stage 2 d/dbp sample schedules - louisiana department of health
TRANSCRIPT
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
29 PALMS TRAILER PARK LA1117023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
49028 SQUIRREL ALLEY RDDBP01 9 September-
18263 TAB CREEK RDDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
A CHILDS WORLD DAY CARE & LEARNING CENTR LA2005266
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
KITCHEN TAPDBP01 9 September-
1 YEAR OLD ROOMDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
A TO Z DAYCARE CENTER LA2103320
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MAIN BLDG FRONTDBP01 8 August-
KITCHENDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ABITA SPRINGS WATER SYSTEM LA1103002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CENTER BOARD @ PACKETDBP02 8 August-
6TH STREET @ ST. CHARLESDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
AIR LIQUIDE GEISMAR UTILITY SERVICES LA2005256
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RUBICON ENTRYDBP01 8 August-
10/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
AJAX BEULAH WATER SYSTEM LA1069015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
963 BETHANY ROADDBP02 12 December-
HWY 487 @ UNION GROVE RDDBP03 12 December-
Wednesday, February 7, 2018 Page 1 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ALABAMA WATER SYSTEM LA1013001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 151 AND LINCOLN PARISH ROADDBP01 7 July-
14077 HIGHWAY 151DBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ALBERTA WATER SYSTEM LA1013002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FAIR RDDBP01 8 August-
LAKEFRONT ROADDBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
ALEXANDER MILNE HOME FOR WOMEN LA1103196
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1024 MILNE CIRCLEDBP01 9 September-
1052 MILNE CIRCLEDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ALLEN PARISH WW DISTRICT NO 1 LA1003001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3090 E RIVER ROADDBP01 6 June-
257 SHALLOW HOLE ROADDBP02 6 June-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
ALMA PLANTATION LTD LA1077048
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
12734 HWY 416DBP02 8 August-
4412 HWY 413DBP04 8 August-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
ALMATIS LA2005165
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ADMIN BLDGDBP01 7 July-
WAREHOUSEDBP03 7 July-
Wednesday, February 7, 2018 Page 2 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ANGELLE S TRAILER PARK WATER SYSTEM LA1055060
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2321 MILLS RD LOT 35DBP02 7 July-
2321 MILLS RD OFFICEDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ANGIE WATER SUPPLY LA1117008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CORNER OF DIXIE ST & HWY 1071DBP01 8 August-
HOUSTON @ 30365DBP02 8 August-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
ANNADALE PLANTATION WATER SUPPLY LA1047011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TRACTOR SHEDDBP01 8 August-
54198 HWY 995DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ARC OF ACADIANA LA1001011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ADMINISTRATION BUILDINGDBP02 6 June-
CAFETERIADBP03 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ARCADIA WATER SYSTEM LA1013003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DANIEL ST @ BEECH STDBP02 8 August-
1192 JONESBORO ROADDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ARCHIBALD WATER SYSTEM LA1083012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
139 HWY 135DBP01 7 July-
646 HWY 3048DBP02 7 July-
Wednesday, February 7, 2018 Page 3 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
ARDAGH GLASS WATER SYSTEM LA2061003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NORTH SIDE OF VISITORS PARKINGDBP01 7 July-
SOUTH WALL OF ADMIN BLDGDBP02 7 July-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ASCENSION CONSOLIDATED UTILITY DIST 1 LA1005045
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MODESTEDBP01 6 June-
JULESDBP03 6 June-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ASCENSION PARISH WATER WORKS DISTRICT 2 LA1005001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MARCHAND SCHOOL ROAD AT HWY 22DBP02 6 June-
HIGHWAY 44 AND HIGHWAY 942DBP03 6 June-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ASSUMPTION PARISH WW DISTRICT 1 LA1007001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1100 HIGHWAY 662DBP01 9 September-
2505 HIGHWAY 1DBP02 9 September-
7261 HIGHWAY 1DBP03 9 September-
3649 HIGHWAY 308DBP04 9 September-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
ATHENS WATER SYSTEM LA1027001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
