staff report: z-23-20-8 july 31, 2020 · 2020-07-31 · staff report: z-23-20-8 . july 31, 2020 ....

24
Staff Report: Z-23-20-8 July 31, 2020 South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission Hearing Date September 3, 2020 Request From: S-1 (9.81 acres) Request To: CP/GCP (9.81 acres) Proposed Use Warehousing with general office and assembly/manufacturing Location Approximately 600 feet north of the northwest corner of 38th Street and Southern Avenue Owner Thomas and Olivia Duvall Applicant/Representative Adam Baugh, Withey Morris PLC Staff Recommendation Approval, subject to stipulations General Plan Conformity General Plan Land Use Map Designation Commerce/Business Park Street Map Classification 38th Street Local Street 25-foot west half street CONNECT PEOPLE AND PLACES CORE VALUE; OPPORTUNITY SITES; LAND USE PRINCIPLE: Support reasonable levels of increased intensity, respectful of local conditions and surrounding neighborhoods. The request from S-1 (Ranch or Farm Residence) zoning to CP/GCP (Commerce Park/General Commerce Park) zoning would allow for increased intensity that is consistent in scale and character with the surrounding zoning and General Plan Land Use designation in the area. Surrounded on three sides by Commerce Park and Industrial Park zoning, activities on the subject site will not impact any residential properties in the area, given the existence of other similar uses. However, as stipulated, the development would provide an increased building setback on the west side of the site and an increased landscape setback where adjacent to a residential zoning district.

Upload: others

Post on 06-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020

South Mountain Village Planning Committee Meeting Date

August 11, 2020

Planning Commission Hearing Date September 3, 2020

Request From: S-1 (9.81 acres)

Request To: CP/GCP (9.81 acres)

Proposed Use Warehousing with general office and assembly/manufacturing

Location Approximately 600 feet north of the northwest corner of 38th Street and Southern Avenue

Owner Thomas and Olivia Duvall Applicant/Representative Adam Baugh, Withey Morris PLC Staff Recommendation Approval, subject to stipulations

General Plan Conformity

General Plan Land Use Map Designation Commerce/Business Park

Street Map Classification

38th Street Local Street 25-foot west half street

CONNECT PEOPLE AND PLACES CORE VALUE; OPPORTUNITY SITES; LAND USE PRINCIPLE: Support reasonable levels of increased intensity, respectful of local conditions and surrounding neighborhoods. The request from S-1 (Ranch or Farm Residence) zoning to CP/GCP (Commerce Park/General Commerce Park) zoning would allow for increased intensity that is consistent in scale and character with the surrounding zoning and General Plan Land Use designation in the area. Surrounded on three sides by Commerce Park and Industrial Park zoning, activities on the subject site will not impact any residential properties in the area, given the existence of other similar uses. However, as stipulated, the development would provide an increased building setback on the west side of the site and an increased landscape setback where adjacent to a residential zoning district.

Page 2: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 2 of 14

STRENGHTEN OUR LOCAL ECONOMY CORE VALUE; ENTREPRENEURS EMERGING ENTERPRISES; LAND USE PRINCIPLE: Encourage land uses that promote the growth of entrepreneurs or new businesses in Phoenix in appropriate locations. Rezoning to CP/GCP will provide opportunity for growth, development, and employment generating uses within the South Mountain Village. Furthermore, the proposal for CP/GCP zoning is consistent with the surrounding area, as commerce park and industrial park zoning are presently found predominantly north of Southern Avenue between 36th Street and 40th Street. CERTAINTY AND CHARACTER CORE VALUE; DESIGN PRINCIPLE: Create new development or redevelopment that is sensitive to the scale and character of the surrounding neighborhoods and incorporates adequate development standards to prevent negative impact(s) on the residential properties. Approval of the request would support a new warehouse building with general office, assembly and manufacturing in an area where similar uses exist. As stipulated, the site would incorporate development standards including increased building setbacks along the west side and increased landscape setbacks that would help mitigate negative impacts to adjacent residential uses. BUILD THE SUSTAINABLE DESERT CITY CORE VALUE; TREES AND SHADE; DESIGN PRINCIPLE: Integrate trees and shade into the design of new development and redevelopment projects throughout Phoenix. The proposal, as stipulated, will be required to provide shade along the adjacent sidewalks, pedestrian paths connecting the development to adjacent streets, the parking lot and provide a shaded employee resting area. This will help to encourage walking and to mitigate the urban heat island effect by covering hard surfaces, thus cooling the micro-climate around the project vicinity.

Applicable Plans, Overlays, and Initiatives

Tree and Shade Master Plan: See Background Item No. 6. Complete Street Guidelines: See Background Item No. 7. Comprehensive Bicycle Master Plan: See Background Item No. 8. Reimagine Phoenix: See Background Item No. 9.

Page 3: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 3 of 14

Surrounding Land Uses/Zoning

Land Use Zoning On Site Single-family home and agricultural uses S-1 North Warehouses IND.PK. South Warehouses and single-family home CP/GCP

and S-1 East (across 38th Street) Warehouses CP/GCP West Single-family homes and agricultural uses S-1

Commerce Park / General Commerce Park

Standards Requirements Met or Not Met Building Setbacks Perimeter Street (38th Street)

30 feet Met (104 feet)

Interior not on a street (North)

0 feet Met (116 feet)

Interior not on a street (South)

0 feet Met (80 feet)

Interior perimeter (South)

20 feet minimum Not Met (80 feet)*

Step back provision requires an 87-foot setback due to the proposed building height.

Perimeter not on a street (West)

20 feet minimum Met (230 feet)

Step back provision requires an 87-foot setback due to the proposed building height.

Landscaped Setbacks Perimeter Street (38th Street)

30 feet Met (30 feet)

Interior not on a street (North)

0 feet Met (0 feet)

Interior not on a street (South)

0 feet Met (6 feet)

Interior perimeter (South)

5 feet Not specified

Perimeter not on a street (West)

5 feet Met (5 feet)

Lot Coverage 50% 34%

Page 4: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 4 of 14

Building Height 18-foot maximum height is permitted within 30 feet of the perimeter lot line, then one-foot of additional height is allowed for every three feet of additional setback, maximum 56 feet to 80 feet with a use permit and site plan.

37 feet maximum height (Not met, requires an 87 foot building setback from the western and southern property lines)*

Parking Manufacturing, wholesale, including but not limited to warehouses: 1 space per 1.5 warehouse or production workers. If the facility runs more than one shift a day, employee count will be based on the two largest shifts and 1 space per 300 sq. ft. of administration office.

Not specified (520 parking spaces provided)

*Variance may be required. Background/Issues/Analysis SUBJECT SITE

1. This request is to rezone a 9.81-acre site, located approximately 600 feet north of the northwest corner of 38th Street and Southern Avenue from S-1 (Ranch or Farm Residence District) to CP/GCP (Commerce Park/General Commerce Park District) to allow a new warehouse with general office and assembly/manufacturing.

SURROUNDING USES AND ZONING

2. North of the subject site are properties zoned and developed under the Ind. Pk. (Industrial Park District). The equivalent zoning is Commerce Park.

South of the subject site are warehouses zoned CP/GCP (Commerce Park/ General

Commerce Park) in addition to a single-family residence zoned S-1 (Ranch or Farm Residence).

Page 5: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 5 of 14 West of the subject site are

multiple single-family residences zoned S-1 (Ranch or Farm Residence). East of the subject site, across 38th Street, are warehouses zoned CP/GCP (Commerce Park/ General Commerce Park).

3. The subject site has a

General Plan Land Use Map designation of Commerce/ Business Park which is consistent with the request to rezone to CP/GCP (Commerce Park/ General Commerce Park). Surrounding properties are also designated as Commerce/Business Park on the General Plan Land Use Map.

4. Site Plan The conceptual site plan proposes a new 133,000 square foot building at 37 feet in

height (40 feet to parapet). This building will incorporate multiple uses such as general office, warehousing, assembly and manufacturing. Access to the site will be exclusively provided from 38th Street where three driveways are proposed.

Figure A. Aerial Map, Source: City of Phoenix Planning and Development Department

Figure B. (Above) General Plan Land Use Map Source: City of Phoenix Planning and Development Department

Figure A. (Right) Aerial Map Source: City of Phoenix Planning and Development Department

Page 6: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 6 of 14

The proposed 520 parking spaces are distributed throughout the site, but primarily concentrated to the rear of the building, along the west. Stipulation No. 1 would require a minimum building setback of 120 feet from the western property line for building exclusive of carports and shade structures except those used for outdoor storage, in order to allow for an increased separation from the existing homes to the west. Stipulation No. 3 incorporates a larger landscape setback along southern and western property lines to provide enhanced screening and buffering from the proposed use and adjacent residential uses in these areas. Staff also recommends a 400 square foot employee resting area that incorporates seating and shade to allow site employees a place outdoors during their workday. This area would be shaded a minimum of 75 percent using large canopy drought-tolerant shade trees of minimum two-inch caliper size and/or architectural shade. This is addressed in Stipulation No. 5.

5. Building Elevations and Conceptual Building Rendering The subject site is proposing a single building with a height of 37 feet (40 feet to the

top of parapet). The building elevations exhibit glass windows across all building elevations and roll-up doors on the south, east and western elevations. The main entrance to the building on the southeast corner of the site incorporates a glass panel wall with an architectural metal feature that wraps around a portion of the eastern and southern building elevations.

Figure C. (Above) Site Plan, Source: John G. Cataldo, Architecture

Page 7: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 7 of 14

Stipulation No. 2 requires conformance with the conceptual building rendering, with specific regard to the glass façade and metal architectural feature to maintain this unique building element along the main entrance to the site.

Figure D. (Above) Building Elevations Source: John G. Cataldo, Architecture

Figure E. (Above) Conceptual Building Rendering, Source: John G. Cataldo, Architecture

Page 8: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 8 of 14 STUDIES AND POLICIES

6. Tree and Shade Master Plan The Tree and Shade Master Plan is a roadmap for creating a healthier, more livable

and prosperous 21st Century desert city. The goal is to treat the urban forest as infrastructure to ensure that trees are an integral part of the city’s planning and development process. In order to enhance the landscaping buffers of this site and to increase the percentage of shade on the site, staff is recommending that the stipulated landscape setbacks include minimum two-inch caliper shade trees planted a minimum of 20 feet on center, or in equivalent groupings. This is addressed in Stipulation No. 4. Furthermore, staff recommends that parking lot shading be required in order to help mitigate the urban heat island effect, given the vast impervious surface areas proposed for vehicle parking, and to help cool the micro-climate of the site plus surrounding areas. Staff is recommending that at a minimum two-inch caliper size drought-tolerant shade trees be used to achieve 25 percent shade in the parking areas. This is addressed in Stipulation No. 6. Additionally, staff recommends that pedestrian walkways, including the sidewalk along 38th Street, be shaded to a minimum of 75 percent using large canopy drought-tolerant shade trees of minimum two-inch caliper size at maturity and/or architectural shade. This is addressed in Stipulation No. 7.

