Specification for Line Pipe for Bundle Casing and Riser Casing      1 of 20 

 

Specification for Steel Line Pipe for Bundle Casing and Riser Casing

Specification for Line Pipe for Bundle Casing and Riser Casing      2 of 20 

TABLE OF CONTENTS    1SCOPE ......................................................................................................................... 3 2.DEFINITIONS ............................................................................................................... 3 3.REFERENCE CODES AND STANDARDS............................................................................. 3 4.MANUFACTURER'S RESPONSIBILITIES ............................................................................ 3 5.PROCESS OF MANUFACTURE ........................................................................................ 4 6.CHEMICAL PROPERTIES ................................................................................................ 5 7.PHYSICAL PROPERTIES AND TESTS ................................................................................. 7 8.HYDROSTATIC TESTS .................................................................................................... 7 9.TOLERANCES, DIMENSIONS AND WEIGHTS..................................................................... 8 10.NON‐DESTRUCTIVE EXAMINATION .............................................................................. 9 11.WORKMANSHIP, VISUAL INSPECTION AND REPAIR OF DEFECTS...................................... 10 12.MILL TEST REPORTS.................................................................................................... 11 13.MARKING, COATING AND SHIPPING............................................................................. 11 14.QUALITY ASSURANCE AND DOCUMENTATION REQUIREMENTS ...................................... 13 15.WARRANTY ............................................................................................................... 15  APPENDIX A  VENDOR DATA REQUIREMENTS LIST (VDRL) 

APPENDIX B  FRACTURE TOUGHNESS TESTS CHARPY V‐NOTCH IMPACT TESTS 

APPENDIX C  CONTRACTOR'S QA/QC PLAN REQUIREMENTS 

 

Specification for Line Pipe for Bundle Casing and Riser Casing      3 of 20 

1.  SCOPE 

This  Specification  defines  the  minimum standards  of  quality  and  acceptability governing  the  materials,  manufacture, inspection,  testing,  coating,  marking, handling,  and  shipping  of  DSAW  (Double Submerged  Arc  Welded)  line  pipe  for  a bundle and casing and riser. 

 

2.  DEFINITIONS 

The following definitions shall apply: COMPANY   MANUFACTURER  Line pipe manufacturer or 

supplier Purchase Order  The  entire  written 

procurement  agreement between  COMPANY  and MANUFACTURER 

Nonconformity  An  instance  of  failure  to meet  contractual requirements,  including physical,  procedural  or performance deficiencies. 

LOT:  A  LOT  shall  mean  one hundred  (100)  joints.  Testing frequency shall be per  LOT  or  heat, whichever  is  lesser number of joints. 

 

3.  REFERENCE CODES AND STANDARDS 

The  latest edition of the following codes and standards  are  referenced,  as  applicable,  in this Specification: a)  American Petroleum Institute (API): 

API 5L Specification for Line Pipe  API  5LW  Recommend  practice  for transportation  line  pipe  on  Barges and Marine Vessels. 

b)  American  Society  for  Testing  and Materials (ASTM) 

ASTM A 370  Standard  Methods and  Definitions  for  Mechanical Testing of Steel Products  ASTM E 384  Standard Test Method for Microhardness of Materials  ASTM E 112  Standard  Test Methods  for  Determining  Average Grain Size  ASTM A 578  Standard  Specification for  Straight  Beam  Ultrasonic Examination of Plain End Clad Plates for Special Application  ASTM E 23  Notched  Bar  Impact Testing of Materials  ASTM E 92  Standard Test Method for  Vickers  Hardness  of  Metallic Materials 

c)  COMPANY Specifications Specification  for  Material  and Application  of  Fusion  Bonded  Epoxy Coating on Line Pipe  Specification  for  Handling, Transporting and Storing of Line Pipe 

 Any additional requirements will be specified in the purchase order or  in an addendum to this specification. 

 This  specification  is written  in  English  units.  All pipe markings  certifications  and material test  reports  shall  be  written  using  English units. 

 

4.  MANUFACTURER'S RESPONSIBILITIES 

4.1  GENERAL This  document  is  not  intended  to  be  all inclusive and the use of the guide list set forth does  not  relieve  MANUFACTURER  of  his responsibility to supply a product capable of 

Specification for Line Pipe for Bundle Casing and Riser Casing      4 of 20 

performing  its  intended  service.  Responsibility for the proper interpretation of this  Specification  shall  rest  with  the authorized  Representatives  of MANUFACTURER and COMPANY.    It shall be MANUFACTURER's  responsibility  to  obtain clarification  from  COMPANY's Representative,  which  shall  be  final  and binding.    MANUFACTURER  shall  obtain COMPANY's written authorization  to deviate from  the  requirements  of  this  Specification, referenced  standards,  drawings  or  Purchase Order.    MANUFACTURER  shall  provide  all labor,  materials,  tools,  and  equipment  and shall  undertake  all  fabrication,  inspection, handling,  reporting,  and  documentation necessary  to perform  the work according  to this  specification  and  the  Purchase  Order.  Personnel  shall be  fully qualified  to perform applicable  services.    Tools  and  equipment shall  be  serviceable  and maintained  in  first class operating condition.  If MANUFACTURER believes this specification conflicts with other terms  of  the  purchase  order, MANUFACTURER  shall  inform  Purchaser.  Such conflicts shall be resolved by the terms and  specific  requirements  of  the  purchase order. 

 4.2  DOCUMENT PRECEDENCE 

In the event of conflict between documents, the priority shall be as follows: a. Purchase Order or Contract b. This Specification c. Referenced Codes and Standards Conflicts  shall be  reviewed with COMPANY's Representative  prior  to  action  by MANUFACTURER. 

 4.3  DEVIATIONS AND DISCLAIMERS 

Work carried out under this specification and reference  specifications  shall  be  performed according to all requirements herein without deviations  or  disclaimers.    If  COMPANY approves changes,  they will be  incorporated into a revised specification.  