14683 HWY 9DBP02 7 July-
HWY 9 SOUTHDBP03 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ATLANTA WATER SUPPLY LA1127001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
12137 MAIN STREETDBP01 9 September-
705 HWY 1228DBP02 9 September-
Wednesday, February 7, 2018 Page 4 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
AUDUBON PARK APARTMENTS WATER SYSTEM LA1033133
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CLUBHOUSEDBP01 9 September-
BUILDING 9DBP02 9 September-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
AUTUMN ACRES MHP WATER SYSTEM LA1017002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 701DBP02 9 September-
LOT 756DBP03 9 September-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
AVOYELLES PARISH WATERWORKS DISTRICT 1 LA1009002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
B.F. LEMOINEDBP01 5 May-
BIG BEND CHURCHDBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
AVOYELLES WARD 3 WATERWORKS DISTRICT LA1009017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
260 LEE STREETDBP01 5 May-
1462 HWY 1187DBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
AVOYELLES WARD ONE WATER SYSTEM INC LA1009016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1638 SALINE RDDBP01 7 July-
HWY 107DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
AVOYELLES WATER COMMISSION LA1009021
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
7162 HWY 1DBP03 5 May-
12066 HWY 1DBP04 5 May-
Wednesday, February 7, 2018 Page 5 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
AZALEA LANE TRAILER PARK LA1103004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 143DBP02 8 August-
LOT 101DBP03 8 August-
1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:
BABY BEGINNINGS LA2005265
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NORTH EAST TAP 1DBP01 8 August-
TAP 1 - INSIDE BLDGDBP02 8 August-
1/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
BACKWOOD VILLAGE WATER SYSTEM LA1127022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 505 AND WILLARD TAYLORDBP02 3 March-
LUCKY ROADDBP03 3 March-
4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
BARKSDALE AFB WATER SYSTEM LA1015022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HANGER ONEDBP03 8 August-
CHILD DEVELOPMENT CENTERDBP05 8 August-
FUELSDBP06 8 August-
OFF LOAD FACILITYDBP07 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BARRON RIDGE SUBDIVISION WATER SYSTEM LA1017072
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
10963 BARROW RIDGEDBP01 6 June-
10829 BARROW RIDGEDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BASF CORPORATION LA2005003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WEST GATE SECURITY BUILDINGDBP02 8 August-
ACETYLENE BUILDINGDBP03 8 August-
Wednesday, February 7, 2018 Page 6 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
BASTROP WATER SYSTEM LA1067003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TEAKWOODDBP02 8 August-
INDUSTRIAL DRIVEDBP04 2 February-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
BATON ROUGE WATER COMPANY LA1033005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
GEN BEN DAVIS @ VETSDBP03 7 July-
14061 TROY DUPLESSISDBP10 7 July-
40250 PELICAN POINT PKWYDBP11 7 July-
9526 ARLEENDBP12 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BAYOU BONNE IDEE WS LA1067002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
11724 HORSESHOE LAKE RDDBP01 8 August-
BONNE IDEE RD.DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BAYOU DES CANNES WATER SYSTEM LA1039016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4283 RUPPERT ROADDBP02 10 October-
591 HWY 190 WESTDBP03 10 October-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
BAYOU LACOMBE MIDDLE SCHOOL LA2103053
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SIDE OF MAIN BUILDINGDBP02 7 July-
SAMPLE TAP AT GYMDBP03 7 July-
4/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
BAYOU LIBERTY WATER ASSOCIATION LA1103005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LIBERTY @ CARROLL RDDBP01 11 November-
DIXIE RANCH RD @ VICTORIA WAYDBP04 8 August-
Wednesday, February 7, 2018 Page 7 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
BAYOU MACON WATER SYSTEM LA1065005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
154 ANTLEY RDDBP01 7 July-
1240 HWY 577 SDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BAYOU PIERRE WATER SYSTEM LA1081008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HALIFAX PLANTATION RD @ HWY 1DBP01 8 August-
HARTS ISLAND RD @ ELLERBEE RDDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
BAYOU TECHE WATER WORKS LA1099002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1009 WENDY DRIVEDBP01 8 August-
