sr 1 to red lion road unofficial - delawaregssdocs.deldot.delaware.gov/bids/t201900704 -...

29
R U TLE DG E L YN M OO R E GARWOOD ESTATES C O RB I TT E S T A T E S ACRES KINGSTON 156 RED LION STATE FOREST R E D L I ON P i g e o n Run 35 378 82 381 R E Y B O L D DR G A R WOO D D R GL O R I A CT K I NG S T ON D R GAYNO R CT V E L L AN DR ME A DO W KNO LLC T P I GE ON D R R UN P I GE ON R UN DR DR HA CK B E R R Y C T J AN SS E N DR V I E W P I GE ON D R GR EE NF I E L D DR DR R O M E O DR GI L DE R CT LE S T E R D R CO R NS T A L K D R S T A GHO R N D R CO UNT R Y P A T H D R M A S ON L A CO R K W OOD CA P O L A P E A CHLE A F T R A I L P A T H H I D E A W A Y L A S W E E T B A Y AV E P L ANT A T I ON G R ADY L A C T T E R R Y GOL D E N CT M A R L I N Y E L L O W F I N T R A I L C OV E AND R E W LA A RB E RR Y S UG C O RB I T T CI R TYBOUTS CORNER MIDDLETOWN LITTLE CREEK DOVER GENERAL LOCATION OF CONTRACT WILMINGTON NEW CASTLE ELSMERE NEWPORT STANTON BELLEFONTE ARDEN TALLEYVILLE CENTERVILLE YORKLYN HOCKESSIN NEWARK GLASGOW BEAR DELAWARE CITY ODESSA TOWNSEND CLAYTON SMYRNA WOODLAND BEACH LEIPSIC CHESWOLD KENTON HARTLY CAMDEN WYOMING WOODSIDE VIOLA BOWERS BEACH FREDERICA FELTON MAGNOLIA HARRINGTON HOUSTON MILFORD SLAUGHTER BEACH BROADKILL BEACH ELLENDALE FARMINGTON GREENWOOD BRIDGEVILLE SEAFORD BLADES BETHEL LAUREL GEORGETOWN MILTON LEWES HENLOPEN ACRES REHOBOTH BEACH DEWEY BEACH INDIAN RIVER INLET BETHANY BEACH SOUTH BETHANY VIEW MILLVILLE OCEAN FRANKFORD DAGSBORO MILLSBORO DELMAR SELBYVILLE FENWICK ISLAND MARYLAND S U SS E X K E N T M A R Y LAND N E W C A S TLE NEW JERSEY PENNSYLVANIA D ELA W A R E R I V E R DEL AW ARE N B AY ATLAN TI C O C E AN 261 3 95 202 141 13BR 495 13 92 92 100 52 3 13 495 82 41 48 34 41 141 100 2 95 4 62 62 7 72 72 273 2 4 7 4 896 58 37 141 273 13 9 295 9 13 1 95 273 2 4 896 72 301 40 71 301 40 301 71 72 1 13 9 301 896 896 301 71 71 299 301 299 1 13 9 13 1 6 42 300 9 42 42 300 44 1 1 44 1 1 8 8 13 1 8 13A 10 1 13 9 1 13A 13A 10 12 13 15 12 1 13 15 14 14 30 1 36 30 1 13 36 16 16 16 13 404 13BR 18 18 404 18 1 13 9 30 9 30 5 24 9 1 9BR 9 1A 1 5 24 26 54 17 54 26 26 24 1 13 24 54 54 24 20 13 20 9 20 6 5 UNITS U.S. CUSTOMARY CONSTRUCTION PLANS FOR: CONTRACT NUMBER: FEDERAL AID PROJECT NUMBER: COUNTY: M.R. #: DEPARTMENT OF TRANSPORTATION THE STATE OF DELAWARE DESIGN DESIGNATION MRD #: FUNCTIONAL CLASS: TYPE OF CONSTRUCTION: A.A.D.T. PROJECTED: YEAR: YEAR: ROAD NAME: D.H.V. PROJECTED: DESIGN SPEED: TRUCKS: DIRECTION OF DISTRIBUTION: A.A.D.T. CURRENT: YEAR: APPROVED DESIGN EXCEPTIONS ADDENDA / REVISIONS ASSOCIATED CONTRACTS DESIGN PARAMETER REQUIRED PROVIDED DATE CONTRACT NO. CONTRACT NAME Y:\ NEW CASTL \ 067\ r o a d\ T 201900704\ P l a ns \ P D Shee t s \t c _001. dgn 10: 51 23- AUG- 2019 L AST REVI SED: 11/ 26/ 2018 SR 1 TO RED LION ROAD US 13 MEDIAN BARRIER REPLACEMENT, T201900704 NEW CASTLE 8310104 SR 7 US 13 TO S. OF US 40 US 13, KOREAN WAR VETERANS MEMORIAL HIGHWAY EXPRESSWAYS & FREEWAY 75809 2017 70 M.P.H. SAFETY IMPROVEMENTS 067 067 SEAL DATE PREPARED BY PROJECT DEVELOPMENT DELDOT - TRANSPORTATION SOLUTIONS BEARING THE "PD" SECTION DESIGNATION. THIS SEAL APPLIES TO ALL SHEETS STATION 6+36 BEGIN CONTRACT STATION 46+50 END CONTRACT N LOCATION MAP NOT TO SCALE DATE DIRECTOR OF TRANSPORTATION SOLUTIONS APPROVED FOR ADVERTISEMENT N/A N/A N/A N/A N/A N/A ESTP-N082(6) 08/27/2019 08/29/2019 UNOFFICIAL WEBSITE COPY

Upload: others

Post on 10-Jul-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

RUTLEDGELYNMOORE

GARWOODESTATES

CORBITTESTATES

ACRESKINGSTON

156

RED LION

STATE FOREST RED

LION

Pig

eon

Run

35

378

82

381

REYBO

LD

DR

GARWOOD DR

GLO

RIA

CT

KINGSTON DR

GA

YN

OR C

T

VELLA

N

DR

MEA

DOW

KNOLL C

T

PIGEO

N

DR RUN

PIGEO

N

RU

N

DR

DR

HAC

KBER

RY

CT

JANSSEN

DR

VIE

W

PIG

EO

N

DR

GREEN

FIELD

D

R

D

R

RO

MEO

D

R

GILD

ER CT

LESTER

DR

CO

RNST

ALK D

R

STAG

HO

RN D

R

CO

UN

TRY PA

TH

DR

MASO

N

LA

CO

RK

WO

OD

CAP

OLA

PE

AC

HLE

AF

TR

AIL PA

TH

HID

EAW

AY

LA

SWEETBAY

AVE

PLA

NTATIO

N

GRA

DY

LA

CTTE

RRY

GOLD

EN

CT

MARLIN

YELLO

WFIN

TRAIL

CO

VE

ANDREW LA

ARBERRY

SUG

CORBITT

CIR

TYBOUTS CORNER

MIDDLETOWN

LITTLE CREEKDOVER

GENERAL LOCATION OF CONTRACT

WILMINGTON

NEW CASTLE

ELSMERE

NEWPORTSTANTON

BELLEFONTE

ARDEN

TALLEYVILLECENTERVILLE

YORKLYN

HOCKESSIN

NEWARK

GLASGOW

BEAR

DELAWARE CITY

ODESSA

TOWNSEND

CLAYTON SMYRNA

WOODLAND BEACH

LEIPSIC

CHESWOLDKENTON

HARTLY

CAMDEN

WYOMING

WOODSIDE

VIOLA

BOWERS BEACH

FREDERICA

FELTON

MAGNOLIA

HARRINGTON

HOUSTONMILFORD

SLAUGHTER BEACH

BROADKILL BEACH

ELLENDALE

FARMINGTON

GREENWOOD

BRIDGEVILLE

SEAFORD

BLADES

BETHEL

LAUREL

GEORGETOWN

MILTON LEWES

HENLOPEN ACRES

REHOBOTH BEACH

DEWEY BEACH

INDIAN RIVER INLET

BETHANY BEACH

SOUTH BETHANY

VIEW

MILLVILLE

OCEAN

FRANKFORD

DAGSBORO

MILLSBORO

DELMARSELBYVILLE FENWICK ISLAND

MARYLAND

SU

SS

EX

KE

NT

MA

RY

LA

ND

NE

W

CA

ST

LE

NEW JERSEY

PENNSYLVANIA

DE

LA

WA

RE

RI

VE

R

DELA

WARE

N

BA

Y

AT

LA

NTIC

OC

EA

N

261

3 95

202

141

13BR

495

13

92

92

100

52

3

13

495

82

41

48

34

41141 100

2

95

4

62

62

7

72

72

273

2

4

7

4

896

5837

141

273

139

295

9

13

195

273

2

4

89672

301

40

71

30140

301

7172

1

139

301896

896

301

71

71

299

301

299

1 13

9

13

1

6

42 300

9

42

42300

44

1 1

44

1 1

8

8

13

1

8

13A

101 13

9

1 13A

13A

10

12

13

15

12

1 1315

14

14

30

136

301 13

36

1616

16

13

404

13BR

18

18

404

18

1 13

9

30

930

524

9

1

9BR

9

1A

1

524

26

54

17

54

26

26

24

1 13

24

54

54

24

20

13

20

9 20

6

5

UNITS

U.S. CUSTOMARY

CONSTRUCTION PLANS FOR:

CONTRACT NUMBER:FEDERAL AID PROJECT NUMBER:

COUNTY: M.R. #:

DEPARTMENT OF TRANSPORTATIONTHE STATE OF DELAWARE

DESIGN DESIGNATIONMRD #:

FUNCTIONAL CLASS:

TYPE OF CONSTRUCTION:

A.A.D.T. PROJECTED:

YEAR:

YEAR:

ROAD NAME:

D.H.V. PROJECTED:

DESIGN SPEED:

TRUCKS:

DIRECTION OF DISTRIBUTION:

A.A.D.T. CURRENT:

YEAR:

APPROVED DESIGN EXCEPTIONS

ADDENDA / REVISIONS

ASSOCIATED CONTRACTS

DESIGN PARAMETER REQUIRED PROVIDED DATE

CONTRACT NO. CONTRACT NAME

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\t

c_001.d

gn

10:5

1

23-A

UG-2

019

LA

ST R

EVIS

ED:

11/2

6/2

018

SR 1 TO RED LION ROADUS 13 MEDIAN BARRIER REPLACEMENT,

T201900704

NEW CASTLE

8310104 SR 7 US 13 TO S. OF US 40

US 13, KOREAN WAR VETERANS MEMORIAL HIGHWAY

EXPRESSWAYS & FREEWAY

75809 2017

70 M.P.H.SAFETY IMPROVEMENTS

067

067

SEAL

DATE

PREPARED BY

PROJECT DEVELOPMENT

DELDOT - TRANSPORTATION SOLUTIONS

BEARING THE "PD" SECTION DESIGNATION.

THIS SEAL APPLIES TO ALL SHEETS

STATION 6+36

BEGIN CONTRACT

STATION 46+50

END CONTRACT

N

LOCATION MAPNOT TO SCALE

DATEDIRECTOR OF TRANSPORTATION SOLUTIONS

APPROVED FOR ADVERTISEMENT

N/A N/A

N/A N/A

N/A

N/A

ESTP-N082(6)

08/27/2019

08/29/2019

UNOFFICIAL WEBSITE

COPY

Page 2: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

N

400 600

SCALE

2000

FEET

US 13 KOREAN WAR VETERANS MEMORIAL HIGHWAY US 13 DUPONT HIGHWAY US 13 DUPONT HIGHWAY

2

INDEX OF SHEETS

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\is_002.d

gn

10:5

1

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

TRL

JKL

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\is_002.d

gn

10:5

1

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

TRL

JKL

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\is_002.d

gn

10:5

1

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

TRL

JKL

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\is_002.d

gn

10:5

1

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

TRL

JKL

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\is_002.d

gn

10:5

1

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

TRL

JKL

MAT

CH

LIN

E S

TA. 13+00

MAT

CH

LIN

E S

TA. 22+00

MAT

CH

LIN

E S

TA. 31+00

MAT

CH

LIN

E S

TA. 40+00

8 9 10 11 12

4+00 6+00 8+00 10+00 12+00 14+00 16+00 18+00 20+00 22+00 24+00 26+00 28+00 30+00 32+00 34+00 36+00 38+00 40+00 42+00 44+00 46+00 48+0049+0049+00

PO

B 4

+00.0

0

POE 4

9+00.0

0

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\is_002.d

gn

10:5

1

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 3: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

3

REVISIONS

ADDENDA AND PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\ar01_003.d

gn

10:5

1

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 4: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

?

MB

EXISTING SYMBOLS PROPOSED SYMBOLS

DRAINAGE SURVEY CONTROL & MONUMENTATION

UTILITY

MANMADE ROADSIDE FEATURES

NATURAL ROADSIDE FEATURES

UTILITY COMPANY FACILITIES

RIGHT-OF-WAY SYMBOLSRIGHT-OF-WAY SYMBOLS

TRAFFIC

LANDSCAPING

IDENTIFIERSCONSTRUCTION PAVEMENT SECTION(S)

PROPERTY MARKER - CONCRETE MON.

