Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet. The following items will be made available on April 14, 2019 unless otherwise noted: • EBS (Electronic Bidding System) files via Bid Express website (www.bidx.com) • Construction Standards can be found under Business via SCDOT web site (www.scdot.org) Access the Construction Extranet (https://www.scdot.org/business/constructionletting-extranet.aspx). for the following items: • Proposals • Plans • Announcements • Bids as Received • CPM Schedule Templates • Contractor Discussin Board Contractors are encouraged to utilize the Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password. Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737-1656. Hardcopy plans and proposals are available via Engineering Publications: o Printed upon request only, call ahead for pickup orders o Located in room G23 SCDOT Headquarters o Email [email protected] /Phone (803)737-4533/ Fax (803)737-4530 o Proposals are $15 and Plans are $1 per sheet o Cash, check, money order, VISA/MC accepted payable to SCDOT (No refunds) o Planholders list is not maintained by SCDOT o Contractors do not have to buy plans to be able to bid Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with all Letting related questions. SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS For May 14, 2019 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street, Columbia, SC

Upload: others

Post on 06-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and postedon the SCDOT web site, Bid Express, and the Construction Extranet.

The following items will be made available on April 14, 2019 unless otherwise noted:

• EBS (Electronic Bidding System) files via Bid Express website (www.bidx.com)

• Construction Standards can be found under Business via SCDOT web site (www.scdot.org)

Access the Construction Extranet (https://www.scdot.org/business/constructionletting-extranet.aspx). for thefollowing items: • Proposals • Plans • Announcements • Bids as Received • CPM Schedule Templates • Contractor Discussin Board

Contractors are encouraged to utilize the Discussion Board to make contact with other Prime andSubcontractors to request/offer quotes. There is no charge to access this site, but you must register for auser name and password.

Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score)issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarterissued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at(803)737-1656.

Hardcopy plans and proposals are available via Engineering Publications: o Printed upon request only, call ahead for pickup orders o Located in room G23 SCDOT Headquarters o Email [email protected] /Phone (803)737-4533/ Fax (803)737-4530 o Proposals are $15 and Plans are $1 per sheet o Cash, check, money order, VISA/MC accepted payable to SCDOT (No refunds) o Planholders list is not maintained by SCDOT o Contractors do not have to buy plans to be able to bid

Visitors are welcome and should sign in at the Park Street entrance. Please contact the ContractAdministration Office at (803)737-1750 with all Letting related questions.

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATIONNOTICE TO CONTRACTORS

For May 14, 2019

Letting Location: SCDOT Headquarters Building

Conference Room 331 955 Park Street, Columbia, SC

Page 2: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 010 1Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

1352210SC File NO(S).:

CO(S).: Chesterfield

DBE Goal Percent: 0.00%

Completion Date:

Description: DRAINAGE REPAIR

11/30/2019

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

0.3700

P036963P036963PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING CATCH BASIN 2.000 EA

REMOVAL & DISPOSAL OF EXISTING CONCRETE 17.000 CY

SITE EXCAVATION 1.000 LS

18" SMOOTH WALL PIPE 824.000 LF

CATCH BASIN -TYPE 9 MH 1.000 EA

CATCH BASIN -TYPE 16 1.000 EA

CATCH BASIN -TYPE 18 1.000 EA

MANHOLE 1.000 EA

EXTRA DEPTH OF BOX 4.000 LF

CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 100.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 128.000 SY

CONCRETE SIDEWALK(6" UNIFORM) 25.000 SY

PERMANENT GRASSING FOR SMALL PROJECTS 0.500 ACRE

TEMPORARY EROSION CONTROL BLANKET (CLASS A) 2.000 MSY

SILT FENCE 900.000 LF

Page 3: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 020 2Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

2289171SC File NO(S).:

CO(S).: Georgetown

DBE Goal Percent: 8.50%

Completion Date:

Description: US 701 BRIDGE/SIX MILE CREEK

9/30/2021

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

0.8840

P028309P028309PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 EA

BRIDGE CONSTRUCTION ACCESS 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS

REMOVAL & DISPOSAL OF EXISTING CATCH BASIN 2.000 EA

REMOVAL & DISPOSAL ITEM NO. 001 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 002 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 003 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 004 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 005 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 006 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 007 1.000 LS

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 1,367.000 SY

REMOVAL OF EXIST. GUARDRAIL 1,128.000 LF

REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS

UNCLASSIFIED EXCAVATION 7,110.000 CY

BORROW EXCAVATION 17,729.000 CY

MUCK EXCAVATION 3,000.000 CY

15" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 9.000 LF

18" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 223.000 LF

GEOTEXTILE, SEPARATION 3,200.000 SY

GEOGRID REINFORCEMENT (UNIAXIAL) 4,000.000 SY

MONITORING DEVICE - SETTLEMENT PLATE 2.000 EA

MONITORING DEVICE – PIEZOMETER – VIBRATING-WIRE 2.000 EA

TEMPORARY SHORING WALL 35.000 LF

PERMANENT SHORING WALL 78.000 LF

STONE BRIDGE LIFT MATERIAL 4,000.000 TON

FINE GRADING 12,030.000 SY

MAINTENANCE STONE 100.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE A 4,264.000 TON

Page 4: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 020 3Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

LIQUID ASPHALT BINDER PG64-22 351.000 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,618.000 SY

MILLED-IN RUMBLE STRIP 2.180 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 1,390.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 1,661.000 TON

HOT MIX ASPH. CONC. SURF. CR. FOR DITCH PAVING 9.150 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 344.000 SF

PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 155.000 SF

TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 50.000 EA

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(60 MPH) 2.000 EA

BARRICADE - TYPE 3 162.000 LF

TEMPORARY CONCRETE BARRIER 1,300.000 LF

TYPE B - FLASHING LIGHT 8.000 EA

PAVEMENT MARKINGS(TEMP-PAINT) 4" YELLOW BROKEN LINES 310.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 16,240.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 16,240.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 148.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 7,772.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 148.000 LF

6" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 310.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 4,680.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 50.000 EA

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"WH.SOLID 640.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"YEL.SOL. 640.000 LF

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 54.750 SF

FLAT SHEET, TYPE III, SIZE DETERMINED BY MSG 6.000 SF

U-SECTION POST FOR SIGN SUPPORTS - 3P 148.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 804.000 LF

CONC. FOR STRUCTURES - CLASS 4000 488.300 CY

GROOVED SURFACE FINISH 762.000 SY

REINF. STEEL FOR STRUCTURES (BRIDGE) 167,669.000 LB

HOOP REINFORCING STEEL FOR STRUCTURES (BRIDGE) 14,270.000 LB

PRESTRESSED CONC. BEAM (TYPE II) 934.300 LF

CONCRETE BRIDGE BARRIER PARAPET 335.600 LF

CONCRETE BRIDGE BARRIER PARAPET TRANSITION 4.000 EA

DYNAMIC PILE ANALYZER TEST SET-UP DYNAMIC PILE ANALYZER TEST SETUP 8.000 EA

PILE DRIVING SET-UP 16.000 EA

STEEL H BEARING PILING (HP14 X 89) 1,134.000 LF

STEEL H BEARING INDEX PILING (HP14 X 89) 166.000 LF

DRILLED SHAFT SET-UP 6.000 EA

DRILLED SHAFT WITH WET & DRY EXCAVATION - 42" DIAMETER 306.000 LF

DRILLED SHAFT WITH WET & DRY EXCAVATION - 48" DIAMETER 184.400 LF

Page 5: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 020 4Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

