SR 520 Montlake Project Noise Monitoring Weekly Report Summary for Monday, December 28, 2020 to Sunday, January 3, 2021 PUBLISHED JANUARY 06, 2021 Monitoring times: Weekdays, 10 p.m. to 7 a.m.; weekends, 10 p.m. to 9 a.m. How to use this report: This dcument summarizes the weekly nighttime nise data fr the SR 520 Mntlake Prject. In it, yu’ll find: Page 1 ‐ Summary f nise levels recrded abve the limits allwed under the Majr Public Prject Cnstructin Nise Variance, fr this week and thrughut the prject. This includes nn ‐prject‐related nise exceedances Page 2 ‐ Map f the prject limits and lcatins f the seven statinary mnitr lcatins Pages 3 – 9 ‐ Night‐by‐night nise recrdings fr each f the prject nise mnitrs, alng with a descriptin f the wrk that night, cmments received frm the public regarding Prject nise, and explanatins fr any nise limit exceedances and actins taken in respnse Page 10 ‐ Lg f public cmments regarding nighttime nise issues and reslutins fr the week WSDOT is sharing this information as per the terms of the Major Public Project Construction Noise Variance (Permit #3030792). MPPCNV start date: Friday, August 16, 2019 MPPCNV days to date: 507 WEEKLY TOTALS Nights worked this week (under the MPPCNV) 0 Project related non-compliance this week 0 Nighttime noise issue comments to the project 0 Non-project-related noise exceedances this week 38 PROJECT TOTALS TO DATE Total Nights Worked (under the MPPCNV) 13 Total Project related non-compliance 48 Total noise issue comments to the project 50 Total non-project related exceedances 1998 Mntlake Prject MPPCNV Weekly Reprt Page 1 f 10

Upload: others

Post on 18-Jan-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SR 520 Montlake Project Weekly Report Summary for Monday ... · 1/15/2021  · Montlake Project MPPCNV Weekly Report Page 2 of 10 . SR 520 Montlake Project Major Public Project Construction

SR 520 Montlake Project

Noise Monitoring Weekly Report Summary for Monday, December 28, 2020 to Sunday, January 3, 2021

PUBLISHED JANUARY 06, 2021

Monitoring times: Weekdays, 10 p.m. to 7 a.m.; weekends, 10 p.m. to 9 a.m.

How to use this report: This d cument summarizes the weekly nighttime n ise data f r the SR 520 M ntlake Pr ject. In it, y u’ll find:

• Page 1 ‐ Summary f n ise levels rec rded ab ve the limits all wed under the Maj r Public Pr ject

C nstructi n N ise Variance, f r this week and thr ugh ut the pr ject. This includes n n ‐pr ject‐related n ise exceedances

• Page 2 ‐ Map f the pr ject limits and l cati ns f the seven stati nary m nit r l cati ns

• Pages 3 – 9 ‐ Night‐by‐night n ise rec rdings f r each f the pr ject n ise m nit rs, al ng with a descripti n f the w rk that

night, c mments received fr m the public regarding Pr ject n ise, and explanati ns f r any n ise limit exceedances and acti ns

taken in resp nse

• Page 10 ‐ L g f public c mments regarding nighttime n ise issues and res luti ns f r the week

WSDOT is sharing this information as per the terms of the Major Public Project Construction Noise Variance (Permit #3030792).

MPPCNV start date: Friday, August 16, 2019

MPPCNV days to date: 507

WEEKLY TOTALS

Nights worked this week (under the MPPCNV) 0

Project related non-compliance this week 0

Nighttime noise issue comments to the project 0

Non-project-related noise exceedances this week 38

PROJECT TOTALS TO DATE

Total Nights Worked (under the MPPCNV) 1 3

Total Project related non-compliance 48

Total noise issue comments to the project 50

Total non-project related exceedances 1998

M ntlake Pr ject MPPCNV Weekly Rep rt Page 1 f 10

Page 2: SR 520 Montlake Project Weekly Report Summary for Monday ... · 1/15/2021  · Montlake Project MPPCNV Weekly Report Page 2 of 10 . SR 520 Montlake Project Major Public Project Construction