PROPERTY MARKER - IRON PIPE

HISTORIC RIGHT-OF-WAY BASELINE

EXISTING RIGHT-OF-WAY

EXISTING PROPERTY LINE

EXISTING EASEMENT

EXISTING DENIAL OF ACCESS

EXISTING R/W & DENIAL OF ACCESS

WOODS LINE BOUNDARY

DELINEATED WETLAND BOUNDARY LINE

SHRUBBERY

TREE STUMP

TREE - DECIDUOUS

TREE - CONIFEROUS

MARSH BOUNDARY LINE

HEDGEROW OR THICKET

GRASS LAWN

WALL - STONE

WALL - BRICK OR BLOCK

TRAFFIC SIGN AND POST

PILLAR OR MISCELLANEOUS POST

PILE - BRIDGE

PAVEMENT - RIGID

PAVEMENT - FLEXIBLE

PARKING METER AND POST

MAILBOX

LAMP AND POST - RESIDENTIAL

GUARDRAIL - WIRE ROPE

GUARDRAIL - STEEL BEAM

FLAG POLE

FENCE - STOCKADE OR SPLIT RAIL

CURB AND GUTTER

FENCE - CHAINLINK OR STRANDED

CURB

BOLLARD - WOOD POST

BOLLARD - STEEL POLE

RIPRAP - LINEAR FEATURE

RIPRAP - AREA FEATURE

DRAINAGE PIPE HEADWALL

DRAINAGE PIPE AND FLOW ARROW

DRAINAGE MANHOLE

DRAINAGE JUNCTION BOX

DRAINAGE INLET

DIRECTIONAL STREAM FLOW ARROW

DITCH OR STREAM CENTERLINE SURVEY BENCHMARK LOCATION

SURVEY TIE POINT LOCATION

SURVEY TRAVERSE POINT

POINT OF CURVATURE OR TANGENCY

POINT OF INTERSECTING TANGENTS

SOIL BORING LOCATION

UTILITY TEST HOLE LOCATION

CABLE TV DISTRIBUTION BOX

ELECTRIC MANHOLE

ELECTRIC METER

ELECTRIC TRANSFORMER

POLE MOUNTED LUMINAIRE

GAS MANHOLE

GAS METER

GAS VALVE

GAS PUMP - SERVICE STATION

RAILROAD TRACKS

SANITARY SEWER MANHOLE

SANITARY SEWER VALVE

SANITARY SEWER CLEANOUT OR VENT

SEPTIC DRAIN FIELD

TELEPHONE BOOTH

TELEPHONE MANHOLE

S.D.F.

TELEPHONE TEST POINT

TRAFFIC - CONDUIT JUNCTION WELL

TRAFFIC - LIGHT POLE AND BASE

TRAFFIC - PEDESTRIAN POLE & BASE

TRAFFIC - SIGNAL CABINET & BASE

TRAFFIC - SIGNAL POLE AND BASE

UTILITY BOX

UTILITY POLE GUY WIRE ANCHOR

UTILITY POLE

WATER - FIRE HYDRANT

WATER METER

WATER VALVE

WELL HEAD

MANHOLE - UNDETERMINED OWNER

R/W-DA

DA

EASEMENT TYPE

100+00

PL

PROPOSED RIGHT-OF-WAY BASELINE

TEMPORARY CONSTRUCTION EASEMENT

RIGHT-TO-ENTER

PROPOSED R/W & DENIAL OF ACCESS

PROPOSED RIGHT-OF-WAY

PROPOSED PERMANENT EASEMENT

PROPOSED DENIAL OF ACCESS

PROPOSED RIGHT-OF-WAY MONUMENT

UNDERDRAIN OUTLET

UNDERDRAIN

FOR CHANNELIZATION ISLANDS.)P.C.C. SIDEWALK - 6" (USE 8" DEPTH

P.C.C. SIDEWALK - 4"

RIPRAP

PIPE & DIRECTIONAL FLOW ARROW

TOPSOIL, SEED AND MULCHPAVEMENT REMOVAL -

PAVEMENT PATCH

MANHOLE

MAILBOX

LIMIT OF CONSTRUCTION

LATERAL OFFSET

JUNCTION BOX - DRAINAGE

IMPACT ATTENUATOR

GUARDRAIL END TREATMENT, TYPE 3

GUARDRAIL END TREATMENT, TYPE 2

GUARDRAIL END TREATMENT, TYPE 1

GUARDRAIL END ANCHORAGE

GUARDRAIL, TYPE 3

GUARDRAIL, TYPE 2

GUARDRAIL, TYPE 1

FLARED END / SAFETY END SECTION

FENCE - METAL / FENCE - WOOD

DITCH

DRAINAGE INLET

CURB OPENING WITH SIDEWALK

CURB OPENING - SUMP / ON GRADE

CURB & GUTTER, TYPE 4

CURB & GUTTER, TYPE 3

CURB & GUTTER, TYPE 2

CURB & GUTTER, TYPE 1

CURB, TYPE 2

CURB, TYPE 1 & TYPE 3

CONSTRUCTION SAFETY FENCE

CONSTRUCTION BASELINE

CLEAR ZONE

BUTT JOINT

BRICK PATTERNED SURFACE

BIOFILTRATION SWALE

CONCRETE SAFETY BARRIER - PERMANENT ADJUST BY CONTRACTOR

ADJUST BY OTHERS

CONCRETE SAFETY BARRIER

CURB OR CURB & GUTTER

CONVERT TO JUNCTION BOX

CONVERT TO DRAINAGE MANHOLE

CURB OPENING - SUMP / ON GRADE

CURB OPENING WITH SIDEWALK

CONSTRUCTION SAFETY FENCE

DRAINAGE INLET

DO NOT DISTURB

ENERGY DISSIPATOR

FENCE

FLARED END SECTION

FILL WITH FLOWABLE FILL

FILTRATION STRUCTURE

GUARDRAIL

JUNCTION BOX

MANHOLE

MONUMENT - RIGHT-OF-WAY

PIPE

RELOCATE BY CONTRACTOR

RELOCATE BY OTHERS

RELOCATE BY PROPERTY OWNER

REMOVE BY CONTRACTOR

REMOVE BY TRAFFIC CONTRACTOR

REMOVE BY OTHERS

SAFETY END SECTION

UNDERDRAIN / LENGTH

UNDERDRAIN OUTLET PIPE

LANDSCAPE PLANTINGS

SHRUBBERY

CONIFEROUS TREE

DECIDUOUS TREE

ITMS CONDUIT

SIGNAL CONDUIT

CONDUIT JUNCTION WELL

LUMINAIRE

PAVEMENT MARKINGS

PAVEMENT STRIPING

TRAFFIC SIGN

SECTIONS FOR MATERIALS AND DEPTHSRECONSTRUCTED PAVEMENT - SEE TYPICAL

B.M.

T.P.

TV

E

EM

E

G

G.M.

G.V.

G.P.

S

S.V.

S.C.O.

B

T

T

J.W.

U

F.H.

W.M.

WV

WELL

D.I.

J.B.

C.B.

?

D

SIZE/TYPE LABEL

(TYPE LABEL)

(TYPE LABEL)

F.P.

LAMP

MB

P.M.

WL

C.M.

I.P.

100+00

TCE

RTE

R/W-DA

R/W

DA

PE

LOC

LO

100+00

CSF

CZ

BFS

RM

TC

A

C

A

C

B

XXX

C

XXX

CJB

XXX

CMH

XXX

C

O

CO

SW

PC

XX

PC-N

XXX

DI

XXX

DND

ED

XXX

F

XXX

FES

XXX

FF

C

GR

XXX

JB

XXX

MH

XXX

P

XXX

RL

C

RL

O

RL

PO

RM

C

RM

O

SES

XXX

UD

XXX

UDO

XXX

M

XXX

FS

ITMS-CON

SIG-CON

LS

XXX

PEDESTRIAN CONNECTION / TYPE

WITHOUT SIDEWALK SURFACE DETECTABLE WARNING SYSTEM

PEDESTRIAN CONNECTION / TYPE

4

LEGENDNOT TO SCALE

XXX

CSF

DELMARVA POWER

DELDOT

SUEZ WATER DELAWARE INC.

DPE (X)

EX-CON (X)

SZ-W (X)

(X) REPRESENTS ASCE DEFINED SUE QUALITY LEVEL

THE PLANSUTILITIES ARE NOTED TO BE IN THE GENERAL AREA OF THE PROJECT BUT NOT SHOWN ON

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\lg01_004.d

gn

10:5

1

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 5: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

GENERAL NOTES

PROJECT FILES THAT WILL BE MADE AVAILABLE TO THE CONTRACTOR, INCLUDE:3.

NONE

CROSS SECTIONS

RIGHT-OF-WAY PLANS (WILL BE MADE AVAILABLE TO THE AWARDED CONTRACTOR)

( X )

DETAILS", DATED 2018, INCLUDING ALL REVISIONS UP TO THE DATE OF ADVERTISEMENT.

SPECIFICATIONS", DATED AUGUST 2016 AND THE DELAWARE DEPARTMENT OF TRANSPORTATION "STANDARD CONSTRUCTION

THIS PROJECT IS TO BE CONSTRUCTED IN ACCORDANCE WITH THE DELAWARE DEPARTMENT OF TRANSPORTATION "STANDARD1.

PROJECT NOTES

ASCII DATA FILES WITH COORDINATES AND ELEVATIONS FOR PROPOSED POINTS AS SELECTED BY THE ENGINEER.

DELDOT.

EXISTING DIGITAL TERRAIN MODEL, IN .DTM FILE FORMAT, COMPATIBLE WITH SOFTWARE CURRENTLY USED BY

DELDOT.

PROPOSED DIGITAL TERRAIN MODEL, IN .DTM FILE FORMAT, COMPATIBLE WITH SOFTWARE CURRENTLY USED BY

SIGNED BY ALL PARTIES PRIOR TO THE DELIVERY OF ANY ELECTRONIC PROJECT FILES.

NOTE: THE DOCUMENT ENTITLED "RELEASE FOR DELIVERY OF DOCUMENTS IN ELECTRONIC FORM TO A CONTRACTOR" MUST BE

( )

( )

( )

( )

( )

( )

ELECTRONIC DESIGN DATA FILES THAT WILL BE MADE AVAILABLE TO THE AWARDED CONTRACTOR, INCLUDE:2.

FEATURE LINES ARE FOR THE PROPOSED TOP SURFACE ELEVATION ONLY.

DESIGN FILE, IN .DGN FILE FORMAT, THAT CONTAINS 3D FEATURE LINES FOR THE PROPOSED DESIGN. 3D

CONTRACTOR'S RESPONSIBILITY TO REVIEW THE DESIGN DATA FILE AND DETERMINE THE LIMITS OF THE PROJECT INCLUDED.

NOTE: THERE MAY BE SOME AREAS OF THE PROJECT NOT INCLUDED IN THE ELECTRONIC DESIGN DATA FILE(S). IT IS THE

INLETS AND TO THE CENTER OF THE STRUCTURE FOR JUNCTION BOXES AND MANHOLES.

STATION AND ELEVATION DATA GIVEN FOR DRAINAGE STRUCTURES ARE TO BE APPLIED TO THE CENTER OF THE GRATE FOR2.

5

NOTESNOT TO SCALE

SECTION 100

UAV, THE FLIGHT TIME, LOCATION OF THE FLIGHT, THE PILOT'S NAME AND THE PILOT'S CONTACT NUMBER DURING THE FLIGHT.

FLIGHTS. THE CONTRACTOR WILL BE REQUIRED TO PROVIDE THE FOLLOWING INFORMATION: THE REGISTRATION NUMBER OF THE

THE CONTRACTOR WILL CONTACT THE DELAWARE TMC AT 302-659-4600 PRIOR TO ANY UNMANNED AIRCRAFT VEHICLE (UAV)1.

SECTION 200

BORROW TYPE A SHALL BE USED FOR BACKFILLING ALL UNDERCUT AREAS AS DIRECTED BY THE ENGINEER.3.

SECTION 900

APPROPRIATE CONSTRUCTION ENGINEER.

PERMIT OR THE NOI CAN BE OBTAINED UPON REQUEST FROM EITHER THE DEPARTMENT'S STORMWATER ENGINEER OR THE

KEPT ON FILE IN EACH OF THE CONSTRUCTION OFFICES AND THE DEPARTMENT'S STORMWATER SECTION. A COPY OF THE GENERAL

INDUSTRIAL PERMITTING REQUIREMENTS FOR THIS CONSTRUCTION PROJECT. A COPY OF THE NPDES GENERAL PERMIT AND NOI IS

WITH DELDOT'S APPROVED SEDIMENT AND STORMWATER MANAGEMENT PLANS WILL CONSTITUTE COMPLIANCE WITH THE NPDES

THIS PROJECT IS COVERED UNDER AN NPDES GENERAL PERMIT FOR CONSTRUCTION. UNDER THE GENERAL PERMIT, COMPLIANCE5.

MISCELLANEOUS

TOTAL DISTURBED AREA FOR THIS PROJECT IS 0.00 ACRES.3.

THE ENGINEER, SHALL BE REPAIRED AND/OR REPLACED IN KIND AT THE CONTRACTOR'S EXPENSE.

ANY ITEMS DAMAGED BY THE CONTRACTOR; DRAINAGE INLETS, GUARDRAIL AND BARRIER AT THE DISCRETION OF2.

CHIEF SCHEDULER AT 302-576-6019.

COMPLETED AND OPERABLE FOR TRANSIT OPERATIONS. FOR EMERGENCY DETOUR INFORMATION ONLY, PLEASE CONTACT DTC’S

OF ANY DETOURS OR CONSTRUCTION, AND [email protected] AT SUCH TIME THE FACILITY IS

THE CONTRACTOR SHALL NOTIFY DART FIRST STATE AT [email protected] AT LEAST 14 DAYS PRIOR TO THE START 6.

DELDOT ENVIRONMENTAL STUDIES STAFF WILL NEED TO REVIEW THESE CHANGES FOR POTENTIAL CULTURAL RESOURCES CONCERNS.

ADD ADDITIONAL ACCESS LOCATIONS, OTHER STOCKPILING/STAGING AREAS, OR OTHERWISE ALTER THE SCOPE OF THE PROJECT,

MODIFIED AND ALL STAGING AND STOCKPILING REMAIN WITHIN THE EXISTING ROADWAY FOOTPRINT. SHOULD IT BE NECESSARY TO

NO HISTORIC PROPERTIES AFFECTED. THERE ARE NO CULTURAL RESOURCE CONCERNS AS LONG AS THE PROJECT SCOPE IS NOT

STATE HISTORIC PRESERVATION OFFICE (SHPO). AS A RESULT, DELDOT CULTURAL RESOURCE STAFF HAVE ISSUED A FINDING OF

STIPULATION II OF DELDOT'S PROGRAMMATIC AGREEMENT WITH THE FEDERAL HIGHWAYS ADMINISTRATION (FHWA) AND DELAWARE

BASED ON CURRENT COORDINATION, THIS PROJECT IS CLEAR FOR CULTURAL RESOURCES AND EXEMPT FROM SHPO REVIEW UNDER7.

GUARDRAIL HARDWARE (RAILS, BLOCKS, POSTS, ETC)c.

EXISING DRAINAGE INLET TOP AND GRATESb.

EXISTING ATTENUATORa.

TO THE FOLLOWING:

ITEMS TO BE REMOVED UNDER ITEM 211000 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS SHALL INCLUDE, BUT NOT BE LIMITED1.

MISCELLANEOUS cont.