4.4  MANUFACTURER REPRESENTATIVE  

MANUFACTURER shall designate in writing to COMPANY  an  authorized  Representative  to serve  as  liaison with  COMPANY  on matters associated with this specification and on the Purchase Order referencing this specification.  This Representative shall be designated prior to  the  performance  of  services  associated with this specification. 

 

5.  PROCESS OF MANUFACTURE 

5.1  PROCEDURE SPECIFICATION MANUFACTURER  shall  submit  complete  and detailed  manufacturing  procedure specifications  including  steel  making, targeted  chemical  analysis,  plate  rolling manufacturing, pipe manufacturing, welding, testing and  inspection for each pipe size and grade.   The manufacturing, welding,  testing, procedure  specifications  must  include  an outline  of  the  manufacturing  procedures carried out  to assure  that pipe will meet all the requirements of this Specification. 

5.2  PROCEDURE QUALIFICATION One test pipe from each of the first two heats shall  be  selected  by  the  COMPANY’s Representative and tested for compliance to all of  the  requirements of  this  specification.  These  pipes  shall  be  used  to  qualify  the manufacturing procedure. Mechanical and chemical tests from the first two  pipes  of  the  initial  mill  run  shall  be completed  within  24  hours  of  production.  Hydrostatic  testing  and  weld  ultrasonic examination shall occur  in due course within normal production flow. 

 MANUFACTURER  should  also  accurately weigh  the  ring  sample  to  confirm  that  it  is within  the  allowable  weight  tolerance.  MANUFACTURER  shall  make  the  results  of these  tests  and measurements  available  to COMPANY's  Representative  as  soon  as  the tests  are  completed.    If  any of  the  tests on either test pipe fails, then,  in addition to the 

Specification for Line Pipe for Bundle Casing and Riser Casing      5 of 20 

re‐test  requirements  for  the  failed  test imposed elsewhere in this specification or API SPEC 5L, the production start up tests of this section shall be required for the second day's production.   This requirement will be carried forward each day until both test pipes pass all the  tests.    Within  two  days  after  the production  start‐up  tests  are  done, MANUFACTURER shall submit a consolidated report of all the tests (including failed tests), weights,  measurements,  and  inspections performed  on  the  two  test  pipes,  including the  photomicrographs  of  the  cross‐section specimens. 

 COMPANY  reserves  the  right  to  require requalification  in  the  case  of  any  proposed procedure  changes.  Production  pipe  can  be produced  simultaneously  with  successful completion  of  manufacturing  procedure qualification tests. 

 Upon  successful  completion  of  the qualification test both the COMPANY and the MANUFACTURER  shall  sign  the manufacturing procedure and  it shall not be changed without prior written permission. 

 5.3  STEEL MAKING 

The  steel  shall be made  in  accordance with API 5L by the electric furnace or basic oxygen process.   Steel shall be  fully killed and made to  fine  grain  practice.    Rare  earth  metal additions are prohibited. 

 5.4  PIPE 

The  pipe  shall  be  made  by  the  double submerged arc (DSAW) method.  The welding flux  shall  be  a  neutral  flux  type  and  the moisture  level  shall  be  maintained  below 0.05 percent.   MANUFACTURER's certificates shall be available for review. 

 

6.  CHEMICAL PROPERTIES 

6.1  CHEMICAL COMPOSITION 

The  chemical  composition  shall  conform  to API  5L  X‐70  as  applicable,  subject  to  the following additional limitations on chemistry: 

 

Specification for Line Pipe for Bundle Casing and Riser Casing      6 of 20 

 PRODUCT ANALYSIS 

 ELEMENT (min.%) (max. %)

     C  0.07  0.14 Si    0.35 Mn    1.60 P    0.015 S    0.009 Cu    0.35 Cr    0.15 Mo    0.10 Ni    0.18 V    0.07 max. Ti    0.02 Nb    0.03 Al‐Soluble  0.015 min. to   0.040 N    0.012 B (no intentional addition) 

  0.0005 

Al Total    0.06 Nb+V+Ti    0.08 Cu+Cr+Mo+Ni    0.50 Sn    0.02 Ca    0.006 

 Carbon Equivalent (by Product Analysis) shall be in accordance with the following formulas: 

 

CE %C %Mn6

%Cr %Mo %V5

%Ni %Cu15

= + ++ +

++

 

 CE shall not exceed 0.43% 

 

Pcm C Si30

Mn Cu Cr20

Mo15

Ni60

V10

5B= + ++ +

+ + + +  

 Shall not exceed 0.21% 

6.2  CHEMICAL ANALYSIS  

Percentages of all elements listed in the table above, plus any other element intentionally added which has been approved by COMPANY, shall be determined in all heat and product analyses. 

   

Specification for Line Pipe for Bundle Casing and Riser Casing      7 of 20 

7.  PHYSICAL PROPERTIES AND TESTS 

7.1  GENERAL Provisions  of  API  5L  shall  apply  except  that mechanical testing shall be conducted on two samples  per  heat  selected  by  COMPANY’s Representative. 

 7.2  YIELD AND TENSILE TESTING 

The  yield  and  tensile  strength  along  the longitudinal and transverse axes of pipes shall be  tested  in  accordance  with  API  5L.  The measured  yield  strength  of  each  test  pipe shall not exceed the specified minimum yield strength of the pipe by more than 15,000 psi for  at  least  80%  of  the  heats  and  no more than  20,000  psi  for  the  remainder.    For longitudinal  tensile  tests,  the  ratio  of  yield strength to ultimate tensile strength shall be a maximum  of  0.85.    For  transverse  tensile tests, the ratio shall be maximum 0.90. 

 7.3  CHARPY IMPACT TESTS 

Notch  toughness  testing  (Charpy  V‐notch tests)  of  the  line  pipe  parent  metal,  weld metal,  and weld HAZ  shall  be  conducted  in accordance  with  Appendix  B  of  this specification. 