KYLE LANDRY @ NORTHSIDE ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BAYVIEW DEVELOPMENT LA2101026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BAYVIEW DRIVE (POC #1)DBP01 9 September-
LOT #6 CAPTAINS LANE (POC#5)DBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BAYWOOD ESTATES SUBD LA1105045
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
42375 MAGNOLIA LOOPDBP01 8 August-
17384 BAYWOOD DRIVEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BCC DETENTION CENTER WS LA1083016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
UNIT 2DBP01 8 August-
FIRE HOUSEDBP02 8 August-
Wednesday, February 7, 2018 Page 8 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BEAR CREEK WATER SYSTEM LA1049001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1254 ARCADIA HWYDBP01 7 July-
475 BEAR KNOLLDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BEAU CHENE WATER SYSTEM LA1103006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
205 MAKO NAKODBP01 8 August-
137 ACADIAN LANEDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BEAUREGARD DISTRICT NO 2 WARD NO 5 LA1011012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SNYDER RD @ HWY 389DBP01 7 July-
4456 HWY 27DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BEAUREGARD WATER DISTRICT #5 LA1011009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DANIEL ASHWORTH RDDBP01 8 August-
MIDDLE OF FISH HOLE LOOPDBP02 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
BEAUREGARD WATER WORKS DIST #3 LA1011008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1-2 RAGLEY ON CONLEYDBP01 9 September-
TEXAS EASTERN ROADDBP02 9 September-
BANNISTER ROADDBP03 9 September-
THOMAS SMITH ROADDBP04 9 September-
CLAYTON ISLES ROADDBP05 9 September-
SCHEUTZ ROADDBP06 9 September-
Wednesday, February 7, 2018 Page 9 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BEEKMAN WATER SYSTEM LA1067018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HENDRIX RD - STATE LINEDBP01 10 October-
STEVENSON @ CROSSETTDBP02 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BELAH FELLOWSHIP WATER SYSTEM LA1059001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HASSAN DRIVE @ HWY 8DBP01 7 July-
HURRICANE CR & WHITE SULPHUR SPRINGS RDDBP02 7 July-
1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
BEL-DI-GIL WATER SYSTEM LA1017004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ADGER STDBP01 7 July-
HWY 173DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BELLA VISTA MHP WATER SYSTEM LA1017005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
308 BUDDYDBP01 8 August-
3006 BELLA VISTADBP02 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
BELLE CHASSE WATER DISTRICT LA1075001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BC FIREHOUSE - HWY 123DBP02 9 September-
WILSON SUBD HWY 23DBP03 9 September-
GRAIN ELEVATORDBP05 9 September-
WOODLAND HIGHWAYDBP06 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BELLE PLACE TRAILER PARK WATER SYSTEM LA1055082
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
600 ST NAZAIRE LOT 23DBP01 6 June-
600 ST NAZAIRE LOT 75DBP02 6 June-
Wednesday, February 7, 2018 Page 10 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BELLE RINA LA1005006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
819 E VERNADBP01 8 August-
614 E VERNADBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BELLEVILLE SUBDIVISION WATER SYSTEM LA1055094
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
128 LA RUE CANNES(TCR006)DBP02 8 August-
141 LA RUE BIARRITZ(MRT007)DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BELLEVUE WATER SYSTEM LA1015041
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BODCAU DAM ROADDBP01 8 August-
S. CLOVER LEAFDBP02 8 August-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
BELLWOOD WATER SYSTEM LA1069014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 117 & 118 EDBP01 9 September-
4600 HWY 118 @ MINKDBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
BELMONT WATERWORKS INC LA1085053
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 1216DBP02 8 August-
HIGHWAY 174DBP03 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
BERNICE WATER SYSTEM LA1111001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
PINE GROVE ROADDBP01 8 August-
PISGAH ROADDBP02 8 August-
Wednesday, February 7, 2018 Page 11 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
BETTER WATERWORKS WATER SYSTEM LA1073003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
201 BARBARA DRIVEDBP01 8 August-
BARNES RD SWARTZ FAIRBANKSDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BEVERLY HEIGHTS MANOR LA1103178
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
537 PANTHERDBP01 9 September-
526 NORTHSHORE LANEDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BIENVILLE WATER SYSTEM LA1013004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
