) Y
Status: The status of the issue as it sits with the Project. i.e. ‘actioned’, ‘closed’, ‘pending information / further guidance’. Language: 1. Note: RSA P/L does not typically use the Austroads risk rating method, mostly because it can only be applied to some points and therefore can skew the perceived risk of other
points, and also due to it being a highly subjective approach, giving the false impression of objectivity. 2. ‘Urgent’ / ‘High-Risk’: Needs immediate attention / changes as per RSA suggestion or similar. 3. ‘Recommend’ / ‘Serious’ / ‘Important’: Must be robustly reviewed. Most likely requires a change to avoid a high-risk road environment for one or more user groups. 4. ‘Should’ / ‘Suggest’ / ‘Significant’: Based on the view of the RSA team the suggestion should be done, but it concedes that there could be reasons why inaction or alternative
action is equally correct. Must be robustly reviewed by contractor and where relevant key traffic engineering project stakeholders. 5. ‘Review’ / ‘Consider’: RSA is raising an observation but has no strong opinion on the outcome and need for changes. Project should review because it’s not an immediate and
high risk and may not be immediately obvious to RSA the reasons for the practice / setup / behaviour. May need monitoring. 6. ‘Minor’: Typically a low road-safety consequence / compliance issues (to guidelines or plans) / administrative controls. Unlikely to increase risk of crash. 7. ‘Note’: Little or no road safety significance. Typically added to give a complete picture of the design, site, context, analysis, auditors understanding. Intent of Issues Listing Order: Audit points might be clustered according to location, theme, or time. When this is not done and the audit comprises an uncategorised list of points, the key issues are often discussed first. However, there is no official ordering of points, and they should all be read on their merits and on the basis of the language guide below. References: 1. Austroads Guide to Road Safety – Road Safety Audit – 2009, 2. AS 1742.3 – 2009, 3. RMS Traffic Control at Work Sites V. 4.0 (June 2010) Safe System: Austroads guidelines encourage practitioners to adopt safe system principles within design and within road safety audits. Safe system (roads) calls for a design to not allow serious injury and fatalities to occur for the expected road users and the typical crash types expected for that design type. This design-objective is considered within this road safety audit as a ‘good practice’ objective. However, a road safety audit by definition does not have the aim of checking ‘Safe System conformance’. Process and Quality: RSA P/L’s quality assurance process is based on its senior auditors having a rich experience base, but also utilises customised checklists designed for niche areas in traffic engineering/road design (e.g. safety barriers, pavement shaping, CBD traffic management), in conjunction with a four-layer audit process: 1. on-site inspection; 2. media and data capture and review; 3. specialist / second auditor input; and (where warranted) 4. secondary blinded reviews. Audit Coverage: The audit has attempted to balance the safety needs of all road users. As per Austroads guidelines, the suggestions provided have attempted to be realistic/feasible and commensurate with the actual risk posed. Suggestions are made are from a safety perspective only, and are made in the absence of full project knowledge and design constraints. RSA P/L can provide a detailed risk assessment / issue evaluation report upon request. The audit raises potential safety risks noted / observed / anticipated by the audit team, and in particular the higher-risk issues. However, a road safety audit is fundamentally a subjective qualitative process undertaken by people, highly influenced by the experience, views and limitations of the individual team members. It is expected that the project team has competence to identify safety issues itself as the project progresses, and to ask the audit team further questions where necessary.
RSA-06543
Page 1 of 8 Sydney Metro City and South West
SHORT FORMAT Road Safety Audit Report
Title Sydney Metro City and South West RSA P/L Reference RSA-06543 Sub-Title / Work Package Construction Traffic Management Plan
Waterloo Site Report Date 28 November 2017
Audit Stage Desktop Lead (Senior) Auditor Secondary Auditor / Reviewer
Peter Harris Anthea Jennings, Chris Keramidas
Client John Holland CPB Ghella
TMP / Drawings DD-STDM_DWG- 0005-01 Rev A-00 DD-STDM_DWG- 0005-02 Rev D-00 DD-STDM_DWG- 0005-05 – 07 Rev P2 JCG-SCN-TM-TCP-002296-0001-TCP A.1 JCG-SCN-TM-TCP-002296-0002-TCP -A.1
Report Provider Road Safety Audits P/L
Scope: The scope of the audit is to assess the plans on their merits and in the context of the road environment, not compliance-checking to standards and guidelines.
RSA-06543
Page 2 of 8 Sydney Metro City and South West
Sydney Metro City and South West T Audit Point Comment / Suggestion
John Holland CPB Ghella Contact:
Response
x Status
y Headers*****
1. JCG-SCN-TM-TCP-002296-0002: To traffic entering Botany Rd to head north, from the Wellington St / Raglan St intersection, it may be unclear which side of the bollards to travel (e.g. green arrow or red arrow). • Drivers may take the red arrow potentially head-on
into approaching traffic (blue arrow).
• Southbound Botany Rd drivers may deviate to the left, after the passing the road works (blue arrow) potentially into the path of approaching traffic.
1. Provide addition delineation (purple lines); and
2. Provide signage for northbound traffic to travel to the left of the bollards.
Important.
Accept drawings amended Closed
RSA-06543
Page 3 of 8 Sydney Metro City and South West
Sydney Metro City and South West T Audit Point Comment / Suggestion
John Holland CPB Ghella Contact:
Response
x Status
y Headers*****
2. JCG-SCN-TM-TCP-002296-0001 and 2: There are a number of traffic controller warning signs that are either close or after the traffic controllers.
Review positioning of the signs. Drawings amended Closed
RSA-06543
Page 4 of 8 Sydney Metro City and South West
Sydney Metro City and South West T Audit Point Comment / Suggestion
John Holland CPB Ghella Contact:
Response
x Status
y Headers*****
3. General: The road width is being narrowed in Raglan St Cope St and Wellington St. Drivers may cross the barrier line and head towards / into the oncoming lanes.
Ensure there is enough width for drivers to not need to cross the barrier line. Alternatively, make suitable arrangements.