DRAINAGE INLET TOP UNIT.

CONTRACTOR SHALL CALL 302-326-4540 PRIOR TO DELIVERY. PAYMENT FOR DELIVERY IS INCIDENTAL TO ITEM 602508 MODIFIED

THE CONTRACTOR SHALL DELIVER THE REMOVED PWBD GRATES TO DELDOT AREA 10 YARD, LOCATED AT 250 BEAR CHRISTIANA ROAD.9.

AS DIRECTED BY THE ENGINEER.

WHERE CRACKS IN THE PAVEMENT APPEAR AROUND THE GUARDRAIL POSTS AND ALONG THE 6' WIDE PROPOSED PAVEMENT SECTION

1042 IN THE 2016 STANDARD SPECIFICATIONS. THE SEALANT SHALL BE APPLIED TO THE BITUMINOUS PAVEMENT AT ANY LOCATIONS

MILLINGS SHALL BE INCIDENTAL TO ITEM 401005 SUPERPAVE TYPE C. THE CONTRACTOR SHALL FOLLOW SPECIFICATIONS IN SECTION

APPLY CRACK SEALANT AROUND THE GUARDRAIL POSTS AFTER INSTALLATION TO PREVENT WATER SEEPAGE. THE SEALANT AND

THE CONTRACTOR SHALL FILL IN ANY VOIDS CREATED BY GUARDAIL INSTALLANTION IN THE HOT-MIX PAVEMENT WITH MILLINGS AND8.

SECTION 700

TO ITEM 211000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS.

250 BEAR CHRISTIANA ROAD. CONTRACTOR SHALL CALL 302-326-4540 PRIOR TO DELIVERY. PAYMENT FOR DELIVERY IS INCIDENTAL

THE CONTRACTOR SHALL DELIVER THE REMOVED EXISTING PERMANENT IMPACT ATTENUATOR TO DELDOT AREA 10 YARD, LOCATED AT10.

THE ATTENUATORS MUST BE SELECTED FROM DELDOT'S MOST RECENT APPROVED PRODUCT LIST.

SUBSECTION 724.02 IS MODIFIED AS FOLLOWS: THE CONTRACTOR MUST FURNISH MASH COMPLIANT PERMANENT IMPACT ATTENUATORS.4.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\p

n01_005.d

gn

10:0

4

17-S

EP-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 6: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

5'

12' SHOULDER 12' SHOULDER VARIES 24-36' 10' SHOULDER

6:1 MAX6:1 MAX

VARIES 24-48'10' SHOULDER

VARIES VARIES VARIES

VARIES VARIES VARIES

MATERIALLIFT THICKNESS

MINIMUM MAXIMUM

BITUMINOUS CONCRETE BASE COURSE

GRADED AGGREGATE BASE COURSE

2"

4"

3" 6"

4" 8"

1.25"

2.25"

BITUMINOUS CONCRETE, TYPE 'C'

BITUMINOUS CONCRETE, TYPE 'B'

AND R/W BASELINE

CONSTRUCTION

VARIES 24-36' 10' SHOULDER

6:1 MAX

VARIES 24-48'10' SHOULDER

VARIES VARIES VARIES

VARIES VARIES VARIES

SHOULDER VARIES 12' LEFT TURN LANE 6' MEDIAN

12' SHOULDER 12' SHOULDER VARIES 24-36' 10' SHOULDER

6:1 MAX

VARIES 24-48'10' SHOULDER

VARIES VARIES VARIES

VARIES VARIES VARIES

3' 3'

6

TYPICAL SECTIONSNOT TO SCALE

O.G.

O.G.

O.G.

LOC

LOC6'

3'

R/W

EXISTING

R/W

EXISTINGAND R/W BASELINE

CONSTRUCTION

R/W

EXISTINGAND R/W BASELINE

CONSTRUCTION

R/W

EXISTING

STATION 39+60 TO STATION 45+89

US 13 DUPONT HIGHWAY

VARIES 75-168'+/- VARIES 75-876'+/-

VARIES 168-253'+/-

VARIES 253-520'+/- VARIES 441-876'+/-

VARIES 800-876'+/-

A

B

C

LEGEND

ITEM 720023- GALVANIZED STEEL BEAM GUARDRAIL, TYPE 3-31

ITEM 401005 - SUPERPAVE TYPE C PG 64-22 (CARBONATE STONE)

ITEM 301001 - GRADED AGGREGATE BASE COURSE, TYPE B

A

D

D

LOC

3'

16'

LOC LOC

14'LOC

VARIES

VARIES

VARIES 14-16'

3'3'

E

4"

B

2"

C

6:1 MAX

R/W

EXISTING

O.G.

6:1 MAX

R/W

EXISTING

O.G.

6" GABC, TYPE B

3" HOT-MIX, TYPE B

2" HOT-MIX, TYPE C

6" GABC, TYPE B

3" HOT-MIX, TYPE B

2" HOT-MIX, TYPE C

6" GABC, TYPE B

3" HOT-MIX, TYPE B

2" HOT-MIX, TYPE C

6" GABC, TYPE B

3" HOT-MIX, TYPE B

2" HOT-MIX, TYPE C

6" GABC, TYPE B

3" HOT-MIX, TYPE B

2" HOT-MIX, TYPE C

6" GABC, TYPE B

3" HOT-MIX, TYPE B

2" HOT-MIX, TYPE C

D

STATION 16+90 TO STATION 36+87

STATION 6+36 TO STATION 15+44

US 13 DUPONT HIGHWAY

VARIES

5' MAX/

6"

E ITEM 209001 - BORROW, TYPE A

ITEM 723002 - PCC SAFETY BARRIER, PERMANENT, DOUBLE FACE 32" (SEE DETAIL)

F ITEM 501006 - PORTLAND CEMENT CONCRETE PAVEMENT, 12"

F F

DF F

* (OR NEAREST PCC BARRIER JOINT)

STATION 36+87 TO STATION 39+60

STATION 16+55* TO STATION 16+90

STATION 15+44 TO STATION 15+94*

US 13 DUPONT HIGHWAY

MATCH EXISTING MATCH EXISTING

2' 2'2'

2' 2'2'

2' 2'

MATCH EXISTING MATCH EXISTING

MATCH EXISTING MATCH EXISTING

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\ts.d

gn

11:5

1

27-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 7: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

7

VERTICAL CONTROL

HORIZONTAL AND400 600

SCALE

2000

FEET

CONSTRUCTION ALIGNMENT CONTROL

POINT NO. STATION OFFSET NORTHING EASTING

N

US 13 KOREAN WAR VETERANS MEMORIAL HIGHWAY US 13 DUPONT HIGHWAY

15000 15009

HORIZONTAL / VERTICAL CONTROL DATA

POINT NO. STATION OFFSET NORTHING EASTING ELEV.

DATUM REFERENCE:

VERTICAL - THIS PROJECT IS REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).

1983 (NAD 83).

HORIZONTAL - THIS PROJECT IS REFERENCED TO THE DELAWARE STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN DATUM OF

9+58.75 68.25 588239.2091 590211.4272TP01 36.90

10+42.70 -56.11 586145.9625 590197.5450TP02 43.27

14+27.69 79.25 586322.9298 590458.7372TP03 50.58

15+42.89 -56.03 586490.8260 590400.5758TP04 53.10

19+56.04 54.34 586790.9193 590705.2344TP05 57.12

19+84.27 -56.95 586871.4383 590624.0661TP06 57.31

23+89.12 53.59 587164.5558 590924.2347TP07 61.06

24+00.14 -65.78 587234.5940 590826.9441TP08 60.85

29+69.17 53.69 587664.4130 591218.4970TP09 59.56

30+21.98 -68.61 587771.9523 591139.8796TP10 59.15

34+00.81 54.18 588036.1747 591437.8300TP11 56.61

37+11.47 -48.50 588355.9889 591506.8976TP12 57.16

38+30.17 54.05 588406.2876 591655.4815TP13 58.34

42+73.41 70.47 588780.0551 591894.5057TP14 59.13

4+00.00 0.00 585477.4043 589869.242915000

9+00.00 0.00 585908.3284 590122.826215001

14+00.00 0.00 586339.2525 590376.409415002

19+00.00 0.00 586770.1765 590629.992615003

24+00.00 0.00 587201.1006 590883.575815004

29+00.00 0.00 587632.0247 591137.159015005

34+00.00 0.00 588062.9487 591390.742215006

39+00.00 0.00 588493.8728 591644.325415007

44+00.00 0.00 588924.7969 591897.908715008

49+00.00 0.00 589355.7209 592151.491915009

TP06

TP01

TP02

TP03

TP04

TP05 TP07

TP08

TP09

TP10

TP11

TP12

TP13TP14

NOTE: NEGATIVE DENOTES LEFT OF BASELINE.

4+00 6+00 8+00 10+00 12+00 14+00 16+00 18+00 20+00 22+00 24+00 26+00 28+00 30+00 32+00 34+00 36+00 38+00 40+00 42+00 44+00 46+00 48+0049+0049+00

PO

B 4

+00.0

0

POE 4

9+00.0

0

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\h

v01.d

gn

10:5

1

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 8: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

N

8

CONSTRUCTION PLAN

CP-01

60 90

SCALE

300

FEET

US 13 KOREAN WAR VETERANS MEMORIAL HIGHWAY

CONSTRUCTION B US 13L

RIGHT-OF-WAY AS SHOWN IS BASED ON RW PLANS FOR CONTRACT 83-10-104EXISTING RIGHT-OF-WAY IS SHOWN FOR INFORMATIONAL PURPOSES ONLY.*GENERAL NOTE:

GUARDRAIL SCHEDULE

NO. ITEM DESCRIPTION / TYPE BEGIN STA. OFFSET LENGTH

GR

003

5.006+55.00001

DI

001

DRAINAGE INLET TOP SCHEDULE

NO. STATION OFFSET BOX SIZE GRATE

MA

TC

H LIN

E S

TA. 13+00

A

C

A

C

DI

002

5.009+42.55002

D.I.

D.I.

A

C

D.I.

A

C

RM

C

GUARDRAIL

RM

C

RM

C

93.25" x 53"

93.25" x 53"

GR

001

635.875.006+64.13003 GALVANIZED STEEL BEAM GUARDRAIL, TYPE 3-31

28.135.006+36.00001 W-BEAM, TYPE 1-27 TO TYPE 1-31 TRANSITION SECTION

*NOTE: GUARDRAIL TRANSITION SECTION PAID UNDER ITEM 720021 GALVANIZED STEEL BEAM GUARDRAIL, TYPE 1-31

PWBD-1

PWBD-1

PAVEMENTBARRIER/

CONC.

PAVEMENTBARRIER/

CONC.

002 W-BEAM, TYPE 1-27 TO TYPE 1-31 TRANSITION SECTION 6+36.00 5.00 28.13

GR

002

*NOTE 1: PROPOSED INLET TOPS WILL MATCH EXISTING FLOW LINE

SEE CONSTRUCTION DETAIL SHEETS.

DRAINAGE INLET GRATES. TWO GRATES PER INLET BASIN.

*NOTE 2: PWBD GRATES TO BE PAID UNDER ITEM 602100 REPLACE

4+00 5+00

6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00

PO

B 4

+00.0

0

65'

18"R

CP

65' 18"R

CP

P.C.C. BARRIER6' CONCRETEP.C.C. BARRIER6' CONCRETE

HOT-MIX

HOT-MIX

HOT-MIX

HOT-MIX

D.I.

D.I. D.I.

D.I.

T.P. T.P.

T.P. T.P.

T.P.

EXISTING R/W

EXISTING RW & DA

EXISTING RW & DA

EXISTING RW & DA

EXISTING R/W

STA 8+50 RTPER CONTRACT 83-10-104 RW PLANSAPPROXIMATE LOCATION OF DA

75'+/-

75'+/-

75'+/-

75'+/-

75'+/-

75'+/-

75'+/-

100'+/-

75'+/-

100'+/-

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\c

p01.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 9: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

60 90

SCALE

300

FEET

N

MATC

H LIN

E S

TA. 22+00

9

CONSTRUCTION PLAN

CP-02

US 13 DUPONT HIGHWAY

RIGHT-OF-WAY AS SHOWN IS BASED ON RW PLANS FOR CONTRACT 83-10-104EXISTING RIGHT-OF-WAY IS SHOWN FOR INFORMATIONAL PURPOSES ONLY.*GENERAL NOTE:

GUARDRAIL SCHEDULE

NO. ITEM DESCRIPTION / TYPE BEGIN STA. OFFSET LENGTH

5.0015+50.00003

GR

009

DI

003

216.775.00004 GALVANIZED STEEL BEAM GUARDRAIL, TYPE 3-31

MATC

H LIN

E S

TA. 13+00

GR

004

A

C

A

CA

C

DI

004

A

C

5.0021+51.00004

NO.

DRAINAGE INLET TOP SCHEDULE

STATION OFFSET BOX SIZE GRATE

GR

007

GR

006

GR

005

GR

008

B

2

BARRIER SCHEDULE

NO. ITEM DESCRIPTION / TYPE LENGTH

TRANSITION MEDIAN BARRIER 50.001

TRANSITION MEDIAN BARRIER 30.00227.505.0015+16.77005 MODIFIED GUARDRAIL TO BARRIER CONNECTION, APPROACH TYPE 2-31

13+00.00

27.505.0015+16.77006 MODIFIED GUARDRAIL TO BARRIER CONNECTION, APPROACH TYPE 2-31

27.505.0016+95.13007 MODIFIED GUARDRAIL TO BARRIER CONNECTION, APPROACH TYPE 2-31

27.505.0016+95.13008 MODIFIED GUARDRAIL TO BARRIER CONNECTION, APPROACH TYPE 2-31

482.375.0017+22.63009 GALVANIZED STEEL BEAM GUARDRAIL, TYPE 3-31

B

1

D.I.

D.I.D.I.

D.I.

*REFER TO CONSTRUCTION DETAIL SHEET FOR MODIFIED GUARDRAIL TO BARRIER CONNECTION.

RM

C

RM

C

DND

AND BARRIERSIGN STRUCTURE

93.25" x 53"

93.25" x 53"

PWBD-1

PWBD-1

PAVEMENTBARRIER/

CONC.PAVEMENTBARRIER/

CONC.

*NOTE 1: PROPOSED INLET TOPS WILL MATCH EXISTING FLOW LINE

SEE CONSTRUCTION DETAIL SHEETS.