253109 LA HWY 9 (NORTH)DBP02 7 July-
LA HWY 507DBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BIG BRANCH TRAILER PARK LA1103182
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TRAILER 1DBP01 8 August-
BTWN TRAILER 22 AND 23DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BIG CAJUN II POWER PLANT LA2077010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BC2 WAREHOUSEDBP01 8 August-
TRAINING CENTERDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BIG OAKS WATER SYSTEM LA1017081
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
11011 BIG OAKS TRAILDBP01 6 June-
10047 BIG OAKS TRAILDBP02 6 June-
Wednesday, February 7, 2018 Page 12 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BIOLAB, INC LA2019053
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WASTEWATER TREATMENT PLANT TAPDBP01 8 August-
CENTRAL MAINTENANCE SAMPLE TAPDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BISTINEAU WATER SYSTEM LA1119001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3948 HWY 371DBP02 7 July-
616 MARTHA WOODSDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BLACK RIVER WATER SYSTEM LA1025002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 124 @ DELTA GINDBP01 8 August-
HWY 124 @ HWY 3037DBP02 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
BLANCHARD WATER SYSTEM LA1017006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
9302 LOWERY RDDBP05 6 June-
8206 N LAKESHORE DRDBP06 6 June-
9735 HEREFORD RDDBP07 6 June-
7411 GREYWOOD DRDBP08 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BLOCKER WATER SYSTEM LA1119002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
KINGS CORNER RDDBP01 8 August-
DAVIS STORE @ PORTERVILLE RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BOASSO INDUSTRIES,LLC LA2103397
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MACHINE SHOPDBP02 8 August-
NE CORNER OF BLDG ON RIGHTDBP03 8 August-
Wednesday, February 7, 2018 Page 13 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
BOB COMMUNITY WATERWORKS LA1043016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
474 COTTON ISLANDDBP01 2 February-
POINT OF ENTRYDBP02 2 February-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BODCAU WATER WORKS LA1015021
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
121 SKIPPER ROADDBP01 9 September-
BETTY JOAN ROADDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BOGUE-LUSA WATER WORKS DISTRICT LA1117009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
12019 HWY 21DBP02 5 May-
109 RALPH DRIVEDBP03 5 May-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
BON TERRE CORPORATION WATER SYSTEM LA1005004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
11485 COUNTRY CLUB DRDBP01 8 August-
39374 BON TERRE DRDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BONITA WATER SYSTEM LA1067004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OLD BONITA ROADDBP01 9 September-
HUMPHREY ROADDBP02 9 September-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
BRADY MOBILE HOME PARK LA1017090
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
5044 GREENWOOD RD - LOT 23DBP01 8 August-
5044 GREENWOOD RD - LOT 31DBP02 8 August-
Wednesday, February 7, 2018 Page 14 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
BRIER LAKE UTILITIES INC LA1103141
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
31101 BELMONT CTDBP02 8 August-
61301 WILDBERRY CTDBP03 8 August-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
BRIGAS ESTATES WATER SYSTEM LA1019001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
QUAIL LANEDBP02 9 September-
5954 NOBIE LANEDBP03 9 September-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
BROOKHOLLOW SUBDIVISION WATER SYSTEM LA1055166
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
114 GREENSIDEDBP02 7 July-
316 CREEKSIDEDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BROUILLETTE WATER SYSTEM INC LA1009003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 452 LOCK AND DAMDBP01 5 May-
KIM RUSH AND FORD'S LANEDBP02 5 May-
1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:
BROWNVILLE WATER SYSTEM LA1073004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WT HEMPHILL & DELAUGHTERDBP01 5 May-
BAILEY & TIPPETTDBP02 5 May-
EDWARDS & WASHINGTONDBP03 5 May-
919 W OLIVEDBP04 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
BRYCELAND WATER SYSTEM LA1013005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
209 COLLINSWORTHDBP02 9 September-
198 RED CLAY HILLDBP03 9 September-
Wednesday, February 7, 2018 Page 15 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
BUCKEYE WATER DISTRICT 50 LA1079004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
282 WOODSON LANDINGDBP01 5 May-
6641 HIGHWAY 28 EDBP02 5 May-