7. Complete Streets Guidelines The City's complete streets policy further advances its goal to create a more

sustainable transportation system that is safe and accessible for everyone. Complete streets provide infrastructure that encourages active transportation such as walking, bicycling, transportation choices and increased connectivity. Through this policy, the primary focus of street design will no longer be solely on the speed and efficiency of automobile travel, but on the safety and comfort of all users. To promote walking, staff recommends that accessible pedestrian pathways constructed of decorative pavers, stamped or colored concrete or another material, other than those used to pave the parking surfaces and drive aisles to connect all building entrances and exits, and all public sidewalks utilizing the minimum possible distance and providing the most direct route. This is addressed in Stipulation No. 8. To promote bicycling, staff recommends that bicycle parking be provided at a rate of one bicycle space per 50 vehicular parking spaces, up to a maximum of 50 bicycle parking spaces. This is addressed in Stipulation No. 9.

Page 9: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 9 of 14

8. Comprehensive Bicycle Master Plan The City of Phoenix adopted the Comprehensive Bicycle Master Plan in 2014 to

guide the development of its Bikeway System and supportive infrastructure. Bicycle lanes have been designed within the 19th Avenue and Southern Avenue corridors, however only the Southern Avenue bicycle lane has been constructed. Staff recommends that bicycle parking be provided at a rate of one bicycle space per 50 vehicular parking spaces, up to a maximum of 50 bicycle parking spaces. This is addressed in Stipulation No. 9.

9. Reimagine Phoenix As part of the Reimagine Phoenix Initiative, the City of Phoenix is committed to

increasing the waste diversion rate to 40 percent by 2020 and to better manage its solid waste resources. Section 716 of the Phoenix Zoning Ordinance establishes standards to encourage the provision of recycling containers for multifamily, commercial, industrial, and mixed-use developments meeting certain criteria. No provisions for recycling containers were depicted on the site plan date stamped May 11, 2020. However, the applicant has described in their submittal documents that recycling of metal materials or remnant products will be part of their operations, and that pickup will be coordinated with a third-party provider.

COMMUNITY INPUT SUMMARY

10. From the time the case was filed to the time the staff report was written, five letters

from different individuals were received on this case. All five letters are in support of this case, citing employment opportunities and land use compatibility as some of the reasons for supporting this project.

INTERDEPARTMENTAL COMMENTS

11. The Water Services Departments commented that the property has existing water mains that can potentially serve the development. A sewer main extension may be required however. In addition, the Water Services Department commented that capacity is a dynamic condition that can change over time due to a variety of factors.

12. The Floodplain Management division of the Public Works Department has indicated

that the parcel is not located in a Special Flood Hazard Area (SFHA), but located in a Shaded Zone X, on panel 2220 L / 2240 L of the Flood Insurance Rate Maps (FIRM) dated February 10, 2017.

13. The Fire Department commented that the project needs to show the locations of fire

hydrants in accordance with Section 507.5 (2018 Phoenix Fire Code).

Page 10: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 10 of 14

14. The Public Transit Department commented that accessible pathways constructed of alternative materials be provided to connect all building entrances and exits, and all public sidewalks utilizing the minimum possible distance and providing the most direct route. In addition, it was requested that a pathway be provided from the main building entrance to the southeast corner of the site, and that pedestrian paths plus sidewalks are shaded to 75 percent using trees or shade structures. Pedestrian shade is addressed in Stipulation No. 6 and 7, while the pathways are addressed in Stipulation No. 8.

15. The Pedestrian Safety Coordinator with the Street Transportation Department

commented that pedestrian entrances need to be separated from vehicular entrances, shaded and attractive to lead pedestrians to the front door in the most direct manner. The salvaging of trees on site and striping on the parking lot area to safely guide pedestrians to the building in the most direct manner were other comments provided. Stipulation No. 8 addresses direct connections between the building entrances plus exits, and adjacent public sidewalks via the most direct route, and alternative materials to be used in pedestrian pathways to differentiate this from drive aisles or parking surfaces. There are several existing trees on the site that may be salvaged, and the applicant also intends to incorporate an edible landscape palette on the site. Section 507.Tab A. of the Phoenix Zoning Ordinance contains criteria regarding the salvaging of plant material of sites, thus this site must comply with this and any other sections of the Zoning Ordinance.

16. The Street Transportation Department requires the dedication of 5 feet of street

right-of-way along 38th Street and improvements to this roadway, including completing the cul-de-sac on the westside of 38th Street. Additionally, Street Transportation commented that all street improvements be updated to address ADA guidelines. These are addressed in Stipulation Nos. 10 through 12. Exclusive access to the subject site is provided along 38th Street for both vehicles and pedestrians. Presently, a portion of 38th Street just south of the subject site is not currently dedicated public right-of-way, which would allow legal access to the site if dedicated. Access to the site and improvements within this access point are addressed in Stipulation No. 13, which would require for the access along 38th Street to be available in addition to related improvements.

17. The Aviation Department requires that the property owner record a Notice to

Prospective Purchasers of Proximity to Airport in order to disclose the existence, and operational characteristics of City of Phoenix Sky Harbor International Airport (PHX) to future owners of the property. Furthermore, that Form 7460-1 be filed for

Page 11: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 11 of 14

the development and that the development receive a “No Hazard Determination” from the FAA. These are addressed in Stipulation Nos. 14 and 15.

18. The site is located in a larger area identified as being archaeologically sensitive. If further review by the City of Phoenix Archaeology Office determines the site and immediate area to be archaeologically sensitive, and if no previous archaeological projects have been conducted within this project area, it is recommended that archaeological Phase I data testing of this area be conducted. Phase II archaeological data recovery excavations may be necessary based upon the results of the testing. A qualified archaeologist must make this determination in consultation with the City of Phoenix Archaeologist. In the event archaeological materials are encountered during construction, all ground disturbing activities must cease within a 33-foot radius of the discovery and the City of Phoenix Archaeology Office must be notified immediately and allowed time to properly assess the materials. This is addressed in Stipulation Nos. 16 through 18.

OTHER

19. Development and use of the site is subject to all applicable codes and ordinances.

Zoning approval does not negate other ordinance requirements such as obtaining a use permit to conduct the proposed outdoor use in this zoning district. Other formal actions such as, but not limited to, zoning adjustments and abandonments, may be required.

Findings

1. The proposal is consistent with the General Plan Land Use Map designation of Commerce/Business Park.

2. The proposed commerce park development, as stipulated, is compatible with the

surrounding land uses.

3. The proposed development is consistent with the scale and character of developments in the surrounding area.

Stipulations

1. A minimum building setback of 120 feet shall be required along the west side of the site, exclusive of carports and shade structures other than those used for outdoor storage, as approved by the Planning and Development Department.

2. The primary building entrance, on the southeast portion of the site, shall be in

general conformance with the building rendering date stamped June 30, 2020, with specific regard to the glass façade and architectural metal feature, as approved by the Planning and Development Department.

Page 12: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 12 of 14

3. A minimum 10-foot wide landscape setback shall be required along the south

and west property lines, except where adjacent to non-residential zoning districts, as approved by the Planning and Development Department.

4. Large canopy drought tolerant trees of minimum 2-inch caliper size shall be

planted 20 feet on center or in equivalent groupings in the ordinance required and stipulated landscape setback areas, as approved by the Planning and Development Department.

5. One outdoor employee resting area of no less than 400 square feet or two 200

square feet areas shall be provided on site. Each required pedestrian area shall include a minimum of two pedestrian seating benches, constructed of quality and durable materials, and shaded to a minimum of 75 percent using large canopy drought-tolerant shade trees of minimum 2-inch caliper size and/or architectural shade, as approved by the Planning and Development Department.

6. All uncovered surface parking lot areas for customer parking and employee

parking shall be landscaped with minimum 2-inch caliper drought-tolerant shade trees. Landscaping shall be dispersed throughout the parking area and achieve 25 percent shade at maturity, as approved by Planning and Development Department.

7. Pedestrian walkways, including the sidewalk along 38th Street, shall be

shaded to a minimum of 75 percent using large canopy drought-tolerant shade trees of minimum 2-inch caliper size at maturity and/or architectural shade, as approved by the Planning and Development Department.

8. Clearly defined, accessible pedestrian pathways constructed of decorative

pavers, stamped or colored concrete or another material, other than those used to pave the parking surfaces and drive aisles shall be provided connecting all building entrances and exits, and all public sidewalks utilizing the minimum possible distance and providing the most direct route, as approved by the Planning and Development Department.

9. “Secured/Covered Bicycle Facilities” shall be provided at a rate of one bicycle

space per 50 vehicular parking spaces, up to a maximum of 20 bicycle parking spaces. These spaces shall be provided as defined in Appendix K of the Comprehensive Bicycle Master Plan, and as approved by the Planning and Development Department.

10. The developer shall dedicate 5 feet of right-of-way for the west half of 38th

Street and shall improve the roadway per the requirements of the City of

Page 13: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 13 of 14

Phoenix local street standards, as approved by the Planning and Development Department.

11. The developer shall improve the west side of the adjacent 38th Street cul-de-

sac with curb, gutter and sidewalk and add a scupper with associated handrail along the existing drainage easement, as approved by the Planning and Development Department.

12. The developer shall construct all streets adjacent to the development with

paving, curb, gutter, sidewalk, curb ramps, streetlights, landscaping and other incidentals as per plans approved by the Planning and Development Department. All improvements shall comply with all ADA accessibility standards.

13. Prior to issuance of building permits, the developer shall work with the adjacent

property owner to dedicate 30 feet of right-of-way for the west half of 38th Street adjacent to 5900 South 38th Street, Phoenix, AZ 85040, APN 122-76-001B. The developer shall install the corresponding paving with thickened edge to a total of 20 feet for the west half street for the length of the parcel. The Street Transportation Department, as its sole discretion, may waive or modify these requirements upon adequate demonstration of “good faith” efforts to obtain the right-of-way dedication from the adjacent property owner.

14. The developer shall record a Notice of Prospective Purchasers of Proximity to

Airport in order to disclose the existence and operational characteristics of Phoenix Sky Harbor International Airport (PHX) to future owners of the property.

15. The developer shall provide documentation to the City prior to construction

permit approval that Form 7460-1 has been filed for the development and that the development received a “No Hazard Determination” from the FAA. If temporary equipment used during construction exceeds the height of the permanent structure a separate Form 7460-1 shall be submitted to the FAA and a “No Hazard Determination” obtained prior to the construction start date.

16. If determined necessary by the Phoenix Archaeology Office, the applicant shall

conduct Phase I data testing and submit an archaeological survey report of the development area for review and approval by the City Archaeologist prior to clearing and grubbing, landscape salvage, and/or grading approval.

17. If Phase I data testing is required, and if, upon review of the results from Phase

I data testing, the City Archaeologist, in consultation with a qualified archeologist, determines such data recovery excavations are necessary, the applicant shall conduct Phase II archaeological data recovery excavations.

Page 14: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Staff Report: Z-23-20-8 July 31, 2020 Page 14 of 14

18. In the event archaeological materials are encountered during construction, the developer shall immediately cease all ground-disturbing activities within a 33-foot radius of the discovery, notify the City Archaeologist, and allow time for the Archaeology Office to properly assess the materials.