DRAINAGE INLET GRATES. TWO GRATES PER INLET BASIN.

*NOTE 2: PWBD GRATES TO BE PAID UNDER ITEM 602100 REPLACE SEE CONSTRUCTION DETAIL SHEETS.

* PAY FOR TRANSITION MEDIAN BARRIER UNDER ITEM 732002.

13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00

GRASS

77' 18"R

CP

100'

18"R

CP

HOT MIX

HOT MIX

GRASS

P.C.C. BARRIER6' CONCRETE

HOT MIX

HOT MIX

T.P. T.P.

T.P.

D.I.

D.I.

T.P. T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

D.I.

D.I.

EXISTING RW & DA

EXISTING RW & DA

EXISTING R/W EXISTING R/W

EXISTING RW & DA

75'+/-

157

+/-

75'+/-

165

+/-

75'+/-

275'

+/-

EXISTING R/W & DA

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\c

p02.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 10: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

60 90

SCALE

300

FEET

10

CONSTRUCTION PLAN

CP-03

US 13 DUPONT HIGHWAY US 13 DUPONT HIGHWAY

MA

TC

H LIN

E S

TA. 31+00

MA

TC

H LIN

E S

TA. 22+00

N

RIGHT-OF-WAY AS SHOWN IS BASED ON RW PLANS FOR CONTRACT 83-10-104EXISTING RIGHT-OF-WAY IS SHOWN FOR INFORMATIONAL PURPOSES ONLY.*GENERAL NOTE:

GUARDRAIL SCHEDULE

NO. ITEM DESCRIPTION / TYPE BEGIN STA. OFFSET LENGTH

900.005.0021+00.00010 GALVANIZED STEEL BEAM GUARDRAIL, TYPE 3-31

GR

010

DI

005

A

C

A

C

CONSTRUCTION B US 13L

5.0030+00.00005

NO.

DRAINAGE INLET TOP SCHEDULE

STATION OFFSET BOX SIZE GRATE

D.I.

D.I.

RM

C

93.25" x 53" PWBD-1

PAVEMENTBARRIER/

CONC.

RM

C

PAVEMENTBARRIER/

CONC.

*NOTE 1: PROPOSED INLET TOPS WILL MATCH EXISTING FLOW LINE

SEE CONSTRUCTION DETAIL SHEETS.

DRAINAGE INLET GRATES. TWO GRATES PER INLET BASIN.

*NOTE 2: PWBD GRATES TO BE PAID UNDER ITEM 602100 REPLACE

22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00

278' 18"RCPP.C.C. BARRIER

HOT MIX

6' CONCRETE

HOT MIX

HOT MIX

HOT MIX

D.I.

D.I.

T.P.T.P.

T.P.

T.P.T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

EXISTING R/W & DA

EXISTING R/W & DA STA 22+73.42 LTPER CONTRACT 83-10-104 RW PLANSAPPROXIMATE LOCATION OF DA

100'+/-

75'+/-

100'+/-

EXISTING R/W & DA

EXIS

TIN

G R/W

& D

A 731'+/-

EXIS

TIN

G R/W & D

A 570' +/ -

EXIS

TIN

G R/W & D

A 3

64'+/-

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\c

p03.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 11: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

US 13 DUPONT HIGHWAY

US 13 DUPONT HIGHWAY

60 90

SCALE

300

FEET

11

CONSTRUCTION PLAN

CP-04

N

MA

TC

H LIN

E S

TA. 31+00

MA

TC

H LIN

E S

TA. 40+00

CONSTRUCTION B US 13L

RIGHT-OF-WAY AS SHOWN IS BASED ON RW PLANS FOR CONTRACT 83-10-104EXISTING RIGHT-OF-WAY IS SHOWN FOR INFORMATIONAL PURPOSES ONLY.*GENERAL NOTE:

5.0030+00.00006

5.0035+66.35007

GR

011

DI

006

DI

007

BARRIER SCHEDULE

NO. ITEM DESCRIPTION / TYPE LENGTH

A

C

A

C

A

C

A

C

DI

008

3.8038+50.00008

A

C

A

C

NO.

DRAINAGE INLET TOP SCHEDULE

STATION OFFSET BOX SIZE GRATE

GUARDRAIL SCHEDULE

NO. ITEM DESCRIPTION / TYPE BEGIN STA. OFFSET LENGTH

559.505.00011 GALVANIZED STEEL BEAM GUARDRAIL, TYPE 3-31

27.505.0036+59.50012 MODIFIED GUARDRAIL TO BARRIER CONNECTION, APPROACH TYPE 2-31

31+00.00

013 MODIFIED GUARDRAIL TO BARRIER CONNECTION, APPROACH TYPE 2-31 36+59.50 5.00 27.50

GR

013

GR

012

B

3

B

4

D.I.

D.I.

D.I.

D.I.D.I.

D.I.

*REFER TO CONSTRUCTION DETAIL SHEET FOR MODIFIED GUARDRAIL TO BARRIER CONNECTION.

RM

C

RM

C

93.25" x 53"

93.25" x 53"

108.5" x 62.75"

PWBD-1

PWBD-2

PWBD-1

PAVEMENTBARRIER/

CONC.

PAVEMENTBARRIER/

CONC.

PCC SAFETY BARRIER, PERMANENT, DOUBLE FACE 32" 283.004

TRANSITION MEDIAN BARRIER 30.003

*NOTE 1: PROPOSED INLET TOPS WILL MATCH EXISTING FLOW LINE

SEE CONSTRUCTION DETAIL SHEET.

DRAINAGE INLET GRATES. TWO GRATES PER INLET BASIN.

*NOTE 2: PWBD GRATES TO BE PAID UNDER ITEM 602100 REPLACE

SEE CONSTRUCTION DETAIL SHEETS.

* PAY FOR TRANSITION MEDIAN BARRIER UNDER ITEM 732002.

31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00

40+00

55'

30"R

CP

18"R

CP

18"RCP18"RCP 18"RCP18"RCP 18"RCP 280' 18"RCP280' 18"RCP

P.C.C. BARRIER

6' CONCRETE

HOTMIX

HOTMIX

6' CONCRETEP.C.C. BARRIER

GRASS

HOT-MIX

HOT-MIX

HOT-MIX

HOT-MIX

HOT-MIX

D.I.

D.I.

T.P.T.P.

D.I.D.I.

D.I.D.I.

T.P.

T.P.

T.P.

EXISTING R/W & DA

EXISTING R/W & DA

EXISTING R/W & DA

100'+/-

136'+/-

EXISTING R/W & D

A

197'+/-

EXISTING R/W &

DA

EXIS

TIN

G R/W

& D

A 866'+/-

EXIS

TIN

G R/W

& D

A 876'+/-

EXIS

TI N

G R/W

& D

A 864'+/-

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\c

p04.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 12: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

10000

10001

10002

10003

10006

10005

10004

CONSTRUCTION B US 13US 13 DUPONT HIGHWAYL

60 90

SCALE

300

FEET

N

12

CONSTRUCTION PLAN

CP-05

US 13 DUPONT HIGHWAY

NO. STATION OFFSET BOX SIZE GRATE BARRIER SCHEDULE

NO. ITEM DESCRIPTION / TYPE LENGTH

DI

009

1.0042+95.00009

MA

TC

H LIN

E S

TA. 40+00

DI

010 A

C

A

C

A

C

A

C

2.8845+47.64010

DRAINAGE INLET TOP SCHEDULE

GUARDRAIL SCHEDULE

NO. ITEM DESCRIPTION / TYPE BEGIN STA. OFFSET LENGTH

23.00VARIES45+65.00014 PERMANENT IMPACT ATTENUATOR, TYPE 5

GR

014

B

5

PCC SAFETY BARRIER, PERMANENT, DOUBLE FACE 32" 567.005

RM

C

RM

C

ATTENUATORIMPACT

93.25" x 53"

93.25" x 53"

PWBD-1

PWBD-1

CURB SCHEDULE

NO. ITEM DESCRIPTION / TYPE LENGTH

C

1

1 53.50MODIFIED PCC CURB, TYPE 2

CURBDEPRESSED

*NOTE: DEPRESS TYPE 2 CURB WITH 1"LIP. SEE DETAIL BELOW.

*NOTE: CURB TO BE PAID UNDER ITEM 702000 TRIANGULAR CHANNILIZING ISLANDS

D.I.

D.I.

PAVEMENTBARRIER/

CONC.

RM

C

PAVEMENTCONC.

1"

2"

8"

PAVEMENT

MODIFIED PCC CURB,TYPE 2 DETAIL

COORDINATE LIST

POINT NO. STATION OFFSET NORTHING EASTING

21.6' R

ON RW PLANS FOR CONTRACT 83-10-104RIGHT-OF-WAY AS SHOWN IS BASED FOR INFORMATIONAL PURPOSES ONLY.EXISTING RIGHT-OF-WAY IS SHOWN

*GENERAL NOTES:

55.40'

55.20'

55.54' 55.41'

55.23'

EXISTING

MATCH

45+94.07 -1.47 589092.8031 591995.073210000

45+94.24 -19.45 589102.0665 591979.653010001

46+00.00 -2.67 589098.5213 591997.039710002

46+00.00 -19.31 589106.9588 591982.701610003

46+08.21 -19.10 589113.9293 591987.045410004

NOTE: NEGATIVE DENOTES LEFT OF BASELINE

46+10.68 -11.89 589111.1686 591993.790910005

46+09.25 -4.84 589108.8320 592000.585510006

PROPOSED PCC ISLAND GRADES AND GEOMETRICS

2'

AND GEOMETRICSISLAND GRADESSEE INSERT FOR

SAWCUT

*NOTE 1: PROPOSED INLET TOPS WILL MATCH EXISTING FLOW LINE

SEE CONSTRUCTION DETAIL SHEETS.

DRAINAGE INLET GRATES. TWO GRATES PER INLET BASIN.

*NOTE 2: PWBD GRATES TO BE PAID UNDER ITEM 602100 REPLACE

40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00

POE 4

9+00.0

0

15"R

CP

18'

95'

18"R

CP

74' 18"R

CP

HOT MIX

HOTMIX

P.C.C. PARKWAY CURB TYPE 2

PCC SIDEWALK

HOTMIX

6' CONCRETE

P.C.C. PARKWAY CURB TYPE 2

4" SIDEWALK

P.C.C. PARKWAY CURB TYPE 2

6' CONCRETEP.C.C. BARRIERP.C.C. BARRIER6' CONCRETE

P.C.C. PARKWAY CURB TYPE 2

P.C.C. PARKWAY CURB TYPE 24" SIDEWALK

HOT MIX

HOTMIX

HOTMIX

J.W.

J.W.

D.I.D.I.

D.I.D.I.

D.I.

D.I.

D.I.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\c

p05.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

EXISTIN

G R/W

& DA

EXIS

TIN

G R/W

& D

A 721'+/-

EXIS

TIN

G R/W & D

A 5

88'+/-

EXI S

TIN

G R/W

& D

A 441'+/-

EXIS

TIN

G R/W & D

A 6

30'+/-

EXIS

TIN

G R/W

& D

A 5

05'+/-

EXIS

TIN

G R/W & D

A 379'+/-

UNOFFICIAL WEBSITE

COPY

Page 13: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

NOT TO SCALE

TOP OF ROADWAY

TRANSITION BARRIER ELEVATION

2'-0"

6" 7"

3"

2'-

8"

2" 2"7"

10"

1'-

7"

2'-0"

3"

3" TO 9"

VARIES

3" TO 9"

VARIES 3"3"

TO

P

OF

RO

AD

WA

Y

1'-

9?

"

SECTION: B-B

4 SPACES @ 1'-6¾" EACH

BLOCK 2 BLOCK 3 BLOCK 4 BENT RAIL

DIRECTION OF TRAVEL

OVERLAP BEAMS IN DIRECTION OF TRAVEL

2 SECTIONS OF W-BEAM, ONE NESTED INSIDE THE OTHER

BLOCK 1

BENT RAIL

4

POST

3

POST

2

POST

1

POST 6

POST

5

POST

7

POST8

POST

9

POST

PLAN

ELEVATION

1.

NOTES:

LIMITS OF PAYMENT FOR MODIFIED GUARDRAIL TO BARRIER CONNECTION APPROACH, TYPE 2-31 TYPE 3-31 GUARDRAIL

TYPE 3-31 GUARDRAIL

"

(TYP.)

SAW-CUT

(TYP.)

SAW-CUT

(TYP.)

SAW-CUT

#5 BARS

9-#5 BARS

#5 BARS

#5 BARS

9-#5 BARS

#5 BARS

9-#5 BARS

#5 BARS

2'-

0"

2'-

0"

2'-

0"

TRAFFIC

EXITING

3"

3"

BARRIER CONNECTION, APPROACH, TYPE 2-31.

STANDARD CONSTRUCTION DETAIL, GUARDRAIL TO

THE DELAWARE DEPARTMENT OF TRANSPORTATION'S

ALL MATERIALS SHALL BE IN ACCORDANCE WITH

2.

BARRIER CONNECTION, APPROACH, TYPE 2-31.

STANDARD CONSTRUCTION DETAIL, GUARDRAIL TO

THE DELAWARE DEPARTMENT OF TRANSPORTATION'S

SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH

CONNECTION, APPROACH TYPE 2-31

MODIFIED GUARDRAIL TO BARRIER

2'-

8"

3'-1 ½"

6 SPACES @ 3'-1 ½"

13

CONSTRUCTION DETAILS

6" TO 24"

VARIES

3'-0"

3'-0"

25 SPACES @ 12"

30'-0" TRANSITION MEDIAN BARRIER

27'-0"

2'-0"

2'-

8"

2'-

8"

2'-6"

2'-0"

SECTION: C-C

APPROACHING

TRAFFIC

TO

P

OF

RO

AD

WA

Y

"

(TYP.)

SAW-CUT

9-#5 BARS

#5 BARS2'-

0"

TRAFFIC

EXITING

2'-

8"

24" TO 30"

VARIES

VARIES

6" TO 24"

SECTION: D-D

BARRIER CONNECTION

SECTION: A-A EXISTING

D

D

D

D

15'-0" TRANSITION

3"

2'-

0"

2'-

8"

9?"2?"

4?"