7887 HICKORY GROVE ROADDBP03 5 May-
112 OLD BEAUBOUEFDBP04 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
C K B TRAILER PARK WATER SYSTEM LA1019059
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BEHIND LOTS 30 & 31 END OF LINE SE SIDEDBP01 8 August-
BEHIND LOT # 1 END OF LINE SW CORNERDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CA INST OF TECH - LIGO OBSERVATORY LA2063042
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TAP AT OFFICEDBP01 8 August-
TAP AT SCHOOL BLDGDBP02 8 August-
10/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
CADEVILLE WATER DISTRICT LA1073060
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 34 AT HWY 546DBP01 8 August-
DR DAVIS DR AT GOLSON RDDBP03 8 August-
10/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
CAJUN MOBILE HOME PARK WATER SYSTEM LA1055121
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
111 GIREER RD LOT 60DBP01 9 September-
111 GIREER RD LOT 10DBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CAL MAINE FOODS, INC LA2091030
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FRONT TAPDBP01 10 October-
CHLORINE ROOMDBP02 10 October-
Wednesday, February 7, 2018 Page 16 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
CALCASIEU PARISH WW 12 WARD 3 LA1019126
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3961 HENRY PUGHDBP01 10 October-
END OF VERMILION DRIVEDBP03 10 October-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
CALCASIEU PARISH WW DIST 9 CARLYSS LA1019116
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
275 GROS ROADDBP01 7 July-
3058 GUM ISLANDDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CALCASIEU PARISH WW DISTRICT 7 LA1019114
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3397 EDGERLY RDDBP01 8 August-
251 SAM DUNHAM RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CALCASIEU PARISH WW DISTRICT 8 LA1019118
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4351 LUTHER ROADDBP01 6 June-
PARK RIDGE LANE @ HWY 90DBP02 6 June-
4/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
CALCASIEU PARISH WW DISTRICT NO 1 LA1019051
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4562 TOPSYDBP01 7 July-
4569 CYPRESS LAKEDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CALCASIEU PARISH WW DISTRICT NO 4 LA1019053
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3740 BACK BAY CTDBP01 6 June-
3405 SMITH FERRY RDDBP02 6 June-
Wednesday, February 7, 2018 Page 17 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CALCASIEU PARISH WW DISTRICT NO 5 LA1019084
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 397DBP02 8 August-
PALOMINODBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CALCASIEU REFINING COMPANY W S LA2019132
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WATER @ C DOCKDBP01 8 August-
WATER @ VACUUM UNITDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CALCASIEU WW #14 WARD 5 LA1019042
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2343 BIG WOODS EDGERLY ROADDBP02 9 September-
GREEN ISLAND ROAD AND POLK SMITH LOOPDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CALHOUN WATER SYSTEM LA1073006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
451 OWENS ROADDBP01 8 August-
267 HWY 151 NDBP02 8 August-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
CAMERON PARISH WATER AND WW DISTRICT 1 LA1023001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1735 MARSHALL STREETDBP01 7 July-
799 DAVIS ROADDBP02 7 July-
4/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
CAMERON PARISH WW DISTRICT 10 LA1023005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DEEP BAYOUDBP01 9 September-
GULF BEACH HIGHWAYDBP02 9 September-
Wednesday, February 7, 2018 Page 18 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
CAMERON PARISH WW DISTRICT 11 - BIG LAKE LA1023013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 384 DEATONVILLEDBP01 6 June-
351 MARTIN HEBERT STDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CAMERON PARISH WW DISTRICT 11-SWEET LAKE LA1023011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1002 HWY 385DBP02 6 June-
605 GRANGERVILLEDBP03 6 June-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CAMERON PARISH WW DISTRICT 2 LA1023002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DELTRA HARDINDBP02 7 July-
RECREATION CIRCLEDBP03 7 July-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
CAMERON PARISH WW DISTRICT 7 LA1023003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6595 W. CREOLE HWYDBP01 9 September-
675 E. CREOLE HWYDBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CAMERON PARISH WW DISTRICT 9 LA1023012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CHENIER PERDUE RD DEAD ENDDBP01 6 June-