CONSTRUCTION CASING - 48" DIAMETER 184.400 LF

15" SMOOTH WALL PIPE 110.000 LF

18" SMOOTH WALL PIPE 532.000 LF

CLEANING EXISTING PIPE 260.000 LF

CATCH BASIN -TYPE 1 CB - TYPE 1 2.000 EA

DROP INLET (24" X 36") 2.000 EA

MANHOLE 3.000 EA

CONCRETE COLLAR FOR UP TO 24" PIPE 3.000 EA

BEVELING OF PIPE END 7.000 EA

4' SLOPE FLUME (6" CURB STYLE WITH CUTOFFS) 116.000 LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 219.000 LF

CONCRETE CURB AND GUTTER (2'-0") OGEE 165.000 LF

DECK JOINT STRIP SEAL 111.700 LF

ELASTOMERIC BEARING 36.000 EA

ELASTOMERIC BEARING ASSEMBLY (FLAT SLAB) 2.000 EA

CROSSHOLE SONIC LOGGING SETUP 6.000 EA

AGGREGATE UNDERDRAIN(AGG#789)WITH 4"PERF.PIPE FOR STRUC 162.000 TON

PREFABRICATED VERTICAL DRAIN WITH FABRIC 11,000.000 LF

RIP-RAP (CLASS A) 95.000 TON

RIP-RAP (CLASS B) 457.000 TON

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE D 736.000 SY

MT3 LEADING END TREATMENT TL3 4.000 EA

MGS3 GR STANDARD SHOULDER 1,475.000 LF

MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 4.000 EA

FLUME INLET AT GUARDRAIL (HANDWORK) 4.000 EA

NON-MOW STRIP UNDER GUARDRAIL 100.000 SY

SACRIFICIAL FLEXIBLE WARNING MARKER POST (FWMP) 48Y/Y 4.000 EA

TEMPORARY BARRIER FENCE 4,193.000 LF

MOVING ITEM NO. 001 1.000 LS

MOVING ITEM NO. 002 1.000 LS

MOVING ITEM NO. 003 1.000 LS

MOVING ITEM NO. 004 1.000 LS

MOVING ITEM NO. 005 1.000 LS

MOVING ITEM NO. 006 1.000 LS

MOVING ITEM NO. 007 1.000 LS

RIGHT OF WAY MARKER(REBAR AND CAP) 35.000 EA

RIGHT OF WAY PLAT 1.000 LS

PERMANENT COVER 6.200 ACRE

TEMPORARY COVER 3.200 ACRE

FERTILIZER (NITROGEN) 630.000 LB

FERTILIZER (PHOSPHORIC ACID) 630.000 LB

FERTILIZER (POTASH) 630.000 LB

Page 6: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 020 5Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

AGRICULTURAL GRANULAR LIME 12,600.000 LB

SELECTIVE WATERING 135,750.000 GAL

MOWING 19.000 ACRE

WATERPROOFING (SUBSTRUCTURE-SECOND METHOD) 33.200 SY

TEMPORARY EROSION CONTROL BLANKET (ECB) 1.863 MSY

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1 6.800 ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 2.300 ACRE

HYDR.EROS.CONTRL.PROD.(HECP) - TYPE 1 AS TRACER UNDER TRM 0.400 ACRE

INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 16.000 LF

INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 16.000 LF

SEDIMENT TUBES FOR DITCH CHECKS 286.000 LF

SILT FENCE 8,146.000 LF

REPLACE/REPAIR SILT FENCE 815.000 LF

FLOATING TURBIDITY BARRIER-LIGHT DUTY 3,000.000 SF

CLEANING SILT BASINS 471.000 CY

REMOVAL OF SILT RETAINED BY SILT FENCE 2,037.000 LF

INLET FILTER CLEANING 4.000 EA

AGGREGATE NO.5 OR 57 FOR EROSION CONTROL 169.000 TON

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

TEMPORARY FLEXIBLE PIPE SLOPE DRAIN - 8" 320.000 LF

ON-THE-JOB TRAINEE (ROADWAY) 520.000 HR

Page 7: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 030 6Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

2289181SC File NO(S).:

CO(S).: Georgetown

DBE Goal Percent: 9.00%

Completion Date:

Description: REPLACE US 17 ALT. BR./SAMPIT RIVER

6/30/2021

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

0.4920

P028308P028308PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

MOBILIZATION - SUBCONTRACTOR 1.000 LS

BRIDGE CONSTRUCTION ACCESS 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS

REMOVAL & DISPOSAL OF LOW LEVEL CONTAMINATED SOIL 152.000 TON

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 1,770.000 SY

REMOVAL OF EXIST. GUARDRAIL 634.000 LF

REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS

UNCLASSIFIED EXCAVATION 1,488.000 CY

BORROW EXCAVATION 37,964.000 CY

MUCK EXCAVATION 11,000.000 CY

GEOTEXTILE FOR SEPARATION OF SUBGRADE&SUBBASE/BASE CR 3,000.000 SY

GEOGRID REINFORCEMENT (UNIAXIAL) 3,200.000 SY

GEOGRID REINFORCEMENT (BIAXIAL) 3,000.000 SY

TEMPORARY SHORING WALL 730.000 LF

STONE BRIDGE LIFT MATERIAL 5,700.000 TON

FINE GRADING 7,645.000 SY

FLOWABLE FILL 100.000 CY

MAINTENANCE STONE 500.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE A 3,308.300 TON

LIQUID ASPHALT BINDER PG64-22 283.900 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 100.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,900.000 SY

MILLED-IN RUMBLE STRIP 0.900 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 1,709.500 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 1,102.300 TON

TEMPORARY CONSTRUCTION SIGNS (BARRICADE MOUNTED) 200.000 SF

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 276.000 SF

PREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE 4"WH.SOLID 360.000 LF

Page 8: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 030 7Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

PREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE4"YEL.SOLID 360.000 LF

BARRICADE - TYPE 3 96.000 LF

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 2 4.000 EA

TEMPORARY CONCRETE BARRIER 1,440.000 LF

TEMP CONC BARRIER WITH ANCHORAGE (INCL SECT OF BARR WALL WITHSLOTS/BOLTS/MISC HARDWARE/ITEMS FOR ATTACHMENT TO BRIDGE)

260.000 LF

CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 2.000 EA

PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 180.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 22,000.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 23,250.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 195.000 LF

TEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.- 4"X4" 15.000 EA

TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 105.000 EA

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 300.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 10,220.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 100.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 14,020.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 130.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 4,750.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 44.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 3.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 3.000 EA

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 6,500.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 10.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 70.000 EA

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"WH.SOLID 360.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"YEL.SOL. 460.000 LF

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 32.380 SF

FLAT SHEET, TYPE III, SIZE DETERMINED BY MSG 38.000 SF

FLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 20.500 SF

FLAT SHEET,TYPE-VIII,IX, OR XI, FIXED SIZE & MSG. 26.520 SF

U-SECTION POST FOR SIGN SUPPORTS - 2P 40.000 LF

U-SECTION POST FOR SIGN SUPPORTS - 3P 180.000 LF

U-SECTION POST FOR SIGN BRACING - 2P 18.667 LF

REFLECTIVE SIGN POST PANELS 30.000 LF

GUARDRAIL DELINEATOR - WHITE 36.000 EA

BARRICADE - PERMANENT WITH TYPE III SHEETING 6.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 724.000 LF

FURNISH & INSTALL SOLAR POWERED FLASHER ASSEM-SINGLE BEACON 1.000 EA

CONC. FOR STRUCTURES - CLASS 4000 515.900 CY

CONC. FOR STRUCTURES - CLASS 4000DS FOR DRILL SHAFTS 12.000 CY

GROOVED SURFACE FINISH 671.000 SY

Page 9: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 030 8Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