Writer Enrique Bojórquez-Gaxiola June 31, 2020 Team Leader Samantha Keating Exhibits Sketch Map Aerial Map Conceptual Site Plan date stamped May 11, 2020 Conceptual Building Elevations date stamped June 30, 2020 Conceptual Renderings date stamped May 11, 2020 Correspondence from the public (5 pages)

Page 15: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Z-69-08

Z-11-98

Z-11-90

Z-SP-13-75

Z-116-00

Z-SP-13-75

Z-14-01 Z-30-97

Z-125-95*

* *

* *

*

*

*

C-2 S-1

R1-6

R-3

C-1MUA

C-1CP/BP

IND.PK.

C-2

S-1

R-3

R-4A

C-1 CP/GCP

CP/GCP

MUA *Z-150-99

CP/BP *Z-94-94

LA SALLE ST

SOUTHERN AVE

39TH

ST

37TH

ST

WAYLAND DR

36TH

ST

38TH

ST

40TH

ST

35TH

PL

GROVE ST

BaselineArea Plan andOverlay District

BROADWAY RD

BASELINE RD

DOBBINS RD

27TH

AVE

19TH

AVE

7TH

AVE

CENT

RAL A

VE7T

H ST

16TH

ST 40TH

ST

48TH

ST

24TH

ST

32ND

ST

SOUTHERN AVE

I-10

SOUTH MOUNTAIN VILLAGECITY COUNCIL DISTRICT: 8

I

APPLICANT'S NAME:

APPLICATION NO. Z-23-20GROSS AREA INCLUDING 1/2 STREETAND ALLEY DEDICATION IS APPROX.

9.81 AcresMULTIPLES PERMITTED

* Maximum Units Allowed with P.R.D. Bonus

S-1CP/GCP

CONVENTIONAL OPTION10

N/A

* UNITS P.R.D. OPTIONN/AN/A

Adam Baugh, Withey Morris PLCDATE: 6/8/2020

REVISION DATES:

AERIAL PHOTO &QUARTER SEC. NO.

QS 3-36ZONING MAP

D-10

REQUESTED CHANGE:FROM: S-1 ( 9.81 a.c.)

TO: CP/GCP ( 9.81 a.c.)

Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2020\Z-23-20.mxd

Z-23-20

0.075 0 0.0750.0375Miles

Page 16: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

Z-69-08

Z-11-98

Z-11-90

Z-SP-13-75

Z-116-00

Z-SP-13-75

Z-14-01 Z-30-97

Z-125-95*

* *

* *

*

*

*

C-2 S-1

R1-6

R-3

C-1MUA

C-1CP/BP

IND.PK.

C-2

S-1

R-3

R-4A

C-1 CP/GCP

CP/GCP

MUA *Z-150-99

CP/BP *Z-94-94

LA SALLE ST

SOUTHERN AVE

39TH

ST

37TH

ST

WAYLAND DR

36TH

ST

38TH

ST

40TH

ST

35TH

PL

GROVE ST

BaselineArea Plan andOverlay District

Maricopa County Assessor's Office

BROADWAY RD

BASELINE RD

DOBBINS RD

27TH

AVE

19TH

AVE

7TH

AVE

CENT

RAL A

VE7T

H ST

16TH

ST 40TH

ST

48TH

ST

24TH

ST

32ND

ST

SOUTHERN AVE

I-10

SOUTH MOUNTAIN VILLAGECITY COUNCIL DISTRICT: 8

I

APPLICANT'S NAME:

APPLICATION NO. Z-23-20GROSS AREA INCLUDING 1/2 STREETAND ALLEY DEDICATION IS APPROX.

9.81 AcresMULTIPLES PERMITTED

* Maximum Units Allowed with P.R.D. Bonus

S-1CP/GCP

CONVENTIONAL OPTION10

N/A

* UNITS P.R.D. OPTIONN/AN/A

Adam Baugh, Withey Morris PLCDATE: 6/8/2020

REVISION DATES:

AERIAL PHOTO &QUARTER SEC. NO.

QS 3-36ZONING MAP

D-10

REQUESTED CHANGE:FROM: S-1 ( 9.81 a.c.)

TO: CP/GCP ( 9.81 a.c.)

Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2020\Z-23-20.mxd

Z-23-20

0.075 0 0.0750.0375Miles

Page 17: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

S

T

A

T

E

O

F

C

A

L

I

F

O

R

N

I

A

RENEW

11-30-21

L

i

c

.

