WORK METHOD STATEMENTWMS Rev.No
ActivityLifting and Crane
OperationCompany Name Date 05 SEPTEMBER. 201
Decription of !or"Special Lifting and loading/Unloading for System Form,
Container, Portable Cabin and other Heavy items
#ro$ect Site % Location
Contact No.
#eron Comp&eting t'i tatement
(HA Ref. No.
(HA Rev. No.
Ta" Step)Activity*
Too& and E+,ipmentRe+,ired
Decription of Wor" )-n detai&* Remar" )Reference*
Preliminaries N/A
Irrespective of Weight and complexity of arrangements all lifting
works shall meet the requirements of lifting procedure to prevent
associated hazards. A qualified lifting supervisor shall be assigned to
ensure crane operators carry out their duty safely and adequate
inspection and maintenance of equipment has been carried out. He
shall review the third party certificates for the crane and lifting gears.
He must also ensure that an approved lifting plan is place and color
coding of slings hackles and tools are done.
-
8/17/2019 Special Lifting work method statement
2/5
Preliminaries
N/A !o lifting activities shall not take place without special
permission of site H" #anager after sunset or before
sunrise
$ifting %rew
%rane operator must be %ompetent and authorized by
the authority for the task and able to &udge distances
height and clearance and shall not color blinded. He
shall know the meaning of escape and safe use of fire
extinguisher
$ifting %rew'igger
'igger must be %ompetent and authorized by authority
for the task and able to determine weight center of
gravity ( characteristic of load and inspect wire rope
sling or lifting gears and familiars with different and
correct signaling technique
-
8/17/2019 Special Lifting work method statement
3/5
%rane)perator
#obile %rane*+ork$ift*,elescopic $oader*-oom* ,ruck*$iftingears.,ower crane (#obile
%rane /%rawler crane
+or #a&or or pecial lift detailed lifting plan design and
execution shall be submitted to authority prior to lift for
approval. %ompetent person approved from must assess
the lifting operation and select the most suitable lifting
operation and select the most suitable lifting appliances
lifting gears and equipment and authorized to stop any
unsafe operation. 0lanning should consider load to be
lifted including slings shackles and lifting gears radius
of operation height of lift presence of restriction like
overhead cables or lifting inside building visibility
method of attaching slings load chart position of crane
ground condition method of signaling lifting appliance
etc.When the crane to be used on slope leveling the ground
or using mats.$ifting operators shall work according the
manufactures instruction procedure and safe work
practice.
-
8/17/2019 Special Lifting work method statement
4/5
'igging $ifting ears
%hains 'opes and $ifting gears must nt be used unless
they have been marked with their safe working load
and must never be overloaded except when under test
and authorized by competent person'ope and slings must be properly attached to crane
hook by ring or thimble or eye to avoid damage to sling
or lifting gear and multiple slings must have their legs
connected by ring or shackle $oad must be secured to
prevent from slipping falling and transit from knocking
anything down. $oose material must be secured to
prevent from slipping falling and transit from knocking
anything down. $oose material must be lifted in a properly designated box. ,agline to be used to control
long and unwieldy load.A hoist or properly contracted and maintained
suspended scaffold * man basket must be used
whenever reasonably practicable and will be color
coded and certified by third party.
'ecord%ertificate records for all the lifting appliances liftinggears with color coding must kept on site and operatorlicenses and badging must be with operator at all times
-
8/17/2019 Special Lifting work method statement
5/5
#repared y / C'ec"ed y /Dicip&ine Dept.
Approved y /
Dicip&ine Dept.