REINF. STEEL FOR STRUCTURES (BRIDGE) 162,603.000 LB

HOOP REINFORCING STEEL FOR STRUCTURES (BRIDGE) 8,043.000 LB

PRESTRESSED CONC. BEAM (TYPE II) 821.000 LF

CONCRETE BRIDGE BARRIER PARAPET 296.000 LF

CONCRETE BRIDGE BARRIER PARAPET TRANSITION 4.000 EA

DYNAMIC PILE ANALYZER TEST SET-UP DYNAMIC PILE ANALYZER TEST SETUP 8.000 EA

PILE DRIVING SET-UP 14.000 EA

STEEL PIPE PILING (18" DIAMETER) 308.000 LF

STEEL PIPE INDEX PILING (18" DIAMETER) 66.000 LF

DRILLED SHAFT SET-UP 6.000 EA

DRILLED SHAFT WITH WET & DRY EXCAVATION - 42" DIAMETER 180.000 LF

DRILLED SHAFT WITH WET & DRY EXCAVATION - 48" DIAMETER 86.400 LF

CONSTRUCTION CASING - 48" DIAMETER 98.400 LF

18" SMOOTH WALL PIPE 232.000 LF

24" SMOOTH WALL PIPE 448.000 LF

42" SMOOTH WALL PIPE 56.000 LF

MANHOLE WITH STANDARD 4' X 4' BOX 2.000 EA

36" X 36" JUNCTION BOX 1.000 EA

BEVELING OF PIPE END 30.000 EA

4' SLOPE FLUME (6" CURB STYLE WITH CUTOFFS) 150.000 LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 148.000 LF

DECK JOINT STRIP SEAL 89.700 LF

ELASTOMERIC BEARING 36.000 EA

CROSSHOLE SONIC LOGGING SETUP 6.000 EA

AGGREGATE UNDERDRAIN(AGG#789)WITH 4"PERF.PIPE FOR STRUC 163.000 TON

RIP-RAP (CLASS A) 70.000 TON

RIP-RAP (CLASS B) 500.000 TON

GEOTEXTILE FABRIC FOR EROSION CONTROL UNDER RIPRAP (CLASS 2) 300.000 SY

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 1)TYPE D 700.000 SY

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 100.000 SY

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE D 500.000 SY

MT3 LEADING END TREATMENT TL3 6.000 EA

MGS3 GR STANDARD SHOULDER 412.500 LF

MGS3CS GR COMPRESSED SHOULDER 262.500 LF

MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 4.000 EA

FLUME INLET AT GUARDRAIL (HANDWORK) 4.000 EA

NON-MOW STRIP UNDER GUARDRAIL 100.000 SY

TEMPORARY BARRIER FENCE 2,000.000 LF

RESET FENCE 100.000 LF

RIGHT OF WAY MARKER(REBAR AND CAP) 24.000 EA

RIGHT OF WAY PLAT 1.000 LS

PERMANENT COVER 4.000 ACRE

Page 10: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 030 9Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

TEMPORARY COVER 12.000 ACRE

FERTILIZER (NITROGEN) 400.000 LB

FERTILIZER (PHOSPHORIC ACID) 400.000 LB

FERTILIZER (POTASH) 400.000 LB

AGRICULTURAL GRANULAR LIME 8,000.000 LB

SELECTIVE WATERING 54,300.000 GAL

MOWING 32.000 ACRE

WATERPROOFING (SUBSTRUCTURE-SECOND METHOD) 28.400 SY

TURF REINFORCEMENT MATTING (TRM) TYPE 1 0.500 MSY

TEMPORARY EROSION CONTROL BLANKET (ECB) 31.400 MSY

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1 14.200 ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 1.800 ACRE

INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 1,479.000 LF

SEDIMENT TUBES FOR DITCH CHECKS 760.000 LF

SILT FENCE 16,930.000 LF

REPLACE/REPAIR SILT FENCE 1,693.000 LF

FLOATING TURBIDITY BARRIER-HEAVY DUTY 6,730.000 SF

CLEANING SILT BASINS 5,100.000 CY

REMOVAL OF SILT RETAINED BY SILT FENCE 4,233.000 LF

INLET FILTER CLEANING 10.000 EA

AGGREGATE NO.5 OR 57 FOR EROSION CONTROL 20.000 TON

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

TEMPORARY FLEXIBLE PIPE SLOPE DRAIN - 12" 200.000 LF

Page 11: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 040 10Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

2852090SC File NO(S).:

CO(S).: Kershaw

DBE Goal Percent: 0.00%

Completion Date:

Description: RESURF.,RECLAA.,ADA RAMPS - KERSHAWCO.

4/30/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

4.1700

P037393P037393PCN: Project No.:

P038354P038354PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 125.000 SY

UNCLASSIFIED EXCAVATION 65.000 CY

BORROW EXCAVATION 812.000 CY

EXCAVATION FOR SHOULDER PAVING 191.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 191.000 STA

CEMENT MODIFIED RECYCLED BASE (8" UNIF)-CURING METHOD B 17,665.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 478.500 TON

MAINTENANCE STONE 20.600 TON

HMA SHOULDER WIDENING COURSE 955.680 TON

LIQUID ASPHALT BINDER PG64-22 409.305 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,060.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,575.000 SY

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 612.480 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 4,846.960 TON

DRIVEWAY PAVING-SURFACE TYPE C 737.125 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 988.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 60.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 75,775.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,072.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1,200.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 94,225.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 30.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 25,275.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 413.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 600.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 37,105.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 303.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 20.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 726.000 LF

SAWCUT FOR LOOP DETECTOR 227.000 LF

Page 12: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 040 11Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

ADJUST DROP INLET ADJUST D. I. 1.000 EA

DETECTABLE WARNING MATERIAL 62.500 SF

PEDESTRIAN RAMP CONSTRUCTION 125.000 SY

PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS 3.093 ACRE

Page 13: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 050 12Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

3290910SC File NO(S).:

CO(S).: Lexington

DBE Goal Percent: 10.00%

Completion Date:

Description: TOWN OF SPRINGDALE SIDEWALK PROJECT

3/31/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

0.3130

P028205P028205PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS

CLEARING & GRUBBING DITCHES 0.500 ACRE

REMOVAL & DISPOSAL OF EXISTING CATCH BASIN 1.000 EA

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 100.000 SY

REMOVAL & DISPOSAL OF EXISTING CONCRETE 0.747 CY

UNCLASSIFIED EXCAVATION 177.000 CY

BORROW EXCAVATION 178.000 CY

60" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 7.000 LF

FLOWABLE FILL 73.000 CY

MAINTENANCE STONE 100.000 TON

LIQUID ASPHALT BINDER PG64-22 0.600 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 11.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 224.000 SF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)8"WH.SOLID 150.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)24"WH.SOL 240.000 LF

CONC. FOR STRUCTURES - CLASS 3000(ROADWAY) 0.747 CY

IRON PIPE HANDRAILING 20.000 LF

18" SMOOTH WALL PIPE 172.000 LF

24" SMOOTH WALL PIPE 20.000 LF

60" SMOOTH WALL PIPE 8.000 LF

CATCH BASIN -TYPE 16 3.000 EA

CATCH BASIN -TYPE 18 2.000 EA

CONCRETE SIDEWALK(4" UNIFORM) 875.000 SY

DETECTABLE WARNING MATERIAL 50.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 48.000 SY

PEDESTRIAN RAMP CONSTRUCTION 100.000 SY

RIP-RAP (CLASS A) 71.000 TON

RIP-RAP (CLASS B) 38.000 TON

Page 14: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 050 13Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE A 189.000 SY

RIGHT OF WAY MARKER(REBAR AND CAP) 7.000 EA

RIGHT OF WAY PLAT 1.000 LS

PERMANENT GRASSING FOR SMALL PROJECTS 1.030 ACRE

TEMPORARY COVER 0.515 ACRE

MOWING 1.545 ACRE

SODDING 1.000 MSY

INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 90.000 LF

INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 90.000 LF

SEDIMENT TUBES FOR DITCH CHECKS 280.000 LF

SILT FENCE 1,600.000 LF

SILT BASINS 208.000 CY

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

Page 15: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 060 14Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