N

o

. C

-1

0

4

5

7

J

O

H

N

G

. CA

T

A

L

D

O

R

E

G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

T

AutoCAD SHX Text
LEVELER
AutoCAD SHX Text
DOCK
AutoCAD SHX Text
TRUCK WELL
AutoCAD SHX Text
RAMP DOWN
AutoCAD SHX Text
S. 38TH STREET
AutoCAD SHX Text
MEZZANINE:
AutoCAD SHX Text
15,000 SQ.FT
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
8
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
10
AutoCAD SHX Text
5
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
44
AutoCAD SHX Text
44
AutoCAD SHX Text
ROLL-UP DOOR
AutoCAD SHX Text
20'X20'
AutoCAD SHX Text
ROLL-UP DOOR
AutoCAD SHX Text
20'X20'
AutoCAD SHX Text
ROLL-UP DOOR
AutoCAD SHX Text
20'X20'
AutoCAD SHX Text
ROLL-UP DOOR
AutoCAD SHX Text
20'X20'
AutoCAD SHX Text
ROLL-UP DOOR
AutoCAD SHX Text
12'X14'
AutoCAD SHX Text
44
AutoCAD SHX Text
44
AutoCAD SHX Text
WAREHOUSE AREA 133,000 S.F.
AutoCAD SHX Text
6
AutoCAD SHX Text
9
AutoCAD SHX Text
8
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
7
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
6
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
NO
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
NO
AutoCAD SHX Text
NO
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
NO
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
NO
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
NO
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
NO
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
NO
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
NO
AutoCAD SHX Text
FIRE HYDRANR
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
IND. PK.
AutoCAD SHX Text
S-1
AutoCAD SHX Text
CP/GCP
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
IND. PK.
AutoCAD SHX Text
IND. PK.
AutoCAD SHX Text
IND. PK.
AutoCAD SHX Text
CP/GCP
AutoCAD SHX Text
CP/GCP
AutoCAD SHX Text
CP/GCP
AutoCAD SHX Text
CP/GCP
AutoCAD SHX Text
S-1
AutoCAD SHX Text
CP/GCP
AutoCAD SHX Text
OF :
AutoCAD SHX Text
SHEET :
AutoCAD SHX Text
Job No :
AutoCAD SHX Text
Drawing No :
AutoCAD SHX Text
Scale :
AutoCAD SHX Text
Manager :
AutoCAD SHX Text
Designer :
AutoCAD SHX Text
Date :
AutoCAD SHX Text
Revisions :
AutoCAD SHX Text
Date :
AutoCAD SHX Text
Drawing Content :
AutoCAD SHX Text
DEVELOPER :
AutoCAD SHX Text
PROJECT NAME & SITE ADDRESS:
AutoCAD SHX Text
ARCHITECTURE . ENGINEERING
AutoCAD SHX Text
835 MISSION STREET, SOUTH PASADENA, CA 91030
AutoCAD SHX Text
FAX : 626-799-7010
AutoCAD SHX Text
OFFICE : 626-799-4400
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
VICINITY, & NOTES
AutoCAD SHX Text
J.C
AutoCAD SHX Text
S.O.
AutoCAD SHX Text
MARCH 2020
AutoCAD SHX Text
2020-024
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
T-1
AutoCAD SHX Text
1
AutoCAD SHX Text
12
AutoCAD SHX Text
N
AutoCAD SHX Text
38TH ST.&SOUTHERN AVE PHOENIX AZ 85042
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
PROJECT DATA
AutoCAD SHX Text
PROJECT DIRECTORY
AutoCAD SHX Text
ARCHITECT:
AutoCAD SHX Text
JOHN G. CATALDO A.I.A., C.S.I.
AutoCAD SHX Text
835 MISSION ST.
AutoCAD SHX Text
SOUTH PASADENA, CA 91030
AutoCAD SHX Text
PHONE:
AutoCAD SHX Text
FAX:
AutoCAD SHX Text
(626) 799-4400
AutoCAD SHX Text
(626) 799-7010
AutoCAD SHX Text
BUILDING OWNER:
AutoCAD SHX Text
G.ADAM BAUGH,ESQ
AutoCAD SHX Text
PHONE: 602 230 0600
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
T-1 PROPOSED SITE PLAN , VICINITY MAP, AND NOTES A-1 PROPOSED ELEVATIONS A-2 CONCEPTUAL DRAINAGE PLAN
AutoCAD SHX Text
SCOPE OF WORK
AutoCAD SHX Text
WITHEY MORRIS PLC 2525 E ARIZONA BALTIMORE CIRCLE #A-212 PHOENIX AZ 85016
AutoCAD SHX Text
CODES
AutoCAD SHX Text
SITE ADDRESS :
AutoCAD SHX Text
38TH ST.&SOUTHERN AVE
AutoCAD SHX Text
PHOENIX AZ 85042
AutoCAD SHX Text
ASSESSOR'S ID No.
AutoCAD SHX Text
A BRAND NEW INDUSTRIAL BUILDING OF 153,000 S.F.
AutoCAD SHX Text
38TH ST.&SOUTHERN AVE
AutoCAD SHX Text
PHOENIX AZ 85042
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text
122-76-002A AND 003A
AutoCAD SHX Text
LEGAL DESCRIPTION:
AutoCAD SHX Text
---
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SCALE: 1" = 1/32''
AutoCAD SHX Text
PROPOSED SITE PLAN
AutoCAD SHX Text
CONSTRUCTION TYPE : III-B FIRE SPRINKLER SYSTEM : YES OCCUPANCY GROUP : F1 , S1 , B SITE AREA BUILDING FOOTPRINT : 138,258 S.F BUILDING AREA ± 153,000 S.FFIRST FLOOR : WAREHOUSE AREA : 133,258 S.F. RETAIL 5,000 S.F. 5,000 S.F. SECOND FLOOR MEZZANINE 15,000 S.F. ---------------------------------- TOTAL 153,258 S.F. 153,258 S.F. AUTO PARKING REQUIRED RETAIL: 1/300 S.F. 5,000/300 = 17 STALLS 1/300 S.F. 5,000/300 = 17 STALLS MEZZANINE: 1/300 S.F. 15,000/300 = 50 STALLS 15,000/300 = 50 STALLS WAREHOUSE: 133,258 S.F 1SPACE PER 1.5 WAREHOUSE 133,000/1500=87 STALLS ________ TOTAL 154 STALLS 154 STALLS REQUIRED TOTAL PARKING PROVIDED 520 AUTO PARKING PROVIDED Standard (9' x 18') 509 stalls 509 stalls Accessible Parking (9' x 20') 11 stalls 11 stalls ---------------------------------- TOTAL 520 stalls 520 stalls
AutoCAD SHX Text
AERIAL VIEW
AutoCAD SHX Text
ALL WORK AND MATERIALS SHALL COMPLY WITH THE FOLLOWING: 2018 INTERNATIONAL BUILDING CODE (IBC) WITH CURRENT AMENDMENTS CITY OF PHOENIX ZONING CODE 2018 International Existing Building Code (IEBC) 2018 International Residential Code (IRC) 2018 International Energy Conservation Code (IECC) 2018 International Fire Code (IFC) 2018 International Fuel Gas Code (IFGC) 2018 International Mechanical Code (IMC) 2018 International Plumbing Code (IPC) 2018 International Swimming Pool and Spa Code (ISPSC) 2017 National Electrical Code (NEC) AND ALL APPLICABLE CODES, LOCAL, CURRENT OSHA LAWS, LISTS OF STANDARDS, DISABLED ACCESS REGULATIONS AND CITY OF PHOENIX AMENDMENTS.
AutoCAD SHX Text
1. ALL CONSTRUCTION SHALL COMPLY WITH THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE ALL CONSTRUCTION SHALL COMPLY WITH THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE CONSTRUCTION SHALL COMPLY WITH THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE CONSTRUCTION SHALL COMPLY WITH THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE SHALL COMPLY WITH THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE SHALL COMPLY WITH THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE COMPLY WITH THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE COMPLY WITH THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE WITH THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE WITH THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE THE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE 2018 EDITION OF THE ARIZONA BUILDING CODE, CODE EDITION OF THE ARIZONA BUILDING CODE, CODE EDITION OF THE ARIZONA BUILDING CODE, CODE OF THE ARIZONA BUILDING CODE, CODE OF THE ARIZONA BUILDING CODE, CODE THE ARIZONA BUILDING CODE, CODE THE ARIZONA BUILDING CODE, CODE ARIZONA BUILDING CODE, CODE ARIZONA BUILDING CODE, CODE BUILDING CODE, CODE BUILDING CODE, CODE CODE, CODE CODE, CODE CODE CODE AMENDMENTS, LAWS AND ORDINANCES AS SPECIFIED BY THE CITY OF PHOENIX BUILDING LAWS AND ORDINANCES AS SPECIFIED BY THE CITY OF PHOENIX BUILDING LAWS AND ORDINANCES AS SPECIFIED BY THE CITY OF PHOENIX BUILDING AND ORDINANCES AS SPECIFIED BY THE CITY OF PHOENIX BUILDING AND ORDINANCES AS SPECIFIED BY THE CITY OF PHOENIX BUILDING ORDINANCES AS SPECIFIED BY THE CITY OF PHOENIX BUILDING ORDINANCES AS SPECIFIED BY THE CITY OF PHOENIX BUILDING AS SPECIFIED BY THE CITY OF PHOENIX BUILDING AS SPECIFIED BY THE CITY OF PHOENIX BUILDING SPECIFIED BY THE CITY OF PHOENIX BUILDING SPECIFIED BY THE CITY OF PHOENIX BUILDING BY THE CITY OF PHOENIX BUILDING BY THE CITY OF PHOENIX BUILDING THE CITY OF PHOENIX BUILDING THE CITY OF PHOENIX BUILDING CITY OF PHOENIX BUILDING CITY OF PHOENIX BUILDING OF PHOENIX BUILDING OF PHOENIX BUILDING PHOENIX BUILDING PHOENIX BUILDING BUILDING BUILDING DEPARTMENT. 2. DO NOT SCALE DRAWINGS. CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB DO NOT SCALE DRAWINGS. CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB NOT SCALE DRAWINGS. CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB NOT SCALE DRAWINGS. CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB SCALE DRAWINGS. CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB SCALE DRAWINGS. CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB DRAWINGS. CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB DRAWINGS. CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB CONTRACTORS SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB VERIFY ALL CONDITIONS AND DIMENSIONS AT JOB ALL CONDITIONS AND DIMENSIONS AT JOB ALL CONDITIONS AND DIMENSIONS AT JOB CONDITIONS AND DIMENSIONS AT JOB CONDITIONS AND DIMENSIONS AT JOB AND DIMENSIONS AT JOB AND DIMENSIONS AT JOB DIMENSIONS AT JOB DIMENSIONS AT JOB AT JOB AT JOB JOB JOB SITE. IF ANY DISCREPANCIES ARE FOUND, THE ARCHITECT SHALL BE NOTIFIED. 3. ALL DIMENSIONS ARE TO FACE OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS ALL DIMENSIONS ARE TO FACE OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS DIMENSIONS ARE TO FACE OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS DIMENSIONS ARE TO FACE OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS ARE TO FACE OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS ARE TO FACE OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS TO FACE OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS TO FACE OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS FACE OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS FACE OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS OF FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS FINISH AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS AND COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS COLUMNS UNLESS NOTED OTHERWISE. CONCRETE IS UNLESS NOTED OTHERWISE. CONCRETE IS UNLESS NOTED OTHERWISE. CONCRETE IS NOTED OTHERWISE. CONCRETE IS NOTED OTHERWISE. CONCRETE IS OTHERWISE. CONCRETE IS OTHERWISE. CONCRETE IS CONCRETE IS CONCRETE IS IS IS DIMENSIONED TO THE SURFACE U.N.O. 4. ABBREVIATIONS THROUGHOUT THE PLAN ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE ABBREVIATIONS THROUGHOUT THE PLAN ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE ABBREVIATIONS THROUGHOUT THE PLAN ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE ABBREVIATIONS THROUGHOUT THE PLAN ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE THROUGHOUT THE PLAN ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE THROUGHOUT THE PLAN ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE THE PLAN ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE THE PLAN ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE PLAN ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE PLAN ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE ARE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE THOSE IN COMMON USE. THE ARCHITECT SHALL DEFINE IN COMMON USE. THE ARCHITECT SHALL DEFINE IN COMMON USE. THE ARCHITECT SHALL DEFINE COMMON USE. THE ARCHITECT SHALL DEFINE COMMON USE. THE ARCHITECT SHALL DEFINE USE. THE ARCHITECT SHALL DEFINE USE. THE ARCHITECT SHALL DEFINE THE ARCHITECT SHALL DEFINE THE ARCHITECT SHALL DEFINE ARCHITECT SHALL DEFINE ARCHITECT SHALL DEFINE SHALL DEFINE SHALL DEFINE DEFINE DEFINE INTENT OF ANY QUESTIONS. 5. ALL CONTRACTORS MUST CONFORM TO ARIZONA LABOR CODE. ALL CONTRACTORS MUST CONFORM TO ARIZONA LABOR CODE. 6. THE CONTRACT DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE UNLESS THE CONTRACT DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE UNLESS CONTRACT DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE UNLESS CONTRACT DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE UNLESS DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE UNLESS DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE UNLESS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE UNLESS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE UNLESS SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE UNLESS SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE UNLESS REPRESENT THE FINISHED STRUCTURE UNLESS REPRESENT THE FINISHED STRUCTURE UNLESS THE FINISHED STRUCTURE UNLESS THE FINISHED STRUCTURE UNLESS FINISHED STRUCTURE UNLESS FINISHED STRUCTURE UNLESS STRUCTURE UNLESS STRUCTURE UNLESS UNLESS UNLESS OTHERWISE SHOWN. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHOWN. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHOWN. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR THE METHOD OF CONSTRUCTION. THE CONTRACTOR THE METHOD OF CONSTRUCTION. THE CONTRACTOR METHOD OF CONSTRUCTION. THE CONTRACTOR METHOD OF CONSTRUCTION. THE CONTRACTOR OF CONSTRUCTION. THE CONTRACTOR OF CONSTRUCTION. THE CONTRACTOR CONSTRUCTION. THE CONTRACTOR CONSTRUCTION. THE CONTRACTOR THE CONTRACTOR THE CONTRACTOR CONTRACTOR CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL AND SHALL BE SOLELY RESPONSIBLE FOR ALL AND SHALL BE SOLELY RESPONSIBLE FOR ALL SHALL BE SOLELY RESPONSIBLE FOR ALL SHALL BE SOLELY RESPONSIBLE FOR ALL BE SOLELY RESPONSIBLE FOR ALL BE SOLELY RESPONSIBLE FOR ALL SOLELY RESPONSIBLE FOR ALL SOLELY RESPONSIBLE FOR ALL RESPONSIBLE FOR ALL RESPONSIBLE FOR ALL FOR ALL FOR ALL FOR ALL ALL ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES, INCLUDING BUT NOT MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES, INCLUDING BUT NOT MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES, INCLUDING BUT NOT METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES, INCLUDING BUT NOT METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES, INCLUDING BUT NOT TECHNIQUES, SEQUENCES, AND PROCEDURES, INCLUDING BUT NOT TECHNIQUES, SEQUENCES, AND PROCEDURES, INCLUDING BUT NOT SEQUENCES, AND PROCEDURES, INCLUDING BUT NOT SEQUENCES, AND PROCEDURES, INCLUDING BUT NOT AND PROCEDURES, INCLUDING BUT NOT AND PROCEDURES, INCLUDING BUT NOT PROCEDURES, INCLUDING BUT NOT PROCEDURES, INCLUDING BUT NOT INCLUDING BUT NOT INCLUDING BUT NOT BUT NOT BUT NOT NOT NOT LIMITED TO INSTALLATION OF ADEQUATE SHORING, BRACING, ETC. TO SAFELY EXECUTE ALL WORKS. 