180 2 B ROADDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CAMPTI WATER SYSTEM LA1069001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 80 @ M&M GROCERYDBP01 8 August-
HIGHWAY 71DBP02 8 August-
Wednesday, February 7, 2018 Page 19 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
CARTER PLANTATION LA1063119
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MAINTENANCE BLDGDBP01 8 August-
30902 CARTER CEMETERY RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CARTHAGE BLUFF MARINA LA1063125
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 10DBP01 8 August-
LOT 19EDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CASTOR WATER SYSTEM LA1013006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POST OFFICEDBP02 8 August-
CITY HALLDBP03 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CECILIA WATER CORPORATION LA1099005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1842 DECLOUETDBP01 3 March-
1039 LYNN ROMERO DRDBP02 3 March-
D'ANGEREAU ROADDBP03 3 March-
1502 GRAND ANSE HWYDBP04 3 March-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CENTRAL BOSSIER WATER SYSTEM LA1015039
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2711 OLD PLAIN DEALING ROADDBP01 8 August-
OLD PLAIN DEALING RD @ ADGER LAKE RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CENTRAL CLAIBORNE WATER SYSTEM LA1027009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CHAT LOOPDBP01 9 September-
LA540DBP02 9 September-
Wednesday, February 7, 2018 Page 20 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CENTRAL GRANT WATER SYSTEM LA1043013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HALFWAY BETWEEN 562 & 827 MILITARY ROADDBP01 8 August-
441 NELMS LOOPDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CENTRAL PARK SUBDIVISION LA1103088
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
38189 COMMERCIAL COURTDBP01 7 July-
56721 CASS STREETDBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CENTRAL WATER SYSTEM LA1119003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BOGALEWIS FLUSH VALVEDBP01 8 August-
BURSON ROADDBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
CERTAINTEED WATER SYSTEM LA2019010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
EYE SHOWERDBP01 8 August-
TRAINING BLDGDBP02 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
CHAPMAN APARTMENTS LA1103150
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
73601 CHAPMAN DR, D-3DBP01 7 July-
73601 CHAPMAN DR, E-3DBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CHARLES ROSE MHP LA1105069
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 1DBP02 8 August-
LOT 37DBP03 8 August-
Wednesday, February 7, 2018 Page 21 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
CHARTRES PLACE SUBDIVISION WATER SYSTEM LA1055173
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
403 TAPESTRYDBP02 7 July-
209 TAPESTRYDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CHATA MOBILE HOME PARK LA1103125
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WORK SHOPDBP01 8 August-
LOT 31DBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CHATAIGNIER WATER SYSTEM LA1039002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1456 LANCE DE CAVELIERDBP01 6 June-
BOB'S ANTIQUE SHOPDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CHATA-IMA ELEMENTARY SCHOOL W S LA2103029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FRONT OF BUILDING (MRT-003)DBP02 8 August-
EAST BUILDING ACROSS FROM WELLDBP03 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CHATHAM WATER SYSTEM LA1049004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
129441 SAWYER ROADDBP01 4 April-
1221 ROBERSON ST.DBP02 4 April-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CHEE CHEE BAY WATER SYSTEM LA1069011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
GOLDONNA ROAD AND CONLAY FREDERICK ROADDBP01 8 August-
CHESAPEAKE GAS PLANT AND MAMMY TRAIL RDDBP02 8 August-
Wednesday, February 7, 2018 Page 22 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CHENIERE DREW NORTH WATER SYSTEM LA1073100
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ARK RD & GREENBRIARDBP02 5 May-
HWY 80 & OLE 15DBP03 5 May-
1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:
CHENIERE DREW SOUTH WATER SYSTEM LA1073099
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1206 PUCKETT LANEDBP02 11 November-
CHEEKS AND CHENIERE STATIONDBP03 11 November-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
CHESTERS MOBILE HOME ESTATE WATER SYSTEM LA1055197
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
112 PELTIERDBP01 8 August-
128 PELTIERDBP02 8 August-
10/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CHESTNUT-READHIMER WATER SYSTEM LA1069012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WEAVER CEM RDDBP01 8 August-
COFFEE CROSSINGDBP02 8 August-