Accept note added to drawing to maintain current lane widths
Closed
RSA-06543
Page 5 of 8 Sydney Metro City and South West
Sydney Metro City and South West T Audit Point Comment / Suggestion
John Holland CPB Ghella Contact:
Response
x Status
y Headers*****
4. General: Pedestrian signage currently reads [ or Pedestrians]. This could be misunderstood to mean into the traffic lane by pedestrians.
Add “Use other footpath” for relevant signs.
Drawings amended Closed
5. DD-STDM-DWG-0005-05:
Roadwork ahead signage is missing from Henderson Rd, eastbound.
Add sign Reject as there is no roadwork on the eastbound carriageway
Closed
RSA-06543
Page 6 of 8 Sydney Metro City and South West
Sydney Metro City and South West T Audit Point Comment / Suggestion
John Holland CPB Ghella Contact:
Response
x Status
y Headers*****
6. DD-STDM-DWG-0005-05: The “roadwork ahead” sign for traffic traveling westbound on Raglan St (blue) will not be visible for drivers turning from Cooper St.
Relocate the sign. Partially accept – note added to drawing
Closed
RSA-06543
Page 7 of 8 Sydney Metro City and South West
Sydney Metro City and South West T Audit Point Comment / Suggestion
John Holland CPB Ghella Contact:
Response
x Status
y Headers*****
7. DD-STDM-DWG-0005-05: The “roadwork ahead” signs on Cooper St are misleading as there is no roadwork on Cooper St.
Change to “roadwork on side road”. Accept drawing amended Closed
RSA-06543
Page 8 of 8 Sydney Metro City and South West
Explanatory Notes Short Format: This ‘short format’ report has been used by RSA P/L since 2008, initiated through requests by clients to assist their processes, for ease with stakeholders, and for timeliness. It is typically confined in use to construction traffic management and typically for discrete packages of plans / areas and often for large projects with repetitious small audit sections. The use of this format assumes that the reader/s know what a road safety audit is and how to respond to it. Projects: Audit points are often raised in projects in relation to: 1. specific themes (e.g. the use of a safety barrier type), or 2. the treatment of particular locations. Once key issues have been initially raised, they will not necessarily be re-raised in future audits. This will depend on the issue, the RSA’s perception of the client’s assessment and understanding of the issue, and other factors. Therefore, discrete audits as part of a project should be read and actioned by a project representative who is familiar with the audit history. Responding: Although the client receiving the report does not have to agree to the audit findings/suggestions, the issues and associated risks should be carefully considered. A written response should be made to all of the audit findings raised, then signed off by the responsible person from the project team. X
Response: The responder should fully or partially accept / reject the audit point and the comment / suggestion (i.e. not merely the suggestion) Y
Status: The status of the issue as it sits with the Project. i.e. ‘actioned’, ‘closed’, ‘pending information / further guidance’. Language: o Note: RSA P/L does not typically use the Austroads risk rating method, mostly because it can only be applied to some points and therefore can skew the perceived risk of other
points, and also due to it being a highly subjective approach, giving the false impression of objectivity.o ‘Urgent’ / ‘High-Risk’: Needs immediate attention / changes as per RSA suggestion or similar.o ‘Recommend’ / ‘Serious’ / ‘Important’: Must be robustly reviewed. Most likely requires a change to avoid a high-risk road environment for one or more user groups.o ‘Should’ / ‘Suggest’ / ‘Significant’: Based on the view of the RSA team the suggestion should be done, but it concedes that there could be reasons why inaction or alternative
action is equally correct. Must be robustly reviewed by contractor and where relevant key traffic engineering project stakeholders.o ‘Review’ / ‘Consider’: RSA is raising an observation but has no strong opinion on the outcome and need for changes. Project should review because it’s not an immediate and
high risk and may not be immediately obvious to RSA the reasons for the practice / setup / behaviour. May need monitoring.o ‘Minor’: Typically, a low road-safety consequence / compliance issues (to guidelines or plans) / administrative controls. Unlikely to increase risk of crash.o ‘Note’: Little or no road safety significance. Typically added to give a complete picture of the design, site, context, analysis, auditors understanding.Intent of Issues Listing Order: Audit points might be clustered according to location, theme, or time. When this is not done and the audit comprises an uncategorised list of points, the key issues are often discussed first. However, there is no official ordering of points, and they should all be read on their merits and on the basis of the language guide below. References: Construction: 1. Austroads Guide to Road Safety – Road Safety Audit – 2009, 2. AS 1742.3 – 2009, 3. Road Management Act 2004 – Code of Practice – Worksite Safety – Traffic Management (2010), and Design: 4. Austroads guidelines and VicRoads supplements and technical publications as relevant. Safe System: Austroads guidelines encourage practitioners to adopt safe system principles within design and within road safety audits. Safe system (roads) calls for a design to not allow serious injury and fatalities to occur for the expected road users and the typical crash types expected for that design type. This design-objective is considered within this road safety audit as a ‘good practice’ objective. However, a road safety audit by definition does not have the aim of checking ‘Safe System conformance’. Process and Quality: RSA P/L’s quality assurance process is based on its senior auditors having a rich experience base, but also utilises customised checklists designed for niche areas in traffic engineering/road design (e.g. safety barriers, pavement shaping, CBD traffic management), in conjunction with a four-layer audit process: 1. on-site inspection; 2. media and data capture and review; 3. specialist / second auditor input; and (where warranted) 4. secondary blinded reviews. Audit Coverage: The audit has attempted to balance the safety needs of all road users. As per Austroads guidelines, the suggestions provided have attempted to be realistic/feasible and commensurate with the actual risk posed. Suggestions are made are from a safety perspective only, and are made in the absence of full project knowledge and design constraints. RSA P/L can provide a detailed risk assessment / issue evaluation report upon request. The audit raises potential safety risks noted / observed / anticipated by the audit team, and in particular the higher-risk issues. However, a road safety audit is fundamentally a subjective qualitative process undertaken by people, highly influenced by the experience, views and limitations of the individual team members. It is expected that the project team has competence to identify safety issues itself as the project progresses, and to ask the audit team further questions where necessary.
