SOUTHEAST BUS TERMINALFACILITY PROJECT SHEET
7200 Bluff Springs Rd.Austin, TX 78744
Building Area: 25,315 Square FeetSite: 22 AcresDate of First Construction: 2014
About the CampusThe Southeast Bus Terminal was built as part of the 2004 Bond Program. It relieved congestion from the district’s other bus terminals and reduced travel distance for buses serving southeast Austin. It includes an administration building, a maintenance building, parking spaces and a fueling station.
For more detailed information about the district’s long-term Facility Master Plan and recommendations for this facility,
please visit www.aisdfuture.com.
Proposed Projects
• Districtwide Fire and Intrusion Alarm Upgrades
• Districtwide Security Camera Replacements
• Safety Improvements
• Technology: Network System Improvements
Facility Condition Assessment (FCA) This Facility District Average - Special Facility
95 62Fail < 30
Poor 30 - 49
Average 50 - 69
Good 70 - 89
Excellent 90 - 100
Estimated Cost of Proposed Projects
$118,000
Projects may include funding from additional sources.
6/26/17