Noise Monitoring Locations: the map bel w sh ws the

w rk limits f the SR 520 M ntlake Pr ject and the

l cati ns f the seven stati nary n ise m nit ring sites EXHIBIT 5. CONSTRUCTION AREA AND NOISE MEASUREMENT LOCATIONS

M ntlake Pr ject MPPCNV Weekly Rep rt Page 2 f 10

Page 3: SR 520 Montlake Project Weekly Report Summary for Monday ... · 1/15/2021  · Montlake Project MPPCNV Weekly Report Page 2 of 10 . SR 520 Montlake Project Major Public Project Construction

SR 520 Montlake Project

Major Public Project Construction Noise Variance

NOISE MONITORING - WEEKLY REPORT

Monday, December 28, 2020 to Sunday, January 3, 2021 10 pm to 7 am (weekdays) / 9am (weekends)

The table bel w includes data gathered fr m n ise m nit ring equipment l cated at seven stati nary and three p rtable l cati ns thr ugh ut the M ntlake Pr ject area

Monday, December 28, 2020 Site Site limit* 10pm - 11pm 11pm - 12am 12am - 1am 1am - 2am 2am - 3am 3am - 4am 4am - 5am 5am - am am - 7am 7am - 8am 8am - 9am

Site 1 -2449 E. Lk WA Blvd 7 53.4 51.9 49.8 47.4 47.5 48.3 50.2 54.9 58.8 N/A N/A

Site 2 - 2015 E. Roanoke St 78 57.8 5 .1 52.8 51.2 51.9 52.5 55.3 58.8 0.7 N/A N/A

Site 3A - 3810 E. McGilvra St 2 4 .9 4 .1 44. 40.2 40.5 42.0 43.9 47.8 49.9 N/A N/A

Site 4 - 2800 Montlake Blvd E 4.1 2.0 59. 58.5 58.8 58.8 3.0 7.9 71. N/A N/A

Site 5 - 25 5 22nd Av E. 5 55. 54.0 51.0 49.4 49.7 50.5 52.9 5 .4 58.7 N/A N/A

Site - 21 0 E. Hamlin St 3 50.0 50. 49.4 4 . 47.7 48.3 48.9 53.5 55.8 N/A N/A

Site 7 - 2209 E. Lake Wa Blvd 52.2 50.5 47.9 45.7 45.3 4 .4 48.9 53. 57.2 N/A N/A

Site 8 - Portable Between Sites 4 and 3 51.1 51.0 48.9 47.0 47.5 49.1 50.3 54.3 55.5 N/A N/A

Site 9 - Portable Between Sites 1 and 7 58.3 5 .7 53.9 51.0 50.0 50.7 53.5 2.1 5.7 N/A N/A

Site 10 - Portable Between Sites 1 and 7 59.9 57.9 5 .3 53.4 52.3 52. 55. 2.2 .3 N/A N/A

*Hourly-Average Leq (dBA)

Notes recorded by the on-site Independent Noise Monitor

Work:

N nighttime c nstructi n w rk perf rmed.

Public Comments:

N public c mments received related t nighttime n ise.

Exceedances:

Site(s) 4 and 10 are n t pr ject related. Exceedances are caused by public traffic driving by the n ise m nit rs.

Non-Compliance:

N ne.

Legend

Leq = Leq means the equivalent s und level, which is the c nstant s und level in a given time peri d.

N/A = Time Peri d n t applicable t MPPCNV

Red = N ise Level Exceedance, pr ject related

Blue = N ise level exceedance, n t pr ject related

~ = N Data Available

# = N c ntract w rk . P rtable m nit rs are n t being used (n t needed).

M ntlake Pr ject MPPCNV Weekly Rep rt Page 3 f 10

Page 4: SR 520 Montlake Project Weekly Report Summary for Monday ... · 1/15/2021  · Montlake Project MPPCNV Weekly Report Page 2 of 10 . SR 520 Montlake Project Major Public Project Construction