7"

2'

1-10"

#5 BARS

9-#5 BARS

#5 BARS

BARRIER CONNECTION

SECTION: A-A PROPOSED

2'-

0"

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\D

T01.d

gn

09:3

6

28-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

J. HASTINGS

7?" TO 9"

VARIES

VARIES 6" TO 9?"

7?" TO 9"

VARIES

PD/BR

2" COV. (TYP.)9-#5 BARS

30" 1'- 0"

2" COV, (TYP.)2" COV, (TYP.)

2" COV, (TYP.)

2" COV, (TYP.)2" COV, (TYP.)

12"

5 SPACES

@ 6"

4 SPACES

@ 6"

27'-6"

#5 BARS

3" TO 9"

VARIES 3" TO 9"

VARIES

#5 BARS

TRAFFIC

APPROACHING

MATERIALS.

ON BEST AVAILABLE INFORMATION. FIELD VERIFY DIMENSIONS PRIOR TO ORDERING

TRANSITION TO MATCH EXISTING BARRIER. DIMENSIONS SHOWN ON PLANS BASED 3.

REINFORCEMENT IS INCIDENTAL TO ITEM 7230022.

PORTLAND CEMENT CONCRETE SAFETY BARRIER, PERMANENT, DOUBLE FACE, 32".

CONTRACTOR SHALL PAY FOR TRANSITION MEDIAN BARRIER UNDER ITEM 7230021.

NOTES:

UNOFFICIAL WEBSITE

COPY

Page 14: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

1'-0"

1'-2"

2'-0"

1'-2"

2'-0"

1'-0"

3 - #5 BARS @ EQ. SPA.

3 - #5 BARS @ EQ. SPA.

3 - #5 BARS @ EQ. SPA.

3 - #5 BARS @ EQ. SPA.

3 - #5 BARS @ EQ. SPA.

10" (TYP.)

2"

BASIN (TYP.)

EXISTING CATCH

BASIN (TYP.)

EXISTING CATCH

1'-0"

4'-5"

1'-0"

TOP & BOTTOM

3 - #5 BARS @ EQ. SPA.

1'-0"

2"R

8"

2'-0"

2'-0"

#5 BAR

(TYP.)

#4 BAR

(TYP.)

#4 BAR

2"

C GUARDRAIL/ SAFETY BARRIER

EM

BE

D

" M

IN.

21

6

PROPOSED TYPE 3-31 GUARDRAIL

PROPOSED C.I.P. SAFETY BARRIER

PROPOSED C.I.P. SAFETY BARRIER

PROPOSED TYPE 3-31 GUARDRAIL PROPOSED TYPE 3-31 GUARDRAIL

CONCRETE SAFETY BARRIER (F-SHAPE)

DELDOT STANDARD B-14 32"

MODIFIED BAR 4B1 FROM

D

DIMENSION

DETAILING

A OR G

HOOK

4d OR

4'-5" (PWBD1)

4'-5" (

PW

BD

1)

2'-9" (PWBD1)

SPA.

7"

#4 BAR @ 7" SPA.

STIRRUP - #4 BARS @ 7" SPA.

7" SPA.

7" SPA.

STIRRUP - #4 BARS @ 7" SPA.STIRRUP - #4 BARS @ 7" SPA.

SPA. (TYP.)

#4 BAR @ 7"

SPA. (TYP.)

#4 BAR @ 7"

2'-9" (

PW

BD

1)

#5 BAR

NOT TO SCALE

14

CONSTRUCTION DETAILS

SHEET D-2-4.

IN THE PRE-1997 STANDARD CONSTRUCTION DETAILS, UNDER PARKWAY CATCH BASINS STANDARD

THE PWBD GRATE DETAILS CAN BE FOUND ONLINE IN THE DELDOT DESIGN RESOURCE CENTER (DRC)1.

INLET GRATES NOTE:

DE

PT

HC-C (PWBD1, PWBD2; UNDER GUARDRAIL)

" = 1'-0"211

B-B (PWBD1, PWBD2; UNDER GUARDRAIL)" = 1'-0"2

11

B-B (PWBD1; UNDER BARRIER)" = 1'-0"2

11

L

PLAN" = 1'-0"4

3

A-A (PWBD1; UNDER BARRIER)" = 1'-0"4

3

0.500

0.625

A-A (PWBD1, PWBD2; UNDER GUARDRAIL)" = 1'-0"4

3

180° HOOKS

BAR SIZE D A OR G J

4

5

3"

"433

5"

6"

8"

10"

J

(INCHES)

DIAMETER, d

d

(F SHAPE) IN ACCORDANCE WITH DELDOT STANDARD B-14.

INLET TOP UNIT. THE CONTRACTOR SHALL INSTALL ALL SECTIONS OF 32" CONCRETE SAFETY BARRIER

THE MODIFIED 4B1 BAR IS STRICTLY INTENDED TO CONNECT THE BARRIER TO THE MODIFIED DRAINAGE5.

" CLEAR COVER.21REINFORCING STEEL SHALL HAVE A 24.

REFER TO SPECIAL PROVISION #602508 AND CONTRACT NO. 83-101-04 FOR ADDITIONAL INFORMATION.3.

PRIOR TO FABRICATION OF THE PRECAST MODIFIED DRAINAGE INLET TOP UNIT.

THE CONTRACTOR SHALL FIELD VERIFY THE DIMENSIONS OF THE EXISTING CATCH BASINS 2.

THE MODIFIED DRAINAGE INLET TOP UNIT.

THE PLANS WERE PREPARED WITH THE ASSUMPTION THAT THE CONTRACTOR WILL PRECAST 1.

NOTE:

"212

" (PWBD2)435'-2

" (P

WB

D2)

43

5'-2

" (PWBD2)433'-6

" (P

WB

D2)

43

3'-6

A

A

B B

C C

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\D

T03.d

gn

09:5

8

28-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

P. HUHN

J. HASTINGS

BR/PD

UNOFFICIAL WEBSITE

COPY

Page 15: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

1800 2700

SCALE

9000

FEET

N

WARNING SIGN LEGEND

W20-01F G20-02

CONSTRUCTION PHASING & M.O.T

CONSTRUCTION WARNING SIGN LOCATION

1 2

1

1

1

1

1

1

22

2

2

15CONTROL PLAN

M.O.T., AND EROSION

CONSTRUCTION PHASING,

AHEAD

WORK

ROAD

ROAD WORK

END

CLOSED

SHOULDER

LEFT

AHEAD

CLOSED

LEFT LANE

W20-5LFW21-5bLF

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\c

s01.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

RED LION

STATE FOREST

BUENA VISTA

CONFERENCE CENTER

Doll

Run

RED

LION

Pig

eon

Run

KATHLEEN H.

5

35

378

406

406

405

82

381

381

382

REYBO

LD

DR

GARWOOD DR

GLO

RIA

CT

MOORES DR

REGAL BLVD

CASTLE RU

N

KIN

GS C

RO

FT D

R

KINGS CROFT DR

KINGSTON DR

N

RE

GA

L C

T

RA

WLIN

GS

DR

GA

YN

OR C

T

VELLA

N

DR

ABBEY CT

DO

RIS

CT

CASSA

NDRA

RD

CLAIR

MO

NT

DR

RR A

VE5A

CALB

URN

CT

DR

FIELDSTONE

SK

YAS

HE

N

CT

MO

AT

67

381

381A

381

SONGSMITH DR

Mc

MULL

EN

CIR

KNOLL

DR

CT

HEATHER

LOFT

PA

XTO

N

LA

82

82

E. VIOLETTE DRBETEL

DR

SH

AM

RO

CK

AVE

ERMINE DR

MARTE

NST

IBEX DR

FA

NTAIL C

THUDSON

CT

CH

ARLES D

R

5C

LO

CK

VIE

W

LOC

KVIE

W

DR

DR

DRW

ELLS

PRIN

G

LINN

CT

7

COUNTRYWOODS

DR

FIE

LD

STO

NE

C

T

C

T

CO

TTA

GE

CY

NTHIA

PERPEN

MEA

DOW

KNOLL C

T

PIGEO

N DR RUN

PIGEO

N

RU

N

DR

D

R

WALK

ER

BU

CKS

ON

C

T

5B

406A

5

13

CONRAIL

DR

HAC

KBER

RY

CT

JANSSEND

R

VIE

W

PIG

EO

N

DR

GREEN

FIELD

D

R

D

R

RO

MEO

D

R

GILD

ER CT

LESTER

DR

CO

RNST

ALK D

R

STAG

HO

RN D

RC

OU

NTR

Y PA

TH

DR

MASO

N

LA

CO

RK

WO

OD

CAP

OLA

PE

AC

HLE

AF

TR

AIL PA

TH

HID

EAW

AY

LA

SWEETBAY

AVE

PLA

NTATIO

N

GRA

DY

LA

CTTE

RRY

GOLD

EN

CT

MARLIN

YELLO

WFIN

TRAIL

CO

VE

CT

WIN

CHESTE

R

EM

ERALD

RID

GE D

R

EM

ER

ALD

RID

GE D

RBRIGHTO

N

HIL

LA

RY CIR

HIL

LA

RY

CT

9

5

405

NORFOLK S

OUTHER

N

VIN

WA

Y

DR

PRINTZ

TRIBBIT

AVE

DR

SHERM

AN

ST

PAYNTER

PL

PETE

RSO

N

CASTLE

WAY

LABOG

GS

LA

CARV

EL

DR

5

5

DR

ANDREW LA

BRIS

TO

L

SUREY

SH

ETLA

ND

LA

JULI

AN

HW

Y

ARBERRY

SUG

LA DR

QUIN

TILIO

CORBITT

CIR

TOLHAM RD

GEISSLER

PARK

TSI

RH

C

FO

EV

OL

YA

W

HC

RU

HC

S. D

UPO

NT

TYBOUTS CORNER

BEAR

CORBIT

UNOFFICIAL WEBSITE

COPY

Page 16: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

PHASE

CSF

XXX

CSF

CONSTRUCTION PHASING & M.O.T

BARRICADE, TYPE 3

CONCRETE SAFETY BARRIER - PORTABLE

CONSTRUCTION SAFETY FENCE / LENGTH

CONSTRUCTION SAFETY FENCE

CONSTRUCTION WARNING SIGN LOCATION

CONSTRUCTION WARNING SIGN

CRASH CUSHION ARRAY

DRUM - TRAFFIC CONTROL

FLAGGER LOCATION

PHASING TRAFFIC FLOW ARROW

TEMPORARY CONSTRUCTION

TEMPORARY PAVEMENT MARKING ARROW

TRUCK WITH MOUNTED ATTENUATOR

WORK AREA - ACTIVE PHASE

ROAD WORK

END

EROSION AND SEDIMENT CONTROL NOTES:

CFL

SSF

SSF

RSF

EROSION & SEDIMENT CONTROL

COMPOST FILTER LOG

COMPOST FILTER LOG / LENGTH

DEWATERING BAG

DEWATERING BASIN

EARTH DIKE

INLET SEDIMENT CONTROL

PERIMETER DIKE/SWALE

PORTABLE SEDIMENT TANK

SANDBAG DIKE

SANDBAG DIVERSION

STONE CHECK DAM

STABILIZED CONSTRUCTION ENTRANCE

SILT FENCE / LENGTH

SILT FENCE

REINFORCED SILT FENCE / LENGTH

REINFORCED SILT FENCE

SUPER SILT FENCE / LENGTH

SUPER SILT FENCE

SUMP PIT

SEDIMENT TRAP / NUMBER

SEDIMENT TRAP

SEDIMENT TRAP WITH INLET AS OUTLET

SEDIMENT TRAP PIPE OUTLET

STILLING WELL

TEMPORARY SWALE

TEMPORARY SLOPE DRAIN

TURBIDITY CURTAIN / LENGTH

TURBIDITY CURTAIN

CFL

SP

ST

ST

ST

DWB

ED

RSF

SCE

SF

T

PST

SB

SBD

SF

TSD

SW

ST

16CONTROL PLAN

M.O.T., AND EROSION

CONSTRUCTION PHASING,

THE DISTURBED AREA FOR THIS PROJECT IS 0.00 ACRES.1.

THE ENGINEER RESERVES THE RIGHT TO MODIFY THE TRAFFIC CONTROL AS FIELD CONDITIONS DICTATE.1.

SHOWS THE FURTHEST LOCATION ANY ONE SIGN MIGHT BE LOCATED.

WARNING SIGN PLACEMENT SHALL BE DICTATED BY EACH PHASE. WARNING SIGN PLACEMENT SHOWN IN THE GENERAL LAYOUT3.

MAINTENANCE OF TRAFFIC NOTES:

( )

( X )

THE CONTRACTOR SHALL NOT BE REQUIRED TO HAVE AN ATSSA SUPERVISOR ASSIGNED TO THIS PROJECT.

STAFF MAY BE THE ATSSA SUPERVISOR. PAYMENT FOR ATSSA SUPERVISOR IS INCIDENTAL TO ITEM 801000.

SUPERINTENDENT FOR THIS PROJECT OR ANOTHER ATSSA CERTIFIED MEMBER OF THE CONTRACTOR'S PROJECT

THE CONTRACTOR SHALL HAVE AN ATSSA SUPERVISOR ASSIGNED TO THIS PROJECT. THE CONTRACTOR'S GENERAL

THIS PROJECT.

AMERICAN TRAFFIC SAFETY SERVICES ASSOCIATION (ATSSA) CERTIFIED TRAFFIC CONTROL SUPERVISOR REQUIREMENT FOR4.

MANUFACTURER'S RECOMMENDATIONS. THE TMA SHALL CONFORM TO THE REQUIREMENTS OF SECTION 6F OF THE DELAWARE MUTCD.

TRAFFIC BARRIER PLACEMENT OR AS DIRECTED BY THE ENGINEER. THE ROLL AHEAD DISTANCE SHALL BE AS PER THE

OPERATIONS: TEMPORARY/PERMANENT PAVEMENT MARKINGS, ROADSIDE SPRAYING, PATCHING, MILLING, SWEEPING, TEMPORARY

A TYPE II TRUCK MOUNTED ATTENUATOR (TMA) SHALL BE REQUIRED ON THIS PROJECT DURING THE FOLLOWING PAVEMENT3.

APPROPRIATE MODIFICATIONS.

