LHC Inje ctor Upgr ade SPS 200 MHz SPS 800 MHz RF Power upgrade Progress report April 2014 Eric Montesinos LIU-SPS meeting, 30 April 2014

Upload: bruno

Post on 23-Feb-2016

70 views

Category:

Documents


0 download

DESCRIPTION

SPS 200 MHz SPS 800 MHz RF Power upgrade. Progress report April 2014. SPS 200 MHz. Existing Amplifiers upgrade New RF Amplifiers New RF Building LSS3 Tunnel integration. Existing amplifiers upgrade. Siemens plant HV AC capacitors for RS2004 trolleys being purchased - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SPS 200 MHz SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

30

April

201

4

LHC Inject

orUpgrade

SPS 200 MHzSPS 800 MHzRF Power upgradeProgress reportApril 2014

Eric

Mon

tesin

os

Page 2: SPS 200 MHz SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

30

April

201

4

LHC Inject

orUpgrade

SPS 200 MHzExisting Amplifiers upgrade

New RF Amplifiers

New RF Building

LSS3 Tunnel integration

Eric

Mon

tesin

os

2

Page 3: SPS 200 MHz SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

30

April

201

4

LHC Inject

orUpgrade

Existing amplifiers upgradeSiemens plant

HV AC capacitors for RS2004 trolleys being purchasedNew prototype RS2004 trolley under evaluationIf validated, 5 additional trolleysMaintenance being completed

Philips plantMaintenance being completed

Eric

Mon

tesin

os

3

Siemens Philips

Page 4: SPS 200 MHz SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

30

April

201

4

LHC Inject

orUpgrade

New RF Amplifiers

Drivers IT completedTTI Norte, Spanish company has been awarded the contractA first pre-series batch of 12 x 1.25 kW units will be built and evaluated

Finals Technical SpecificationUnder completionOpened to all technologiesAll inclusive with options (controls)Maximum ratings increased

Eric

Mon

tesin

os

4

Page 5: SPS 200 MHz SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

30

April

201

4

LHC Inject

orUpgrade

New BAF3 RF buildingConstruction work has started

Trees cutCV piping upgrade doneRoad under constructionBuilding foundations ongoing

OptionsMezzanine validatedGT10 hoppers modified (bigger in case we need to install 4 x 350 mm transmission lines)

Eric

Mon

tesin

os

5

Page 6: SPS 200 MHz SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

30

April

201

4

LHC Inject

orUpgrade

LSS3 Tunnel IntegrationCleaning cables campaign completed

HBWD integration ongoingFeedthroughs orderedVacuum flanges provided by TE-VSCBody under fabricationElectrodes slightly modifiedSupporting & alignment system are okInstallation in August (if project validated and all items delivered on time and tested)

Eric

Mon

tesin

os

6

Page 7: SPS 200 MHz SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

30

April

201

4

LHC Inject

orUpgrade

Involved peopleDep-Group Persons

BE-RF Eric Montesinos, Charles Julie, SPS power team, Elena Chapochnikova, Thomas Bohl, Wolfgang Höfle, Philippe Baudrenghien, Urs Wehrle

BE-ABP Ghislain Roy, Patrick Bestmann, Yannis PapaphilippouBE-ASR Marc Tavlet, Christelle Gaignant, Axelle DeleuBE-BI Christian Boccard, Patrick OdierDGS-SEE Guillaume Fontana, Cécile PintoDGS-RP Nadine Conan, Christophe TromelEN-CV Mauro Nonis, Michele Battistin, Alexandre Broche, Aurelio Berjillos Barranco

EN-EL François Duval, Guillaume Gros, Christophe Crombez, Jean-Pierre Sferruzza, Denis Ribiollet

EN-HE Caterina Bertone, Pascal Brunero, Serge Pelletier, Yann Seraphin, Patrick Vallet, Gilles Roche, Helder Lorenco

EN-MEF Frédéric Galleazzi, Yvon Muttoni, David McFarlane, Antoine Kosmicki, Yannick Beraud

GS-ASE Nino Rama

GS-SE Luz-Anastasia Lopez-Hernandez, Laurent Faisandel, Christophe Biot

TE-EPC Gilles LeGodec, Christophe CoupatTE-MSC Jérémie BaucheTE-VSC Paolo Chiggiato, Antonio Mongelluzzo, Jose Antonio Ferreira Samoza

Eric

Mon

tesin

os

7

Page 8: SPS 200 MHz SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

30

April

201

4

LHC Inject

orUpgrade

SPS 800 MHz powerAll eight individual IOT transmitters validated

First line has been tested up to equivalent of 200 kW at the cavity input(4 x 60 kW + low pass filters losses + combiners losses + circulator losses + WG losses)

As soon as water will be back in the SPS, we will restart the cavities with their new controllers (debugging)

Eric

Mon

tesin

os

8

Cavity #2Load

Short

Cavity #1

Load

Short

End2014

Page 9: SPS 200 MHz SPS 800 MHz RF Power upgrade

LIU

-SPS

mee

ting,

30

April

201

4

LHC Inject

orUpgrade

SPS 800 MHz powerVery bad news from Electrosys regarding circulator, the second one has even not been ordered (not informing us)

We will move the circulator to process the second cavity and operated the first one with fast reflected power measurements to protect the tubes

We are in the process of buying the missing circulators (will be long)

Eric

Mon

tesin

os

9

Cavity #2Load

Short

Cavity #1

Load

Short

End2014

Page 10: SPS 200 MHz SPS 800 MHz RF Power upgrade

Thank you for your attention