Construction Traffic Management Plan – Waterloo Site Establishment
SMCSWTSE-JCG-SWL-TM-PLN-002296Construction Traffic Management Plan – Waterloo Site Establishment Page 20 of 20
Appendix 6 Review comments
Waterloo site establishment
Printed copies are uncontrolled Page 1 of 1
CTMP Review Comments Sheet Project Title Sydney Metro City & south west –Tunnels and station excavation contract
CTMP Title: Waterloo Site Establishment Document Number: SMCSWTSE JCG SWL TM PLN 002296 B-
Reviewer: Centre for Road Safety – Luke Wilby Responder: S Lewis Date:1 November 2017 Date:18 November 2017
Item Section/ Page Comments Response
1 General There is still signage for pedestrians to “watch their step” Was unsure if this meant the footpath wasn’t being closed or it was an added contingency around the site entrance/exit if a pedestrian was to ignore the footpath closed sign?
Drawings revised with signs removed
2 Road safety audit As outlined in the road safety audit, should there be advanced warning that the bus stop is closed to deter pedestrians from attempting to access it?
Drawing removed
3 Lane closure What happens if a wedding/ funeral vehicle needs to access the church? And how will pedestrian access the church?
Access will be maintained
Waterloo site establishment
Printed copies are uncontrolled Page 1 of 4
CTMP Review Comments Sheet Project Title Sydney Metro City & south west –Tunnels and station excavation contract
CTMP Title: Waterloo Site Establishment Document Number: SMCSWTSE JCG SWL TM PLN 002296 B-
Reviewer: City of Sydney Van Le Responder: S Lewis Date:10 November 2017 Date:18 November 2017
Item Section/ Page Comments Response
1 General Error! Reference source not found is referred to in the following sections of the report:
• Section 1.1• Section 2• Section 4.3.2
Document amended
2 2.1.2 “Unrestricted parking exists on both the northern and southern side of Wellington Street between Botany Road and Cope Street”.
Sections of the southern side of Wellington Street, between Botany Road and Cope Street, is signposted as Loading Zone and 2P permit parking
Document amended
3 2.1.3 “there are no other bus stop on Cope Street”
There is another Bus Stop on the eastern side of Cope Street, south of Raglan Street
Document amended
Waterloo site establishment
Printed copies are uncontrolled Page 2 of 4
Item Section/ Page Comments Response
4 2.1.4 “the existing footpaths are approximately 2m wide” and “the existing footpaths are approximately 3.7m wide with an effective pedestrian width of 2.8m”
Please clarify which statement for the width of the footpath is correct
Document amended
5 2.1.4 “There are no driveways on this section of Raglan Street”
There is a driveway on the southern side of Raglan Street between Botany Road and Cope Street
Document amended
6 2.2.1 “Driveway construction”
Section 2.2.2 of the report states that “The main access/ egress is proposed on Botany Road using existing driveways’ and as such there should no need for driveway construction for site establishment works
Document amended
7 2.2.9 “Construction of driveway on Botany Road and Raglan Street”
Section 2.2.2 of the report states that the “The main access/ egress is proposed on Botany Road using existing driveway and as such there should be no need for the construction of a driveway in Raglan Street
Document amended
8 2.2.10 “Construction of driveway on Botany Road and Raglan Street”
Section 2.2.2 of the report states that the “The main access/ egress is proposed on Botany Road using existing driveway and as such there should be no need for the construction of a driveway in Raglan Street
Document amended
Waterloo site establishment
Printed copies are uncontrolled Page 3 of 4
Item Section/ Page Comments Response
9 4.6 Contact number for the Site Superintendent is not provided
Document amended
10 DD-SYDM-DWG-0005-02 Section 3.1 states that “Material swill be removed from site using a combination of vehicles. There trucks will range in size from 5.5m to 19.0m and taken to authorised disposal sites around Sydney”. Swept path plans of the largest vehicle entering and exiting the site must be provided in the report.
Drawing amended
11 DD-SYDM-DWG-0005-04 The lane closure on the eastern side of Botany Road, north of Raglan Street, is excessive and would unnecessary remove parking and impact the Bus stop
Agree drawing replaced
12 DD-SYDM-DWG-0005-04 The report must specify how the Bus Stop on the eastern side of Botany Road, between Raglan and Wellington streets will be temporarily managed or relocated during the kerbside lane closure
Drawing removed
13 2016-2412A Section 2.2.2 of the report states that “The main access/ egress is proposed on Botany Road using existing driveways and as such there should be no need for driveway construction
Refer to revised document. This drawing has also been replaced
14 2016-2412 It is not clear what works are being carried out for this TCP/ The report must specific the works being carried out associated with this TCP
Refer to revised document. This drawing has also been replaced
15 SMCSWTSE-JCG-SWL-TM-DWG-002296-0001
Construction truck routes must utilise State roads before using Regional roads and then local road. The construction truck route must turn right into Lachlan Street from Bourke Street to access South Dowling Street. Construction truck route must not continue north
Noted and drawing amended
Waterloo site establishment
Printed copies are uncontrolled Page 4 of 4
Item Section/ Page Comments Response
on Bourke Street past Lachlan Street
16 SMCSWTSE-JCG-SWL-TM-DWG-002296-0002
Construction truck routes must utilise State roads before using Regional roads and then local road. From South Dowling Street, the construction truck route must turn into Cleveland Street, left into Regent Street and continue onto Botany Road to access into the site. Construct truck route must not use Wyndham Street.
Noted and drawing amended
17 Appendix 5 The Road Safety Audit report specific to the works described in the CTMP must be attached to the report as in Appendix
Document amended
Document: CTMP ‐ Waterloo Site Establishment
Version: B‐00
Date of review: 9/11/2017
Item No
Contract Contractor Doc RevItem Description, Page, Para, Drg
refStakeholder Reviewer Date
Requirement Ref (COA or REMM)
TfNSW comment Contractor Response
1 TSE JHCPBG JV B SCO JB 09-Nov-20171.1 Error message appears due to broken reference
link. Please fix.
Document amended
2 TSE JHCPBG JV B SCO JB 09-Nov-20172 Error message appears due to broken reference
link. Please fix.
