Page 1: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

Software Safety Risk Evaluation (SSRE)

Process

SAŠA ŠPILER

METHOD ENGINEERING

UTRECHT, APRIL 2014

Page 2: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

Content

What is SSRE process?PhasesPDD and exampleRelated literature

Page 3: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

Software Safety Risk Evaluation process

Represented in 2010 (18th IEEE International Requirements Engineering Conference)

Based on: SEI Software Risk Evaluation (SRE) developed in 1992

It is a process used for identification, analysis, consolidation and mitigation of software safety risks (Hill & Talley, 2010).

Page 4: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

Software Safety Risk Evaluation process

SSRE USAGE:

4 projects at 3 NASA Centres

AUTHORS:

JANICE HILL

SCOTT TILLEY

Works at IV&V Facility at NASA

Professor of Software Engineering in a Department of Computer Sciences at Florida Institute of Technology

Page 5: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

Phases

DetectionRisk

specification

Assessment Consolidation Mitigation

2 3 4 51

5

Page 6: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

PDD

Page 7: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

PHASE 1: DETECTION

ProjectProfile

Safety RelatedQuestions Risks

Page 8: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

PHASE 2: RISK SPECIFICATION

Performance Support

Cost Schedule

Project Performance

Support Cost Schedule

ATCS 30 77 33 3

Page 9: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

PHASE 3: ASSESSMENT

MAGNITUDE

1 7

Catastrophic

*

IMPACT

Critical

Marginal

Negligible

Likely

LIKELIHOOD

Probable

Possible

Unlikely

Improbable

RISKPROFILE

low high

Page 10: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

PHASE 3: ASSESSMENT

Project

1 2 3 4 5 6 7

ATCS 20 23 29 33 16 6 1

low high

Page 11: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

PHASE 4: CONSOLIDATION

Risk Candidates

Priority Ranking (1-5)

Project 1 2 3 4 5

ATCS 19 40 51 7 11

Page 12: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

Safety Air Traffic Control Procedure

Restart Safety-Critical Assurance

System Hazard Analysis

PHASE 5: MITIGATION

IMPORTANCE

1.

2.

3.

RISK AREA

Page 13: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

Related Literature

SEI safety requirements evaluation process

Legacy System Risk Database (LSRD) tool

Page 14: Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014

Questions?