 7.4  MACROGRAPHIC,  MICROGRAPHIC,  AND 

HARDNESS EXAMINATION Macrographic Examination: MANUFACTURER shall  conduct  macrographic  examination  of polished and etched  specimens of  the  seam weld  area  cross‐section  removed  from selected  pipe  joints.    COMPANY’s Representative  shall  select  one  pipe  from each  welding  station  at  the  start  of production and may select additional sample pipe  during  production  for  macroscopic examination  of  the  weld  seam.    The  weld seam shall exhibit complete  fusion,  freedom from  other weld  defects,  proper weld  bead alignment, and satisfactory weld bead shape. 

 Microhardness  Testing:  MANUFACTURER shall  conduct  microhardness  tests  on  the 

above  samples  using  the  Vickers  hardness test method (10 Kg  load).    In addition to the above samples, one sample shall be removed from  a  joint  of  pipe  Representative  of  the heat  of  steel  with  the  highest  carbon equivalent  furnished  on  the  order,  and subjected  to  macroscopic  examination  and microhardness  testing.    The  microhardness tests  shall  include  two  traverses  extending from the unaffected base metal on one side of the seam weld seam across the weld to the unaffected base metal on the other side.  All traverses shall be parallel to the pipe surface.  One traverse shall be 1 mm below the outer surface  of  the  pipe,  and  the  other  1  mm below  the  inner  surface.    Microhardness readings  shall  be  uniformly  spaced  2  mm apart.    The  hardness  at  any  location  in  the weld, HAZ, and base metal  shall not exceed 247 Hv10.  If a test specimen fails to meet this criteria MANUFACTURER shall  follow Section SR5B.4 of API Spec 5L.  MANUFACTURER shall include the microhardness test results on the certified material test reports. 

 

8.  HYDROSTATIC TESTS 

Each  pipe  shall  be  satisfactorily hydrostatically  tested  at  the  mill  in accordance with API 5L and the following: • The  test pressure  shall be  such  that  the 

hoop  stress  developed  is  a minimum  of 90  percent  of  the  specified  minimum yield  strength  based  on  nominal  wall thickness. 

• Hold  time  shall  be  a  minimum  of  10 seconds. 

The hydrostatic testing master gauge shall be calibrated  against  a  dead  weight  tester before start of production, at  least once per week  thereafter  and  at  the  end  of production.    The  pressure  chart  shall  be calibrated against  the master gauge at  least twice  per  working  shift.    All  hydrostatic pressure tests shall be recorded on a properly calibrated chart recorder.  

Specification for Line Pipe for Bundle Casing and Riser Casing      8 of 20 

Pressure  gauges  used  in  hydrostatic  testing shall  have  dials  graduated  over  a  range  of double the  intended maximum test pressure but  in  no  case  shall  the  range  be  less  than one and one‐half (1‐1/2) nor more than three (3.0) times that pressure. 

 

9.  TOLERANCES, DIMENSIONS AND WEIGHTS 

Under no  circumstances  shall distorted pipe be shipped to the COMPANY. 

 9.1  JOINTERS 

Jointers shall not be permitted.  9.2  DIAMETER TOLERANCE 

Pipe Body Outside Diameter:  Nominal O.D. + 0.75% / ‐0.25%, measured using a Pi tape. 

 Pipe  Body  Out‐Of‐Round:    At  any  radial section  the  difference  between  maximum and minimum diameter dimensions shall not exceed  1%  of  the  nominal  O.D.    Out‐Of‐Round shall be checked using calipers on one joint out of every 100.   Measurements  shall be made at five  locations on 8 foot  intervals along the sampled joint, and results reported to the COMPANY. 

 Pipe Ends Out‐Of‐Round:   At  the pipe ends, the outside diameter, measured at any point (using  calipers),  shall  not  be  less  than  the specified  minimum  outside  diameter  nor shall it exceed the specified minimum outside diameter  by  more  than  one  percent  (1%).  Out‐Of‐Round shall be checked using calipers at  both  ends  of  one  joint  out  of  every  50.  Results shall be reported to COMPANY. 

 9.3  WALL THICKNESS 

Wall thickness shall be within  limits required to meet the weight tolerance given in Section 9.6  and  shall,  as  a  minimum,  be  ±  5%  of specified  nominal  wall  in  lieu  of  the requirements of API 5L.   If the wall thickness at any point is less than 95% of the specified wall thickness,  it  is classified as a defect.   At 

the  time  of  the  preproduction meeting  the mill will specify the exact target nominal wall thickness  they  intend  to  roll.   Manufactured wall  thickness  shall  also  meet  the  weight requirements in Section 9.6. 

 9.4  END SQUARENESS REQUIREMENTS 

At  least  three  times  during  each  working shift,  two  pipes  shall  be  selected  for  end squareness  testing.    Maximum  end squareness off‐plane shall be ±1/16 inch for a single  pipe  joint  end.    End  squareness measurement method  shall be defined with the bid. 

 Pipe  failing  to  meet  the  requirements  of Section 9.4 herein  shall be  re‐machined and the  testing  frequency  shall  be  increased  to hourly.    The  frequency may  revert  to  three tests  per  working  shift  when  four  (4) consecutive  satisfactory  measurements  are made. 

 9.5  STRAIGHTNESS 

Deviation  from  a  straight  line between pipe ends  shall  not  exceed  0.15  percent  of  the pipe  length. MANUFACTURER  shall measure the straightness of those pipes which appear to be  least straight using a taut  line or other method  described  in  MANUFACTURER's approved work plan and API 5L.   The actual number  so  measured  will  depend  on  the number  of  measurements  COMPANY's Representative  reasonably  determines necessary based on the visual inspection and the number of measured pipes found not to be within specified limits.  

