7/23/2019 Ss Corner Strip and Floor Strip http://slidepdf.com/reader/full/ss-corner-strip-and-floor-strip 1/8 September 05, 2011 Attention : MS. ADELAIDA COBRES AVP - Project Director  Sea Residences Lot 4, Road 11 cor. Road 23, !P-"s#and 1A  Pasa$ it$  %&r' : ARCH. CID ORBETA DCI - Project Manager  Sea Residences Re : Qotation !or Pro"osed S""#$ and Insta##  o! Pa%er&#oc's and Pa%er Ti#es at Sea Resi Dear (a)am*Sir, +ereit& is o'r 'otation or t&e Proposed S'pp#$ and "nsta##ation o Pa/ !#ocs and Pa/er ti#es at Sea Residences Parin Area. MATERIAL LABOR  Descri"tion Qt$ (nit (nit Price (nit Price ra$ Pa/erb#ocs .50 m2 1,000.00 250.00 reen Pa/erb#ocs 1.00 m2 1,500.00 250.00 Pa/er %i#es 422.25 m2 1,600.00 350.00 oncrete Socca##o 1.00 #m. 450.00 350.00 )rand Tota# A*ont P+" Respect'##$ $o'rs, RODELO PABALATE President

Upload: alainmelcrescini

Post on 18-Feb-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ss Corner Strip and Floor Strip

7/23/2019 Ss Corner Strip and Floor Strip

http://slidepdf.com/reader/full/ss-corner-strip-and-floor-strip 1/8

September 05, 2011

Attention : MS. ADELAIDA COBRES

AVP - Project Director

  Sea Residences

Lot 4, Road 11 cor. Road 23, !P-"s#and 1A

  Pasa$ it$

 %&r' : ARCH. CID ORBETA

DCI - Project Manager

  Sea Residences

Re : Qotation !or Pro"osed S""#$ and Insta##

  o! Pa%er&#oc's and Pa%er Ti#es at Sea Resi

Dear (a)am*Sir,

+ereit& is o'r 'otation or t&e Proposed S'pp#$ and "nsta##ation o Pa/

!#ocs and Pa/er ti#es at Sea Residences Parin Area.

MATERIAL LABOR

  Descri"tion Qt$ (nit (nit Price (nit Price

ra$ Pa/erb#ocs .50 m2 1,000.00 250.00

reen Pa/erb#ocs 1.00 m2 1,500.00 250.00

Pa/er %i#es 422.25 m2 1,600.00 350.00

oncrete Socca##o 1.00 #m. 450.00 350.00

)rand Tota# A*ont P+"

Respect'##$ $o'rs,

RODELO PABALATE

President

Page 2: Ss Corner Strip and Floor Strip

7/23/2019 Ss Corner Strip and Floor Strip

http://slidepdf.com/reader/full/ss-corner-strip-and-floor-strip 2/8

Para/isib#e %rees Desined (.

Page 3: Ss Corner Strip and Floor Strip

7/23/2019 Ss Corner Strip and Floor Strip

http://slidepdf.com/reader/full/ss-corner-strip-and-floor-strip 3/8

tion

ences Par'ing Area

er

TOTAL Tota# Price

 Materia#,La&or

1,250.00 56,35.00

1,50.00 2,000.00

2,250.00 650,02.50

00.00 140,00.00

777777777

 /01230.45

Page 4: Ss Corner Strip and Floor Strip

7/23/2019 Ss Corner Strip and Floor Strip

http://slidepdf.com/reader/full/ss-corner-strip-and-floor-strip 4/8

Page 5: Ss Corner Strip and Floor Strip

7/23/2019 Ss Corner Strip and Floor Strip

http://slidepdf.com/reader/full/ss-corner-strip-and-floor-strip 5/8

8ebr'ar$ 2, 2012

  AVP - Project Director

  D" - Project (anaer

  CP-6A: 7it-ot,ID 8or's at )rand Lo&&$ CD 9 E7

  Co**on Toi#ets Li!t Lo&&$ at )7 27 - 7

Dear (a)am*Sir,

+ereit& is o'r 'otation or t&e Proposed S'pp#$ and "nsta##ation

o #ear %int or %oers , D, 9 : 8

  Descri"tion Qt$ (nitMATERIAL LABOR

 (nit Price (nit Price

C#ear tint

  112.00 pcs 4,000.00 450.00

.00 pcs 4,00.00 450.00

Reception o'nter

1.1m ; 2.2m .00 pcs 4,000.00 450.00

1.1m ; 1.25m .00 pcs 3,200.00 450.00

)rand Tota# A*ont P+"

Respect'##$ $o'rs,

RODELO PABALATE

President

Attention < MS. ADELAIDA COBRES

 %&r' < ARCH. CID ORBETA

Project < SEA RESIDE;CES P+ase 2 9 3

S'bject < Qotation !or Pro"osed S""#$ and Insta##ation

  o! C#ear Tint

2nd-15t& =oor >2 sides?>1.35m ; 2.3m?

ro'nd 8#oor Lit Lobb$>1.35m ; 2.5m?

Page 6: Ss Corner Strip and Floor Strip

7/23/2019 Ss Corner Strip and Floor Strip

http://slidepdf.com/reader/full/ss-corner-strip-and-floor-strip 6/8

Para/isib#eonstr'ction

Page 7: Ss Corner Strip and Floor Strip

7/23/2019 Ss Corner Strip and Floor Strip

http://slidepdf.com/reader/full/ss-corner-strip-and-floor-strip 7/8

TOTALTota# Price

 Materia#,La&or

4,450.00 46,400.00

5,150.00 41,200.00

4,450.00 35,00.00

3,50.00 26,200.00

P+"56655.55

Page 8: Ss Corner Strip and Floor Strip

7/23/2019 Ss Corner Strip and Floor Strip

http://slidepdf.com/reader/full/ss-corner-strip-and-floor-strip 8/8