stacy's sw section presentation final (1)€¦ · title: microsoft powerpoint - stacy's...

27
Electrical System Reliability Presented by Stacy Cheevers, Plant Manager

Upload: others

Post on 19-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Electrical System Reliability

Presented by Stacy Cheevers,Plant Manager

Page 2: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM
Page 3: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Terms

Distribution Line: 13,200 volts Transmission Line: 69,000 volts Sub Station: Outdoor structure where voltage is stepped

down or up Switching station: power is only switchedMetal Clad Switchgear: High voltage (13.2kv) breakers Recloser: Circuit breaker in a sub station

Page 4: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Customer to rural COOPSingle feed to plantOutdated and undersized

substation

BWD Electrical System

Page 5: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

1985 BWD electrical fire caused rationing

1986 BWD staff had concerns for the reliability of the electrical system

History

Page 6: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

System Improvements

1987 electrical upgrade Allgeier Martin1st 480v generator and emergency connection for

intake1st underground high voltage feedersNew Switching Station #1

Page 7: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Need for WTP expansion

1989 conducted interviews for consultant for a 40MGD Plant Expansion

MWH new design engineersVery competent electrical engineerBrought in a new concept: true redundant powerEmphasis put on redundancy and robustness

Page 8: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Combined effort BWD and MWH push CEC for more reliable source

2000 addition of three 2MW generators and underground feed to intake

Allowed for load more efficient shedding program

Next Phase

Page 9: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

2004 CEC built Beaver Sub

BWD sold a corner tract at minimal cost

2005 added SS1A and 2nd

feed (underground) to a 2nd intake structure

Multi Phase Expansion

Page 10: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

New SUB Adjacent to Plant

Page 11: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

2005 New 60MDG Plant 2006 Reconfigured

generators to feed SS#1 2008 2nd 69kv line to

Beaver Sub to complete loop

Multi Phase Expansion

Page 12: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Elm Springs

Prairie Creek

Page 13: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Elm Springs

Prairie Creek

Page 14: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Switching Station Pro

Page 15: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Overhead Cons

Page 16: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Underground Pros and Cons

Page 17: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Very reliable system Very complicated Takes a high skill level to

operate and maintainAssures we are prepared

to stay up and running

Current System

Page 18: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

2015 Adding additional generator capacity to ensure an average day’s need can be met

Page 19: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Where We Came From

Page 20: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Where We Are Now

Page 21: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Intakes

Page 22: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

After Significant upgrades or changes need for updated coordination study

Revise plant one-linesUpdate Arc Flash program

Don’t overlook

Page 23: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Several Small 480V Generators on AutoStart

Page 24: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

BWD has 3 Electricians certified in Thermography

Looking into Ultrasonic detection

Performs Extensive Preventive Maintenance

Page 25: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Replacement

Page 26: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

What’s Next

Page 27: Stacy's SW Section Presentation final (1)€¦ · Title: Microsoft PowerPoint - Stacy's SW Section Presentation final (1) Author: ExecDir Created Date: 10/31/2019 12:51:24 PM

Questions?