7. SEPARATE BUILDING PERMITS SHALL BE TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS SEPARATE BUILDING PERMITS SHALL BE TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS BUILDING PERMITS SHALL BE TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS BUILDING PERMITS SHALL BE TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS PERMITS SHALL BE TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS PERMITS SHALL BE TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS SHALL BE TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS SHALL BE TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS BE TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS BE TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS TAKEN OUT FOR ELECTRICAL AND MECHANICAL PORTIONS OUT FOR ELECTRICAL AND MECHANICAL PORTIONS OUT FOR ELECTRICAL AND MECHANICAL PORTIONS FOR ELECTRICAL AND MECHANICAL PORTIONS FOR ELECTRICAL AND MECHANICAL PORTIONS ELECTRICAL AND MECHANICAL PORTIONS ELECTRICAL AND MECHANICAL PORTIONS AND MECHANICAL PORTIONS AND MECHANICAL PORTIONS MECHANICAL PORTIONS MECHANICAL PORTIONS PORTIONS PORTIONS AND SHALL BE PAID FOR BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY SHALL BE PAID FOR BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY SHALL BE PAID FOR BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY BE PAID FOR BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY BE PAID FOR BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY PAID FOR BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY PAID FOR BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY FOR BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY FOR BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY THE CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY CONTRACTOR. THE BUILDING PERMIT SHALL BE PROCESSED BY THE BUILDING PERMIT SHALL BE PROCESSED BY THE BUILDING PERMIT SHALL BE PROCESSED BY BUILDING PERMIT SHALL BE PROCESSED BY BUILDING PERMIT SHALL BE PROCESSED BY PERMIT SHALL BE PROCESSED BY PERMIT SHALL BE PROCESSED BY SHALL BE PROCESSED BY SHALL BE PROCESSED BY BE PROCESSED BY BE PROCESSED BY PROCESSED BY PROCESSED BY BY BY JOHN CATALDO & ASSOCIATES AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND CATALDO & ASSOCIATES AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND CATALDO & ASSOCIATES AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND & ASSOCIATES AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND & ASSOCIATES AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND ASSOCIATES AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND ASSOCIATES AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND PAID FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND FOR BY THE CONTRACTOR. ALL OTHER PERMITS AND BY THE CONTRACTOR. ALL OTHER PERMITS AND BY THE CONTRACTOR. ALL OTHER PERMITS AND THE CONTRACTOR. ALL OTHER PERMITS AND THE CONTRACTOR. ALL OTHER PERMITS AND CONTRACTOR. ALL OTHER PERMITS AND CONTRACTOR. ALL OTHER PERMITS AND ALL OTHER PERMITS AND ALL OTHER PERMITS AND OTHER PERMITS AND OTHER PERMITS AND PERMITS AND PERMITS AND AND AND LICENSES SHALL BE OBTAINED AND PAID FOR BY THE CONTRACTOR. 8. REQUIRED PERMITS SHALL BE OBTAINED FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. REQUIRED PERMITS SHALL BE OBTAINED FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. PERMITS SHALL BE OBTAINED FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. PERMITS SHALL BE OBTAINED FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. SHALL BE OBTAINED FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. SHALL BE OBTAINED FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. BE OBTAINED FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. BE OBTAINED FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. OBTAINED FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. OBTAINED FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. FROM THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. THE "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. "STATE DIVISION OF INDUSTRIAL SAFETY & CAL. DIVISION OF INDUSTRIAL SAFETY & CAL. DIVISION OF INDUSTRIAL SAFETY & CAL. OF INDUSTRIAL SAFETY & CAL. OF INDUSTRIAL SAFETY & CAL. INDUSTRIAL SAFETY & CAL. INDUSTRIAL SAFETY & CAL. SAFETY & CAL. SAFETY & CAL. & CAL. & CAL. CAL. CAL. OSHA" FOR ANY TRENCHES OR EXCAVATIONS 9. SEPARATE PLANS SHALL BE PLAN CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR SEPARATE PLANS SHALL BE PLAN CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR PLANS SHALL BE PLAN CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR PLANS SHALL BE PLAN CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR SHALL BE PLAN CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR SHALL BE PLAN CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR BE PLAN CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR BE PLAN CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR PLAN CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR PLAN CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR CHECKED AND SEPARATE PERMITS SHALL BE OBTAINED FOR AND SEPARATE PERMITS SHALL BE OBTAINED FOR AND SEPARATE PERMITS SHALL BE OBTAINED FOR SEPARATE PERMITS SHALL BE OBTAINED FOR SEPARATE PERMITS SHALL BE OBTAINED FOR PERMITS SHALL BE OBTAINED FOR PERMITS SHALL BE OBTAINED FOR SHALL BE OBTAINED FOR SHALL BE OBTAINED FOR BE OBTAINED FOR BE OBTAINED FOR OBTAINED FOR OBTAINED FOR FOR FOR ANY MODIFICATION TO EXISTING AUTOMATIC FIRE-EXTINGUISHING SYSTEM AS APPLICABLE. 10. ALL ARCHITECTURAL, ELECTRICAL, MECHANICAL AND PLUMBING REQUIREMENTS MUST BE ALL ARCHITECTURAL, ELECTRICAL, MECHANICAL AND PLUMBING REQUIREMENTS MUST BE ARCHITECTURAL, ELECTRICAL, MECHANICAL AND PLUMBING REQUIREMENTS MUST BE ARCHITECTURAL, ELECTRICAL, MECHANICAL AND PLUMBING REQUIREMENTS MUST BE ELECTRICAL, MECHANICAL AND PLUMBING REQUIREMENTS MUST BE ELECTRICAL, MECHANICAL AND PLUMBING REQUIREMENTS MUST BE MECHANICAL AND PLUMBING REQUIREMENTS MUST BE MECHANICAL AND PLUMBING REQUIREMENTS MUST BE AND PLUMBING REQUIREMENTS MUST BE AND PLUMBING REQUIREMENTS MUST BE PLUMBING REQUIREMENTS MUST BE PLUMBING REQUIREMENTS MUST BE REQUIREMENTS MUST BE REQUIREMENTS MUST BE MUST BE MUST BE BE BE COORDINATED BEFORE THE CONTRACTOR PROCEEDS WITH CONSTRUCTION. 11. NOT USED. NOT USED. 12. ALL AREAS AFFECTED OR DAMAGED BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND ALL AREAS AFFECTED OR DAMAGED BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND AREAS AFFECTED OR DAMAGED BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND AREAS AFFECTED OR DAMAGED BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND AFFECTED OR DAMAGED BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND AFFECTED OR DAMAGED BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND OR DAMAGED BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND OR DAMAGED BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND DAMAGED BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND DAMAGED BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND BY ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND ALTERATIONS, REMOVAL OF EXISTING CONSTRUCTION AND REMOVAL OF EXISTING CONSTRUCTION AND REMOVAL OF EXISTING CONSTRUCTION AND OF EXISTING CONSTRUCTION AND OF EXISTING CONSTRUCTION AND EXISTING CONSTRUCTION AND EXISTING CONSTRUCTION AND CONSTRUCTION AND CONSTRUCTION AND AND AND NEW WORK SHALL BE PATCHED AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY WORK SHALL BE PATCHED AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY WORK SHALL BE PATCHED AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY SHALL BE PATCHED AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY SHALL BE PATCHED AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY BE PATCHED AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY BE PATCHED AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY PATCHED AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY PATCHED AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY AND AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY AND REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY REPAIRED TO MATCH EXISTING OR IN A SATISFACTORY TO MATCH EXISTING OR IN A SATISFACTORY TO MATCH EXISTING OR IN A SATISFACTORY MATCH EXISTING OR IN A SATISFACTORY MATCH EXISTING OR IN A SATISFACTORY EXISTING OR IN A SATISFACTORY EXISTING OR IN A SATISFACTORY OR IN A SATISFACTORY OR IN A SATISFACTORY IN A SATISFACTORY IN A SATISFACTORY A SATISFACTORY A SATISFACTORY SATISFACTORY SATISFACTORY MANNER APPROVED BY THE ARCHITECT AND PROJECT MANAGER. 13. THE CONTRACTOR SHALL MAINTAIN FIRE ACCESS DURING CONSTRUCTION. THE CONTRACTOR SHALL MAINTAIN FIRE ACCESS DURING CONSTRUCTION. 14. THE CONTRACTOR SHALL MAINTAIN THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE THE CONTRACTOR SHALL MAINTAIN THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE CONTRACTOR SHALL MAINTAIN THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE CONTRACTOR SHALL MAINTAIN THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE SHALL MAINTAIN THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE SHALL MAINTAIN THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE MAINTAIN THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE MAINTAIN THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE SITE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE CLEAN OF RUBBISH SO AS NOT TO IMPEDE THE OF RUBBISH SO AS NOT TO IMPEDE THE OF RUBBISH SO AS NOT TO IMPEDE THE RUBBISH SO AS NOT TO IMPEDE THE RUBBISH SO AS NOT TO IMPEDE THE SO AS NOT TO IMPEDE THE SO AS NOT TO IMPEDE THE AS NOT TO IMPEDE THE AS NOT TO IMPEDE THE NOT TO IMPEDE THE NOT TO IMPEDE THE TO IMPEDE THE TO IMPEDE THE IMPEDE THE IMPEDE THE THE THE ACCESS AND WORK OF OTHERS. 15. SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR REQUIRED BY THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR REQUIRED BY THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR BY THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR BY THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT FOR SHALL BE SUBMITTED TO THE ARCHITECT FOR SHALL BE SUBMITTED TO THE ARCHITECT FOR BE SUBMITTED TO THE ARCHITECT FOR BE SUBMITTED TO THE ARCHITECT FOR SUBMITTED TO THE ARCHITECT FOR SUBMITTED TO THE ARCHITECT FOR TO THE ARCHITECT FOR TO THE ARCHITECT FOR THE ARCHITECT FOR THE ARCHITECT FOR ARCHITECT FOR ARCHITECT FOR FOR FOR REVIEW PRIOR TO FABRICATION. ALLOW MINIMUM OF ONE WEEK FOR REVIEW BY THE ARCHITECT. 16. TYPICAL DETAILS AND GENERAL NOTES APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY TYPICAL DETAILS AND GENERAL NOTES APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY DETAILS AND GENERAL NOTES APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY DETAILS AND GENERAL NOTES APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY AND GENERAL NOTES APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY AND GENERAL NOTES APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY GENERAL NOTES APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY GENERAL NOTES APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY NOTES APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY NOTES APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY APPLY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY TO ALL PARTS OF THE JOB, EXCEPT WHERE THEY ALL PARTS OF THE JOB, EXCEPT WHERE THEY ALL PARTS OF THE JOB, EXCEPT WHERE THEY PARTS OF THE JOB, EXCEPT WHERE THEY PARTS OF THE JOB, EXCEPT WHERE THEY OF THE JOB, EXCEPT WHERE THEY OF THE JOB, EXCEPT WHERE THEY THE JOB, EXCEPT WHERE THEY THE JOB, EXCEPT WHERE THEY JOB, EXCEPT WHERE THEY JOB, EXCEPT WHERE THEY EXCEPT WHERE THEY EXCEPT WHERE THEY WHERE THEY WHERE THEY THEY THEY CONTRADICT WITH DETAILS, NOTES, ON OTHER SHEETS. 17. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST RELATIVE TO EXISTING CONDITIONS IS GIVEN AS BEST TO EXISTING CONDITIONS IS GIVEN AS BEST TO EXISTING CONDITIONS IS GIVEN AS BEST EXISTING CONDITIONS IS GIVEN AS BEST EXISTING CONDITIONS IS GIVEN AS BEST CONDITIONS IS GIVEN AS BEST CONDITIONS IS GIVEN AS BEST IS GIVEN AS BEST IS GIVEN AS BEST GIVEN AS BEST GIVEN AS BEST AS BEST AS BEST BEST BEST POSSIBLE, BUT WITHOUT GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH BUT WITHOUT GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH BUT WITHOUT GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH WITHOUT GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH WITHOUT GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH WHERE ACTUAL CONDITIONS CONFLICT WITH WHERE ACTUAL CONDITIONS CONFLICT WITH ACTUAL CONDITIONS CONFLICT WITH ACTUAL CONDITIONS CONFLICT WITH CONDITIONS CONFLICT WITH CONDITIONS CONFLICT WITH CONFLICT WITH CONFLICT WITH WITH WITH THE DRAWING, THEY SHALL BE REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS DRAWING, THEY SHALL BE REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS DRAWING, THEY SHALL BE REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS THEY SHALL BE REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS THEY SHALL BE REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS SHALL BE REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS SHALL BE REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS BE REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS BE REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS REPORTED TO THE ARCHITECT SO THAT THE PROPER REVISIONS TO THE ARCHITECT SO THAT THE PROPER REVISIONS TO THE ARCHITECT SO THAT THE PROPER REVISIONS THE ARCHITECT SO THAT THE PROPER REVISIONS THE ARCHITECT SO THAT THE PROPER REVISIONS THE ARCHITECT SO THAT THE PROPER REVISIONS ARCHITECT SO THAT THE PROPER REVISIONS ARCHITECT SO THAT THE PROPER REVISIONS SO THAT THE PROPER REVISIONS SO THAT THE PROPER REVISIONS THAT THE PROPER REVISIONS THAT THE PROPER REVISIONS THE PROPER REVISIONS THE PROPER REVISIONS PROPER REVISIONS PROPER REVISIONS REVISIONS REVISIONS MAY BE MADE. MODIFICATIONS OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT BE MADE. MODIFICATIONS OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT BE MADE. MODIFICATIONS OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT MADE. MODIFICATIONS OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT MADE. MODIFICATIONS OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT MODIFICATIONS OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT MODIFICATIONS OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT OF CONSTRUCTION SHALL NOT BE MADE WITHOUT OF CONSTRUCTION SHALL NOT BE MADE WITHOUT CONSTRUCTION SHALL NOT BE MADE WITHOUT CONSTRUCTION SHALL NOT BE MADE WITHOUT SHALL NOT BE MADE WITHOUT SHALL NOT BE MADE WITHOUT NOT BE MADE WITHOUT NOT BE MADE WITHOUT BE MADE WITHOUT BE MADE WITHOUT MADE WITHOUT MADE WITHOUT MADE WITHOUT WITHOUT WITHOUT WRITTEN APPROVAL OF THE ARCHITECT. 