ENGINEER WILL REVIEW THE CURRENT SEDIMENT AND STORMWATER MANAGEMENT PLAN AND ISSUE AN EXTENSION WITH ANY

MONTHS PRIOR TO THE EXPIRATION OF THE APPROVED SEDIMENT AND STORMWATER MANAGEMENT PLANS. THE STORMWATER

THE PROJECT IS ANTICIPATED TO EXTEND BEYOND THE FIVE YEARS, THE CONTRACTOR WILL INFORM THE ENGINEER THREE

BEGINNING ON THE DATE THE STORMWATER ENGINEER SIGNED THE CONSTRUCTION TITLE SHEET. IF THE FINAL ACCEPTANCE OF

DELDOT'S DELEGATED AUTHORITY. THE SEDIMENT AND STORMWATER MANAGEMENT PLANS ARE VALID FOR A FIVE YEAR PERIOD,

THE SEDIMENT AND STORMWATER MANAGEMENT PLANS HAVE BEEN APPROVED BY DELDOT'S STORMWATER ENGINEER UNDER2.

3.

FOR THIS PROJECT

EROSION POTENTIAL

( X ) INSIGNIFICANT

( ) MINOR

( ) MAJOR

NONE

CONTRACTOR EROSION AND SEDIMENT CONTROL SUPERVISOR REQUIREMENT

STORMWATER REGULATIONS.

CONTRACTOR TRAINING PROGRAM, AS DEFINED IN SECTION 6.2 OF THE DELAWARE SEDIMENT AND

SEDIMENT AND STORMWATER REGULATIONS.

CERTIFIED CONSTRUCTION REVIEWER (CCR), AS DEFINED IN SECTION 6.3 OF THE DELAWARE

GENERAL NOTES:

CLOSURE MATRIX.

ALL LANE CLOSURES MAY ONLY OCCUR DURING ACCEPTABLE LANE CLOSURE HOURS IN ACCORDANCE WITH THE LANE2.

CLOSURE.

ADJUSTMENT OF SIGNAL PHASING FOR THE INTERSECTION OF US 13 AND RED LION ROAD; DURING THE LEFT TURN LANE

CONTRACTOR SHALL CONTACT THE TRAFFIC SIGNALS SECTION PRIOR TO THE BEGINNING OF PHASE 2, TO REQUEST THE

CONTRACTOR SHALL MAINTAIN THE LEFT TURN LANE FROM NORTHBOUND US 13 TO RED LION ROAD DURING PHASE 1. 5.

LOCATION AND MESSAGE SHALL BE COORDINATED AND APPROVED BY THE DISTRICT TRAFFIC SAFETY OFFICER.

CONTRACTOR SHALL INSTALL VMS BOARDS ON US 13 AND SR 1 FOR PUBLIC NOTIFICATION 10 DAYS PRIOR TO CONSTRUCTION.4.

DELAWARE MUTCD.

(SOUTHBOUND US 13 LANE CLOSURE), TA-34 (NORTHBOUND MEDIAN CLOSURE), AND TA-35D (LANE STRIPING) OF THE

MAINTENANCE OF TRAFFIC DURING LANE CLOSURES AND LANE SHIFTS SHALL CONFORM TO TYPICAL APPLICATION 33 1.

DEVICES.

CONTRACTOR MUST PROTECT EXPOSED GUARDRAIL AND BARRIER ENDS AT ALL TIMES WITH APPROPRIATE TRAFFIC CONTROL 6.

AT US 13 N/B AT RED LION ROAD AS PER JIM BUNTING.

CONTRACTOR SHALL COORDINATE WITH DELDOT TMC FOR SIGNAL TIMING ADJUSTMENTS WHEN CLOSING THE LEFT TURN LANE 7.

NOT TO SCALE

THE ANTICIPATED DURATION FOR THE LEFT TURN LANE CLOSURE AND DETOUR IS 25 DAYS.8.

VERTICAL DIFFERENCES SHALL BE CORRECTED IN THE ACCORDANCE WITH TABLE 6G-1 OF THE DELAWARE MUTCD.

MATERIAL WORLD BE PAID FOR UNDER THE RESPECTOVE CONTRACT MATERIAL ITEM.

DROP-OFFS, UNLESS THE MATERIAL IS EVENTUALLY UTILIZED AS PART OF A PERMANENT ROADWAY AT WHICH TIME THE

PAYMENT SHALL BE MADE FOR MILLINGS OR GABC TEMPORARY ROADWAY MATERIAL (TRM) USED TO PROTECT EDGE

SPECIFIED IN TABLE 6G-1 AND SHALL BE COMPACTED. EXCESS BASE COURSE MATERIAL SHALL BE PUSHED AHEAD AND

-MAINTENANCE OF TRAFFIC. THE BASE COURSE MATERIAL SHALL BE PLACED AT NO GREATER THAN THE SLOPE

AND PAVEMENT BOX EDGE OF TRAVEL WAY, DRIVEWAY OE ENTRANCE ACCESS SHALL BE INCIDENTAL TO ITEM NO. 801000

GRADING AND MAINTAINING BASE COURSE THAT IS BEING USED FOR ROADWAY WEDGE/FILLET BETWEEN TRAVEL LANES

EDGE OF ROADWAY DROP-OFF b.

EDGE DROP-OFFS ADJACENT TO LIVE ROADWAY (LANES AND SHOULDERS) AND THE PROPOSED ROAD CONSTRUCTION a.

MATERIAL FROM UNRAVELLING:PREVENT THE

TO USE BITUMINOUS CONCRETE OF COLD PATCH. aLL MILLINGS AND GABE WILL BE ROLLED AND COMPACTED TO HELP

EDGE DROP OFF NEEDS TO BE MAINTAINED UNLESS OTHERWISE NOTED IN THE PLANS OR DIRECTED BY THE ENGINEER

MILLINGS OR GABE SHALL BE USED AT THE FOLLOWING LOCATION WHERE ACCESS TO A BUSINESS, RESIDENCE, OR B.

UNDER THE BITUMINOUS CONCRETE MILLING ITEM.

SHALL BE PAID AS NOTED IN THE CONTRACT DOCUMENT. TAPER MILL BITUMINOUS CONCRETE SHALL BE PAID

OR APPROVED BY THE ENGINEER. PAYMENT FOR COLD PATCH, BITUMINOUS CONCRETE OR BITUMINOUS CONCRETE WEDGE

PATCH, BITUMINOUS CONCRETE, BITUMINOUS CONCRETE WEDGE, OR TAPER MILL, AS NOTED IN THE CONTRACT DOCUMENTS

OPERATIONS) IS PROHIBITED UNLESS IT IS OTHERWISE DESIGNATED TO BE USED IN THE CONTRACTPLANS. USE COLD

POTHOLE REPAIR, TAPERED EDGE FOR UTILITIES, BUTT JOINTS, AND LONGITUDINAL DROP-OFFS (MILLING AND PAVING

HIGH VOLUME ENTRANCES AND ACCESS RAMP FOR THE PURPOSE OF PROVIDING A TEMPORARY ROADWAY SURFACE,

THE USE OF MILLINGS AND GRADED AGGREGATE BASE COURSE (GABC) IN THE TRAVEL WAY, TEMPORARY TRAVEL WAY, A.2.

CONTRACTOR SHALL ENTER AND EXIT THE WORK AREA IN THE DIRECTION OF TRAFFIC FLOW.5.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\c

s02.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 17: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

N

10' SHOULDER

US 13 - NB

10' SHOULDER

US 13 - SB

PH

ASE 0

1

PH

ASE 0

1

PH

AS

E 0

1PH

ASE 0

1

PH

ASE 0

1

1'1'

BARRIER

EXISTING

BARRIER

TEMPORARY

33' WORK ZONE 36' TRAVEL LANES24' TRAVEL LANES

BARRIER SCHEDULE

NO. ITEM DESCRIPTION / TYPE LENGTH

2

TEMPORARY IMPACT ATTENUATOR - NON GATING, REDIRECTIVE, TEST LEVEL 31

TEMPORARY P.C.C. SAFETY BARRIER, UNPINNED

23.00'

B

2

B

1

CONTROL DEVICES WHEN WORK FOR THIS PHASE IN COMPLETED.

REMOVE ALL TEMPORARY TRAFFIC CONTROL AND EROSION AND SEDIMENT 12.

SEQUENCE OF CONSTRUCTION NOTES

PHASE 1

INSTALL W-BEAM GUARDRAIL FROM SOUTHERN END TO NORTHERN END.7.

WORKING FROM SOUTH TO NORTH.

REMOVE EXISTING CONCRETE MEDIAN BARRIER TO TOP OF CONCRETE SLAB 2.

MA

TC

H LIN

E S

TA. 13+00

60 90

SCALE

300

FEET

DEFLECTION

5' BARRIER

17CONTROL PLAN - PHASE 1

M.O.T., AND EROSION

CONSTRUCTION PHASING,

325.00'

ON TYPICAL SECTIONS (6' WIDTH)

INSTALL 2" TYPE C SUPERPAVE OVERLAY IN SHOULDER TO LIMITS SHOWN 6.

GUARDRAIL FROM SOUTH TO NORTH.

SIGN STRUCTURE, AS SHOWN ON THE PLANS. CONTINUE TO INSTALL W-BEAM

INSTALL TRANSITION BARRIER TO GUARDRAIL CONNECTION, NORTH OF THE 10.

BACKFILL AND CONSTRUCT GABC PER TYPICAL SECTION.4.

CD-01 SHEET, AS SHOWN ON THE PLANS

INSTALL GUARDRAIL TO BARRIER CONNECTOR, TO TRANSITION BARRIER, SEE 8.

BARRIER SECTION, AS SHOWN ON THE PLANS.

INSTALL BARRIER SECTION AND CONNECT TO EXISTING SIGN STRUCTURE 9.

45' DRUM SPACING

100' TAPER

260' TAPER

CLOSED

SHOULDER

LEFT

CLOSURE.

LANE CLOSURE ON US 13 SB AND TA-34 FOR THE US 13 NB MEDIAN/SHOULDER

INSTALL ALL TEMPORARY TRAFFIC CONTROL DEVICES. FOLLOW TA-33 FOR THE 1.

SAME DAY.

INSTALL PROPOSED INLET TOPS AND INSTALL/REPLACE GRATES ON THE 5.

IS COMPLETED

REMOVE ALL TEMPORARY TRAFFIC CONTROL WHEN WORK FOR THIS PHASE11.

PAVEMENT ON EACH SIDE.

EXCAVATE 2' WIDE CONCRETE BARRIER FOUNDATION AND 2' WIDE CONCRETE 3.

CUSHION ARRAY

70 MPH CRASH

ROAD NAME SPEED LIMIT (S) TYPE OF TAPER

SHOULDER (L/3)

TAPER WIDTH (W)

12'

TAPER CALC

L = WS = 780'

TAPER

260'65 MPH

TAPER LENGTH SCHEDULE

US 13 N/B

US 13 S/B 65 MPH 12' 100'DOWNSTREAM NONE

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\cs03.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

4+00 5+00

6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00

65'

18"R

CP

65' 18"R

CP

D.I.

D.I. D.I.

D.I.

T.P. T.P.

T.P. T.P.

T.P.

UNOFFICIAL WEBSITE

COPY

Page 18: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

N

PHASE 01

PHASE 01

PHASE 01

PHASE 01

PHASE 01

PHASE 01

PHASE 01

PHASE 01

PHASE 01

BARRIER SCHEDULE

NO. ITEM DESCRIPTION / TYPE LENGTH

3

10' SHOULDER

PH

AS

E 0

1

PH

AS

E 0

1

PH

AS

E 0

1

US 13 - NB

36' TRAVEL LANES1'

BARRIER

TEMPORARY

10' SHOULDER

US 13 - SB

PH

ASE 0

1

PH

ASE 0

1

1'

BARRIER

EXISTING

33' WORK ZONE24' TRAVEL LANES

TEMPORARY P.C.C. SAFETY BARRIER, UNPINNED

MATC

H LIN

E S

TA. 13+00

MATC

H LIN

E S

TA. 22+00

60 90

SCALE

300

FEET

B

3

DEFLECTION

5' BARRIER

18CONTROL PLAN - PHASE 1

M.O.T., AND EROSION

CONSTRUCTION PHASING,

900.00'

45' DRUM SPACING

SEQUENCE OF CONSTRUCTION NOTES

PHASE 1

INSTALL W-BEAM GUARDRAIL FROM SOUTHERN END TO NORTHERN END.7.

WORKING FROM SOUTH TO NORTH.

REMOVE EXISTING CONCRETE MEDIAN BARRIER TO TOP OF CONCRETE SLAB 2.

ON TYPICAL SECTIONS (6' WIDTH)

INSTALL 2" TYPE C SUPERPAVE OVERLAY IN SHOULDER TO LIMITS SHOWN 6.

GUARDRAIL FROM SOUTH TO NORTH.

SIGN STRUCTURE, AS SHOWN ON THE PLANS. CONTINUE TO INSTALL W-BEAM

INSTALL TRANSITION BARRIER TO GUARDRAIL CONNECTION, NORTH OF THE 10.

BACKFILL AND CONSTRUCT GABC PER TYPICAL SECTION.4.

CD-01 SHEET, AS SHOWN ON THE PLANS

INSTALL GUARDRAIL TO BARRIER CONNECTOR, TO TRANSITION BARRIER, SEE 8.

BARRIER SECTION, AS SHOWN ON THE PLANS.

INSTALL BARRIER SECTION AND CONNECT TO EXISTING SIGN STRUCTURE 9.

.

PAVEMENT ON EACH SIDE.

EXCAVATE 2' WIDE CONCRETE BARRIER FOUNDATION AND 2' WIDE CONCRETE 3.

CLOSURE.

LANE CLOSURE ON US 13 SB AND TA-34 FOR THE US 13 NB MEDIAN/SHOULDER

INSTALL ALL TEMPORARY TRAFFIC CONTROL DEVICES. FOLLOW TA-33 FOR THE 1.

SAME DAY.

INSTALL PROPOSED INLET TOPS AND INSTALL/REPLACE GRATES ON THE 5.

IS COMPLETED

REMOVE ALL TEMPORARY TRAFFIC CONTROL WHEN WORK FOR THIS PHASE11.

13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00

77'

18"R

CP

100'

18"R

CP

T.P. T.P.

T.P.

D.I.

D.I.

T.P. T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

D.I.

D.I.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\cs04.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 19: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

N

PHASE 01

PHASE 01

PHASE 01

PHASE 01

PHASE 01

CONTROL DEVICES WHEN WORK FOR THIS PHASE IN COMPLETED.

