snolab facility status fraser duncan snolab workshop 27 august 2009

24
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Upload: buddy-andrews

Post on 15-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

SNOLABFacility Status

Fraser DuncanSNOLAB Workshop27 August 2009

Page 2: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

2km overburden(6000mwe)

UndergroundLaboratory

SurfaceFacility

Muon Flux = 0.27/m2/day

MEI & HIME astro/ph 0512125

Page 3: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

The SNOLAB Expansion

SNO Cavern

Cube Hall Cryopit

Ladder Labs

PersonnelArea

UtilityArea

Page 4: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Excavation Clean Rm LaboratoryArea Volume Area Volume Area Volume

Original

SNO Areas

Original+ Phase I

Original+ Phase I &I I

20,049 f t2 582,993 f t3 12,196 f t2 470,360 f t3 8,095 f t2 412,390 f t3

1,863 m2 16,511 m3 1,133 m2 13,321 m3 752 m2 11,679 m3

65,340 f t2 1,367,488 f t3 41,955 f t2 1,049,393 f t3 26,117 f t2 837,604 f t3

6,072 m2 38,728 m3 3,899 m2 29,719 m3 2,427 m2 23,721 m3

77,636 f t2 1,647,134 f t3 53,180 f t2 1,314,973 f t3 32,877 f t2 1,043,579 f t3

7,215 m2 46,648 m3 4,942 m2 37,241 m3 3,055 m2 29,555 m3

Laboratory Space

All clean spaces to be operated as Class 2000 clean room.

SNOLAB Workshop 27,28 Aug 2009Fraser Duncan

Page 5: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Status Since last workshop in October 2008

Chiller and sewage treatment plant went operational in Dec 08

Commissioned HVAC in all new areas.

Rough cleaned and painted Ladder Labs.

Relocated personnel area to new refuge station 3 Feb 09.

Transitioned to clean room conditions in Ladder Labs 5 Aug 09.

Last major Contractor work: Concrete floor in “TAC” drift outside Cryopit; 5 T Monorail beam in Cryopit.

Continuing operation of the PICASSO and DEAP-1 Dark Matter Search experiments and the PUPS seismology station.

Fraser Duncan SNOLAB Workshop 27,28 Aug 2009

Page 6: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Chiller

Page 7: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Chiller

Page 8: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

LunchRoom

Occupied New PersonnelFacilities 3 Feb 2009

Page 9: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

LunchRoom

Page 10: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

MeetingRoom

Page 11: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

CryopitAccess

Page 12: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

CryopitAccess

Page 13: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Cryopit

Page 14: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Cryopit

Page 15: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

CubeHall

Page 16: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

CubeHall

Page 17: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Unsealing door to Ladder Labs

Page 18: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

LadderLabs

Page 19: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Construction Status With the “going clean” of the

Ladder Labs there is now 40,000 ft2 (3,700 m2) of space inside the clean room boundary of the lab. For comparison the surface building is 32,000 ft2.

However the Ladder Labs still require a “fine clean” to bring them to clean room conditions.

Fraser Duncan SNOLAB Workshop 27,28 Aug 2009

Page 20: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Facility Construction Schedule

Contractor work almost done (still some “building automation” and fire alarm tasks).

Remaining work will be done primarily by SNOLAB personnel (with contractors as necessary).

Next facility construction activities:

Fine cleaning of Ladder Labs

Installation of services (plumbing, electrical) in Ladder Labs and Cube Hall.

Cryopit: prepare and paint.

Renovation of old Personnel Area (reclaim for experiments or infrastructure).

Fraser Duncan SNOLAB Workshop 27,28 Aug 2009

Page 21: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Experiment Installation Cube Hall

Installation of steel work for DEAP-3600 and MiniCLEAN this fall. Contract awarded, construction to begin in September. Will go clean after civil work is complete.

SNO Cavity

Repairs to cavity liner and modification of detector support to hold down the Acrylic Vessel for liquid scintillator.

SNO Utility Room

Excavation of pit for liquid scintillator purification system.

Other

Work as necessary for other experiments such as HALO and PICASSO.

Fraser Duncan SNOLAB Workshop 27,28 Aug 2009

Page 22: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Facility Personnel Nominal staff of ~40 including scientists,

engineers, technicians, cleaners, admin, IT.

New Hires

Project Engineer, Tom O'Malley (started 4 Aug) Will be working on installations for DEAP-3600,

MiniCLEAN, SNO+ and others.

Process Systems Engineer, Allan Barr (starts 31 Aug).

Will be maintaining the SNOLAB Ultra Pure Water Systems as well as participating in the installation and operation of the SNO+ liquid scintillator process systems.

Fraser Duncan SNOLAB Workshop 27,28 Aug 2009

Page 23: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

Major laboratory construction complete.

Most spaces now under clean room conditions.

Now preparing for the Day 1 experiments

Civil work in Cube Hall starts next month.

Summary

Time to do some (more) science.

Page 24: SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

End