18. WHERE NO SPECIFIC DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR WHERE NO SPECIFIC DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR NO SPECIFIC DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR NO SPECIFIC DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR SPECIFIC DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR SPECIFIC DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR OR CONSTRUCTION SHALL BE IDENTICAL OR OR CONSTRUCTION SHALL BE IDENTICAL OR CONSTRUCTION SHALL BE IDENTICAL OR CONSTRUCTION SHALL BE IDENTICAL OR SHALL BE IDENTICAL OR SHALL BE IDENTICAL OR BE IDENTICAL OR BE IDENTICAL OR IDENTICAL OR IDENTICAL OR OR OR SIMILAR TO THAT INDICATED. FOR LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO TO THAT INDICATED. FOR LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO TO THAT INDICATED. FOR LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO THAT INDICATED. FOR LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO THAT INDICATED. FOR LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO INDICATED. FOR LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO INDICATED. FOR LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO FOR LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO FOR LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO LIKE CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO CASES OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO OF CONSTRUCTION ON THIS PROJECT, SUBJECT TO CONSTRUCTION ON THIS PROJECT, SUBJECT TO CONSTRUCTION ON THIS PROJECT, SUBJECT TO ON THIS PROJECT, SUBJECT TO ON THIS PROJECT, SUBJECT TO THIS PROJECT, SUBJECT TO THIS PROJECT, SUBJECT TO PROJECT, SUBJECT TO PROJECT, SUBJECT TO SUBJECT TO SUBJECT TO TO TO TO REVIEW AND APPROVAL BY THE ARCHITECT. 19. THESE DRAWINGS DO NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. THESE DRAWINGS DO NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. DRAWINGS DO NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. DRAWINGS DO NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. DO NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. DO NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. COMPONENTS FOR CONSTRUCTION SAFETY. COMPONENTS FOR CONSTRUCTION SAFETY. FOR CONSTRUCTION SAFETY. FOR CONSTRUCTION SAFETY. CONSTRUCTION SAFETY. CONSTRUCTION SAFETY. SAFETY. SAFETY. SAFETY OF ALL PARTIES PRESENT ON THE JOBSITE IS THE RESPONSIBILITY OF THE CONTRACTOR. 20. ALL MATERIALS FOR THE COMPLETION OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, ALL MATERIALS FOR THE COMPLETION OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, MATERIALS FOR THE COMPLETION OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, MATERIALS FOR THE COMPLETION OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, FOR THE COMPLETION OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, FOR THE COMPLETION OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, THE COMPLETION OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, THE COMPLETION OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, COMPLETION OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, COMPLETION OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, OF THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, THE WORK ELEMENTS NOTED HEREIN SHALL BE NEW, WORK ELEMENTS NOTED HEREIN SHALL BE NEW, WORK ELEMENTS NOTED HEREIN SHALL BE NEW, ELEMENTS NOTED HEREIN SHALL BE NEW, ELEMENTS NOTED HEREIN SHALL BE NEW, NOTED HEREIN SHALL BE NEW, NOTED HEREIN SHALL BE NEW, HEREIN SHALL BE NEW, HEREIN SHALL BE NEW, SHALL BE NEW, SHALL BE NEW, BE NEW, BE NEW, NEW, NEW, FIRST QUALITY CONDITION AND DELIVERED TO THE JOBSITE IN AN UNDAMAGED CONDITION. 21. ALL REQUIRED WORK SHALL BE PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED ALL REQUIRED WORK SHALL BE PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED REQUIRED WORK SHALL BE PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED REQUIRED WORK SHALL BE PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED WORK SHALL BE PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED WORK SHALL BE PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED SHALL BE PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED SHALL BE PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED BE PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED BE PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED PERFORMED BY THE GENERAL CONTRACTOR UNLESS NOTED BY THE GENERAL CONTRACTOR UNLESS NOTED BY THE GENERAL CONTRACTOR UNLESS NOTED THE GENERAL CONTRACTOR UNLESS NOTED THE GENERAL CONTRACTOR UNLESS NOTED GENERAL CONTRACTOR UNLESS NOTED GENERAL CONTRACTOR UNLESS NOTED CONTRACTOR UNLESS NOTED CONTRACTOR UNLESS NOTED UNLESS NOTED UNLESS NOTED NOTED NOTED OTHERWISE. ALL REFERENCES TO THE "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS ALL REFERENCES TO THE "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS ALL REFERENCES TO THE "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS REFERENCES TO THE "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS REFERENCES TO THE "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS TO THE "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS TO THE "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS THE "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS THE "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS "CONTRACTOR" INCLUDE THE GENERAL CONTRACTOR AND HIS INCLUDE THE GENERAL CONTRACTOR AND HIS INCLUDE THE GENERAL CONTRACTOR AND HIS THE GENERAL CONTRACTOR AND HIS THE GENERAL CONTRACTOR AND HIS GENERAL CONTRACTOR AND HIS GENERAL CONTRACTOR AND HIS CONTRACTOR AND HIS CONTRACTOR AND HIS AND HIS AND HIS HIS HIS SUB-CONTRACTORS: THEY SHALL BE ONE AND THE SAME. 22. THE CONTRACTOR SHALL COORDINATE THE WORK EFFORTS OF THE VARIOUS TRADES TO AVOID THE CONTRACTOR SHALL COORDINATE THE WORK EFFORTS OF THE VARIOUS TRADES TO AVOID CONTRACTOR SHALL COORDINATE THE WORK EFFORTS OF THE VARIOUS TRADES TO AVOID CONTRACTOR SHALL COORDINATE THE WORK EFFORTS OF THE VARIOUS TRADES TO AVOID SHALL COORDINATE THE WORK EFFORTS OF THE VARIOUS TRADES TO AVOID SHALL COORDINATE THE WORK EFFORTS OF THE VARIOUS TRADES TO AVOID COORDINATE THE WORK EFFORTS OF THE VARIOUS TRADES TO AVOID COORDINATE THE WORK EFFORTS OF THE VARIOUS TRADES TO AVOID THE WORK EFFORTS OF THE VARIOUS TRADES TO AVOID THE WORK EFFORTS OF THE VARIOUS TRADES TO AVOID WORK EFFORTS OF THE VARIOUS TRADES TO AVOID WORK EFFORTS OF THE VARIOUS TRADES TO AVOID EFFORTS OF THE VARIOUS TRADES TO AVOID EFFORTS OF THE VARIOUS TRADES TO AVOID OF THE VARIOUS TRADES TO AVOID OF THE VARIOUS TRADES TO AVOID THE VARIOUS TRADES TO AVOID THE VARIOUS TRADES TO AVOID VARIOUS TRADES TO AVOID VARIOUS TRADES TO AVOID TRADES TO AVOID TRADES TO AVOID TO AVOID TO AVOID AVOID AVOID POSSIBLE INTERFERENCES, DUPLICATION OF WORK OR UNFINISHED GAPS BETWEEN OPERATIONS. INTERFERENCES, DUPLICATION OF WORK OR UNFINISHED GAPS BETWEEN OPERATIONS. INTERFERENCES, DUPLICATION OF WORK OR UNFINISHED GAPS BETWEEN OPERATIONS. DUPLICATION OF WORK OR UNFINISHED GAPS BETWEEN OPERATIONS. DUPLICATION OF WORK OR UNFINISHED GAPS BETWEEN OPERATIONS. OF WORK OR UNFINISHED GAPS BETWEEN OPERATIONS. OF WORK OR UNFINISHED GAPS BETWEEN OPERATIONS. WORK OR UNFINISHED GAPS BETWEEN OPERATIONS. WORK OR UNFINISHED GAPS BETWEEN OPERATIONS. OR UNFINISHED GAPS BETWEEN OPERATIONS. OR UNFINISHED GAPS BETWEEN OPERATIONS. UNFINISHED GAPS BETWEEN OPERATIONS. UNFINISHED GAPS BETWEEN OPERATIONS. GAPS BETWEEN OPERATIONS. GAPS BETWEEN OPERATIONS. BETWEEN OPERATIONS. BETWEEN OPERATIONS. OPERATIONS. OPERATIONS. SUB-CONTRACTORS SHALL PROPERLY CONNECT AND COORDINATE THEIR WORK WITH THE WORK OF SHALL PROPERLY CONNECT AND COORDINATE THEIR WORK WITH THE WORK OF SHALL PROPERLY CONNECT AND COORDINATE THEIR WORK WITH THE WORK OF PROPERLY CONNECT AND COORDINATE THEIR WORK WITH THE WORK OF PROPERLY CONNECT AND COORDINATE THEIR WORK WITH THE WORK OF CONNECT AND COORDINATE THEIR WORK WITH THE WORK OF CONNECT AND COORDINATE THEIR WORK WITH THE WORK OF AND COORDINATE THEIR WORK WITH THE WORK OF AND COORDINATE THEIR WORK WITH THE WORK OF COORDINATE THEIR WORK WITH THE WORK OF COORDINATE THEIR WORK WITH THE WORK OF THEIR WORK WITH THE WORK OF THEIR WORK WITH THE WORK OF WORK WITH THE WORK OF WORK WITH THE WORK OF WITH THE WORK OF WITH THE WORK OF THE WORK OF THE WORK OF WORK OF WORK OF OF OF OTHERS AS SHOWN ON THE DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM AS SHOWN ON THE DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM AS SHOWN ON THE DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM SHOWN ON THE DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM SHOWN ON THE DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM ON THE DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM ON THE DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM THE DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM THE DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM DRAWINGS. ANY AND ALL DELAYS OR CHANGES ARISING FROM ANY AND ALL DELAYS OR CHANGES ARISING FROM ANY AND ALL DELAYS OR CHANGES ARISING FROM AND ALL DELAYS OR CHANGES ARISING FROM AND ALL DELAYS OR CHANGES ARISING FROM ALL DELAYS OR CHANGES ARISING FROM ALL DELAYS OR CHANGES ARISING FROM DELAYS OR CHANGES ARISING FROM DELAYS OR CHANGES ARISING FROM OR CHANGES ARISING FROM OR CHANGES ARISING FROM CHANGES ARISING FROM CHANGES ARISING FROM ARISING FROM ARISING FROM FROM FROM CONFLICTS BETWEEN TRADES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO BETWEEN TRADES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO BETWEEN TRADES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO TRADES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO TRADES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO THE RESPONSIBILITY OF THE CONTRACTOR AT NO THE RESPONSIBILITY OF THE CONTRACTOR AT NO RESPONSIBILITY OF THE CONTRACTOR AT NO RESPONSIBILITY OF THE CONTRACTOR AT NO OF THE CONTRACTOR AT NO OF THE CONTRACTOR AT NO THE CONTRACTOR AT NO THE CONTRACTOR AT NO CONTRACTOR AT NO CONTRACTOR AT NO AT NO AT NO NO NO ADDITIONAL COST TO THE TENANT.
AutoCAD SHX Text
%%UGENERAL NOTES:
AutoCAD SHX Text
1. CONTRACTOR SHALL INSPECT THE PREMISES AND SURROUNDING SITE CONDITIONS PRIOR TO CONTRACTOR SHALL INSPECT THE PREMISES AND SURROUNDING SITE CONDITIONS PRIOR TO SHALL INSPECT THE PREMISES AND SURROUNDING SITE CONDITIONS PRIOR TO SHALL INSPECT THE PREMISES AND SURROUNDING SITE CONDITIONS PRIOR TO INSPECT THE PREMISES AND SURROUNDING SITE CONDITIONS PRIOR TO INSPECT THE PREMISES AND SURROUNDING SITE CONDITIONS PRIOR TO THE PREMISES AND SURROUNDING SITE CONDITIONS PRIOR TO THE PREMISES AND SURROUNDING SITE CONDITIONS PRIOR TO PREMISES AND SURROUNDING SITE CONDITIONS PRIOR TO PREMISES AND SURROUNDING SITE CONDITIONS PRIOR TO AND SURROUNDING SITE CONDITIONS PRIOR TO AND SURROUNDING SITE CONDITIONS PRIOR TO SURROUNDING SITE CONDITIONS PRIOR TO SURROUNDING SITE CONDITIONS PRIOR TO SITE CONDITIONS PRIOR TO SITE CONDITIONS PRIOR TO CONDITIONS PRIOR TO CONDITIONS PRIOR TO PRIOR TO PRIOR TO TO TO SUBMITTING A BID PRICE TO REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS A BID PRICE TO REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS A BID PRICE TO REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS BID PRICE TO REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS BID PRICE TO REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS PRICE TO REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS PRICE TO REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS TO REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS TO REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS REVIEW ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS ACTUAL CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS CONDITIONS, AVAILABILITY OF PARKING, LOCATIONS AVAILABILITY OF PARKING, LOCATIONS AVAILABILITY OF PARKING, LOCATIONS OF PARKING, LOCATIONS OF PARKING, LOCATIONS PARKING, LOCATIONS PARKING, LOCATIONS PARKING, LOCATIONS LOCATIONS LOCATIONS OF POSSIBLE TRASH DUMPSTERS, GENERAL SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING POSSIBLE TRASH DUMPSTERS, GENERAL SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING POSSIBLE TRASH DUMPSTERS, GENERAL SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING TRASH DUMPSTERS, GENERAL SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING TRASH DUMPSTERS, GENERAL SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING DUMPSTERS, GENERAL SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING DUMPSTERS, GENERAL SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING GENERAL SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING GENERAL SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING SITE ACCESS FOR TRUCKS AND DELIVERIES, STOCKING ACCESS FOR TRUCKS AND DELIVERIES, STOCKING ACCESS FOR TRUCKS AND DELIVERIES, STOCKING FOR TRUCKS AND DELIVERIES, STOCKING FOR TRUCKS AND DELIVERIES, STOCKING TRUCKS AND DELIVERIES, STOCKING TRUCKS AND DELIVERIES, STOCKING TRUCKS AND DELIVERIES, STOCKING AND DELIVERIES, STOCKING AND DELIVERIES, STOCKING DELIVERIES, STOCKING DELIVERIES, STOCKING STOCKING STOCKING OF SUPPLIES, ETC. 2. CONTRACTOR SHALL VERIFY KEYING REQUIREMENTS OF ALL LOCKS WITH TENANT PRIOR TO CONTRACTOR SHALL VERIFY KEYING REQUIREMENTS OF ALL LOCKS WITH TENANT PRIOR TO SHALL VERIFY KEYING REQUIREMENTS OF ALL LOCKS WITH TENANT PRIOR TO SHALL VERIFY KEYING REQUIREMENTS OF ALL LOCKS WITH TENANT PRIOR TO VERIFY KEYING REQUIREMENTS OF ALL LOCKS WITH TENANT PRIOR TO VERIFY KEYING REQUIREMENTS OF ALL LOCKS WITH TENANT PRIOR TO KEYING REQUIREMENTS OF ALL LOCKS WITH TENANT PRIOR TO KEYING REQUIREMENTS OF ALL LOCKS WITH TENANT PRIOR TO REQUIREMENTS OF ALL LOCKS WITH TENANT PRIOR TO REQUIREMENTS OF ALL LOCKS WITH TENANT PRIOR TO OF ALL LOCKS WITH TENANT PRIOR TO OF ALL LOCKS WITH TENANT PRIOR TO ALL LOCKS WITH TENANT PRIOR TO ALL LOCKS WITH TENANT PRIOR TO LOCKS WITH TENANT PRIOR TO LOCKS WITH TENANT PRIOR TO WITH TENANT PRIOR TO WITH TENANT PRIOR TO TENANT PRIOR TO TENANT PRIOR TO PRIOR TO PRIOR TO TO TO ORDERING HARDWARE AS SPECIFIED HEREIN. 