Page 1: South George Mason Drive Pedestrian Bridge Repair May 2013

Storm Sewer Pipe

Rehabilitation

Completed Storm Drainage

Maintenance Projects

South George Mason Drive

Pedestrian Bridge Repair

Mason District

Project #: WBS SD-000008-001

I/O 2G25-057-000

Page 2: South George Mason Drive Pedestrian Bridge Repair May 2013

DESCRIPTION:

The Maintenance and Stormwater Management Division completed repairs to the South George Mason

Drive Pedestrian Bridge during the second half of FY 2013. The bridge hand rails were sanded, primed

and painted for long term finish. A concrete epoxy was also used to make repairs to the concrete deck

and piers to extend the life of the bridge as well as a deck finish was applied. The bridge maintenance

was completed with support of the Mason District Supervisors Office and the Virginia Department of

Transportation.

PROJECT OVERVIEW:

Fund No: 300-C30010 General Construction and Improvements

300-C30060 Walkway Improvements

Project No: WBS SD-000008-001

I/O 2G25-057-000

Project Name: South George Mason Drive Pedestrian Bridge Repair

Completion: 2nd Half FY 2013

District: Mason

Tax Maps: 062-3

Watersheds: Four Mile Run

DPWES PROJECT TEAM:

William Schell

Matthew Adams

Project Details

Page 3: South George Mason Drive Pedestrian Bridge Repair May 2013

Project is located west of Leesburg

Pike on South George Mason Drive in

tax map grid 62-3 in the Mason District.

South George Mason

Project Location

South George Mason Pedestrian

Bridge Repair

Page 4: South George Mason Drive Pedestrian Bridge Repair May 2013

Example Before and After Photos

Handrail Rusting (before) Handrail Rehabilitation (after)

Page 5: South George Mason Drive Pedestrian Bridge Repair May 2013

Example Before and After Photos

Damage to Concrete Bridge Deck (left)

Concrete Repairs to Bridge Deck (right)

Page 6: South George Mason Drive Pedestrian Bridge Repair May 2013

Example Before and After Photos

Before Painting: (below)

After Painting (below)

Page 7: South George Mason Drive Pedestrian Bridge Repair May 2013

Example Before and After Photos

Bridge Pier Before Rehabilitation (below)

Bridge Pier After Concrete Patch and

Screen Replacement (below)

Page 8: South George Mason Drive Pedestrian Bridge Repair May 2013

South George Mason Pedestrian

Bridge

For additional information, please call

Irene Haske, Public Information Officer

703-324-5821, TTY 711

[email protected]