9.6  WEIGHT MANUFACTURER  shall  aim  for  an  average weight per  lot  to be between 0  and  ‐3% of the calculated weight based on the specified diameter  and  wall  thickness.  MANUFACTURER  shall  set  the  target  wall thickness  to meet  this weight  requirement.  Weight of individual pipe sections shall be no more  than  three  percent  heavier  or  seven 

Specification for Line Pipe for Bundle Casing and Riser Casing      9 of 20 

percent  lighter  than  the  calculated  weight, base  on  the  specified  diameter  and  wall thickness.    Continuous  control  of  pipe  joint weight in the manufacturing process shall be based on the average weight of a lot, where a lot is no more than 100 sequentially weighed pipes.   The weight of a  lot  shall not vary by more  than  3%  greater  or  3%  less  than  the calculated  weight.    MANUFACTURER  shall determine the weight of each pipe within an accuracy of 0.3% of actual and record it with a pipe  serial number  representing  the order of  production.    At  COMPANY's  option,  and with  written  approval  from  COMPANY's Representative, the MANUFACTURER may be allowed  to  substitute pipes  from one  lot  for pipes  from  another  lot.   MANUFACTURER’s work  plan  shall  include  a  description  of  the method the MANUFACTURER  intends to use to  accurately weigh  each  pipe.    Just  before production  begins,  the weighing  scales  shall be certified by an independent testing agency to  be  accurate  to  0.1  percent,  after  being calibrated  with  weights  traceable  to  the standard weights  at  the National  Bureau  of Standards.  The first pipe produced shall then be weighted and set aside. Before each day's production,  the pipe scales shall be checked by weighing the test pipe.  If the scale reading is  not  within  0.2  percent  of  the  original reading, the scale shall be re‐calibrated. 

 9.7  PIPE LENGTH 

Pipe lengths shall be between 37 and 43 feet inclusive, with an average length of 40 feet. 

 

10.  NON‐DESTRUCTIVE EXAMINATION 

10.1  GENERAL Nondestructive  examination  shall  comply with  API  5L,  MANUFACTURER’s  detailed nondestructive examination procedures, and this specification. 

 MANUFACTURER  shall  submit  detailed  NDE procedures  proposed  for  use  on  the  job  to 

the COMPANY for review and approval prior to the start of production. 

 All  nondestructive  examination  shall  be performed  by  personnel  who  have  been qualified  in  accordance  with  ASNT Recommended  Practice  Document  SNT‐TC‐1A  or  equally  qualified  as  approved  by  the COMPANY.   Personnel  interpreting results of any  nondestructive  testing method  shall  be qualified  in  accordance  with  Level  II requirements  of  SNT‐TC‐1A  or  equally qualified as approved by COMPANY. 

 If  the  rejection  rate  during  production exceeds five percent (5%), COMPANY shall be entitled  to  refuse  acceptance  of  production until cause thereof is rectified.  

10.2  ULTRASONIC EXAMINATION REQUIREMENTS Ultrasonic  examination  of  all  pipe  ends, parent  plate,  and  the  entire  length  of  the seam weld shall be conducted. 

 Automated UT equipment shall operate at a maximum  scanning  rate  of  65  ft/min.,  and shall  be  dynamically  calibrated  using  a COMPANY  approved  reference  standard  a minimum  of  three  times  per  shift,  or  once every  50  pipe  joints.    The  UT  reference standard shall be a full length pipe taken from the order that contains a single 1/16 inch drill hole and six (6) N5 notches.  Two notches on each  side  of  the  weld  (OD  of  pipe),  one longitudinal  and  one  transverse.    Two  ID notches, one longitudinal and one transverse.  All notches shall be located so that each can be independently displayed. 

 Manual UT is required for any part of the pipe not fully examined by automated UT, and to confirm  the  presence  and  nature  of  all indications discovered during  automated UT examination.   Maximum  allowable  scanning rate for manual UT is 6 in./min. 

 10.3  PLATE LAMINATION EXAMINATION 

Specification for Line Pipe for Bundle Casing and Riser Casing      10 of 20 

Plate used in the manufacture of pipe shall be examined  ultrasonically  for  laminations  in accordance  with  ASTM  A578  Level  II Supplementary Requirement     S‐1; however, acceptance  criteria  shall  be  in  accordance with this specification. 

 Plate  Edges:    The  plate  shall  be  examined over  a minimum width  of  1  inch  along  the entire  length of all edges to be welded.   Any lamination  with  a  dimension  over  1/8  inch shall be cause for plate rejection. 

 Plate Body:    The  body  of  the plate  shall be ultrasonically examined with 100%  coverage by  longitudinal scanning or 50% coverage by transverse  scanning.    Discontinuities  in  any area  of  the  plate  shall  not  exceed  an  area covered  by  a  2  inch  maximum  diameter circle.  More than one recordable condition in any 24 inch maximum length of plate, or any condition  listed as continuous shall be cause for plate rejection. 

 10.4  PIPE SEAM WELD EXAMINATION 

Both  sides  of  the  full  length  of  each  weld seam shall be examined by automatic UT, for longitudinal  and  transverse  defects.    Both sides of the weld seam for a minimum of the last 8 inches from each end shall be examined by  manual  UT  for  longitudinal,  transverse, and oblique defects. 

 In addition,  radiographic examination of  the full  length  of  the  weld  seam  shall  be conducted.    RT  methods,  procedures,  and acceptance  criteria  in  accordance  with  API Spec 5L and this Specification. 

 10.5  END AREA EXAMINATION 

All pipe shall be ring gauged.  An automatic or manual UT examination shall be  performed  on  each  pipe  end  for  a minimum distance of 4 inches from the weld bevel using an approved procedure.   The UT examination  shall  be  capable  of  detecting 

cracks,  lamination,  inclusions,  etc.,  in  both longitudinal and transverse orientations. 

 Bi‐directional  magnetic  particle  inspection (dry method)  shall be performed on  the OD and ID of all pipe ends and bevels.  Any visible lamination  in  the  weld  bevel  is  cause  for rejection. 