3851720SC File NO(S).:

CO(S).: Orangeburg

DBE Goal Percent: 0.00%

Completion Date:

Description: SAFETY IMPROV. ON SC 6

6/30/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

6.0200

P038330P038330PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

LIMB TRIMMING 1.000 L S

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,200.000 SY

UNCLASSIFIED EXCAVATION 100.000 CY

BORROW EXCAVATION 1,404.000 CY

EXCAVATION FOR SHOULDER PAVING 582.920 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 582.920 STA

MAINTENANCE STONE 38.900 TON

HMA SHOULDER WIDENING COURSE 5,100.000 TON

LIQUID ASPHALT BINDER PG64-22 694.500 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,886.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 533.000 SY

MILLED-IN RUMBLE STRIP 16.560 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 6,977.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,052.000 SF

PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 500.000 LF

PAVEMENT MARKINGS(TEMP-PAINT) 4" YELLOW BROKEN LINES 12,000.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 116,584.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 43,880.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 1,200.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 250.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 58,292.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 600.000 LF

6" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 6,000.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 21,940.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 439.000 EA

EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY 1.000 LS

FLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 180.000 SF

U-SECTION POST FOR SIGN SUPPORTS - 3P 200.000 LF

REFLECTIVE SIGN POST PANELS 120.000 LF

GUARDRAIL DELINEATOR - WHITE 120.000 EA

Page 16: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 060 15Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

15" SMOOTH WALL PIPE 280.000 LF

18" SMOOTH WALL PIPE 280.000 LF

24" SMOOTH WALL PIPE 40.000 LF

CLEANING EXISTING PIPE 200.000 LF

BEVELING OF PIPE END 280.000 EA

REMOVE & DISPOSE SEMI-RIGID GR DEVICE 1,600.000 LF

MT3 LEADING END TREATMENT TL3 10.000 EA

MGS3CS GR COMPRESSED SHOULDER 3,000.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 6.700 ACRE

SEDIMENT TUBES FOR DITCH CHECKS 100.000 LF

SILT FENCE 2,000.000 LF

Page 17: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 070 16Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

4646790SC File NO(S).:

CO(S).: York

DBE Goal Percent: 9.00%

Completion Date:

Description: INTERCHANGE IMPR. - I-77 AT SC 460

6/30/2021

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

1.8000

00423310042331RD01PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

UTILITY RELOCATION NO. ____ 001 1.000 EA

UTILITY RELOCATION NO. ____ 002 1.000 EA

TRAFFIC CONTROL 1.000 LS

LAW ENFORCEMENT OFFICER 300.000 HR

TEMPORARY SHORING 310.000 SF

LEVEL 3 - EARTH-BORNE VIBRATION MONITORING 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN ROADWAY 1.000 ACRE

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 8,040.000 SY

REMOVAL & DISPOSAL OF EXISTING CURB 46.000 LF

REMOVAL OF EXIST. GUARDRAIL 1,016.000 LF

REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS

UNCLASSIFIED EXCAVATION 3,400.000 CY

ROCK EXCAVATION 340.000 CY

BORROW EXCAVATION 25,840.000 CY

FINE GRADING 25,526.000 SY

FLOWABLE FILL 71.200 CY

MAINTENANCE STONE 750.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE A 6,665.000 TON

LIQUID ASPHALT BINDER PG64-22 424.000 TON

LIQUID ASPHALT BINDER PG76-22 219.000 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 25,920.000 SY

MILLED-IN RUMBLE STRIP 0.670 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 3,048.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE A 3,280.000 TON

OPEN-GRADED FRICTION COURSE 482.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 520.000 SF

PORTABLE TERMINAL IMPACT ATTENUATOR 3.000 EA

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(70MPH) 2.000 EA

TEMPORARY CONCRETE BARRIER 4,229.000 LF

Page 18: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 070 17Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 2.000 EA

PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 2,098.000 LF

PAVEMENT MARKINGS(TEMP-PAINT) 4" YELLOW BROKEN LINES 97.000 LF

PAVEMENT MARKINGS(TEMP-PAINT) 6" WHITE BROKEN LINES 21,000.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 1,303.000 LF

PAVEMENT MARKING(TEMPORARY-THERMOPLASTIC)-4"WHITE SOLID LINE 1,980.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-6" WHITE SOLID LINES 6,960.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-6" YELLOW SOLID LINES 6,402.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES 556.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-12" WHITE SOLID LINES 116.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 413.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"YELLOW SOLID LINES 786.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE SINGLE ARROW 3.000 EA

PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE COMBINATION ARROWS 1.000 EA

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,500.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 22,000.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 16,300.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,800.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 18.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,600.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 47.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 25.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,100.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,200.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 6,900.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 100.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 250.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 50.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 50.000 EA

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 854.000 SF

MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MEDIAN BARRIER 2.000 EA

MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON OVERHEAD SUPPORT 56.000 EA

MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE 13.000 EA

F&I MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MAST ARM 15.000 EA

EXTRUDED PANEL SIGNS - GROUND MOUNTED EXTRUDED 1,512.000 SF

EXTRUDED PANEL SIGNS- MOUNTED OVERHEAD 2,588.000 SF

U-SECTION POST FOR SIGN SUPPORTS - 2P 1,170.000 LF

FLEXIBLE DELINEATOR POST, 4"X12", TYPE 4 SHEETING REFLECTOR 100.000 EA

OVERHEAD SIGN STRUCTURE NO.(____) 003 1.000 EA

OVERHEAD SIGN STRUCTURE NO.(____) 004 1.000 EA

OVERHEAD SIGN STRUCTURE NO.(____) 005 1.000 EA

Page 19: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 070 18Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

OVERHEAD SIGN STRUCTURE NO.(____) 006 1.000 EA

OVERHEAD SIGN STRUCTURE NO.(____) 007 1.000 EA

OVERHEAD SIGN STRUCTURE NO.(____) 008 1.000 EA

OVERHEAD SIGN STRUCTURE NO.(____) 009 1.000 EA

DESIGN & INSTALLATION OF RDWY. LIGHTING ELECTRICAL SYSTEM 010 1.000 LS

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 50.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 2,846.000 LF

FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (DIRECTIONAL BORED) 7,781.000 LF

NO. 2 COPPER WIRE, 1 CONDUCTOR, 600V,TYPE RHH,RHW,USE 5,960.000 LF

NO. 12 COPPER WIRE, 1 CONDUCTOR, 600V,TYPE RHH,RHW,USE 1,200.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 6,209.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 8,140.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 18,781.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 17,380.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 7,248.000 LF

FURNISH & INSTALL FIBER OPTIC CABLE-SINGLE MODE 2,070.000 LF

FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER 1.000 EA

SAWCUT FOR LOOP DETECTOR 4,177.000 LF

FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 2.000 EA

F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 18.000 EA

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 21.000 EA

17"X30"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 4.000 EA

30"X48"X30"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 4.000 EA

FURNISH & INSTALL 40' WOOD POLE - CLASS II-CCA TREATED(0.60) 8.000 EA

FURNISH & INSTALL 3/8" BACK GUY FOR WOOD POLE 16.000 EA

FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 1,123.000 LF

FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 9.000 EA

F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 011 2.000 EA

FURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD 1.000 EA

FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD 4.000 EA

FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 012 33.000 EA

F&I - 12" 1-WAY-1 SECTION(GA)VEHICLE TRAFFIC SIGNAL 3.000 EA

F&I - 1-WAY-1SECT.HAND/MAN EMBLEM PEDESTRIAN SIGNAL HEAD 14.000 EA

F&I-PED PUSH BUTTON MICRO ASSEMBLY(9"X15")AND SIGN(R-10-3E or R10-4a) 8.000 EA

REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LS

LUMINAIRE OPTION FOR MAST ARM - TO ACCOUNT FOR TALLER POLE 4.000 EA

DESIGN, FURNISH & INSTALL STEEL POLE WITH TWIN MAST ARMS INCLUDINGFOUNDATION 013

2.000 EA

DESIGN, FURNISH & INSTALL STEEL POLE WITH MAST ARM INCLUDINGFOUNDATION

6.000 EA

INSTALL CLOSED CIRCUIT TV CAMERA - HIGHWAY USAGE 2.000 EA

CONC. FOR STRUCTURES - CLASS 4000 365.400 CY

Page 20: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 070 19Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