SR 520 Montlake Project

Major Public Project Construction Noise Variance

NOISE MONITORING - WEEKLY REPORT

Monday, December 28, 2020 to Sunday, January 3, 2021 10 pm to 7 am (weekdays) / 9am (weekends)

The table bel w includes data gathered fr m n ise m nit ring equipment l cated at seven stati nary and three p rtable l cati ns thr ugh ut the M ntlake Pr ject area

Tuesday, December 29, 2020 Site Site limit* 10pm - 11pm 11pm - 12am 12am - 1am 1am - 2am 2am - 3am 3am - 4am 4am - 5am 5am - am am - 7am 7am - 8am 8am - 9am

Site 1 -2449 E. Lk WA Blvd 7 54.4 53.7 50.8 49.9 50.4 50. 53. 5 .9 0.5 N/A N/A

Site 2 - 2015 E. Roanoke St 78 0.5 0.0 5 .8 57.1 5 . 5 .4 58.9 1.8 3.9 N/A N/A

Site 3A - 3810 E. McGilvra St 2 49.0 50.3 4 .2 51.1 48.5 51.4 52.7 54.1 55.2 N/A N/A

Site 4 - 2800 Montlake Blvd E .0 70. 2.0 1. 0.7 0.7 .2 70.9 72.2 N/A N/A

Site 5 - 25 5 22nd Av E. 5 58.7 58.5 55.1 5 .1 55.0 55.5 58.0 0.3 2.4 N/A N/A

Site - 21 0 E. Hamlin St 3 53.0 52.3 50.9 49.5 51.0 49.9 53.1 55.5 57. N/A N/A

Site 7 - 2209 E. Lake Wa Blvd 54.3 54.5 50.8 49.5 49. 49.7 53.0 5 .5 0.0 N/A N/A

Site 8 - Portable Between Sites 4 and 3 55.2 5 .1 51.3 49. 51.8 50.3 54.1 5 . 58.9 N/A N/A

Site 9 - Portable Between Sites 1 and 7 0.0 59. 5 .5 54.0 53.5 54.1 57.2 2.9 7.9 N/A N/A

Site 10 - Portable Between Sites 1 and 7 0.5 59.5 55.7 54.4 53.4 54.4 57.7 3.4 8.0 N/A N/A

*Hourly-Average Leq (dBA)

Notes recorded by the on-site Independent Noise Monitor

Work:

N nighttime c nstructi n w rk perf rmed.

Public Comments:

N public c mments received related t nighttime n ise.

Exceedances:

Site(s) 4, 9 and 10 are n t pr ject related. Exceedances are caused by public traffic driving by the n ise m nit rs.

Non-Compliance:

N ne.

Legend

Leq = Leq means the equivalent s und level, which is the c nstant s und level in a given time peri d.

N/A = Time Peri d n t applicable t MPPCNV

Red = N ise Level Exceedance, pr ject related

Blue = N ise level exceedance, n t pr ject related

~ = N Data Available

# = N c ntract w rk . P rtable m nit rs are n t being used (n t needed).

M ntlake Pr ject MPPCNV Weekly Rep rt Page 4 f 10

Page 5: SR 520 Montlake Project Weekly Report Summary for Monday ... · 1/15/2021  · Montlake Project MPPCNV Weekly Report Page 2 of 10 . SR 520 Montlake Project Major Public Project Construction

SR 520 Montlake Project

Major Public Project Construction Noise Variance

NOISE MONITORING - WEEKLY REPORT

Monday, December 28, 2020 to Sunday, January 3, 2021 10 pm to 7 am (weekdays) / 9am (weekends)

The table bel w includes data gathered fr m n ise m nit ring equipment l cated at seven stati nary and three p rtable l cati ns thr ugh ut the M ntlake Pr ject area

Wednesday, December 30, 2020 Site Site limit* 10pm - 11pm 11pm - 12am 12am - 1am 1am - 2am 2am - 3am 3am - 4am 4am - 5am 5am - am am - 7am 7am - 8am 8am - 9am