 10.6  THIRD PARTY INSPECTION  

COMPANY, at  its election and sole cost, may inspect  with  its  own  forces  or  use  an inspection service to inspect any or all phases of  the  manufacture  of  the  pipe  and  the materials used in the manufacture of the pipe covered  by  these  specifications.    Inspectors representing COMPANY shall have free entry at  all  times  to  all  parts  of  the MANUFACTURER’s  works  that  concern  the manufacture  of  the  pipe  covered  by  these specifications.   COMPANY  reserves  the  right to  inspect  the  pipe  at  a  later  date  to  the appropriate  COMPANY  or  API  specifications utilizing  approved  COMPANY  contractors  at the COMPANY’s sole expense. 

 10.7  DEMAGNETIZATION 

After the manufacturing process, the pipe will be  left  in a substantially demagnetized state with the magnetic flux density not to exceed 20  gauss  as measured  by  a  Bell  600  gauss meter or equivalent.   MANUFACTURER  shall accomplish any necessary demagnetization at the manufacturing plant. 

 

11.  WORKMANSHIP, VISUAL INSPECTION AND REPAIR OF DEFECTS 

11.1  GENERAL The  provisions  of  API  5L  shall  apply  for workmanship, visual  inspection and repair of defects.    If  the wall  thickness at any point  is determined  to  be  less  than  95%  of  the specified  nominal  wall  thickness  it  shall  be considered a defect and is unacceptable. 

 11.2  INSPECTION AT MILL 

Specification for Line Pipe for Bundle Casing and Riser Casing      11 of 20 

COMPANY  may  have  permanent Representatives  for  inspection  and  quality assurance at the pipe mill who shall have free access  to  all  facilities  where  work  is  being carried  out.    In  such  instances,  inspection notices shall be sent to the COMPANY at least 10 days prior to the start of manufacturing. 

 11.3  INSPECTION REQUIREMENTS 

MANUFACTURER  shall  not  submit  pipe  for inspection  by  COMPANY's  Inspector  until MANUFACTURER's  Inspectors have accepted the pipe. 

 11.4  LIGHTING 

Ample  fluorescent  lighting,  both  overhead and  at  pipe  ends  (for  internal  inspection), shall  be  provided  at  the  Inspector's  table.  Minimum  acceptable  illumination  level  shall be  500  lux.    The  inspector  must  visually inspect  100%  of  the  internal  surface  of  the pipe ends. 

 11.5  ULTRASONIC EQUIPMENT 

MANUFACTURER  shall  have  ultrasonic equipment  available  for  use  by  COMPANY's Inspectors  to check remaining wall thickness after defects are ground out. 

 11.6  REJECTED PIPE 

Rejected  pipe,  resulting  from  COMPANY's inspection,  is  to  be  clearly  marked  and segregated from acceptable pipe. 

 11.7  DENTS 

The repair of dents is not permitted.  11.8  REPAIR OF SURFACE DEFECTS 

Repair  of  surface  defects  by  grinding  is permitted  provided  all  grinds  are  examined by  ultrasonic  and  magnetic  particle examination,  and  the  remaining  wall thickness  under  the  ground  area  is  at  least 95% of the specified nominal wall thickness. 

 11.9  WELD REPAIR 

MANUFACTURER shall not make weld repairs to parent pipe material. • Welds  may  be  repaired  once  to  a 

procedure  which  shall  be  approved  by COMPANY.    All  weld  repairs  must  be approved  by  the  COMPANY’s Representative subject to the following: ‐  No back‐to‐back repairs are allowed. ‐  No repair  is greater than 60% of pipe 

wall depth. ‐  Not more  than  three  (3)  repairs  per 

joint. ‐  No  repair closer  than 12”  to  the end 

bevel.  

12.  MILL TEST REPORTS 

12.1  INSPECTION AND TEST DOCUMENTATION MANUFACTURER  shall  furnish  a  certified ladle  analysis  for  each  heat,  together  with chemical  check  analysis,  physical  properties and mill hydrostatic test pressure certificates of the  furnished pipe.   The MANUFACTURER shall furnish one original and seven copies of each  report  which  shall  be  signed  by COMPANY's Representative. 

 The  COMPANY  Representative  shall witness sampling and test. 

 12.2  SHIPMENT TALLY REPORTS 

MANUFACTURER  shall also  furnish  copies of shipment tally reports. 

 

13.  MARKING, COATING AND SHIPPING 

13.1  GENERAL All pipe manufactured in accordance with this Specification shall have all required markings per  API  5L  plus  "BPX  TROIKA  PROJECT".    In addition, MANUFACTURER  shall be  required to  implement  an  alphanumeric  sequential system  of  marking  pipe  joints  prior  to shipment.    The  alphanumeric  numbering system  shall  be  included  on  the  marking stencil. 

 

Specification for Line Pipe for Bundle Casing and Riser Casing      12 of 20 

13.2  STENCILING Markings and pipe joint unique identification numbers,  in  English  units,  shall  be  paint stenciled on the pipe.   No die stenciling (hot or cold) shall be allowed.   Pipe  identification number  shall  be  stenciled  on  both  ends  of each pipe  joint.   All other markings  shall be stenciled on one end only. 

 13.3  MARKING PAINT 

The white marking paint shall be coated with lacquer  or  varnish  and  be  capable  of remaining  fully  readable  and  unaffected under  normal  shipping  and  handling conditions. 

 13.4  BEVEL PROTECTORS 

Protective end caps or bevel protectors shall be installed on pipe prior to shipment.  Bevel ends  shall  be  protected  from  damage with HDPE  (plastic)  bevel  protectors  which  shall cover  the  whole  ID  cross‐section  such  as furnished by Drilltec or equivalent.  A sample representative of the type of bevel protectors to be furnished by the MANUFACTURER shall be presented to the COMPANY for approval. 

 13.5  SHIPPING 

MANUFACTURER  shall  be  responsible  for shipping  pipe  F.O.B.  per  the  terms  of  the Purchase Order.   Shipping and handling shall be  in  accordance  with  the  applicable standard  for  the mode(s)  of  transportation utilized  and  referenced  in  Section 3, herein.  Pipe shall be shipped below deck. 