Document amended
3 TSE JHCPBG JV B SCO JB 09-Nov-20172.2 Sewer works occupying the parking lane in
Botany Rd will be subject to ROL approval
Noted ‐ refer to change of traffic
control arrangement as discussed
at TCG held 14 Nov 2017
4 TSE JHCPBG JV B SCO JB 09-Nov-2017
2.2.3 Can you provide detail of when the drill rigs will
be on site, and vehicle movements increase to
520 movements a month?
the vehicle movements will
increase once piling works
commence. Delivery of machinery
to site will be included with weekly
traffic forecast
5 TSE JHCPBG JV B SCO JB 09-Nov-2017
Will the relocation of the bus stop as flagged in
TCG meetings be moved during this site
establishment phase? If so, please update to
include this detail
No requirement during site
establishment
6 TSE JHCPBG JV B SCO JB 09-Nov-2017Please ensure you consult with STA/SCO
regarding any overnight closures of the bus stop
during the sewer works
Noted and agreed
7 TSE JHCPBG JV B SCO JB 09-Nov-20172.2.5 Suggest detailing the pedestrian management to
be in place for those not aware of the previous
arrangement
Document amended
8 TSE JHCPBG JV B SCO JB 09-Nov-2017
2.2.6 Suggest amending last sentence to read 'All
personnel will be informed that no parking will
be available to them on site, with limited street
parking available subject to signposted
restrictions.'
No change to document as City of Sydney want it made quite clear to workers that parking in the surrounding street system is to be discouraged at all times
9 TSE JHCPBG JV B SCO JB 09-Nov-2017
Can you provide some detail or indicative
schedule of when the piling rigs are to be
delivered
Unable to provide this within the document as these details will only be known once we have certainty of approval times. We will include details within the weekly Traffic Forecast were lane closures are required
10 TSE JHCPBG JV B SCO JB 09-Nov-2017Deliveries requiring a lane closure will require an
ROL and will be subject to approvalNoted and agreed
Stakeholder Comment TrackerSydney Metro City & Southwest
3.2
2.2.4
RESPONSE STATUSO OpenC Closed
11 TSE JHCPBG JV B SCO JB 09-Nov-20173.3 Where are the designated holding areas for
trucks? Can you please include this information in
the text
Within site as noted into eh document given the room available.
12 TSE JHCPBG JV B SCO JB 09-Nov-20174.1 Once available please include a copy of the RSA
for site establishment works and provide
reference to Appendix 5 in the text
Document amended
13 TSE JHCPBG JV B SCO JB 09-Nov-20174.3 Are you able to include a table of indicative
communications to be used as part of this site
establishment phase?
Document amended
14 TSE JHCPBG JV B SCO JB 09-Nov-20174.3.2 Error message appears due to broken reference
link. Please fix.Document amended
15 TSE JHCPBG JV B SCO JB 09-Nov-20174.6, Table 3 Contact details are missing for the site
superintendent ‐ please update the table to
include this
Document amended
16 TSE JHCPBG JV B SCO JB 09-Nov-2017Appendix 3,
Table of works
Suggest amending 'out of peak hours' on line 5 to
'outside of peak periods' for consistencyDocument amended
17 TSE JHCPBG JV B SCO JB 09-Nov-2017
DWG‐0005‐04 Is a lane closure for the full length of Botany Rd
between Boundary St and Raglan St really
necessary?
This section of road is typically occupied with
parked vehicles and this lane closure would see a
significant loss of parking in the area.
Additionally, this will effect a bus stop/zone
which has not otherwise been identified in this
CTMP
drawing removed
18 TSE JHCPBG JV B SCO JB 09-Nov-2017
DWG‐0005‐05 Will pedestrians still be able to use the signalised
pedestrian crossing on the eastern side of Botany
Rd, across Raglan St? Will the pram ramp be
accessible? And finally, how will you prevent
pedestrians accessing the work area?
Yes drawing amended
19 TSE JHCPBG JV B SCO JB 09-Nov-2017
Will a footpath closure be required as part of
these works? If so, please detail the pedestrian
detour or alternatively specify how access will be
maintained.
Drawing replaced ‐pedestrian
management in place as per
Appendix 3
20 TSE JHCPBG JV B SCO JB 09-Nov-2017
The 'Look up and live' sign and key identifies
overhead electrical power lines however these
have not been shown on the TCP, nor have any
such related works been indicated in the CTMP.
Please remove and update TCP or include detail
of works as appropriate.
Drawing replaced
21 TSE JHCPBG JV B SCO JB 09-Nov-2017
2016‐2526 The 'Look up and live' sign and key identifies
overhead electrical power lines however these
have not been shown on the TCP, nor have any
such related works been indicated in the CTMP.
Please remove and update TCP or include detail
of works as appropriate.
Drawing replaced
22 TSE JHCPBG JV B SCO JB 09-Nov-2017
2016‐2412 The 'Look up and live' sign and key identifies
overhead electrical power lines however these
have not been shown on the TCP, nor have any
such related works been indicated in the CTMP.
Please remove and update TCP or include detail
of works as appropriate.
Drawing replaced
2016‐2412A
23 TSE JHCPBG JV B SCO JB 09-Nov-2017General ‐ TCPs Please ensure indicative spacing is provided for
all signs and cones, as well as signatures for the
reviewed by / approved by text box on all TCPs
Drawings amended
24 TSE JHCPBG JV B SCO JB 09-Nov-2017Appendix 5 Please ensure the RSA is included in the revised
CTMPDocument amended
25 TSE JHCPBG JV B SCO AG 14-Nov-2017Appendix 3 any footpath closures that divert pedestrians to
cross at unsignalised locations will require traffic
controllers
Crossing points are located at
existing pedestrian facilities.