Site 1 -2449 E. Lk WA Blvd 7 5 .5 53. 51.5 50. 49.5 49.2 52.0 54.5 58.8 N/A N/A

Site 2 - 2015 E. Roanoke St 78 0.2 58.0 55.4 5 .3 53. 57.2 5 .3 59.9 3.1 N/A N/A

Site 3A - 3810 E. McGilvra St 2 53.5 52.2 52.2 51.1 50. 52.5 52.0 52.5 52. N/A N/A

Site 4 - 2800 Montlake Blvd E 7.5 5.3 2.5 1.7 1.2 9.4 4.4 8. 70.0 N/A N/A

Site 5 - 25 5 22nd Av E. 5 59.2 57.4 54.9 55.4 52. 5 .8 55.1 57.7 1.3 N/A N/A

Site - 21 0 E. Hamlin St 3 58.0 55.4 52.9 51.7 51.4 51.5 53.9 55.8 5 .8 N/A N/A

Site 7 - 2209 E. Lake Wa Blvd 5 .5 53. 51. 50. 48.9 50.5 51.2 54. 58.5 N/A N/A

Site 8 - Portable Between Sites 4 and 3 58.1 55.5 52.3 52.0 51.8 53.0 54.9 55. 57.2 N/A N/A

Site 9 - Portable Between Sites 1 and 7 1.8 59.4 5 .8 55. 54.1 53.0 55. 1.9 .0 N/A N/A

Site 10 - Portable Between Sites 1 and 7 1.8 59.8 5 .9 55.3 53.1 52.1 55. 1.4 .5 N/A N/A

*Hourly-Average Leq (dBA)

Notes recorded by the on-site Independent Noise Monitor

Work:

N nighttime c nstructi n w rk perf rmed.

Public Comments:

N public c mments received related t nighttime n ise.

Exceedances:

Site(s) 4, 9 and 10 are n t pr ject related. Exceedances are caused by public traffic driving by the n ise m nit rs.

Non-Compliance:

N ne.

Legend

Leq = Leq means the equivalent s und level, which is the c nstant s und level in a given time peri d.

N/A = Time Peri d n t applicable t MPPCNV

Red = N ise Level Exceedance, pr ject related

Blue = N ise level exceedance, n t pr ject related

~ = N Data Available

# = N c ntract w rk . P rtable m nit rs are n t being used (n t needed).

M ntlake Pr ject MPPCNV Weekly Rep rt Page 5 f 10

Page 6: SR 520 Montlake Project Weekly Report Summary for Monday ... · 1/15/2021  · Montlake Project MPPCNV Weekly Report Page 2 of 10 . SR 520 Montlake Project Major Public Project Construction

SR 520 Montlake Project

Major Public Project Construction Noise Variance

NOISE MONITORING - WEEKLY REPORT

Monday, December 28, 2020 to Sunday, January 3, 2021 10 pm to 7 am (weekdays) / 9am (weekends)

The table bel w includes data gathered fr m n ise m nit ring equipment l cated at seven stati nary and three p rtable l cati ns thr ugh ut the M ntlake Pr ject area

Thursday, December 31, 2020 Site Site limit* 10pm - 11pm 11pm - 12am 12am - 1am 1am - 2am 2am - 3am 3am - 4am 4am - 5am 5am - am am - 7am 7am - 8am 8am - 9am

Site 1 -2449 E. Lk WA Blvd 7 57.0 54.3 54.7 55.9 0.5 49. 49.2 49.1 51.7 N/A N/A

Site 2 - 2015 E. Roanoke St 78 59.5 58.4 58.4 .4 4.7 53.8 53. 55.0 57. N/A N/A

Site 3A - 3810 E. McGilvra St 2 48.5 47.5 49.0 45.7 43.4 42.8 44.1 43.4 45.9 N/A N/A

Site 4 - 2800 Montlake Blvd E 5.9 5.2 .4 70.2 57.5 54.2 55.8 2.7 .8 N/A N/A

Site 5 - 25 5 22nd Av E. 5 57.7 5 . 5 .5 5.0 4.5 52.7 52.4 53.3 55.5 N/A N/A

Site - 21 0 E. Hamlin St 3 5 .0 55.9 5 .4 58.3 52.7 49.5 51.0 49. 51.1 N/A N/A

Site 7 - 2209 E. Lake Wa Blvd 5 .5 53.9 55.3 58.3 2.2 49.8 48.8 49.5 51.8 N/A N/A