REMOVE ALL TEMPORARY TRAFFIC CONTROL AND EROSION AND SEDIMENT 12.

PH

AS

E 0

1

PH

AS

E 0

1

24' TRAVEL LANES1'

BARRIER

TEMPORARY

10' SHOULDER

US 13 - SB

PH

ASE 0

1

PH

ASE 0

1

1'

BARRIER

EXISTING

33' WORK ZONE24' TRAVEL LANES

US 13 - NB

10' SHOULDER

MA

TC

H LIN

E S

TA. 22+00

MA

TC

H LIN

E S

TA. 31+00

12' ON-RAMP

PH

ASE 0

1

DEFLECTION

5' BARRIER

BARRIER SCHEDULE

NO. ITEM DESCRIPTION / TYPE LENGTH

4 TEMPORARY P.C.C. SAFETY BARRIER, UNPINNED

B

4

60 90

SCALE

300

FEET

19CONTROL PLAN - PHASE 1

M.O.T., AND EROSION

CONSTRUCTION PHASING,

900.00'

45' DRUM SPACING

SEQUENCE OF CONSTRUCTION NOTES

PHASE 1

INSTALL W-BEAM GUARDRAIL FROM SOUTHERN END TO NORTHERN END.7.

WORKING FROM SOUTH TO NORTH.

REMOVE EXISTING CONCRETE MEDIAN BARRIER TO TOP OF CONCRETE SLAB 2.

ON TYPICAL SECTIONS (6' WIDTH)

INSTALL 2" TYPE C SUPERPAVE OVERLAY IN SHOULDER TO LIMITS SHOWN 6.

GUARDRAIL FROM SOUTH TO NORTH.

SIGN STRUCTURE, AS SHOWN ON THE PLANS. CONTINUE TO INSTALL W-BEAM

INSTALL TRANSITION BARRIER TO GUARDRAIL CONNECTION, NORTH OF THE 10.

BACKFILL AND CONSTRUCT GABC PER TYPICAL SECTION.4.

CD-01 SHEET, AS SHOWN ON THE PLANS

INSTALL GUARDRAIL TO BARRIER CONNECTOR, TO TRANSITION BARRIER, SEE 8.

BARRIER SECTION, AS SHOWN ON THE PLANS.

INSTALL BARRIER SECTION AND CONNECT TO EXISTING SIGN STRUCTURE 9.

.

PAVEMENT ON EACH SIDE.

EXCAVATE 2' WIDE CONCRETE BARRIER FOUNDATION AND 2' WIDE CONCRETE 3.

CLOSURE.

LANE CLOSURE ON US 13 SB AND TA-34 FOR THE US 13 NB MEDIAN/SHOULDER

INSTALL ALL TEMPORARY TRAFFIC CONTROL DEVICES. FOLLOW TA-33 FOR THE 1.

SAME DAY.

INSTALL PROPOSED INLET TOPS AND INSTALL/REPLACE GRATES ON THE 5.

IS COMPLETED

REMOVE ALL TEMPORARY TRAFFIC CONTROL WHEN WORK FOR THIS PHASE11.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\cs05.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00

278' 18"RCP

D.I.

D.I.

T.P.T.P.

T.P.

T.P.T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

UNOFFICIAL WEBSITE

COPY

Page 20: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

N

PHASE 01

PHASE 01

PHASE 01

60 90

SCALE

300

FEET

MA

TC

H LIN

E S

TA. 31+00

BARRIER SCHEDULE

NO. ITEM DESCRIPTION / TYPE LENGTH

5 TEMPORARY P.C.C. SAFETY BARRIER, UNPINNED

B

5

PH

ASE 0

1

PH

AS

E 0

1

24' TRAVEL LANES1'

BARRIER

TEMPORARY

10' SHOULDER

US 13 - SB

PH

ASE 0

1

1'

BARRIER

EXISTING

33' WORK ZONE12' TRAVEL LANES

US 13 - NB

10' SHOULDER24' ON-RAMP

PH

ASE 0

1

DEFLECTION

5' BARRIER

PH

ASE 0

1

20CONTROL PLAN - PHASE 1

M.O.T., AND EROSION

CONSTRUCTION PHASING,

860.00'

45' DRUM SPACING

SEQUENCE OF CONSTRUCTION NOTES

PHASE 1

INSTALL W-BEAM GUARDRAIL FROM SOUTHERN END TO NORTHERN END.7.

WORKING FROM SOUTH TO NORTH.

REMOVE EXISTING CONCRETE MEDIAN BARRIER TO TOP OF CONCRETE SLAB 2.

ON TYPICAL SECTIONS (6' WIDTH)

INSTALL 2" TYPE C SUPERPAVE OVERLAY IN SHOULDER TO LIMITS SHOWN 6.

GUARDRAIL FROM SOUTH TO NORTH.

SIGN STRUCTURE, AS SHOWN ON THE PLANS. CONTINUE TO INSTALL W-BEAM

INSTALL TRANSITION BARRIER TO GUARDRAIL CONNECTION, NORTH OF THE 10.

BACKFILL AND CONSTRUCT GABC PER TYPICAL SECTION.4.

CD-01 SHEET, AS SHOWN ON THE PLANS

INSTALL GUARDRAIL TO BARRIER CONNECTOR, TO TRANSITION BARRIER, SEE 8.

BARRIER SECTION, AS SHOWN ON THE PLANS.

INSTALL BARRIER SECTION AND CONNECT TO EXISTING SIGN STRUCTURE 9.

.

PAVEMENT ON EACH SIDE.

EXCAVATE 2' WIDE CONCRETE BARRIER FOUNDATION AND 2' WIDE CONCRETE 3.

CLOSURE.

LANE CLOSURE ON US 13 SB AND TA-34 FOR THE US 13 NB MEDIAN/SHOULDER

INSTALL ALL TEMPORARY TRAFFIC CONTROL DEVICES. FOLLOW TA-33 FOR THE 1.

SAME DAY.

INSTALL PROPOSED INLET TOPS AND INSTALL/REPLACE GRATES ON THE 5.

IS COMPLETED

REMOVE ALL TEMPORARY TRAFFIC CONTROL WHEN WORK FOR THIS PHASE11.

31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00

40+00

55'

30"R

CP

18"R

CP

18"RCP18"RCP 18"RCP18"RCP 18"RCP 280' 18"RCP280' 18"RCP

D.I.

D.I.

T.P.T.P.

D.I.D.I.

D.I.D.I.

T.P.

T.P.

T.P.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\cs06.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 21: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

60 90

SCALE

300

FEET

N

PHASE 02

PHASE 02

PHASE 02

LENGTH

BARRIER SCHEDULE

ITEM DESCRIPTION / TYPENO.

B

5

MA

TC

H LIN

E S

TA. 40+00

MA

TC

H LIN

E S

TA. 31+00

VARIES 10-12'

SHOULDER

TRAVEL LANES

12'

US 13 - SB

PH

ASE 0

2

1'

BARRIER

EXISTING

VARIES 22-30'

WORK ZONE

BARRIER

TEMPORARY

DEFLECTION

5' BARRIER

PH

ASE 0

2

TRAVEL LANES

24'

US 13 - NB

10' SHOULDER

B

6

PH

AS

E 0

2

6

TEMPORARY IMPACT ATTENUATOR - NON GATING, REDIRECTIVE, TEST LEVEL 35

TEMPORARY P.C.C. SAFETY BARRIER, UNPINNED

23.00'

PHASE 02

PHASE 02

PHASE 02

PHASE 02

PHASE 02

PHASE 02

VARIES 1-8'

21CONTROL PLAN - PHASE 2

M.O.T., AND EROSION

CONSTRUCTION PHASING,

318.00'

45' DRUM SPACING

100' TAPER

220' TAPER

CLOSED

SHOULDER

LEFT

SEQUENCE OF CONSTRUCTION NOTES

INSTALL PROPOSED BARRIER FOOTER PER TYPICAL SECTION.6.

REMOVE EXISTING CONCRETE MEDIAN BARRIER TO TOP OF CONCRETE SLAB WORKING FROM SOUTH TO NORTH.4.

AND TA-34 FOR THE US 13 NB LEFT TURN LANE CLOSURE.

INSTALL ALL TEMPORARY TRAFFIC CONTROL DEVICES. FOLLOW TA-33 FOR THE LANE CLOSURE ON US 13 SB 3.

EXCAVATE 2' WIDE CONCRETE BARRIER FOUNDATION AND 2' WIDE CONCRETE PAVEMENT ON EACH SIDE.5.

INSTALL PROPOSED INLET TOPS AND INSTALL/REPLACE GRATES ON THE SAME DAY. 7.

THE PLANS.

INSTALL GUARDRAIL TO BARRIER CONNECTOR, TO TRANSITION BARRIER, SEE CD-01 SHEET, AS SHOWN ON 8.

THE PLANS.

INSTALL BARRIER FROM SOUTH TO NORTH. INSTALL BARRIER OVER INLETS, SEE CD-02 SHEET, AS SHOWN ON 9.

IS COMPLETED.

REMOVE ALL TEMPORARY TRAFFIC CONTROL AND SEDIMENT CONTROL DEVICES WHEN WORK FOR THIS PHASE 11.

SIGN ON NEW MEDIAN BARRIER WALL.

AARON HUNT (GUIDE SIGN SUPERVISOR 302-222-4907) WITH REGARD TO RE-INSTALLING SIGNAL AHEAD

TA-35D TO INSTALL PROPOSED STRIPING PER THE SIGNING AND STRIPING PLANS. COORDINATE WITH

AFTER COMPLETION OF PHASE 2, CONTRACTOR WILL COORDINATE WITH THE TRAFFIC SECTION AND FOLLOW 12.

BY THE DISTRICT SAFETY OFFICER.

THE CLOSURE OF THE LEFT TURN LANE. LOCATION OF THE BOARDS SHALL BE COORDINATED AND APPROVED

CONTRACTOR SHALL INSTALL VMS BOARDS ON US 13 AND SR 1 FOR PUBLIC NOTIFICATION 10 DAYS PRIOR TO 2.

INSTALL PERMANENT IMPACT ATTENUATOR, AS SHOWN ON THE PLANS.10.

PHASE 2

ROAD NAME SPEED LIMIT (S) TYPE OF TAPER

SHOULDER (L/3)

TAPER WIDTH (W)

12'

TAPER CALC

L = WS = 660'

TAPER

220'55 MPH

TAPER LENGTH SCHEDULE

US 13 N/B

US 13 S/B 55 MPH 12' 100'DOWNSTREAM NONE

CLOSURE AND DETOUR DURATION IS 25 DAYS.

LEFT TURN LANE ON TO W/B RED LION ROAD PRIOR TO COMPLETION OF THE THIS PHASE. ANTICIPATED

TIMING ADJUSTMENTS. CONTRACTOR WILL CONTACT DELDOT TMC IN ADVANCE OF REOPENING THE N/B US 13

OF CLOSING THE N/B US13 LEFT TURN LANE ON TO W/B RED LION ROAD TO COORDINATE TRAFFIC SIGNAL

CONTRACTOR WILL CONTACT DELDOT TRANSPORTATION MANAGEMENT CENTER (302) 659-4600 IN ADVANCE 1.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\cs08.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00

40+00

55'

30"R

CP

18"R

CP

18"RCP18"RCP 18"RCP18"RCP 18"RCP 280' 18"RCP280' 18"RCP

D.I.

D.I.

T.P.T.P.

D.I.D.I.

D.I.D.I.

T.P.

T.P.

T.P.

UNOFFICIAL WEBSITE

COPY

Page 22: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

N

PHASE 02

PHASE 02

PHASE 02

IMPACT ATTENUATOR

MA

TC

H LIN

E S

TA. 40+00

60 90

SCALE

300

FEET

2'

TURN CURB ISLAND

EXISTING LEFT

60 90

SCALE

300

FEET

VARIES 10-12'

SHOULDER

TRAVEL LANES

12'

US 13 - SB

PH

ASE 0

2

1'

BARRIER

EXISTING

VARIES 22-30'

WORK ZONE

BARRIER

TEMPORARY

DEFLECTION

5' BARRIER

PH

AS

E 0

2

TRAVEL LANES

24'

US 13 - NB

10' SHOULDER

PH

AS

E 0

2

LENGTH

BARRIER SCHEDULE

ITEM DESCRIPTION / TYPENO.

7

TEMPORARY IMPACT ATTENUATOR - NON GATING, REDIRECTIVE, TEST LEVEL 38

TEMPORARY P.C.C. SAFETY BARRIER, UNPINNED

23.00

573.00

B

7

B

8

6'

MA

TC

H LIN

E S

TA. 48+00

22CONTROL PLAN - PHASE 2

M.O.T., AND EROSION

CONSTRUCTION PHASING,

45' DRUM SPACING

SEQUENCE OF CONSTRUCTION NOTES

INSTALL PROPOSED BARRIER FOOTER PER TYPICAL SECTION.6.

REMOVE EXISTING CONCRETE MEDIAN BARRIER TO TOP OF CONCRETE SLAB WORKING FROM SOUTH TO NORTH.4.

AND TA-34 FOR THE US 13 NB LEFT TURN LANE CLOSURE.

INSTALL ALL TEMPORARY TRAFFIC CONTROL DEVICES. FOLLOW TA-33 FOR THE LANE CLOSURE ON US 13 SB 3.

EXCAVATE 2' WIDE CONCRETE BARRIER FOUNDATION AND 2' WIDE CONCRETE PAVEMENT ON EACH SIDE.5.

INSTALL PROPOSED INLET TOPS AND INSTALL/REPLACE GRATES ON THE SAME DAY. 7.

THE PLANS.

INSTALL GUARDRAIL TO BARRIER CONNECTOR, TO TRANSITION BARRIER, SEE CD-01 SHEET, AS SHOWN ON 8.

THE PLANS.

INSTALL BARRIER FROM SOUTH TO NORTH. INSTALL BARRIER OVER INLETS, SEE CD-02 SHEET, AS SHOWN ON 9.

IS COMPLETED.

REMOVE ALL TEMPORARY TRAFFIC CONTROL AND SEDIMENT CONTROL DEVICES WHEN WORK FOR THIS PHASE 11.

SIGN ON NEW MEDIAN BARRIER WALL.