Document: CTMP - Waterloo site - Site EstablishmentVersion: B-00Date of review: 30/10/2017
Item No Contract Contractor Doc Rev
Requirement Ref (COA or
REMM)Stakeholder Reviewer Date Item Description,
Page, Para, Drg ref TfNSW comment Contractor Response
1 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 1.1 Format error, line states "Error! Reference source not found" Document amended
2 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2 Consider using the existing drawing as an inset to a larger drawing; to provide context
Not required as reviewers are familiar with the areas in question
3 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2 Format error states "Error! Reference source not found Document amended
4 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2 (intro paragraph), 2.1.1,
Both mention parking restrictions, but only intro references Appendix 1. No mention of Appendix 1 in Sections 2.1.2, 2.1.3, 2.1.4
Section 2 states: "The existing parking restrictions at the site are detailed below and are also included in Appendix 1". Below section 2 sites Sections 2.11, 2.1.2, 2.1.3 and 2.1.4. No change to document required
5 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.1.2 Clarify which Council
Waterloo site is located within the City of Sydney LGA. This is known to the reviewers. No change to document required
6 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.1.3 Suggest information on buses, including impacts, be added to Section2.2.4
It is - no change to document required
7 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.2"Duration 2 months". Is this the time to establish site? If so how long will site be in operation once it is set-up? Will there be any changes to site that differ from this CTMP?
It is the time to undertake the works detailed in Section 2.2.1 which is a subheading of Section 2.2. No change to document required
8 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.2.1 Mixing short and long term works can create confusion. Suggest clarifying what works occur when
Refer to Appendix 2 for long term set ups(Site Operations) and Appendix 3 for short term set ups (Traffic Control Plans)
9 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.2.2Is the movement based on a 5 day or 6 day week? IS it from only Botany Rd. Site establishment covers all access points/driveways?
Full work day - volumes will be less per half day of works
10 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.2.2 Provide clarity on "minimal truck numbers" Refer to Table 1 for movements during peak hours
Sydney Metro City & Southwest Stakeholder Comment Tracker
RESPONSE STATUSO OpenC Closed
11 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.2.4This section only deals with buses, can the heading be changed or is there other public transport that needs addressing?
This section is included in all CTMP and thus captures all forms of public transport. Your suggested change is immaterial to the information provided
12 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.2.4"…during sewer works at night" related to section 2.2.1? Again, mixing short and long term works can create confusion. Suggest clarifying what works occur when
Refer to Appendix 2 for long term set ups(Site Operations) and Appendix 3 for short term set ups (Traffic Control Plans). Section 2.2.4 is for Works required.
13 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.2.5 What was previously used? Reference TCPs in Appendix? Document amended
14 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.2.6 Clarify how many of the 15-20 will be able to park. Are they all "essential staff or subcontractor…"? Document amended
15 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.2.9 Point : is this once site is operational, so long term? Appendix 3 is not clear on time frames
Refer to Appendix 2 for long term set ups(Site Operations) and Appendix 3 for short term set ups (Traffic Control Plans). No change to document required
16 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 2.2.11 RMS also need to approve this CTMP.
Yes - this is not about the approval of the CTMP but licenses/ permits etc. No change to document required
17 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Table 1
Table needs clarity: -Are those movements in and out or just in? -Saturday is not mentioned -Average of 2 per hour, is there a peak where this will increase? -Is this just from Botany Rd access or Raglan St access?
Movements as noted in the EIS. Saturday is not mentioned in the EIS either. This is an average of movements during the works, as identified in the EIS. All from Botany Road
18 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 3.1 Title of Section is "logistics routes", text mentions haulage. Which is it? Is there a difference? Document amended
19 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 3.2Mention lane closure on Botany Rd for piling rig delivery. Update section with how? When? Any operational information?
Refer to Appendix 3. Details on lane closures occurring at site will be provided via the weekly Traffic Forecast
20 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 3.3Clarify what "operator selection will be based on safety performance criteria" means. What operators? What safety performance criteria?
Refer to Chain Of Responsibility Plan for TSE works
21 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 3.3Clarify what ""…comprehensively trained with regard to community expectations and impact from haulage operations." means
Refer to Chain Of Responsibility Plan for TSE works
22 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 3.3"Trucks will arrive post the site start times" Does this mean just trucks? What about light vehicles? Does site start time differ from construction hours?
This sentence is to provide readers with confirmation that trucks will not queue prior to site start times.
23 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 4.2 "…regular updates" How will this be achieved?Through TTLG, email out of Traffic Forecasts, direct communications with ES
24 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 4.3 Information in this section is general. What will actually be done for the sewer works and establishing site? Document amended
25 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 4.3.1 How does this section differ from 2.4.4? No detail provided on VMS messages or locations
No requirement for VMS as works are undertaken during lane closures which have been occurring on site since DELTA works commenced
26 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 4.3.2 Format error states "Error! Reference source not found" Document amended
27 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Table 2 Main contact for RMS is Anthony McMahon (for now) These are TCG attendees.
28 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 4.4Deals with short term inspections, not clear on long term inspections. How will CTMP be updated if changes are made?
Long term inspections undertaken in accordance with TCAWS requirements
29 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 4.5 This section does not give any detail on how environmental maintenance will be undertaken. Refer to CEMP
30 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Section 4.6 Cameron Butcher phone number missing Document amended
31 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 DD_SYDM-DWG-0005-02
Drawing states "bus zone affected by construction swept paths". This issue is not covered in Section 2.2.4. Section 2.2.4 states: "The existing bus stop on Botany Rd will be retained…" Clarify
Drawing states that bus stop is NOT affected by swept paths
32 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Notes on TCP reference TCP 100 which is a two of three lane closure TCP. None of the TCPs are for this situation Drawings amended
33 TSE JHCPBG JV B-00 IG BG 30-Oct-2017Notes on TCP reference sections of AS1742.3 and TCAWs which is great but how will the person installing the TCP be able to obtain this information while out on the road?
Drawings amended
34 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 TCPs are not signed (5.1.2 of TC@Ws Manual). Drawings amended
35 TSE JHCPBG JV B-00 IG BG 30-Oct-2017TCPs should not be drawn on aerials photographs, see TC@AWS Appendix D. The aerial does lack clarity when trying to establish lanes closed
there is no mention of this requirement in Appendix D. No change proposed
36 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 What is the worksite protection method/device?Reduced speed limit, bollards, traffic controllers as noted on the drawings
37 TSE JHCPBG JV B-00 IG BG 30-Oct-2017
Some of the TCPs were drawn for Delta by a subcontractor. Does JHCPBG JV plan to take responsibility of TCPs drawn for others? Will Lack Group (who drew the TCPs) be installing them?