Site 8 - Portable Between Sites 4 and 3 5 .9 55.9 5 .4 5 .8 52.5 49.9 51.4 50.8 52.5 N/A N/A

Site 9 - Portable Between Sites 1 and 7 72.5 59.5 0.2 0.4 8.2 55.9 52.8 54. 57.7 N/A N/A

Site 10 - Portable Between Sites 1 and 7 .4 1.1 1.0 0.5 8. 5 .9 53.5 54.8 58.1 N/A N/A

*Hourly-Average Leq (dBA)

Notes recorded by the on-site Independent Noise Monitor

Work:

N nighttime c nstructi n w rk perf rmed.

Public Comments:

N public c mments received related t nighttime n ise.

Exceedances:

Site(s) 4, 5, 9 and 10 are n t pr ject related. Exceedances are caused by public traffic driving by the n ise m nit rs.

Non-Compliance:

N ne.

Legend

Leq = Leq means the equivalent s und level, which is the c nstant s und level in a given time peri d.

N/A = Time Peri d n t applicable t MPPCNV

Red = N ise Level Exceedance, pr ject related

Blue = N ise level exceedance, n t pr ject related

~ = N Data Available

# = N c ntract w rk . P rtable m nit rs are n t being used (n t needed).

M ntlake Pr ject MPPCNV Weekly Rep rt Page 6 f 10

Page 7: SR 520 Montlake Project Weekly Report Summary for Monday ... · 1/15/2021  · Montlake Project MPPCNV Weekly Report Page 2 of 10 . SR 520 Montlake Project Major Public Project Construction

SR 520 Montlake Project

Major Public Project Construction Noise Variance

NOISE MONITORING - WEEKLY REPORT

Monday, December 28, 2020 to Sunday, January 3, 2021 10 pm to 7 am (weekdays) / 9am (weekends)

The table bel w includes data gathered fr m n ise m nit ring equipment l cated at seven stati nary and three p rtable l cati ns thr ugh ut the M ntlake Pr ject area

Friday, January 1, 2021 Site Site limit* 10pm - 11pm 11pm - 12am 12am - 1am 1am - 2am 2am - 3am 3am - 4am 4am - 5am 5am - am am - 7am 7am - 8am 8am - 9am

Site 1 -2449 E. Lk WA Blvd 7 53.9 51.5 50.2 50.0 45.7 47. 49.0 52.3 53.9 5 .1 5 .8

Site 2 - 2015 E. Roanoke St 78 57.9 5 .3 54.1 52.3 49.9 50.4 52.5 5 .0 58.8 59.7 0.3

Site 3A - 3810 E. McGilvra St 2 49.7 47.5 49.1 48.4 4 .7 49.5 48.3 48.8 51. 53.4 51.7

Site 4 - 2800 Montlake Blvd E 4.8 2.4 0. 58.3 57.2 57.5 58. 4.3 8.1 7. 8.0

Site 5 - 25 5 22nd Av E. 5 5 .8 54.9 52.7 51.3 48.4 49.4 51. 55.1 57.7 58.8 59.0

Site - 21 0 E. Hamlin St 3 55.5 53.2 52.1 50.5 47.8 48.4 51.0 51.9 54.9 5 .9 58.0

Site 7 - 2209 E. Lake Wa Blvd 53.4 51.7 51.1 48.4 45.3 45.7 48.5 52.5 54.1 55.7 5 .9

Site 8 - Portable Between Sites 4 and 3 5 .3 53.1 51.3 51.4 47.2 49.3 51.1 52.9 55.1 57.5 57.8

Site 9 - Portable Between Sites 1 and 7 59.1 57.2 55.9 54.2 50.5 51.5 52.4 58.4 0.1 1.4 3.5

Site 10 - Portable Between Sites 1 and 7 59.8 57.7 5 .1 53.9 50.5 49.1 51.8 58.7 0.2 1.4 3.9

*Hourly-Average Leq (dBA)

Notes recorded by the on-site Independent Noise Monitor

Work:

N nighttime c nstructi n w rk perf rmed.