PARTIAL DEPTH PATCHING OF EXISTING DECK 50.000 SY

SPALL REPAIR 10.000 SF

GROOVED SURFACE FINISH 801.000 SY

REINF. STEEL FOR STRUCTURES (BRIDGE) 91,680.000 LB

HOOP REINFORCING STEEL FOR STRUCTURES (BRIDGE) 3,858.000 LB

CONCRETE BRIDGE BARRIER PARAPET 1,333.000 LF

CONCRETE BRIDGE BARRIER PARAPET TRANSITION 2.000 EA

STRUCTURAL STEEL 1.000 LS

DYNAMIC PILE ANALYZER TEST SET-UP DYNAMIC PILE ANALYZER TEST SETUP 2.000 EA

PILE DRIVING SET-UP 6.000 EA

REINF. PILE TIPS (HP14 X 102) 6.000 EA

STEEL H BEARING PILING (HP14 X 102) 239.200 LF

STEEL H BEARING INDEX PILING (HP14X 102) 129.500 LF

MICROPILE SET-UP 31.000 EA

MICROPILES INSTALLED IN SOIL 1,150.000 LF

MICROPILES INSTALLED IN ROCK 310.000 LF

VERIFICATION LOAD TEST 1.000 EA

PROOF LOAD TEST 3.000 EA

18" RC PIPE CUL.-CLASS IV 70.000 LF

24" R. C. PIPE CUL. BEVELED END SECTN-CL 3 1.000 EA

36" R. C. PIPE CUL. BEVELED END SECTN-CL 3 1.000 EA

18" SMOOTH WALL PIPE 1,344.000 LF

24" SMOOTH WALL PIPE 612.000 LF

30" SMOOTH WALL PIPE 138.000 LF

36" SMOOTH WALL PIPE 456.000 LF

CATCH BASIN -TYPE 15(SINGLE) 2.000 EA

CATCH BASIN -TYPE 16 11.000 EA

CATCH BASIN -TYPE 18 1.000 EA

DROP INLET (24" X 24") 2.000 EA

DROP INLET (24" X 36") 4.000 EA

DROP INLET TYPE 112 1.000 EA

MANHOLE 5.000 EA

24" X 24" JUNCTION BOX 3.000 EA

ADJUST CATCH BASIN 1.000 EA

CONCRETE CURB (9" X 15") 2,222.000 LF

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 125.000 LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 2,171.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 2,270.000 SY

DETECTABLE WARNING MATERIAL 88.000 SF

CONCRETE MEDIAN 1,130.000 SY

CONCRETE FLUME 525.000 LF

PEDESTRIAN RAMP CONSTRUCTION 175.000 SY

Page 21: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 070 20Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

SURFACE APPLIED DETECTABLE WARNING 120.000 SF

POLYMER MODIFIED ASPHALT EXPANSION JOINT 93.000 LF

GEOTEXTILE FOR DRAINAGE FILTRATION (FABRIC PROTECTED)CLASS 1 332.000 SY

12" PIPE SLOPE DRAIN 440.000 LF

METAL INTAKE SPILLWAY ASSEMBLY 2.000 EA

RIP-RAP (CLASS B) 400.000 TON

SLOPE PROTECTION-4" CONCRETE 1,715.000 SY

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 1)TYPE B 350.000 SY

MT3 LEADING END TREATMENT TL3 6.000 EA

MO350 WBBC2 W BRIDGE CONNECTOR TL2 1.000 EACH

MB TRAILING END TREATMENT 3.000 EA

MGS3 GR STANDARD SHOULDER 2,000.000 LF

MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 3.000 EA

SACRIFICIAL FLEXIBLE WARNING MARKER POST (FWMP) 48Y/Y 100.000 EA

56SS REINFORCED BARRIER WALL 305.000 LF

CONC BARR TY6 GLARE SHIELD SYSTEM 215.000 LF

CONC BARRIER TOE DRAIN 21.000 EA

48"-CHAIN LINK FENCE 705.000 LF

RIGHT OF WAY MARKER(REBAR AND CAP) 25.000 EA

RIGHT OF WAY PLAT 1.000 LS

PERMANENT COVER 15.000 ACRE

TEMPORARY COVER 10.000 ACRE

STRAW OR HAY MULCH WITH TACKIFIER 25.000 ACRE

FERTILIZER (NITROGEN) 1,200.000 LB

FERTILIZER (PHOSPHORIC ACID) 1,200.000 LB

FERTILIZER (POTASH) 1,200.000 LB

AGRICULTURAL GRANULAR LIME 24,000.000 LB

SELECTIVE WATERING 135,750.000 GAL

MOWING 50.000 ACRE

TURF REINFORCEMENT MATTING (TRM) TYPE 1 1.375 MSY

TURF REINFORCEMENT MATTING (TRM) TYPE 2 0.297 MSY

TURF REINFORCEMENT MATTING (TRM) TYPE 3 0.110 MSY

TEMPORARY EROSION CONTROL BLANKET (CLASS B) 0.588 MSY

INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 555.000 LF

SEDIMENT TUBES FOR DITCH CHECKS 2,328.000 LF

SILT FENCE 4,160.000 LF

REPLACE/REPAIR SILT FENCE 1,600.000 LF

CLEANING SILT BASINS 300.000 CY

REMOVAL OF SILT RETAINED BY SILT FENCE 1,040.000 LF

DITCH CHECK 400.000 TON

INLET STRUCTURE FILTER - TYPE B 12.000 EA

AGGREGATE NO.5 OR 57 FOR EROSION CONTROL 250.000 TON

Page 22: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 070 21Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

CLEAN OUT AND RESEAL 1" EXPANSION JOINT 195.000 LF

CONCRETE MEDIAN BARRIER (SPECIAL) 542.000 LF

CONCRETE ROADSIDE BARRIER (SPECIAL) 63.000 LF

Page 23: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 080 22Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

4650570SC File NO(S).:

CO(S).: York

DBE Goal Percent: 10.00%

Completion Date:

Description: REPLACE BRIDGE US 21/STEELE CREEK

240 Days

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

0.2940

P028381P028381PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BRIDGE CONSTRUCTION ACCESS 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 315.000 SY

REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS

UNCLASSIFIED EXCAVATION 3,380.000 CY

BORROW EXCAVATION 5,057.000 CY

BORROW PIT SET-UP 1.000 LS

GEOGRID REINFORCEMENT (UNIAXIAL) 1,400.000 SY

FINE GRADING 2,500.000 SY

MAINTENANCE STONE 235.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE B 790.000 TON

LIQUID ASPHALT BINDER PG64-22 86.000 TON

FULL DEPTH ASPH. PAV. PATCHING 12"UNIF 622.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 2,250.000 SY

MILLED-IN RUMBLE STRIP 0.542 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 521.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 395.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 256.000 SF

PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 276.000 SF

DETOUR SIGNS 590.000 SF

BARRICADE - TYPE 3 216.000 LF

CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 1.000 EA

TYPE B - FLASHING LIGHT 32.000 EA

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 2,500.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 160.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 440.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) EPOXY PAINT 30.000 LF

4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 220.000 LF

Page 24: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 080 23Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 2,500.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 160.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,250.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 34.000 EA

