speed flooring system

Upload: abhijit-bhattacharjee

Post on 03-Jun-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Speed Flooring System

    1/31

    Speed Floor System

  • 8/12/2019 Speed Flooring System

    2/31

    Jindal Speed Floor

    LIGHTER FASTER EASIER

  • 8/12/2019 Speed Flooring System

    3/31

    The heart of the system is a roll-

    formed, galvanised (Z275) high

    tensile (350MPa) steel joist 3mm

    thick.

    The joist is manufactured by roll-

    former in a single integrated

    operation.

    The joists are Punched, pressed,pre-cambered and cut to length at

    a fast production rate.

    Speed Floor Joist

    LIGHTER | FASTER | EASIER

    Joist Roll Forming Line

  • 8/12/2019 Speed Flooring System

    4/31

    Average Production Speed : 100 Mtr / Hour

    Nominal Coil Width : 400 mm to 600 mm

    Gauge : 3 mm

    Steel Grade : G350 Mpa

    Machine Capacity : 8000 MT / Year

    or (1 Million Sq. Mtr / Year Floor Area)

    Speed Floor System:

  • 8/12/2019 Speed Flooring System

    5/31

    Jindal Speed Floor

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    6/31

    Speed Floor Joist Stocking & Bundle

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    7/31

    The shoes are simply

    bolted to the joists and ready to

    ship.

    Ready to go

    Joists can be palletized,

    containerised or loadedon and transport directly

    to job site.

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    8/31

    Affiliations:

  • 8/12/2019 Speed Flooring System

    9/31

    Advantages:

    No need of propping and speedy erection The joists are lightweight, requiring less craneage than other concrete

    flooring systems.

    Speedy erection

    Cost effective

    Less labour intensive Safe to use in seismic sensitive zones

    Easily accommodates services through pre-punched service holes

    Bottom of the joist can support a suspended fire rated ceiling directly

    fixed to the joist

    Lockbars and plywood sheets are reusable The Speedfloor joists are custom manufactured to suit particular job

    conditions.

    Generally Speedfloor uses a 75mm or 90mm topping. A general

    weight saving can be made throughout the structural components of

    the building.

  • 8/12/2019 Speed Flooring System

    10/31

    1. JOIST (Series 200, 250, 300, 350 and 400)

    2. Shoe

    JoistShoe

    Components of Speed Floor System:

  • 8/12/2019 Speed Flooring System

    11/31

    3. Lock Bar 630 mm , 930 mm & 1230 mm

    4. HT NBW M16 X 40 mm Long

    Lock bars NBW

    Components of Speed Floor System:

  • 8/12/2019 Speed Flooring System

    12/31

    5. Hanging Angle L40 X 75 X 1.8 mm

    6. Edge Angle L40 X 90 X 1.6 mm

    Edge

    Angle

    Hanging

    Angle

    Components of Speed Floor System:

  • 8/12/2019 Speed Flooring System

    13/31

    7. Plywood 1.2 Mtr X 2.4 Mtr X 12 mm

    8. Tor Steel

    8 mm Diameter

    9. Welded Mesh 6 or 8 mm Diameter

    Plywood

    Components of Speed Floor System:

  • 8/12/2019 Speed Flooring System

    14/31

    10. Lockbars

    Components of Speed Floor System:

    01 Adjustable Lock Bar 330-630 (LB1)

    02 Adjustable Lock Bar 630-930 (LB2)

    03 Adjustable Lock Bar 930-1230 (LB3)

    04 Adjustable Lockbar 1230-1530 (LB4)

    05 Standard Lockbar 630 (LB5)

    06 Standard Lockbar 930 (LB6)

    07 Standard Lockbar 1230 (LB7)

  • 8/12/2019 Speed Flooring System

    15/31

    Concrete Slab Casting:

    15LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    16/31

    Cross-sectional View:

    16LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    17/31

    Projects using Speed Floor

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    18/31

    7 storey building constructedusing structural steel frame with

    Speed-floor.

    Commercial Buildings

    The ground floor retail complexexposing Speed floor joists

    The stores services, such aselectrical cabling, have been

    accommodated through the

    exposed joists.

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    19/31

    Two storey commercialbuilding with basement car

    parking

    Low rise buildings

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    20/31

    Steel frames structures

    RCC frame buildings

    Poured insitu or precast concrete frames

    Light gauge steel frames

    Conventional Structural brick wall constructions etc

    Speed Floor Applications

    The Speed floor composite flooring system is suitable

    for use in all types of construction including :

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    21/31

    General individual Houses

    Multi-storey residential blocks

    Single and multi-storey retail developments

    Mezzanine floors

    Car parks and storage buildings

    Multi-storey office complexes etc.

    Potential End Uses

    The range of end uses include :

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    22/31

    Work Under Progress

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    23/31

    Restaurant Using Speed Floor System

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    24/31

    Usage of Speed Floor System in Services

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    25/31

    MULTI STOREY CAR PARKBUILDINGS

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    26/31

    Structural Steel Parking Buildings

    Today, structural steel-framed parking structuresare being built in all parts of the world.

    By using the steel structures as main frame,there are so many advantages. Few of them are Cost savings

    Faster in completion

    Quality

    Sustainable construction.

    Early occupancy

    Easy recyclable

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    27/31

  • 8/12/2019 Speed Flooring System

    28/31

    Multi Storey Car Park

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    29/31

    Multi Storey Car Park

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    30/31

    SAMPLE:- Multi Level Car Park

    LIGHTER | FASTER | EASIER

  • 8/12/2019 Speed Flooring System

    31/31

    h d l l & d

    Thank you