Public Comments:

N public c mments received related t nighttime n ise.

Exceedances:

Site(s) 4 are n t pr ject related. Exceedances are caused by public traffic driving by the n ise m nit rs.

Non-Compliance:

N ne.

Legend

Leq = Leq means the equivalent s und level, which is the c nstant s und level in a given time peri d.

N/A = Time Peri d n t applicable t MPPCNV

Red = N ise Level Exceedance, pr ject related

Blue = N ise level exceedance, n t pr ject related

~ = N Data Available

# = N c ntract w rk . P rtable m nit rs are n t being used (n t needed).

M ntlake Pr ject MPPCNV Weekly Rep rt Page 7 f 10

Page 8: SR 520 Montlake Project Weekly Report Summary for Monday ... · 1/15/2021  · Montlake Project MPPCNV Weekly Report Page 2 of 10 . SR 520 Montlake Project Major Public Project Construction

SR 520 Montlake Project

Major Public Project Construction Noise Variance

NOISE MONITORING - WEEKLY REPORT

Monday, December 28, 2020 to Sunday, January 3, 2021 10 pm to 7 am (weekdays) / 9am (weekends)

The table bel w includes data gathered fr m n ise m nit ring equipment l cated at seven stati nary and three p rtable l cati ns thr ugh ut the M ntlake Pr ject area

Saturday, January 2, 2021 Site Site limit* 10pm - 11pm 11pm - 12am 12am - 1am 1am - 2am 2am - 3am 3am - 4am 4am - 5am 5am - am am - 7am 7am - 8am 8am - 9am

Site 1 -2449 E. Lk WA Blvd 7 58.9 57.2 52.9 50.3 49. 4 .7 48. 49.8 52.2 53.0 57.4

Site 2 - 2015 E. Roanoke St 78 4.7 2.8 57.9 54.1 53.1 51.5 52.7 54.9 57.3 58.7 0.8

Site 3A - 3810 E. McGilvra St 2 0.2 0.4 53.9 48.7 45.9 42.8 43. 45.2 49.1 49.3 52.2

Site 4 - 2800 Montlake Blvd E 8.3 .1 3.0 1.2 58.5 59.5 59. 2.7 .4 .0 7.8

Site 5 - 25 5 22nd Av E. 5 2.7 1.0 5 .3 52.3 51. 49.9 51.1 53.2 55.5 5 .7 59.7

Site - 21 0 E. Hamlin St 3 55.7 5 .7 52.9 51. 49.2 48.8 50.4 51.1 54.8 55.3 57.0

Site 7 - 2209 E. Lake Wa Blvd 58.9 57.5 53.3 50.5 48.2 4 .4 48.5 49.4 52.7 53.7 5 .9

Site 8 - Portable Between Sites 4 and 3 57.8 57. 51.8 50.0 50.8 48.5 50.3 51.8 53.9 55.0 57.3

Site 9 - Portable Between Sites 1 and 7 3.7 2.0 57.5 0.3 53.7 50.9 52.2 54.0 57.3 59.3 3.3

Site 10 - Portable Between Sites 1 and 7 4.7 2.2 58.4 5 .9 54.9 51.7 54.1 55.0 58.1 59.7 4.4

*Hourly-Average Leq (dBA)

Notes recorded by the on-site Independent Noise Monitor

Work:

N nighttime c nstructi n w rk perf rmed.

Public Comments:

N public c mments received related t nighttime n ise.

Exceedances:

Site(s) 4 are n t pr ject related. Exceedances are caused by public traffic driving by the n ise m nit rs.

Non-Compliance:

N ne.

Legend

Leq = Leq means the equivalent s und level, which is the c nstant s und level in a given time peri d.