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 884.000 LF

CONC. FOR STRUCTURES - CLASS 4000 486.500 CY

GROOVED SURFACE FINISH 839.000 SY

REINF. STEEL FOR STRUCTURES (BRIDGE) 131,885.000 LB

HOOP REINFORCING STEEL FOR STRUCTURES (BRIDGE) 6,443.000 LB

PRESTRESSED CONC. BEAM (TYPE III) 1,065.000 LF

CONCRETE BRIDGE BARRIER PARAPET 376.000 LF

CONCRETE BRIDGE BARRIER PARAPET TRANSITION 4.000 EA

PILE DRIVING SET-UP 14.000 EA

REINF. PILE TIPS (HP14 X 73) 14.000 EA

STEEL H BEARING PILING (HP14 X 73) 322.000 LF

DRILLED SHAFT SET-UP 6.000 EA

DRILLED SHAFT WITH ROCK EXCAVATION - 42" DIAMETER 57.000 LF

DRILLED SHAFT WITH WET & DRY EXCAVATION - 48" DIAMETER 96.000 LF

CONSTRUCTION CASING - 48" DIAMETER 96.000 LF

18" SMOOTH WALL PIPE 252.000 LF

BEVELING OF PIPE END 14.000 EA

4' SLOPE FLUME (6" CURB STYLE WITH CUTOFFS) 123.906 LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 212.225 LF

ELASTOMERIC BEARING 36.000 EA

CROSSHOLE SONIC LOGGING SETUP 6.000 EA

AGGREGATE UNDERDRAIN(AGG#789)WITH 4"PERF.PIPE FOR STRUC 140.000 TON

RIP-RAP (CLASS A) 1,717.000 TON

RIP-RAP (CLASS B) 683.000 TON

GEOTEXTILE FABRIC FOR EROSION CONTROL UNDER RIPRAP (CLASS 2) 6,036.000 SY

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 1,204.000 SY

MT3 LEADING END TREATMENT TL3 4.000 EA

MGS3CS GR COMPRESSED SHOULDER 512.500 LF

MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 4.000 EA

FLUME INLET AT GUARDRAIL (HANDWORK) 4.000 EA

RIGHT OF WAY MARKER(REBAR AND CAP) 20.000 EA

RIGHT OF WAY PLAT 1.000 LS

PERMANENT COVER 2.510 ACRE

TEMPORARY COVER 1.255 ACRE

COMPOST 675.000 CY

FERTILIZER (NITROGEN) 251.000 LB

FERTILIZER (PHOSPHORIC ACID) 251.000 LB

FERTILIZER (POTASH) 251.000 LB

Page 25: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 080 24Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

AGRICULTURAL GRANULAR LIME 5,020.000 LB

SELECTIVE WATERING 54,300.000 GAL

MOWING 7.530 ACRE

WATERPROOFING (SUBSTRUCTURE-SECOND METHOD) 30.000 SY

TURF REINFORCEMENT MATTING (TRM) TYPE 1 0.781 MSY

TEMPORARY EROSION CONTROL BLANKET (ECB) 1.847 MSY

SEDIMENT TUBES FOR DITCH CHECKS 860.000 LF

SILT FENCE 1,810.000 LF

REPLACE/REPAIR SILT FENCE 181.000 LF

FLOATING TURBIDITY BARRIER-LIGHT DUTY(6'DEPTH) 100.000 LF

CLEANING SILT BASINS 180.000 CY

REMOVAL OF SILT RETAINED BY SILT FENCE 453.000 LF

AGGREGATE NO.5 OR 57 FOR EROSION CONTROL 837.000 TON

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

Page 26: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 090 25Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5150551SC File NO(S).:

CO(S).: Lexington Richland

DBE Goal Percent: 0.00%

Completion Date:

Description: MICROSURF.,FDP,ADA RAMPS - S-860, US321, SC 6, S-34

11/30/2019

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

6.3800

P038036P038036PCN: Project No.:

P038038P038038PCN: Project No.:

P038039P038039PCN: Project No.:

P038040P038040PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 425.000 SY

MAINTENANCE STONE 10.000 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,000.000 SY

MICRO SURFACING SURFACE COURSE 133,542.931 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,444.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 16,320.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 81,185.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 4,800.000 LF

12" WHITE SOLID LINES - FAST DRY PAINT 1,000.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,405.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 50.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 12.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3,700.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 126,310.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 225.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 5,075.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 24,370.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 500.000 LF

12" WHITE SOLID LINES - THERMO. - 125 MIL. 500.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 480.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 5.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 4.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,150.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 31,855.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 460.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 110.000 EA

Page 27: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 090 26Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 539.000 EA

REMOVAL OF ALL PAVEMENT MARKINGS 16.500 LM

4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZEDPOLYMER– 20 MILS

3,040.000 LF

4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

16,225.000 LF

8" WHITE SOLID LINES-(CROSS WALK & CHANNELIZATION)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

1,900.000 LF

24" WHITE SOLID LINES-(STOP/DIAGONAL LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

225.000 LF

WHITE SINGLE ARROWS (LEFT, STRIAGHT, RIGHT) SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

20.000 EA

WHITE WORD MESSAGE "ONLY" - SINGLE COMPONENT HYBRIDIZED POLYMER–20 MILS

2.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT) - SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS 002

2.000 EA

4" YELLOW BROKEN LINES (GAPS EXCLUDED) - SINGLE COMPONENTHYBRIDIZED POLYMER - 20 MILS

700.000 LF

4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS

31,300.000 LF

24" YELLOW DIAGONAL LINE - SINGLE COMPONENT HYBRIDIZED POLYMER - 20MILS 001

120.000 LF

ADJUST DROP INLET ADJUST D. I. 4.000 EA

DETECTABLE WARNING MATERIAL 212.500 SF

PEDESTRIAN RAMP CONSTRUCTION 425.000 SY

Page 28: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 100 27Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5349021SC File NO(S).:

CO(S).: Greenville Spartanburg

DBE Goal Percent: 0.00%

Completion Date:

Description: MICROSURFACE - GREENVILLE &SPARTANBURG CO.

5/31/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

7.2700

P037449P037449PCN: Project No.:

P037462P037462PCN: Project No.:

P037640P037640PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 10.100 LaMi

MICRO SURFACING SURFACE COURSE 136,689.271 SY

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 9,760.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 59,031.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 160.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 273.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 26.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 2.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 5,280.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 159,268.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4,820.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 160.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 40.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 22.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,960.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 24,706.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 264.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 196.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 820.000 EA

REMOVAL OF ALL PAVEMENT MARKINGS 19.700 LM

4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZEDPOLYMER– 20 MILS

60.000 LF

4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

59,031.000 LF

24" WHITE SOLID LINES-(STOP/DIAGONAL LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

233.000 LF

WHITE SINGLE ARROWS (LEFT, STRIAGHT, RIGHT) SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

4.000 EA

WHITE WORD MESSAGE "ONLY" - SINGLE COMPONENT HYBRIDIZED POLYMER–20 MILS

2.000 EA

Page 29: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 100 28Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

WHITE WORD MESSAGE "STOP AHEAD" -SC HYBRIDIZED POLYMER -20 MIL. 2.000 EA

RAILROAD CROSSING SYMBOLS - SINGLE COMPONENT HYBRIDIZED POLYMER -20 MILS

2.000 EA

4" YELLOW BROKEN LINES (GAPS EXCLUDED) - SINGLE COMPONENTHYBRIDIZED POLYMER - 20 MILS

680.000 LF

4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS

54,560.000 LF

Page 30: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 110 29Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5349221SC File NO(S).:

CO(S).: Oconee Pickens

DBE Goal Percent: 0.00%

Completion Date:

Description: MICROSURFACE - OCONEE & PICKENS CO.