3. THESE DRAWINGS AND WRITTEN SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY THESE DRAWINGS AND WRITTEN SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY DRAWINGS AND WRITTEN SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY DRAWINGS AND WRITTEN SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY AND WRITTEN SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY AND WRITTEN SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY WRITTEN SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY WRITTEN SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY ARE COMPLEMENTARY AND WHAT IS REQUIRED BY ARE COMPLEMENTARY AND WHAT IS REQUIRED BY COMPLEMENTARY AND WHAT IS REQUIRED BY COMPLEMENTARY AND WHAT IS REQUIRED BY AND WHAT IS REQUIRED BY AND WHAT IS REQUIRED BY WHAT IS REQUIRED BY WHAT IS REQUIRED BY IS REQUIRED BY IS REQUIRED BY REQUIRED BY REQUIRED BY BY BY ONE SHALL BE BINDING AS IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL SHALL BE BINDING AS IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL SHALL BE BINDING AS IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL BE BINDING AS IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL BE BINDING AS IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL BINDING AS IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL BINDING AS IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL AS IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL AS IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL IF REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL REQUIRED BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL BY ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL ALL. REFER ALSO TO BID INSTRUCTIONS AND GENERAL REFER ALSO TO BID INSTRUCTIONS AND GENERAL REFER ALSO TO BID INSTRUCTIONS AND GENERAL ALSO TO BID INSTRUCTIONS AND GENERAL ALSO TO BID INSTRUCTIONS AND GENERAL TO BID INSTRUCTIONS AND GENERAL TO BID INSTRUCTIONS AND GENERAL BID INSTRUCTIONS AND GENERAL BID INSTRUCTIONS AND GENERAL INSTRUCTIONS AND GENERAL INSTRUCTIONS AND GENERAL AND GENERAL AND GENERAL GENERAL GENERAL CONDITIONS AND SPECIFICATIONS UNDER SEPARATE COVER. 4. NO SUBSTITUTIONS OF SPECIFIED MATERIALS SHALL BE ALLOWED WITHOUT FIRST SUBMITTING NO SUBSTITUTIONS OF SPECIFIED MATERIALS SHALL BE ALLOWED WITHOUT FIRST SUBMITTING SUBSTITUTIONS OF SPECIFIED MATERIALS SHALL BE ALLOWED WITHOUT FIRST SUBMITTING SUBSTITUTIONS OF SPECIFIED MATERIALS SHALL BE ALLOWED WITHOUT FIRST SUBMITTING OF SPECIFIED MATERIALS SHALL BE ALLOWED WITHOUT FIRST SUBMITTING OF SPECIFIED MATERIALS SHALL BE ALLOWED WITHOUT FIRST SUBMITTING SPECIFIED MATERIALS SHALL BE ALLOWED WITHOUT FIRST SUBMITTING SPECIFIED MATERIALS SHALL BE ALLOWED WITHOUT FIRST SUBMITTING MATERIALS SHALL BE ALLOWED WITHOUT FIRST SUBMITTING MATERIALS SHALL BE ALLOWED WITHOUT FIRST SUBMITTING SHALL BE ALLOWED WITHOUT FIRST SUBMITTING SHALL BE ALLOWED WITHOUT FIRST SUBMITTING BE ALLOWED WITHOUT FIRST SUBMITTING BE ALLOWED WITHOUT FIRST SUBMITTING ALLOWED WITHOUT FIRST SUBMITTING ALLOWED WITHOUT FIRST SUBMITTING WITHOUT FIRST SUBMITTING WITHOUT FIRST SUBMITTING FIRST SUBMITTING FIRST SUBMITTING SUBMITTING SUBMITTING SPECIFICATIONS, SAMPLES, COST AND TIME SCHEDULE IMPACT DATE TO P.M. FOR APPROVAL. 5. AT THE TIME OF BID SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY AT THE TIME OF BID SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY THE TIME OF BID SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY THE TIME OF BID SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY TIME OF BID SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY TIME OF BID SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY OF BID SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY OF BID SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY BID SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY BID SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY SUBMITTAL, THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY THE CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY CONTRACTOR SAHLL ADVISE THE P.M. IN WRITING OF ANY SAHLL ADVISE THE P.M. IN WRITING OF ANY SAHLL ADVISE THE P.M. IN WRITING OF ANY ADVISE THE P.M. IN WRITING OF ANY ADVISE THE P.M. IN WRITING OF ANY THE P.M. IN WRITING OF ANY THE P.M. IN WRITING OF ANY P.M. IN WRITING OF ANY P.M. IN WRITING OF ANY IN WRITING OF ANY IN WRITING OF ANY WRITING OF ANY WRITING OF ANY OF ANY OF ANY ANY ANY SPECIFIED MATERIALS OR EQUIPMENTS WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN MATERIALS OR EQUIPMENTS WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN MATERIALS OR EQUIPMENTS WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN OR EQUIPMENTS WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN OR EQUIPMENTS WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN EQUIPMENTS WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN EQUIPMENTS WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN WHICH ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN ARE EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN UNAVAILABLE OR WILL CAUSE A DELAY IN UNAVAILABLE OR WILL CAUSE A DELAY IN OR WILL CAUSE A DELAY IN OR WILL CAUSE A DELAY IN WILL CAUSE A DELAY IN WILL CAUSE A DELAY IN CAUSE A DELAY IN CAUSE A DELAY IN A DELAY IN A DELAY IN DELAY IN DELAY IN IN IN THE CONSTRUCTION COMPLETION SCHEDULE. 6. IMMEDIATELY AFTER BEING AWARDED THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A IMMEDIATELY AFTER BEING AWARDED THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A AFTER BEING AWARDED THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A AFTER BEING AWARDED THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A BEING AWARDED THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A BEING AWARDED THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A AWARDED THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A AWARDED THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A THE CONTRACT, THE CONTRACTOR SHALL SUBMIT A CONTRACT, THE CONTRACTOR SHALL SUBMIT A CONTRACT, THE CONTRACTOR SHALL SUBMIT A THE CONTRACTOR SHALL SUBMIT A THE CONTRACTOR SHALL SUBMIT A CONTRACTOR SHALL SUBMIT A CONTRACTOR SHALL SUBMIT A SHALL SUBMIT A SHALL SUBMIT A SUBMIT A SUBMIT A A A CONSTRUCTION SCHEDULE. THIS SCHEDULE SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE SCHEDULE. THIS SCHEDULE SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE SCHEDULE. THIS SCHEDULE SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE THIS SCHEDULE SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE THIS SCHEDULE SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE SCHEDULE SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE SCHEDULE SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE SHALL BE CONTINUOUSLY UPDATED AND POSTED ON THE BE CONTINUOUSLY UPDATED AND POSTED ON THE BE CONTINUOUSLY UPDATED AND POSTED ON THE CONTINUOUSLY UPDATED AND POSTED ON THE CONTINUOUSLY UPDATED AND POSTED ON THE UPDATED AND POSTED ON THE UPDATED AND POSTED ON THE AND POSTED ON THE AND POSTED ON THE POSTED ON THE POSTED ON THE ON THE ON THE THE THE JOBSITE AT ALL TIMES. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC SHALL BE RESPONSIBLE FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC SHALL BE RESPONSIBLE FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC BE RESPONSIBLE FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC BE RESPONSIBLE FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC RESPONSIBLE FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC RESPONSIBLE FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC FOR SUPPLYING TEMPORARY UTILITIES (ELECTRIC SUPPLYING TEMPORARY UTILITIES (ELECTRIC SUPPLYING TEMPORARY UTILITIES (ELECTRIC TEMPORARY UTILITIES (ELECTRIC TEMPORARY UTILITIES (ELECTRIC UTILITIES (ELECTRIC UTILITIES (ELECTRIC (ELECTRIC (ELECTRIC POWER/LIGHTING , WATER, ETC.) TO THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, , WATER, ETC.) TO THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, , WATER, ETC.) TO THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, WATER, ETC.) TO THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, WATER, ETC.) TO THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, ETC.) TO THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, ETC.) TO THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, TO THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, TO THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, THE JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, JOBSITE FOR USE BY ALL CONSTRUCTION TRADES, FOR USE BY ALL CONSTRUCTION TRADES, FOR USE BY ALL CONSTRUCTION TRADES, USE BY ALL CONSTRUCTION TRADES, USE BY ALL CONSTRUCTION TRADES, BY ALL CONSTRUCTION TRADES, BY ALL CONSTRUCTION TRADES, ALL CONSTRUCTION TRADES, ALL CONSTRUCTION TRADES, CONSTRUCTION TRADES, CONSTRUCTION TRADES, TRADES, TRADES, INCLUDING THOSE NOT A SUBCONTRACTOR TO THE GENERAL CONTRACTOR. 8. ALL CONTRACTORS SHALL MAINTAIN THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, ALL CONTRACTORS SHALL MAINTAIN THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, ALL CONTRACTORS SHALL MAINTAIN THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, ALL CONTRACTORS SHALL MAINTAIN THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, CONTRACTORS SHALL MAINTAIN THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, CONTRACTORS SHALL MAINTAIN THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, SHALL MAINTAIN THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, SHALL MAINTAIN THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, MAINTAIN THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, MAINTAIN THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, THE PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, PREMISES CLEAN AND FREE OF ALL TRASH AND DEBRIS, CLEAN AND FREE OF ALL TRASH AND DEBRIS, CLEAN AND FREE OF ALL TRASH AND DEBRIS, AND FREE OF ALL TRASH AND DEBRIS, AND FREE OF ALL TRASH AND DEBRIS, FREE OF ALL TRASH AND DEBRIS, FREE OF ALL TRASH AND DEBRIS, OF ALL TRASH AND DEBRIS, OF ALL TRASH AND DEBRIS, ALL TRASH AND DEBRIS, ALL TRASH AND DEBRIS, TRASH AND DEBRIS, TRASH AND DEBRIS, AND DEBRIS, AND DEBRIS, DEBRIS, DEBRIS, AND SHALL PROTECT ALL ADJACENT WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL SHALL PROTECT ALL ADJACENT WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL SHALL PROTECT ALL ADJACENT WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL PROTECT ALL ADJACENT WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL PROTECT ALL ADJACENT WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL ALL ADJACENT WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL ALL ADJACENT WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL ADJACENT WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL ADJACENT WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL WORK FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL FROM DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL DAMAGE, SPOILING, PAINT OVERSPRAY, ETC. ALL SPOILING, PAINT OVERSPRAY, ETC. ALL SPOILING, PAINT OVERSPRAY, ETC. ALL PAINT OVERSPRAY, ETC. ALL PAINT OVERSPRAY, ETC. ALL OVERSPRAY, ETC. ALL OVERSPRAY, ETC. ALL ETC. ALL ETC. ALL ALL ALL FIXTURES, EQUIPMENTS, GLAZING, FLOORS, ETC. SHALL BE LEFT CLEAN AND READY FOR CABINETRY. 9. NO HAZARDOUS MATERIALS TO BE STORED ON SITE.NO HAZARDOUS MATERIALS TO BE STORED ON SITE.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
EXISTING ZONING :
AutoCAD SHX Text
S-1
AutoCAD SHX Text
SITE ACREAGE :
AutoCAD SHX Text
9.57 NET / GROSS
AutoCAD SHX Text
PROPOSED ZONING :
AutoCAD SHX Text
CP/GCP
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text
NO CONDOMINIUM PROPOSED
AutoCAD SHX Text
LANDSCAPE : 6%%%
068554
May 11
Page 18: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission

S

T

A

T

E

O

F C

A

L

I

F

O

R

N

I

A

RENEW

11-30-21

L

i

c

.

N

o

. C-1

0

4

5

7

J

O

H

N

G

. CA

T

A

L

D

O

R

E

G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

T

AutoCAD SHX Text
%%P 0.00' F.F.
AutoCAD SHX Text
GARAGE FLOOR
AutoCAD SHX Text
%%P40'-0' F.F.
AutoCAD SHX Text
PARAPET
AutoCAD SHX Text
%%P20'-0' F.F.
AutoCAD SHX Text
PARAPET
AutoCAD SHX Text
%%P 0.00' F.F.
AutoCAD SHX Text
GARAGE FLOOR
AutoCAD SHX Text
40'-0' F.F.
AutoCAD SHX Text
PARAPET
AutoCAD SHX Text
- 4.00' F.F.
AutoCAD SHX Text
TRUCK WELL LINE
AutoCAD SHX Text
%%P 0.00' F.F.
AutoCAD SHX Text
GARAGE FLOOR
AutoCAD SHX Text
%%P40'-0' F.F.
AutoCAD SHX Text
PARAPET
AutoCAD SHX Text
%%P20'-0' F.F.
AutoCAD SHX Text
PARAPET
AutoCAD SHX Text
%%P 0.00' F.F.
AutoCAD SHX Text
GARAGE FLOOR
AutoCAD SHX Text
40'-0' F.F.
AutoCAD SHX Text
PARAPET
AutoCAD SHX Text
37'-0'
AutoCAD SHX Text
TOP OF ROOF
AutoCAD SHX Text
37'-0'
AutoCAD SHX Text
TOP OF ROOF
AutoCAD SHX Text
37'-0'
AutoCAD SHX Text
TOP OF ROOF
AutoCAD SHX Text
37'-0'
AutoCAD SHX Text
TOP OF ROOF
AutoCAD SHX Text
OF :
AutoCAD SHX Text
SHEET :
AutoCAD SHX Text
Job No :
AutoCAD SHX Text
Drawing No :
AutoCAD SHX Text
Scale :
AutoCAD SHX Text
Manager :
AutoCAD SHX Text
Designer :
AutoCAD SHX Text
Date :
AutoCAD SHX Text
Revisions :
AutoCAD SHX Text
Date :
AutoCAD SHX Text
Drawing Content :
AutoCAD SHX Text
DEVELOPER :
AutoCAD SHX Text
PROJECT NAME & SITE ADDRESS:
AutoCAD SHX Text
ARCHITECTURE . ENGINEERING
AutoCAD SHX Text
835 MISSION STREET, SOUTH PASADENA, CA 91030
AutoCAD SHX Text
FAX : 626-799-7010
AutoCAD SHX Text
OFFICE : 626-799-4400
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
ELEVATIONS
AutoCAD SHX Text
J.C
AutoCAD SHX Text
S.O.
AutoCAD SHX Text
MARCH 2020
AutoCAD SHX Text
2020-024
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
A-2
AutoCAD SHX Text
1
AutoCAD SHX Text
12
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
38TH ST.&SOUTHERN AVE
AutoCAD SHX Text
PHOENIX AZ 85042
AutoCAD SHX Text
SCALE: 1" = 1/16'-1"
AutoCAD SHX Text
NORTH ELEVATION
AutoCAD SHX Text
38TH ST. & SOUTHERN AVE. PHOENIX, AZ 85042
AutoCAD SHX Text
Industrial Metal Supply
068554
June 30 2020
Page 19: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission
068554
May 11
Page 20: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission
Page 21: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission
Page 22: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission
Page 23: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission
Page 24: Staff Report: Z-23-20-8 July 31, 2020 · 2020-07-31 · Staff Report: Z-23-20-8 . July 31, 2020 . South Mountain Village Planning Committee Meeting Date August 11, 2020 Planning Commission