Drawing amended
38 TSE JHCPBG JV B-00 IG BG 30-Oct-201740 ROADOWRK speed signs should be duplicated (both sides of the road at the start of the speed zone (TCAWs Section 8.2.5)
TCAWS notes that If not physically possible then another sign should be located 0.5D from the start of the zone
39 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Titled DD_SYDM-DWG-0005-04 should be 003? As next TCP is also 004 Drawing replaced
40 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Dimension missing on sign spacing Drawing replaced
All TCPs
41 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 How will bus stop opposite Boundary St will be managed? Drawing replaced
42 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 There is parking along this section of road. Will spaces be reserved? How will trapped cars exit? Drawing replaced
43 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 The speed reduction should start before the taper as per TCP 57 in TCAWs Drawing replaced
44 TSE JHCPBG JV B-00 IG BG 30-Oct-2017T1-5 sign in top right corner may cause confusion, consider repositioning the drawing's cut line or the sign face on the drawing
Drawing replaced
45 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 How will bus stop just north of Raglan/Henderson intersection will be managed? Drawing replaced
46 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Why is there a 60 speed sign north of Raglan St facing NB traffic? This is a SB, one way only section of road Drawing replaced
47 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Consider traffic controllers at each end of the closure to manage pedestrians. There are pubs at both ends. Drawing replaced
48 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Bus stop is closed, what is the alternative? Drawing replaced
49 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Workmen signs are not installed on Henderson Rd EB or Regent St SB
The lane closure is on the southern side of Raglan Street hence neither of these directions noted are impacted by the works
50 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Speed signs are not installed on Raglan St EB Drawing amended
51 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 There is parking along this section of road. Will spaces be reserved? How will trapped cars exit? Under traffic control
52 TSE JHCPBG JV B-00 IG BG 30-Oct-2017TCP shows the pedestrian crossing on eastern side of Botany Rd, across Raglan St, as closed. Can it be left open?
Drawing amended
53 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Consider traffic controllers at each end of the closure to manage pedestrians. There is a pub opposite.
Traffic controllers will roam area once initial set up installed
54 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Why is sign spacing on Raglan St and Cope St at 40m not 50m? Drawing amended
55 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Consider additional 40 ROADWORK mid way along worksite
Drawing amended - no requirement for speed zone for this lane closure
56 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 There is parking along this section of road. Will spaces be reserved? How will trapped cars exit? Refer to response to Item 51
DD_SYDM-DWG-0005-04
DD_SYDM-DWG-0005-04
(should be 003?)
DD_SYDM-DWG-0005-05
57 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Consider additional 40 ROADWORK mid way along worksite Drawing amended
58 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Consider traffic controllers at each end of the closure to manage pedestrians. There are pubs at both ends Refer to response to Item 53
59 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 What lane width will be provided EB along Wellington St existign traffic lane
60 TSE JHCPBG JV B-00 IG BG 30-Oct-201750 speed sign WB on Wellington at intersection with Botany. This sign may create confusion as Botany Rd is 60km/hr.
Drawing amended
61 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Consider traffic controllers at each end of the closure to manage pedestrians. There is a pub opposite. Refer to response to Item 53
62 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Suggest separating the 40ROADWORK and WORKMEN signs as well as the END ROADOWRK and 50 speed sign Drawing replaced
63 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Why is stop/slow required? Drawing replaced
64 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 What role are the two traffic controllers, to the south of the work, undertaking? Drawing replaced
65 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Is the "Look up and live sign" required on a TCP? Drawing replaced
66 TSE JHCPBG JV B-00 IG BG 30-Oct-2017There is a pedestrian crossing, as part of the signals, on the western side of the intersection of Botany Rd, Raglan St and Henderson Rd
Drawing replaced
67 TSE JHCPBG JV B-00 IG BG 30-Oct-2017TCP shows a total of 45m from work site to Raglan St, is this correct? If so TCP 2016-2526 cant not be undertaken. Clarify
Drawing replaced
68 TSE JHCPBG JV B-00 IG BG 30-Oct-2017
How will the footpath be closed? Is this what the TCs are doing? Where are the signs installed? How is the footpath closed at Wellington St as it appears to be a long way from the work site, people may walk through.
Drawing replaced
69 TSE JHCPBG JV B-00 IG BG 30-Oct-2017
This TCP is set-up for a slow lane closure SB. TCP DD_SYDM-DWG-0005-04 (should be 003?) is also set-up for the same closure, yet both start in different places, with different signs. Clarify
Drawing replaced
70 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Suggest separating the 40ROADWORK and WORKMEN signs as well as the END ROADOWRK and 50 speed sign Drawing replaced
71 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Why is stop/slow required? Drawing replaced
DD_SYDM-DWG-0005-06
DD_SYDM-DWG-0005-07
Plan No. 2016-2412
72 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 What role are the two traffic controllers, to the south of the work, undertaking? Drawing replaced
73 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Is the "Look up and live sign" required on a TCP? Drawing replaced
74 TSE JHCPBG JV B-00 IG BG 30-Oct-2017There is a pedestrian crossing, as part of the signals, on the western side of the intersection of Botany Rd, Raglan St and Henderson Rd
Drawing replaced
75 TSE JHCPBG JV B-00 IG BG 30-Oct-2017TCP shows a total of 45m from work site to Raglan St, is this correct? IF so TCP 2016-2526 cant not be undertaken. Clarify
Drawing replaced
76 TSE JHCPBG JV B-00 IG BG 30-Oct-2017
This TCP is set-up for a slow lane closure SB. TCP DD_SYDM-DWG-0005-04 (should be 003?) is also set-up for the same closure, yet both start in different places, with different signs. Clarify
Drawing 0005-04 removed
77 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 TRUCK TURNING sign has been superseded Drawing replaced
78 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Why are PEDESTRIAN WATCH STEP signs used? Drawing replaced
79 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 How will one traffic controller stop and hold two sides of the driveway? Drawing replaced
80 TSE JHCPBG JV B-00 IG BG 30-Oct-20172016-2412 and 2016-2412A shows a total of 45m from work site to Raglan St, is this correct? Is so, this TCP cannot be undertaken. Clarify