6/30/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

13.2000

P037430P037430PCN: Project No.:

P037431P037431PCN: Project No.:

P037448P037448PCN: Project No.:

P037483P037483PCN: Project No.:

P037522P037522PCN: Project No.:

P037529P037529PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 11.010 LaMi

MICRO SURFACING SURFACE COURSE 280,844.457 SY

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 25,380.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 109,799.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,330.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,124.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 38.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 12.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,380.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 290,167.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 12,510.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 34,825.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 2,130.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 882.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 34.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 8.000 EA

WHITE WORD MESSAGE "SCHOOL" -THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,190.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 78,662.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 705.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 225.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,312.000 EA

REMOVAL OF ALL PAVEMENT MARKINGS 37.560 LM

4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZEDPOLYMER– 20 MILS

180.000 LF

4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

74,974.000 LF

Page 31: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 110 30Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

8" WHITE SOLID LINES-(CROSS WALK & CHANNELIZATION)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

200.000 LF

24" WHITE SOLID LINES-(STOP/DIAGONAL LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

242.000 LF

WHITE SINGLE ARROWS (LEFT, STRIAGHT, RIGHT) SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

4.000 EA

WHITE WORD MESSAGE "ONLY" - SINGLE COMPONENT HYBRIDIZED POLYMER–20 MILS

4.000 EA

4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS

77,087.000 LF

Page 32: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 120 31Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5352130SC File NO(S).:

CO(S).:

DBE Goal Percent: 0.00%

Completion Date:

Description: DISTRICT 3: SITE SPECIFIC DECK REPAIRS

5/1/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

0.0000

P038284P038284PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

LAW ENFORCEMENT OFFICER 950.000 HR

PARTIAL DEPTH PATCHING OF EXISTING DECK 2,630.000 SY

COMPRESSION SEAL JOINT 474.000 LF

DECK JOINT STRIP SEAL 100.000 LF

CONCRETE CLASS 4000 FOR FULL DEPTH DECK PATCHING 289.000 CY

HOT-POURED ELASTIC FILLER JOINT 4,814.000 LF

Page 33: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 130 32Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5448761SC File NO(S).:

CO(S).: Cherokee Union

DBE Goal Percent: 0.00%

Completion Date:

Description: MICROSURFACING

6/30/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

5.6600

P037281P037281PCN: Project No.:

P037286P037286PCN: Project No.:

P037288P037288PCN: Project No.:

P037293P037293PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 350.000 LF

LIQUID ASPHALT BINDER PG64-22 5.695 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 383.300 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 725.000 SY

MILLED-IN RUMBLE STRIP 3.140 MI

HOT MIX ASPHALT SURFACE COURSE TYPE E 97.230 TON

MICRO SURFACING SURFACE COURSE 78,000.660 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,480.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 896.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 113,850.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 330.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 60.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 113,850.000 LF

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 50.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 356.000 EA

REMOVAL OF ALL PAVEMENT MARKINGS 11.320 LM

4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZEDPOLYMER– 20 MILS

448.000 LF

4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

56,925.000 LF

24" WHITE SOLID LINES-(STOP/DIAGONAL LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

165.000 LF

4" YELLOW BROKEN LINES (GAPS EXCLUDED) - SINGLE COMPONENTHYBRIDIZED POLYMER - 20 MILS

30.000 LF

4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS

56,925.000 LF

RESET350 W-BEAM STRONG POST SYSTEM 1,350.000 LF

MO350 LEADING TYPE T TL3 (50') 7.000 EA

Page 34: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 140 33Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5448781SC File NO(S).:

CO(S).: Chester Fairfield York

DBE Goal Percent: 0.00%

Completion Date:

Description: MICROSURFACING - S-186, S-30, S-797,S-1099

7/31/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

7.2100

P037282P037282PCN: Project No.:

P037284P037284PCN: Project No.:

P037289P037289PCN: Project No.:

P037294P037294PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

LIQUID ASPHALT BINDER PG64-22 15.576 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,800.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 2,485.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 2,461.000 SY

MILLED-IN RUMBLE STRIP 1.740 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 263.327 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 24.950 TON

MICRO SURFACING SURFACE COURSE 95,303.330 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 840.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 490.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 149,772.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 274.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 8.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 6.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 908.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 147,322.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 9.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 492.000 EA

REMOVAL OF ALL PAVEMENT MARKINGS 14.420 LM

4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZEDPOLYMER– 20 MILS

245.000 LF

4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

74,886.000 LF

24" WHITE SOLID LINES-(STOP/DIAGONAL LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

138.000 LF

WHITE SINGLE ARROWS (LEFT, STRIAGHT, RIGHT) SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

4.000 EA

Page 35: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 140 34Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

WHITE WORD MESSAGE "ONLY" - SINGLE COMPONENT HYBRIDIZED POLYMER–20 MILS

3.000 EA

RAILROAD CROSSING SYMBOLS - SINGLE COMPONENT HYBRIDIZED POLYMER -20 MILS

2.000 EA

4" YELLOW BROKEN LINES (GAPS EXCLUDED) - SINGLE COMPONENTHYBRIDIZED POLYMER - 20 MILS

454.000 LF

4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS

73,661.000 LF

Page 36: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 150 35Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5448811SC File NO(S).:

CO(S).: Chesterfield Lancaster

DBE Goal Percent: 0.00%

Completion Date:

Description: MICROSURFACING

5/31/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

4.0100

P037283P037283PCN: Project No.:

P037290P037290PCN: Project No.:

P037292P037292PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

LIQUID ASPHALT BINDER PG64-22 3.250 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 250.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 50.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE E 50.000 TON

MICRO SURFACING SURFACE COURSE 54,852.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,248.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 380.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 83,208.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 104.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 608.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 83,208.000 LF

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 50.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 232.000 EA

REMOVAL OF ALL PAVEMENT MARKINGS 7.340 LM

4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZEDPOLYMER– 20 MILS

190.000 LF

4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

41,604.000 LF

8" WHITE SOLID LINES-(CROSS WALK & CHANNELIZATION)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

52.000 LF

24" WHITE SOLID LINES-(STOP/DIAGONAL LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

394.000 LF

4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS

41,604.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 12.000 SY

DETECTABLE WARNING MATERIAL 25.000 SF

PEDESTRIAN RAMP CONSTRUCTION 50.000 SY

Page 37: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 160 36Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5452150SC File NO(S).:

CO(S).:

DBE Goal Percent: 0.00%

Completion Date:

Description: DISTRICT 4: SITE SPECIFIC DECK REPAIRS

5/1/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

0.0000

P038312P038312PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

LAW ENFORCEMENT OFFICER 530.000 HR

PARTIAL DEPTH PATCHING OF EXISTING DECK 609.000 SY

CONCRETE CLASS 4000 FOR FULL DEPTH DECK PATCHING 83.000 CY

HOT-POURED ELASTIC FILLER JOINT 5,890.000 LF

Page 38: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 170 37Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5552160SC File NO(S).:

CO(S).:

DBE Goal Percent: 0.00%

Completion Date:

Description: SITE SPECIFIC DECK REPAIRS - DISTRICT 5

5/1/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

0.0000

P038294P038294PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

LAW ENFORCEMENT OFFICER 500.000 HR

PARTIAL DEPTH PATCHING OF EXISTING DECK 1,744.009 SY

COMPRESSION SEAL JOINT 440.000 LF

DECK JOINT STRIP SEAL 176.000 LF

CONCRETE CLASS 4000 FOR FULL DEPTH DECK PATCHING 75.000 CY

Page 39: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 180 38Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5750161SC File NO(S).:

CO(S).: Calhoun Orangeburg

DBE Goal Percent: 0.00%

Completion Date:

Description: MICROSUR./PVMT MARKINGS/G-RAIL - US601, S-31, US 321

6/30/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

4.0300

P037759P037759PCN: Project No.:

P037767P037767PCN: Project No.:

P037957P037957PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MILLED-IN RUMBLE STRIP 3.820 MI

MICRO SURFACING SURFACE COURSE 87,826.663 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 792.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 2,772.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 42,670.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 120.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 2.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 3,970.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 38,680.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 5,222.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 52,370.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 120.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 7,940.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 77,360.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 146.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 244.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 523.000 EA

REMOVAL OF ALL PAVEMENT MARKINGS 11.200 LM

MT3 LEADING END TREATMENT TL3 4.000 EA

MGS3CS GR COMPRESSED SHOULDER 400.000 LF

MO350 THRIE-BEAM STRONG POST SYSTEM 125.000 LF

MO350 LEADING TYPE T TL3 (50') 4.000 EA

Page 40: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 190 39Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5750541SC File NO(S).:

CO(S).: Allendale BambergHampton

DBE Goal Percent: 0.00%

Completion Date:

Description: FDP, MICRO, PVT MARKINGS, G-RAIL-ALLENDALE, BAMBERG, HAMPT

7/31/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

12.5400

P038016P038016PCN: Project No.:

P038017P038017PCN: Project No.:

P038044P038044PCN: Project No.:

P038054P038054PCN: Project No.:

P038073P038073PCN: Project No.:

P038075P038075PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 4.900 TON

LIQUID ASPHALT BINDER PG64-22 2.520 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 490.000 SY

MILLED-IN RUMBLE STRIP 2.930 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 40.000 TON

MICRO SURFACING SURFACE COURSE 287,926.675 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,716.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 16,675.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 99,320.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 150.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 920.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 4.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 4.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 3,950.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 93,120.000 LF

24" YELLOW SOLID LINES - PERM.PVMT.MARKING 340.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 33,350.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 231,340.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 300.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,892.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 4.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 4.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 8,920.000 LF

Page 41: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 190 40Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 213,640.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 680.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 920.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 28.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 537.000 EA

REMOVAL OF ALL PAVEMENT MARKINGS 36.150 LM

4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

16,250.000 LF

24" WHITE SOLID LINES-(STOP/DIAGONAL LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS

26.000 LF

4" YELLOW BROKEN LINES (GAPS EXCLUDED) - SINGLE COMPONENTHYBRIDIZED POLYMER - 20 MILS

510.000 LF

4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS

13,700.000 LF

REMOVE & DISPOSE SEMI-RIGID GR DEVICE 100.000 LF

MO350 W-BEAM STRONG POST SYSTEM 3,000.000 LF

MOP350 THRIE WITH BASE PL 6.25 SPACE 320.000 LF

MO350 THRIE-BEAM STRONG POST SYSTEM 125.000 LF

MO350 LEADING TYPE T TL3 (50') 8.000 EA

Page 42: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 200 41Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

5751790SC File NO(S).:

CO(S).: Aiken Calhoun ClarendonHampton Orangeburg

DBE Goal Percent: 0.00%

Completion Date:

Description: R/W AND L/A FENCE REPLACEMENT

6/30/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

57.8500

P038146P038146PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

WOVEN WIRE FENCE - TYPE 1 WITH 2 STRANDS BARBED 305,500.000 LF

48"-CHAIN LINK FENCE 8,400.000 LF

24' WIDE- CHAIN LINK FENCE GATE (48"HT) DOUBLE SWING GATES 12.000 EA

Page 43: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 210 42Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

8850710SC File NO(S).:

CO(S).: Aiken Saluda

DBE Goal Percent: 0.00%

Completion Date:

Description: SAFETY IMPR. US 1 - AIKEN & SALUDA CO.

10/31/2020

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

14.9700

P038121P038121PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

LIMB TRIMMING 1.000 L S

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,366.000 SY

UNCLASSIFIED EXCAVATION 180.000 CY

BORROW EXCAVATION 2,000.000 CY

EXCAVATION FOR SHOULDER PAVING 1,307.330 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 1,307.330 STA

MAINTENANCE STONE 91.000 TON

HMA SHOULDER WIDENING COURSE 14,608.000 TON

LIQUID ASPHALT BINDER PG64-22 1,645.480 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 9,186.030 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,311.100 SY

MILLED-IN RUMBLE STRIP 37.140 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 14,525.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,016.000 SF

PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 2,604.000 LF

PAVEMENT MARKINGS(TEMP-PAINT) 4" YELLOW BROKEN LINES 99,532.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 490,192.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 132,886.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 2,080.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,302.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 122,548.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,040.000 LF

6" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 49,766.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 66,453.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 900.000 EA

EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY 1.000 LS

FLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 235.000 SF

U-SECTION POST FOR SIGN SUPPORTS - 3P 338.000 LF

REFLECTIVE SIGN POST PANELS 130.000 LF

GUARDRAIL DELINEATOR - WHITE 300.000 EA

Page 44: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

Call No.: 210 43Page:Letting Date: May 14, 2019 Letting Time: 2:00 P.M.

South Carolina Department of Transportation 4/8/2019

Description Quantity Units

15" SMOOTH WALL PIPE 576.000 LF

18" SMOOTH WALL PIPE 372.000 LF

BEVELING OF PIPE END 237.000 EA

MT3 LEADING END TREATMENT TL3 26.000 EA

MGS3 GR STANDARD SHOULDER 5,300.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 9.000 ACRE

SEDIMENT TUBES FOR DITCH CHECKS 120.000 LF

SILT FENCE 7,250.000 LF

REPLACE/REPAIR SILT FENCE 725.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 1,813.000 LF

Page 45: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will beconsidered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT,written by a SURETY satisfactory to the Department, properly executed in South Carolina Department ofTransportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized,the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NOOTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.

SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express deliveryservice or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bidopening.

1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bonds submitted by US mail or express delivery service shall be enclosed in sealed envelope or container with Contractor Name and "Bid Bond for SC File No._______", and enclosed in an outer, sealed envelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC 29202-0365, or 955 Park Street, Columbia, South Carolina, 29201. Bid bonds submitted by US mail or express delivery service must be received by the Contract Administrator, or designee, prior to the time and date for opening of proposals indicated in the beginning of this Notice. The department will not be responsible for delays in the US mail or express delivery service.

2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealed envelope marked with Contractor Name and "Bid Bond for SC File No._______", and must be delivered directly to the Contract Administrator or designee prior to the time and date for opening of proposals indicated in the beginning of this Notice.

PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department ofTransportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED APREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BEALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the ContractsAdministration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by callingJeff Elliott at (803)737-1253.

STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisementcontemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways.The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance withthe provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the FederalHighway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that itwill affirmatively insure that in any contract entered into pursuant to this advertisement minority businessenterprises will be afforded full opportunity to submit bids in response to this invitation and will not bediscriminated against on the grounds of race, color, sex, religion or national origin in consideration foraward. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and SpecialProvision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of theproposal.Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsiblefor carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called tothe fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours andSafety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations.

Notice is hereby given that in addition to the Standard Specifications for Highway Construction, Edition of2007, the "Supplemental Specifications", and the "Project Special Provisions", the following govern SCDOTHighway Lettings:

Page 46: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION …...concrete curb and gutter (3'-0") vertical face 100.000 lf concrete sidewalk(4" uniform) 128.000 sy concrete sidewalk(6" uniform) 25.000

TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the solejudge of determining the local time and the arrival of the designated time for the opening and reading of thebids.

Information in this notice is the latest available at the time of its publication. The information contained inthe proposals, plans, and any addenda issued shall govern over this notice. Quantities shown herein areapproximate for information only and should not be used for bidding purposes. The Department reservesthe right to change these quantities without notice.

THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECTANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.

MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARYOF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THEFEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH INTHE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETYACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS.CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNINGSPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED INTHIS CONTRACT.

Prepared by J. Taylor

Issued by:

J.Brian ParnellContract Administrator