AARON HUNT (GUIDE SIGN SUPERVISOR 302-222-4907) WITH REGARD TO RE-INSTALLING SIGNAL AHEAD

TA-35D TO INSTALL PROPOSED STRIPING PER THE SIGNING AND STRIPING PLANS. COORDINATE WITH

AFTER COMPLETION OF PHASE 2, CONTRACTOR WILL COORDINATE WITH THE TRAFFIC SECTION AND FOLLOW 12.

BY THE DISTRICT SAFETY OFFICER.

THE CLOSURE OF THE LEFT TURN LANE. LOCATION OF THE BOARDS SHALL BE COORDINATED AND APPROVED

CONTRACTOR SHALL INSTALL VMS BOARDS ON US 13 AND SR 1 FOR PUBLIC NOTIFICATION 10 DAYS PRIOR TO 2.

INSTALL PERMANENT IMPACT ATTENUATOR, AS SHOWN ON THE PLANS.10.

PHASE 2

CLOSURE AND DETOUR DURATION IS 25 DAYS.

LEFT TURN LANE ON TO W/B RED LION ROAD PRIOR TO COMPLETION OF THE THIS PHASE. ANTICIPATED

TIMING ADJUSTMENTS. CONTRACTOR WILL CONTACT DELDOT TMC IN ADVANCE OF REOPENING THE N/B US 13

OF CLOSING THE N/B US13 LEFT TURN LANE ON TO W/B RED LION ROAD TO COORDINATE TRAFFIC SIGNAL

CONTRACTOR WILL CONTACT DELDOT TRANSPORTATION MANAGEMENT CENTER (302) 659-4600 IN ADVANCE 1.

40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00

15"R

CP

18'

95'

18"R

CP

74' 18"R

CP

D.I.D.I.

D.I.D.I.

D.I.

D.I.

D.I.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\cs09.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 23: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

N

60 90

SCALE

300

FEET

MAT

CH LIN

E S

TA. 48+00

PHASE 02

23CONTROL PLAN - PHASE 2

M.O.T., AND EROSION

CONSTRUCTION PHASING,

45' DRUM SPACING

660' TAPER

AHEAD

CLOSED

LEFT LANE

ROAD NAME SPEED LIMIT (S) TYPE OF TAPER TAPER WIDTH (W)

12'

TAPER CALC

L = WS = 660'

TAPER

660'55 MPH

TAPER LENGTH SCHEDULE

US 13 S/B SHIFTING

SEQUENCE OF CONSTRUCTION NOTES

INSTALL PROPOSED BARRIER FOOTER PER TYPICAL SECTION.6.

REMOVE EXISTING CONCRETE MEDIAN BARRIER TO TOP OF CONCRETE SLAB WORKING FROM SOUTH TO NORTH.4.

AND TA-34 FOR THE US 13 NB LEFT TURN LANE CLOSURE.

INSTALL ALL TEMPORARY TRAFFIC CONTROL DEVICES. FOLLOW TA-33 FOR THE LANE CLOSURE ON US 13 SB 3.

EXCAVATE 2' WIDE CONCRETE BARRIER FOUNDATION AND 2' WIDE CONCRETE PAVEMENT ON EACH SIDE.5.

INSTALL PROPOSED INLET TOPS AND INSTALL/REPLACE GRATES ON THE SAME DAY. 7.

THE PLANS.

INSTALL GUARDRAIL TO BARRIER CONNECTOR, TO TRANSITION BARRIER, SEE CD-01 SHEET, AS SHOWN ON 8.

THE PLANS.

INSTALL BARRIER FROM SOUTH TO NORTH. INSTALL BARRIER OVER INLETS, SEE CD-02 SHEET, AS SHOWN ON 9.

IS COMPLETED.

REMOVE ALL TEMPORARY TRAFFIC CONTROL AND SEDIMENT CONTROL DEVICES WHEN WORK FOR THIS PHASE 11.

SIGN ON NEW MEDIAN BARRIER WALL.

AARON HUNT (GUIDE SIGN SUPERVISOR 302-222-4907) WITH REGARD TO RE-INSTALLING SIGNAL AHEAD

TA-35D TO INSTALL PROPOSED STRIPING PER THE SIGNING AND STRIPING PLANS. COORDINATE WITH

AFTER COMPLETION OF PHASE 2, CONTRACTOR WILL COORDINATE WITH THE TRAFFIC SECTION AND FOLLOW 12.

BY THE DISTRICT SAFETY OFFICER.

THE CLOSURE OF THE LEFT TURN LANE. LOCATION OF THE BOARDS SHALL BE COORDINATED AND APPROVED

CONTRACTOR SHALL INSTALL VMS BOARDS ON US 13 AND SR 1 FOR PUBLIC NOTIFICATION 10 DAYS PRIOR TO 2.

INSTALL PERMANENT IMPACT ATTENUATOR, AS SHOWN ON THE PLANS.10.

PHASE 2

CLOSURE AND DETOUR DURATION IS 25 DAYS.

LEFT TURN LANE ON TO W/B RED LION ROAD PRIOR TO COMPLETION OF THE THIS PHASE. ANTICIPATED

TIMING ADJUSTMENTS. CONTRACTOR WILL CONTACT DELDOT TMC IN ADVANCE OF REOPENING THE N/B US 13

OF CLOSING THE N/B US13 LEFT TURN LANE ON TO W/B RED LION ROAD TO COORDINATE TRAFFIC SIGNAL

CONTRACTOR WILL CONTACT DELDOT TRANSPORTATION MANAGEMENT CENTER (302) 659-4600 IN ADVANCE 1.

48+00 49+00

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AS

TL\0

67\r

oad\T

201900704\Pla

ns\P

D Sheets\cs10.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

UNOFFICIAL WEBSITE

COPY

Page 24: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

2 4

UNOFFICIAL WEBSITE

COPY

gspadafino
Rectangle
Page 25: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

N

60 90

SCALE

300

FEET

US 13 KOREAN WAR VETERANS MEMORIAL HIGHWAY

MA

TC

H LIN

E S

TA. 13+00

STRIPINGTIE INTO EXISTING

STRIPINGTIE INTO EXISTING

25

AND CONDUIT PLAN

SIGNING, STRIPING

SS-01

4+00 5+00

6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00

65'

18"R

CP

65' 18"R

CP

P.C.C. BARRIER6' CONCRETEP.C.C. BARRIER6' CONCRETE

HOT-MIX

HOT-MIX

HOT-MIX

HOT-MIX

D.I.

D.I. D.I.

D.I.

T.P. T.P.

T.P. T.P.

T.P.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\s

s01.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

EXISTING R/W

EXISTING RW & DA

EXISTING RW & DA

EXISTING RW & DA

EXISTING R/W

STA 8+50 RTPER CONTRACT 83-10-104 RW PLANSAPPROXIMATE LOCATION OF DA

75'+/-

75'+/-

75'+/-

75'+/-

75'+/-

75'+/-

75'+/-

100'+/-

75'+/-

100'+/-

PAVEMENT MARKINGS LEGEND

ITEM QUANTITYSYM

A 1,404 LF5" SOLID (ITEM 817013)

EPOXY RESIN PAINT PAVEMENT STRIPING, YELLOW

A

A

UNOFFICIAL WEBSITE

COPY

Page 26: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

60 90

SCALE

300

FEET

N

MATC

H LIN

E S

TA. 22+00

US 13 DUPONT HIGHWAY

MATC

H LIN

E S

TA. 13+00

26

AND CONDUIT PLAN

SIGNING, STRIPING

SS-02

13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00

GRASS

77' 18"R

CP

100'

18"R

CP

HOT MIX

HOT MIX

GRASS

P.C.C. BARRIER6' CONCRETE

HOT MIX

HOT MIX

T.P. T.P.

T.P.

D.I.

D.I.

T.P. T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

D.I.

D.I.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\s

s02.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

EXISTING RW & DA

EXISTING RW & DA

EXISTING R/W EXISTING R/W

EXISTING RW & DA

75'+/-

157

+/-

75'+/-

165

+/-

75'+/-

275'

+/-

EXISTING R/W & DA

PAVEMENT MARKINGS LEGEND

ITEM QUANTITYSYM

A 1,800 LF5" SOLID (ITEM 817013)

EPOXY RESIN PAINT PAVEMENT STRIPING, YELLOW

A

A

UNOFFICIAL WEBSITE

COPY

Page 27: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

60 90

SCALE

300

FEET

US 13 DUPONT HIGHWAY US 13 DUPONT HIGHWAY

MA

TC

H LIN

E S

TA. 31+00

MA

TC

H LIN

E S

TA. 22+00

N

CONSTRUCTION B US 13L

27

AND CONDUIT PLAN

SIGNING, STRIPING

SS-03

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\s

s03.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00

278' 18"RCPP.C.C. BARRIER

HOT MIX

6' CONCRETE

HOT MIX

HOT MIX

HOT MIX

D.I.

D.I.

T.P.T.P.

T.P.

T.P.T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

T.P.

EXISTING R/W & DA

EXISTING R/W & DA STA 22+73.42 LTPER CONTRACT 83-10-104 RW PLANSAPPROXIMATE LOCATION OF DA

100'+/-

75'+/-

100'+/-

EXISTING R/W & DA

EXIS

TIN

G R/W

& D

A 731'+/-

EXIS

TIN

G R/W & D

A 570' +/ -

EXIS

TIN

G R/W & D

A 3

64'+/-

A

A

PAVEMENT MARKINGS LEGEND

ITEM QUANTITYSYM

A 1,800 LF5" SOLID (ITEM 817013)

EPOXY RESIN PAINT PAVEMENT STRIPING, YELLOW

UNOFFICIAL WEBSITE

COPY

Page 28: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

US 13 DUPONT HIGHWAY

US 13 DUPONT HIGHWAY

60 90

SCALE

300

FEET

N

MA

TC

H LIN

E S

TA. 31+00

MA

TC

H LIN

E S

TA. 40+00

CONSTRUCTION B US 13L

28

AND CONDUIT PLAN

SIGNING, STRIPING

SS-04

31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00

40+00

55'

30"R

CP

18"R

CP

18"RCP18"RCP 18"RCP18"RCP 18"RCP 280' 18"RCP280' 18"RCP

P.C.C. BARRIER

6' CONCRETE

HOTMIX

HOTMIX

6' CONCRETEP.C.C. BARRIER

GRASS

HOT-MIX

HOT-MIX

HOT-MIX

HOT-MIX

HOT-MIX

D.I.

D.I.

T.P.T.P.

D.I.D.I.

D.I.D.I.

T.P.

T.P.

T.P.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\s

s04.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

EXISTING R/W & DA

EXISTING R/W & DA

EXISTING R/W & DA

100'+/-

136'+/-

EXISTING R/W & D

A

197'+/-

EXISTING R/W &

DA

EXIS

TIN

G R/W

& D

A 866'+/-

EXIS

TIN

G R/W

& D

A 876'+/-

EXIS

TI N

G R/W

& D

A 864'+/-

A

A

PAVEMENT MARKINGS LEGEND

ITEM QUANTITYSYM

A 1,801 LF5" SOLID (ITEM 817013)

EPOXY RESIN PAINT PAVEMENT STRIPING, YELLOW

B

B 114 LF5" SOLID (ITEM 817013)

EPOXY RESIN PAINT PAVEMENT STRIPING, WHITE

+87

2

NOTE: CONTRACTOR SHALL COORDINATE WITH AARON HUNT (GUIDE SIGN SUPERVISOR 302-222-4907) WITH REGARD TO RE-INSTALLING A SIGNAL AHEAD SIGN ON THE NEW MEDIAN BARRIER WALL.

<-- Red Lion Rd.

1

UNOFFICIAL WEBSITE

COPY

Page 29: SR 1 TO RED LION ROAD UNOFFICIAL - Delawaregssdocs.deldot.delaware.gov/bids/T201900704 - Plans.pdf · slaughter beach broadkill beach ellendale farmington greenwood bridgeville seaford

CONSTRUCTION B US 13US 13 DUPONT HIGHWAYL

60 90

SCALE

300

FEET

N

US 13 DUPONT HIGHWAY

MA

TC

H LIN

E S

TA. 40+00

STRIPINGTIE INTO EXISTING

29

AND CONDUIT PLAN

SIGNING, STRIPING

SS-05

40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00

15"R

CP

18'

95'

18"R

CP

74' 18"R

CP

HOT MIX

HOTMIX

P.C.C. PARKWAY CURB TYPE 2

PCC SIDEWALK

HOTMIX

6' CONCRETE

P.C.C. PARKWAY CURB TYPE 2

4" SIDEWALK

P.C.C. PARKWAY CURB TYPE 2

6' CONCRETEP.C.C. BARRIERP.C.C. BARRIER6' CONCRETE

P.C.C. PARKWAY CURB TYPE 2

P.C.C. PARKWAY CURB TYPE 24" SIDEWALK

HOT MIX

HOTMIX

HOTMIX

D.I.D.I.

D.I.D.I.

D.I.

D.I.

D.I.

PD

CONTRACT

T201900704

COUNTYDESIGNED BY:

CHECKED BY:

BRIDGE NO.

NEW CASTLE

ADDENDA / REVISIONS SECTION

SHEET NO.

Y:\

NE

WC

AST

L\0

67\road\T

201900704\ Pla

ns\P

D Sheets\s

s05.d

gn

10:5

2

23-A

UG-2

019

SR 1 TO RED LION ROADREPLACEMENT,

US 13 MEDIAN BARRIER N/A

T. LAWLESS

G. SPADAFINO

EXISTIN

G R/W

& DA

EXIS

TIN

G R/W

& D

A 721'+/-

EXIS

TIN

G R/W & D

A 5

88'+/-

EXI S

TIN

G R/W

& D

A 441'+/-

EXIS

TIN

G R/W & D

A 6

30'+/-

EXIS

TIN

G R/W

& D

A 5

05'+/-

EXIS

TIN

G R/W & D

A 379'+/-

J.W.

J.W.

PAVEMENT MARKINGS LEGEND

ITEM QUANTITYSYM

A 1,248 LF5" SOLID (ITEM 817013)

EPOXY RESIN PAINT PAVEMENT STRIPING, YELLOW

B 647 LF5" SOLID (ITEM 817013)

EPOXY RESIN PAINT PAVEMENT STRIPING, WHITE

BC

A

A

C 15 SF16" SOLID (ITEM 817002)

ALKYD-THERMOPLASTIC PAVEMENT STRIPING, WHITE

+47

UNOFFICIAL WEBSITE