 13.6  COATING 

Pipe shall be shipped bare with no external or internal oils or varnishes applied (except over external paint stencils) and shall be free from loose  mill  scale,  dirt,  oil,  grease  or  other extraneous material, both inside and outside, that might be detrimental to the satisfactory nondestructive  inspection of  the material at the  COMPANY’s  inspection  facility  or application of an internal or external coating/ insulation  in a coating yard or  in the field.   If 

pipe is discovered in the inspection or coating yard  facilities  to  have  mill  scale  or  other extraneous  substances  of mill  origin  on  the internal  or  external  surface  which  requires abrasive  blasting  beyond  that  which  is normally performed  in order to satisfactorily prepare  the  pipe  for  inspection  or  coating, the cost of said cleaning shall be borne by the MANUFACTURER.  The MANUFACTURER shall be  notified  sufficiently  in  advance  of  any additional  cleaning  in  order  to  permit inspection of the pipe. 

 13.7  HANDLING, STORING AND SHIPPING 

• MANUFACTURER  shall  handle  and properly  care  for  all materials  and  pipe during  all  phases  of  manufacturing  in such a manner as to minimize mechanical damage and corrosion. 

• All  handling  shall  be  done  with  slings, padded  hooks  or  unpadded  hooks approved by COMPANY.   In no case shall brass lined hooks be used. 

• Prior  to  loading,  all  rail  cars,  trucks, barges,  ships or other  conveyances  shall be  cleaned  of  debris  or  any  substance that might damage the pipe. 

• Suitable  timber and other dunnage  shall be  used  to  protect  the  pipe  against damage in transit. 

• Loading  onto  or  into  rail  cars,  trucks, barges,  ships or other  conveyances  shall be  done  in  accordance with  API  RP  5L1 and API RP 5LW, where applicable, and in all cases  in accordance with a procedure approved by COMPANY. 

• Finished pipe to be stored for a significant period of time at the mill shall be stored in a manner to prevent corrosion. 

• MANUFACTURER shall be responsible for repairs  to pipe  sections damaged during shipment  to  the  point  of  delivery specified  on  the  Purchase  Order  or CONTRACT. 

 

Specification for Line Pipe for Bundle Casing and Riser Casing      13 of 20 

14.  QUALITY ASSURANCE AND DOCUMENTATION REQUIREMENTS 

14.1  GENERAL COMPANY  shall  be  permitted  access  by  the MANUFACTURER  to  all  manufacturing, fabrication,  and  inspection  areas  prior  to award  and  at  any  time  work  is  being performed  for COMPANY.   MANUFACTURER shall  submit MANUFACTURER's Quality  Plan for the work to COMPANY for review with the bid. MANUFACTURER's Quality Plan  shall be tailored  after  a  recognized  quality  standard such  as  API‐Q1,  ISO‐9000,  MIL‐Q9858A,  or equivalent  and  shall  address  all elements  in detailing  Quality Management measures  to be  applied  during  execution  of  the  work.  These  documents  shall  be  available  at MANUFACTURER's  or  Submanufacturers' facilities  for  review.    Typical  plan requirements are detailed in Appendix C. 

 14.2  PROCEDURES AND REPORTS 

MANUFACTURER  shall  provide  COMPANY (see  also  Appendix  A)  with  the  following procedures,  reports  and  records  (all procedures,  reports  and  records  shall  be  in the  English  language  and  use  the  English system of units): a) Welding  procedure  specifications; 

procedure qualification records; weld repair  procedures;  weld  repair procedure  qualification  records; welder  performance  qualification records. 

b) Manufacturing  procedure specifications per Section 5.1. 

c) Tally sheets per Section 12.2. d) Inspection  and NDE procedures  shall 

be made available  to BPX within  the confines of manufacturer's mill library for  review  and  acceptance  prior  to their use. 

e) Mill certificates of each melt of steel, including  ladle  and  production composition,  heat  lot  number,  heat treatment, and carbon equivalent. 

f) Certified  material  test  certificates, including all mechanical tests. 

g) Inspection  reports  including  NDE reports. 

h) Current  list  of  qualified  NDE personnel;  NDE  Personnel Certification Records to be presented to  COMPANY  prior  to  using  the personnel. 

i) Certified  test  reports  including hydrostatic test reports and charts. 

j) Packing,  shipping  and  handling procedures;  to  be  submitted  to COMPANY for review and acceptance prior to their use. 

k) Daily  Inspection  Reports  shall  be furnished to COMPANY at the end of each  day.    The  copies  shall  be submitted to COMPANY the following day  and  shall  include  all nonconformity  reports  initiated, dispositioned,  or  completed  during the month. 

l) Quality plan per Section 14.1 above. m) Inspection/NDE  equipment 

calibration reports. n) Production Schedule 

 COMPANY  reserves  the  right  to  disapprove nonconformity  dispositions  and  to  require revised dispositions when the nonconformity was not resolved by a method or procedure that  was  pre‐approved  by  COMPANY.  Common  repair  procedures  and  potential applications shall be submitted to COMPANY for  approval  in  advance  of  their  use.  COMPANY  may  request  Design MANUFACTURER's  assistance  in  reviewing and dispositioning nonconformities. 

 14.3  NOTIFICATIONS 

COMPANY  shall  be  notified  by MANUFACTURER a minimum of ten working days prior to: • Ladle sampling tests • Start of plate rolling 

Specification for Line Pipe for Bundle Casing and Riser Casing      14 of 20 

• Manufacturing of procedure qualification pipe 

• Start of pipe production • Inspection  and  testing  of  procedure 

qualification pipe • Commencement  of  production 

manufacturing of pipe • Shipping of pipe 

 14.4  INSPECTION MATRIX 

An  Inspection Matrix  shall  be  presented  to the  COMPANY  by  the  MANUFACTURER detailing each activity to be performed along with space  left for the COMPANY to  indicate which  activity  shall  be witnessed,  reviewed, or monitored.  This inspection matrix shall be used  by  MANUFACTURER  to  identify  any witness points for COMPANY  inspection, and shall  represent  the  basis  for  COMPANY  to evaluate  proper  implementation  of requirements  contained  herein.    COMPANY reserves  the  right  to  increase  or waive  any inspection activity. 

