FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 1116 April 2010 1 Roseires Dam Heightening Project General Location Roseires Dam Heightening Project Stage 1 – Constructed 1960’s

Upload: others

Post on 12-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Stage 1 – Constructed 1960’s · Stage 2 – 1960’s Grid System Roseires Dam Heightening Project Coordinate Systems System Datum / Epoch Usage Era Ellipsoid / Ref Frame Sudan

FIG Congress 2010  Facing the Challenges – Building the Capacity  Sydney, Australia, 11‐16 April 2010  1

Roseires Dam Heightening Project

General Location

Roseires Dam Heightening Project

Stage 1 – Constructed 1960’s

Page 2: Stage 1 – Constructed 1960’s · Stage 2 – 1960’s Grid System Roseires Dam Heightening Project Coordinate Systems System Datum / Epoch Usage Era Ellipsoid / Ref Frame Sudan

FIG Congress 2010  Facing the Challenges – Building the Capacity  Sydney, Australia, 11‐16 April 2010  2

Roseires Dam Heightening Project

Stage 2 – 1960’s Grid System

Roseires Dam Heightening Project

Coordinate Systems System Datum / Epoch Usage Era Ellipsoid /

Ref Frame

Sudan National Trig Survey

Horizontal Adindan

Vertical – Khartoum

1950’s - current Clark 1880

Roseires Project Stage I Local

(OLD)

Horizontal –Unknown

Vertical – Khartoum

1960’s - 2008

Unknown

Roseires Project Stage 2 (SMEC)

Horizontal WGS84 / current

Vertical - Alexandria

Current GRS80 ITRF 2000

Sudan National Irrigation Network

DIUREF2007 (IGN France)

Horizontal WGS84 / 2005.0

Vertical - Alexandria

2008 - current

GRS80 ITRF 2005

Page 3: Stage 1 – Constructed 1960’s · Stage 2 – 1960’s Grid System Roseires Dam Heightening Project Coordinate Systems System Datum / Epoch Usage Era Ellipsoid / Ref Frame Sudan

FIG Congress 2010  Facing the Challenges – Building the Capacity  Sydney, Australia, 11‐16 April 2010  3

Roseires Dam Heightening Project

Primary Control

Roseires Dam Heightening Project

Transformations

SMECObs

Scale, Rotation & Shift of OLD Coords to WGS84

+ = E

N OLD

R OLD

WGS84

s E

N

E0

N0

WGS84

OLD WGS84

Page 4: Stage 1 – Constructed 1960’s · Stage 2 – 1960’s Grid System Roseires Dam Heightening Project Coordinate Systems System Datum / Epoch Usage Era Ellipsoid / Ref Frame Sudan

FIG Congress 2010  Facing the Challenges – Building the Capacity  Sydney, Australia, 11‐16 April 2010  4

Roseires Dam Heightening Project

Transformations

SMECObs

Scale, Rotation & Shift of OLD Coords to WGS84

+ = E

N OLD

R OLD

WGS84

s E

N

E0

N0

WGS84

OLD WGS84

WGS84

E

N

SMECObs

IGN Coords DIUREF2007

E

N DIUREF2007

+ = .

(tobs – 2005.0) E N NUVEL-1A

.

Tectonic Plate Motion

Roseires Dam Heightening Project

Concrete Dam Control Extension

Page 5: Stage 1 – Constructed 1960’s · Stage 2 – 1960’s Grid System Roseires Dam Heightening Project Coordinate Systems System Datum / Epoch Usage Era Ellipsoid / Ref Frame Sudan

FIG Congress 2010  Facing the Challenges – Building the Capacity  Sydney, Australia, 11‐16 April 2010  5

Roseires Dam Heightening Project

Concrete Dam Control Extension

Roseires Dam Heightening Project

Concrete Dam Control Extension

Page 6: Stage 1 – Constructed 1960’s · Stage 2 – 1960’s Grid System Roseires Dam Heightening Project Coordinate Systems System Datum / Epoch Usage Era Ellipsoid / Ref Frame Sudan

FIG Congress 2010  Facing the Challenges – Building the Capacity  Sydney, Australia, 11‐16 April 2010  6

Roseires Dam Heightening Project

Concrete Dam Control Extension

Roseires Dam Heightening Project

Concrete Dam Control Extension

Page 7: Stage 1 – Constructed 1960’s · Stage 2 – 1960’s Grid System Roseires Dam Heightening Project Coordinate Systems System Datum / Epoch Usage Era Ellipsoid / Ref Frame Sudan

FIG Congress 2010  Facing the Challenges – Building the Capacity  Sydney, Australia, 11‐16 April 2010  7

Roseires Dam Heightening Project

Concrete Dam Control Extension

Roseires Dam Heightening Project

Supervision & Contracts Training

•Local survey staff

•Foreign construction contractor survey staff

Quality Assurance (QA)

•Installation procedures

•Supervision & Monitoring

Working conditions

•Climate – productivity

•Safety & Security

Contract conditions

•Accommodation & Messing

•Transport & Travel

•Leave breaks

•Financial considerations (FOREX, Tax)