N/A = Time Peri d n t applicable t MPPCNV

Red = N ise Level Exceedance, pr ject related

Blue = N ise level exceedance, n t pr ject related

~ = N Data Available

# = N c ntract w rk . P rtable m nit rs are n t being used (n t needed).

M ntlake Pr ject MPPCNV Weekly Rep rt Page 8 f 10

Page 9: SR 520 Montlake Project Weekly Report Summary for Monday ... · 1/15/2021  · Montlake Project MPPCNV Weekly Report Page 2 of 10 . SR 520 Montlake Project Major Public Project Construction

SR 520 Montlake Project

Major Public Project Construction Noise Variance

NOISE MONITORING - WEEKLY REPORT

Monday, December 28, 2020 to Sunday, January 3, 2021 10 pm to 7 am (weekdays) / 9am (weekends)

The table bel w includes data gathered fr m n ise m nit ring equipment l cated at seven stati nary and three p rtable l cati ns thr ugh ut the M ntlake Pr ject area

Sunday, January 3, 2021 Site Site limit* 10pm - 11pm 11pm - 12am 12am - 1am 1am - 2am 2am - 3am 3am - 4am 4am - 5am 5am - am am - 7am 7am - 8am 8am - 9am

Site 1 -2449 E. Lk WA Blvd 7 54.9 54.0 55.8 50.0 50. 49.7 53.7 57.8 0.8 N/A N/A

Site 2 - 2015 E. Roanoke St 78 0.3 58. 59.7 57.0 55.3 55.7 59.1 2.1 3.3 N/A N/A

Site 3A - 3810 E. McGilvra St 2 52.5 52.1 54.0 51.2 50.2 51.2 53.5 53. 54.2 N/A N/A

Site 4 - 2800 Montlake Blvd E .2 5.2 3.5 0.0 59.5 1.3 .7 71.0 72.2 N/A N/A

Site 5 - 25 5 22nd Av E. 5 58.7 57.8 58.9 5 .0 54.7 55.1 57.9 0.1 1.2 N/A N/A

Site - 21 0 E. Hamlin St 3 54.2 53. 58.7 49.5 51.1 50. 54.0 57.0 59.4 N/A N/A

Site 7 - 2209 E. Lake Wa Blvd 55.5 54.2 5 .4 50.4 50.0 50.0 53.7 57. 0.1 N/A N/A

Site 8 - Portable Between Sites 4 and 3 5 .3 54.0 5 .2 48. 51.0 49.4 53.9 57.4 59.0 N/A N/A

Site 9 - Portable Between Sites 1 and 7 0.2 58.7 59. 5 .1 54.3 52.3 57.8 5.1 7.4 N/A N/A

Site 10 - Portable Between Sites 1 and 7 0.5 59.3 59.2 53.8 54.3 51.9 58.8 5.5 8.4 N/A N/A

*Hourly-Average Leq (dBA)

Notes recorded by the on-site Independent Noise Monitor

Work:

N nighttime c nstructi n w rk perf rmed.

Public Comments:

N public c mments received related t nighttime n ise.

Exceedances:

Site(s) 4, 9 and 10 are n t pr ject related. Exceedances are caused by public traffic driving by the n ise m nit rs.

Non-Compliance:

N ne.

Legend

Leq = Leq means the equivalent s und level, which is the c nstant s und level in a given time peri d.

N/A = Time Peri d n t applicable t MPPCNV

Red = N ise Level Exceedance, pr ject related

Blue = N ise level exceedance, n t pr ject related

~ = N Data Available

# = N c ntract w rk . P rtable m nit rs are n t being used (n t needed).

M ntlake Pr ject MPPCNV Weekly Rep rt Page 9 f 10

Page 10: SR 520 Montlake Project Weekly Report Summary for Monday ... · 1/15/2021  · Montlake Project MPPCNV Weekly Report Page 2 of 10 . SR 520 Montlake Project Major Public Project Construction

SR 520 Montlake Project

Major Public Project Construction Noise Variance

NOISE MONITORING - WEEKLY REPORT

Monday, December 28, 2020 to Sunday, January 3, 2021 10 p.m. to 7 a.m. (weekdays)/9a.m. (weekends)

Public Comment Log Date / Time To/From Issue Resolution

N n ise related c mplains.

M ntlake Pr ject MPPCNV Weekly Rep rt Page 10 f 10