 14.5  RECORDS 

MANUFACTURER  shall  keep  up‐to‐date records  adequate  to  confirm  that  the work, including  all  required  tests,  inspections, certifications, and reviews have been carried out  according  to  this  specification.    These records shall be indexed and legibly recorded in  enough  detail  that  they  can  be  accessed and understood by a qualified,  independent third  party.    MANUFACTURER  shall  update these  records  daily  during  the  production period.    The  records  shall  be  available  for review by Purchaser's Representative during the production period.   Records shall include the information given in API SPEC 5L and the following: a) A  description  of  each  test,  or 

inspection, its results and a reference to  the  paragraph  number  of  the requirement herein; 

b) The date of the test or inspection; 

c) The  name  and  qualifications  or authority of the inspector or reviewer and his employer; 

d) Evidence of calibrations; e) All  information  needed  for  the 

reports described in Section 14.2; f) MANUFACTURER  shall  furnish  daily 

inspection reports.  14.6  CERTIFICATE OF COMPLIANCE 

MANUFACTURER  shall  furnish  a  test certificate for every lot of pipe (as defined by API  5L)  to  verify  compliance  with  this specification.  The test certificate shall comply with  Section  SR15  of  API  SPEC  5L  and MANUFACTURER'S work  plan  shall  describe procedures  for  reporting  and  meeting  the requirements  of  Section  SR15.    The  test certificate  shall  also  include  the  following additional information: a) MANUFACTURER'S  name  and 

business address; b) Mill location; c) COMPANY’s purchase order number; d) This specification number; e) Specification limits for the test results 

required  by  Section  SR15.1  of  API SPEC 5L; 

f) All  other  information  required  by regulatory  authorities  in  whose jurisdiction  the  pipe  fails  during manufacture or delivery. 

 14.7  PRODUCTION HISTORY REPORT 

Before  Purchaser  accepts  the  pipe, MANUFACTURER  shall  furnish  a  production history  report  including  the  following information: a) A  "MS  Excel"  spreadsheet  file  and 

printout  with  the  identifying  serial number  of  each  pipe  in  the  left column and the following information about  each  pipe  in  the  adjacent columns: • The  pipe  number,  as  referenced 

on  the  material  certificates  and 

Specification for Line Pipe for Bundle Casing and Riser Casing      15 of 20 

certificates  of  compliance described in Section 14.6 above, 

• The heat number as  listed on the material certificates, 

• Diameter  and  wall  thickness  of each pipe measured, 

• Weight and length of each pipe, • Average  measured  weight,  wall 

thickness,  diameter,  and  length for all pipes and for each lot. 

b) Photo  macrographs  of  etched specimens  per  7.5  labeled  and identified with the heat and  lot  from which they were taken; 

 c) Histograms  showing  statistical 

distribution of the results of required chemical  and  mechanical  tests.  MANUFACTURER's  work  plan  shall describe how this  information will be presented and details of what will be included. 

15.  WARRANTY 

It  is  agreed  that  COMPANY  may hydrostatically test all or portions of the  line to be constructed with the pipe furnished on this order to a construction test pressure not exceeding  100  percent  of  the  specified minimum  yield  strength  based  on  nominal pipe  dimensions.    At  COMPANY's  election injurious  mill  defects  other  than  those resulting in failure under the line test, may be repaired  as  set  out  in  the  appropriate  API Specification  at MANUFACTURER’s  expense.  Any pipe that fails under  line test as a result of  laminations or other mill defects  shall be replaced  by  the  MANUFACTURER  with  the provision  that  construction  and  testing practices are followed as set forth in Title 30, Part 250 of  the Code of Federal Regulations and  latest revisions thereto.   Total direct on‐set  cost of  such  replacement,  including  cost for  finding,  cutting  out  and  replacing  the defective  pipe,  shall  be  borne  by  the MANUFACTURER.    The  MANUFACTURER's undertaking herein shall not be construed as 

an  agreement  to  hold  the  COMPANY harmless against costs and expenses incurred by  it as  the  result of damage  to  the pipe  in transit  or  from  damage  sustained  in  its installation.    COMPANY  may  elect  to  raise and lower the field test pressure one or more times  either  as  part  of  a  planned  testing routine or as a consequence of a failure in the pipeline  or  in  the  testing  equipment.  However, these pressure fluctuations shall in no way relieve the MANUFACTURERS of their obligations herein. 

 By the acceptance of the purchase order for the manufacture  of  pipe  covered  by  these Specifications,  the  MANUFACTURER guarantees and warrants that the pipe will be manufactured  in  accordance  with  the aforesaid  API  Specifications  with  such additional  requirements  as  are  contained  in these Specifications. 

Specification for Line Pipe for Bundle Casing and Riser Casing      16 of 20 

 

Specification for Line Pipe for Bundle Casing and Riser Casing      17 of 20 

APPENDIX A  

MANUFACTURER DATA REQUIREMENTS LIST (VDRL)   CLIENT:   ___________________________________   P.O. NO.:___________________________  LOCATION:   _________________  SELLER/SUBCONTRACTOR: ____________________________  EQUIPMENT TAG NO.(S): __________________________________________________________  DESCRIPTION(S):  API 5L X‐70 DSAW Line Pipe__________________________________________  The seller's/subcontractor's quotation shall state his intended compliance with this listing, as regards to the type of data required and schedule for data submittal, as well as the quantity and data form (reproducible, prints, etc.) indicated in the inquiry and purchase order/subcontract standard clauses.  The seller/subcontractor shall confirm responsibility for similar compliance by his subvendors and/or subcontractors.  As  a part of  the  seller's/subcontractor's quotation,  any deviation(s)  from  the data  submittal  schedule  shall be shown in the comments column.  All data submitted shall be  identified with equipment tag number, equipment description, buyer's  job number, and purchase order/subcontract number.  AFTER ORDER IS PLACED, UNLESS OTHERWISE NOTED IN THE COMMENTS COLUMN, the following data submittal schedule shall apply:  

FOR  APPROVAL  DATA  DUE    3    WEEKS  AFTER  PURCHASE  ORDER/SUBCONTRACT  IS  PLACED, 

CERTIFIED CORRECT DATA DUE  4  WEEKS AFTER BUYER'S APPROVAL, RECORD DATA DUE  8  WEEKS 

AFTER PURCHASE ORDER/SUBCONTRACT IS PLACED. 