Drawing replaced
81 TSE JHCPBG JV B-00 IG BG 30-Oct-2017 Appendix 4 Is the grey route on the Google map a secondary route or a remnant?
No it is a remnant and there is no way to turn this off. The route is clearly stated in text under the map
Plan No.2016-2412A
Plan No. 2016-2526
Document: CTMP - Waterloo Site EstablishmentVersion: B-00Date of review: 1/11/2017
Item No Contract Contractor Doc Rev Requirement Ref (COA or REMM) Stakeholder Reviewer Date Item Description,
Page, Para, Drg ref RMS comment Contractor Response
1 TSE JHCPBG B-00 CM 01-Nov-2017 1.1 "Figure 1Error! Reference source not found." Reference to be corrected. Document amended
2 TSE JHCPBG B-00 CM 01-Nov-2017 Section 2 "Figure 2Error! Reference source not found." Reference to be corrected. Document amended
3 TSE JHCPBG B-00 CM 01-Nov-2017 2.2.1
"The current parking restrictions will be retained along the site frontages." - Several TCPs show kerbside lane closures across the site frontages. The table in Appendix 3 indicates parking lanes are to be used and "Existing parking restrictions (or unrestricted parking) will be temporarily removed during these works". This should be discussed in the body of the CTMP, not just the appendix.
These are short term impacts. The section that you are referencing is about long term impacts
4 TSE JHCPBG B-00 CM 01-Nov-2017 2.2.2
"The main access/egress is proposed on Botany Road…" Is there any other access/egress apart from this one? If so, then discussion regarding other accesses should be included. If not, then there is no need to refer to this one as the "main" access/egress.
Document amended
5 TSE JHCPBG B-00 CM 01-Nov-2017 2.2.2"There will be minimal truck numbers during the peak periods (AM and PM)." This is a generic statement. Give specific numbers for the site specific CTMP.
refer to Table 1 for details on peak period movements
6 TSE JHCPBG B-00 CM 01-Nov-2017 2.2.4What type of disruption to bus stop operation is expected? Will there be a closure of the bus stop? If so, how long and how often?
refer to Appendix 3
7 TSE JHCPBG B-00 CM 01-Nov-2017 2.2.9"Appendix 3 provides details on expected durations…" There are no details of expected durations or dates related to the works being undertaken.
This will be provided via the weekly Traffic Forecast
8 TSE JHCPBG B-00 CM 01-Nov-2017 2.2.9 and 2.2.10
"Construction of driveways on Botany Road and Raglan Street" - What is the purpose and function of the driveway proposed on Raglan Street. This has not been discussed in the CTMP.
Document amended
9 TSE JHCPBG B-00 CM 01-Nov-2017 4.3 This information is suitable for an overall TMP, but more detail is required for the site specific TMPs. Document amended
10 TSE JHCPBG B-00 CM 01-Nov-2017 4.3.2 "Table 2Error! Reference source not found." Reference to be corrected. Document amended
11 TSE JHCPBG B-00 CM 01-Nov-2017 4.6, Table 3 Contact number missing for Cameron Butcher Document amended
12 TSE JHCPBG B-00 CM 01-Nov-2017 App 2 No access/egress drawings for Raglan Street driveway mentioned in 2.2.9 and 2.2.10 Refer to response to Item 8
13 TSE JHCPBG B-00 CM 01-Nov-2017 App 3 DWG-0005-04 (Sheet 1) - Length missing between 'kerbside lane closed' symbolic sign and taper. Drawing removed
14 TSE JHCPBG B-00 CM 01-Nov-2017 App 3DWG-0005-04 (Sheet 1) -If T1-5 sign is referring to the sign on Sheet 2, then it should be removed from Sheet 1 to avoid any misinterpretation or confusion.
Drawing removed
Stakeholder Comment TrackerSydney Metro City & Southwest
RESPONSE STATUSO OpenC ClosedCS Closed subject to additional action / information
15 TSE JHCPBG B-00 CM 01-Nov-2017 App 3
DWG-0005-04 (Sheet 1) - There is a bus stop on Botany Road across from Boundary Street, which is not shown in this plan. How will bus activity at this location be managed during this time?
Drawing removed
16 TSE JHCPBG B-00 CM 01-Nov-2017 App 3
DWG-0005-04 (Sheet 2) shows 'Bus Stop Closed'. There is also a bus stop on Botany Road, north of Raglan Street in the southbound direction, which is not shown in this plan. How will bus activity at these locations be managed during this time?
Drawing removed
17 TSE JHCPBG B-00 CM 01-Nov-2017 App 3
DWG-0005-04 (Sheet 2), 05, 06 and 07 show works area over kerbside along site frontage, resulting in the closure of the corresponding parking lanes. No discussion of approvals to remove parking has been included in this CTMP.
These are short term impacts at night as noted in the Table associated with Appendix 3
18 TSE JHCPBG B-00 CM 01-Nov-2017 App 3
DWG-0005-04 (Sheet 2) - TCP shows '60 speed limit' signs on Botany Road facing northbound traffic, north of Raglan/Henderson intersection. Botany Road is only southbound at this location.
Drawing removed
19 TSE JHCPBG B-00 CM 01-Nov-2017 App 3DWG-0005-06 - '40 speed limit' signs should be '40 roadwork' signs on the approach to site area, as per other TCPs speed limits removed from this drawing
20 TSE JHCPBG B-00 CM 01-Nov-2017 App 3 2016-24412A - What is the function of the three traffic controllers shown in the plan? Drawing removed
Document: CTMP - Waterloo Site EstablishmentVersion: EDate of review: 30/11/2017
Item No Contract Contractor Doc Rev Requirement Ref (COA or REMM) Stakeholder Reviewer Date Item Description,
Page, Para, Drg ref RMS comment Contractor Response
1 TSE JHCPBG E RMS CM 30-Nov-2017 2.1.1CHANGED FROM REV B-00End of page 5 is repeated at the start of page 6 from "A heritage mail box…"
Document amended
2 TSE JHCPBG E RMS CM 30-Nov-2017 2.2.4
PREVIOUS RMS COMMENT:What type of disrutption to bus stop operation is expected? Will there be a closure of the bus stop? If so, how long and how often?