 ABBREVIATIONS:  Q = With Quotation, A = Approval, C = Certified, 

R = Record, P = Prints, RP = Reproducible, M = Microfilm, S = Shotdown 

Specification for Line Pipe for Bundle Casing and Riser Casing      18 of 20 

MANUFACTURER  DATA REQUIREMENTS LIST (VDRL)   Data      Data Required Code  Data Description/Definition  Q  A    C  R  Comments  

MANUFACTURER Data Schedule  3P        6P 

Production Schedule  3P  6P    6P 

QA/QC Plan  3P  6P    6P 

Manufacturing Procedure Specification  3P  6P    6P 

Internal Pressure Test Certificate, Records and Report        6P 

Heat Treatment Records Date/Time/Check Off Chart        6P 

Mill Test Certificate including        6P Mechanical and Chemical  Composition Tests 

Proposed Chemical Composition  6P  6P    6P 

Non‐Conformity Reports        6P 

Welding Procedure Specifications  6P 

Procedure Qualification Records  6P 

Welder Performance Qualifications Records  6P 

Weld Repair Procedures    6P 

Weld Repair Procedures Qualifications Resumes    6P 

Tallies      6P 

Individual Joint Weight      6P 

Inspection Reports including Daily NDE Reports (all methods) and Dimension Check Results      6P 

  

Specification for Line Pipe for Bundle Casing and Riser Casing      19 of 20 

APPENDIX B  

FRACTURE TOUGHNESS TESTS CHARPY V‐NOTCH IMPACT TESTS 

  B1. Charpy V‐Notch  impact  testing of  the  line pipe parent metal, weld metal, and weld heat affected zone 

(HAZ)  shall  be  conducted  in  accordance  with  API  Spec  5L  Supplementary  Requirement  SR5  and  this specification. 

 B2. A set of Charpy V‐notch impact specimens shall consist of three specimens.  A complete test shall consist of 

three sets of Charpy V‐notch specimens removed from one sample  joint of pipe.   One set of specimens shall be removed from each of the following locations:  (a) the line pipe parent metal; (b) the long seam weld metal; (c) the weld HAZ.  Frequency of testing shall be one complete Charpy V‐notch test from two joints of pipe from each heat of steel. 

 B3. Specimen orientation  shall be  transverse  to  the  longitudinal axis of  the pipe with  the V‐notch oriented 

radially through the pipe wall.  The weld metal Charpy V‐notch specimens shall have the V‐notch located at the weld centerline.   The HAZ Charpy V‐notch specimens shall have the V‐notch  located 1 mm from the weld metal‐HAZ interface. 

 B4. Test temperature shall be 0 degrees F   B5. Absorbed energy and shear area values shall be as follows:   

Minimum average (3 specimens) absorbed energy:        60 ft‐lbs.  Minimum absorbed energy for a single specimen:           45 ft‐lbs.  Minimum average (3 specimens) shear area:                   90%  Minimum shear area for a single specimen:                      70% 

  The absorbed energy values herein are for full size (10 mm x 10 mm) specimens.  If the wall thickness does 

not  permit  the  use  of  full  size  specimens,  10 mm  x  7.5 mm,  10 mm  x  6.7 mm,  or  10 mm  x  5.0 mm specimens may  be  used.    The minimum  absorbed  energy  values  shall  be  83%,  75%  or  67%  of  those tabulated above  respectively.   The  largest sub‐size specimen which can be obtained  from  the pipe wall shall be used for testing. 

 B6. BPX’s Inspector is authorized to permit a retest if there is a reason to believe that the failure of a specimen 

is due  to  some  fault  in  its preparation or  testing, and  that  it has not provided a  true  indication of  the toughness of the material 

 B7. Retesting of sample test failures shall be handled in accordance with SR5B.  

Specification for Line Pipe for Bundle Casing and Riser Casing      20 of 20 

APPENDIX C  

MANUFACTURER’S QA/QC PLAN REQUIREMENTS   C1. Before work begins, MANUFACTURER shall submit to COMPANY and receive written approval for, a Quality 

plan and QA/QC procedures  for carrying out  the work according  to  this  specification and  the purchase order, including but not limited to the following: 

 a) Organization description;   b) Quality control and inspection procedures, including procedures for identifying, documenting, and 

segregating or disposing of non‐conforming materials;   c) Description of personnel qualification for performing the verification activities;   d) Methods employed to obtain homogeneous plate quality and method of plate forming;   e) Welding procedure including method, speed of welding and welding electrical characteristics;   f) UT procedure for plate, welds   g) Radiography procedure   h) Weld procedure   i) Method of straightening, sizing, and hydrostatic testing;   j) Method of measuring and controlling pipe straightness and end squareness;   k) Description of bevel protectors;   l) Procedures for maintaining heat and lot identity of all pipe, as required under Section SR15.2 of API 

SPEC 5L;   m) A description of the format and  information to be  included on the required reports, described  in 

Section 14.2 and elsewhere in this specification;   n) Method of accurately weighing pipes. 

 In  addition,  the  Quality  Plan  should  also  include  a  list  of  specific  attributes  and  activities  subject  to verification, frequency of verification, acceptance criteria, and reporting and documentation requirements.