CONTRACTOR'S RESPONSE:refer to Appendix 3
RMS REVISED RESPONSE:Although the information appears in Appendix 3, details should be discussed here in the "Impact on Public Transport" section.
it was:"The existing bus stop on Botany Road will be retained for the site establishment works. There will be disruptions to bus stop operations during the sewer works at night with the southbound bus stop being closed".
3 TSE JHCPBG E RMS CM 30-Nov-2017 2.2.5
No discussion of pedestrian detours to be implemented as shown in several TCPs. Although the information appears in Appendix 3, details should be discussed here in the "Impact on Pedestrians and Cyclists" section.
Document amended
4 TSE JHCPBG E RMS CM 30-Nov-2017 2.2.9
PREVIOUS RMS COMMENT:'"Appendix 3 provides details on expected durations…" There are no details of expected durations or dates related to the works being undertaken.
CONTRACTOR'S RESPONSE:This will be provided via the weekly Traffic Forecast
REVISED RMS COMMENT:If this is the case, this should be stated in the CTMP. Further, the reference indicating that expected durations can be found in Appendix 3 should be removed.
Document amended
5 TSE JHCPBG E RMS CM 30-Nov-2017 4.3.1
"… including variable message signs (VMS)." No plans for VMS signs are shown in this CTMP. If no VMS are to be used, then this remark should be removed from this section. Document amended
6 TSE JHCPBG E RMS CM 30-Nov-2017 App 2NEW DRAWINGTitle above reviewer and approver is illegible Drawings amended
7 TSE JHCPBG E RMS CM 30-Nov-2017 App 3
DWG-0005-04 - DRAWING DELETEDHow is the work that was previously proposed under this drawing now going to be undertaken?
There was no requirement for this TCP
Stakeholder Comment TrackerSydney Metro City & Southwest
RESPONSE STATUSO OpenC ClosedCS Closed subject to additional action / information
8 TSE JHCPBG E RMS CM 30-Nov-2017 App 3
NEW DRAWING, ISSUE PREVIOUSLY RAISEDTCP-SWL-BOT-SB-120003 and 120004 - There is a bus stop on Botany Road, north of Raglan Street in the southbound direction (within the 60m merge taper), which is not shown in this plan. How will bus activity at these locations be managed during this time?
Drawings amended
9 TSE JHCPBG E RMS CM 30-Nov-2017 App 3
NEW DRAWINGTCP-DRG-002296-0001 (Sheet 1 and 2) - No spacings are shown between 'Traffic Controller' symbolic sign and traffic controller.
Drawings amended
Register No. Issued to: Date of IssueRegister No.1 XXXRegister No.2 XXXRegister No.3 XXX
Suite 2.06, Level 2 29-31 Solent Circuit Baulkham Hills NSW 2153 Tel: 61 (02) 9659 5433 e-mail: [email protected] Web: www.hbi.com.au
Leaders in Environmental Consulting
1
HBI Healthy Buildings International Pty Ltd A.C.N. 003 270 693 A.B.N. 39 003 270 693
Mr Stuart Hodgson 18 December 2017 Director Program Sustainability Environment & Planning Sydney Metro Transport for NSW PO Box K659 HAYMARKET NSW 1240 Ref: TSE CTMP WL Site Est.
Dear Stuart
RE: Endorsement of Construction Traffic Management Plan – Waterloo Site Establishment: Sydney Metro City & Southwest – TSE Works Reference is made to the following documents required by the Condition of Approval E82 of the Sydney Metro City & Southwest project (SSI – 15_7400 January 9 2017) and submitted to the Environmental Representative (ER) for review and endorsement:
Construction Traffic Management Plan – Waterloo Site Establishment: Sydney Metro City & Southwest, TSE Works (Document SMCSWTSE‐JCG‐SWL‐TM‐PLN‐002296 Revision F dated 1 December 2017).
Email from the Sydney Coordination office dated 14 December 2017 stating “In accordance with Schedule C1 Appendix A.9 Section 2.1 ( c ) and 2.2 ( c ) of the Principal’s General Specifications G10 – Traffic and Transport Management and Minister’s Condition of Approval E82 for the Sydney Metro City & South West the Roads and Maritime Service of NSW and the Sydney Coordination Office approve the Sydney Metro City & South West Construction Traffic Management Plan – Waterloo Site Establishment - TSE Works Rev F SMCSWTSE-JCGSWL-TM-PLN-002296 for site establishment”.
The Roads and Maritime Service of NSW and the Sydney Coordination Office approval above is conditional on the following requirements:
Obtaining Road Occupancy Licences (ROLs) from the Transport Management Centre (TMC) as required;
Obtaining an approved hoarding installation certificate from city of Sydney Council;
Complying with haulage routes as approved by SCO/RMS and described in Appendix 4 of the CTMP;
Addressing any issues raised by Council, STA, Taxi Council, residents/ businesses, Emergency Services in the CTMP approval process;
Addressing any safety issues identified in the Road Safety Audit review of this CTMP;
Leaders in Environmental Consulting
2
HBI Healthy Buildings International Pty Ltd
The Construction Traffic Management Plan being updated as required prior to construction commencing to ensure consistency with the final Construction Traffic Management Framework when it is approved
Promptly addressing any CBD Taskforce and/or TMC and/or RMS issue that eventuates during the works.
As an approved ER for the Sydney Metro City & Southwest project, I have reviewed the above documents. The review did not comprise a technical review, as the ERs are not traffic experts and have relied on the SCO RMS Approval for technical aspects of the Plan. It is noted the document provides review comments and responses in Appendix 6. It is considered that the plan is consistent with Condition E82 of the Project Approval subject to the above conditions being complied with and is endorsed in accordance with Condition A24(d) of the Infrastructure Approval. Yours sincerely
Michael Woolley Environmental Representative – Sydney Metro – City and South West