1/1/2018 YR Monitoring Begin Date: Frequency of Sampling:
CHOUDRANT WATER SYSTEM LA1061002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
160 WALKER ROADDBP02 8 August-
NORFIELD DR & LOBLOLLY LNDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITGO PETROLEUM - CONTRACTOR COMP W S LA2019138
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
GATE 64 GUARD SHACKDBP01 9 September-
VACANT TRAILER ON EAST SIDE OF PROPERTYDBP02 9 September-
Wednesday, February 7, 2018 Page 23 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITGO PETROLEUM REFINERY WATER SYSTEM LA2019015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
D DOCKDBP02 9 September-
K34DBP03 9 September-
4/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
CITGO-PECAN GROVE CENTER LA2019141
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
COOK HOUSEDBP01 9 September-
WOMENS OUTSIDE RESTROOMDBP02 9 September-
1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF ABBEVILLE WATER SYSTEM LA1113001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
VFW LIONS CLUB/JIMMY VORHOFF, JR. DRIVEDBP01 3 March-
WEST PORT STREETDBP02 3 March-
CORNER INNDBP03 3 March-
FRANKS ALLEYDBP04 3 March-
10/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF ALEXANDRIA WATER SYSTEM LA1079001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2125 AIRBASE ROADDBP03 11 November-
145 ST ANDREWSDBP05 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF BAKER WATER SYSTEM LA1033003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
17417 WISDOMDBP01 9 September-
12443 WEDGEWOODDBP02 9 September-
1801 DEBRA STREETDBP03 9 September-
14203 FELICITY DRIVEDBP04 9 September-
Wednesday, February 7, 2018 Page 24 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF BOGALUSA WATER SYSTEM LA1117001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1228 BORGNE AVEDBP01 4 April-
733 SUPERIOR AVEDBP02 4 April-
1700 S COLUMBIA STDBP03 4 April-
1509 YOUNGS RDDBP04 4 April-
7/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF BOSSIER CITY WATER SYSTEM LA1015004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POE 1401 HAMILTONDBP01 8 August-
N WILLOW AT AIRLINEDBP02 8 August-
2007 WAKEFIELDDBP03 8 August-
3009 DONALDDBP04 8 August-
2200 LANDAUDBP05 8 August-
HWY 80@SWEPCO POLE #79DBP06 8 August-
2223 KIRBY SMITHDBP07 8 August-
BARKSDALE@ RR WWTPDBP08 8 August-
1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF BREAUX BRIDGE WATER SYSTEM LA1099003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
606 LATIOLAISDBP01 11 November-
1213 S MAIN STDBP02 11 November-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF BROUSSARD HWY 90 WATER SYSTEM LA1055194
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1225 HWY 90 - MEL'S DINERDBP01 6 June-
FABRE RDDBP02 6 June-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF BROUSSARD PURCHASE WATER SYSTEM LA1055193
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
606 ST. ETIENNE RD.DBP01 6 June-
PEAR TREE CIRCLEDBP02 6 June-
Wednesday, February 7, 2018 Page 25 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF BROUSSARD WATER SYSTEM LA1055003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
702 HUVAL DRIVEDBP02 6 June-
POST OFFICE - S. EOLA ROADDBP04 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF CARENCRO WATER SYSTEM LA1055005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
333 EAST GLORIA SWITCHDBP01 9 September-
121 ANDRE STDBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF DENHAM SPRINGS WATER SYSTEM LA1063004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
11400 LA HWY 1033DBP02 8 August-
10000 DAVIS LANEDBP03 8 August-
JOHNSON ROADDBP05 8 August-
30593 FAIRWAY VIEWDBP06 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF DERIDDER WATER SYSTEM LA1011001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1507 NORTH PINE ROADDBP02 8 August-
HIGHWAY 3226DBP05 8 August-
1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF GONZALES WATER SYSTEM LA1005030
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2425 S. BURNSIDE AVEDBP05 8 August-
2312 S SAN FRANCISCODBP06 8 August-
1908 S ROBERT WILSON RDDBP07 8 August-
1517 N COONTRAP RDDBP08 8 August-
Wednesday, February 7, 2018 Page 26 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF HAMMOND WATER SYSTEM LA1105009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
101 CONRAD ANDERSONDBP01 5 May-
SOUTH RANGE ROAD @ E. HANSONDBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF JEANERETTE WATER SYSTEM LA1045004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MAIN STREET - EAST ENDDBP01 9 September-
MAIN STREET - WEST ENDDBP02 9 September-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF JENNINGS WATER SYSTEM LA1053003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2404 EAST ACADEMY AVEDBP01 8 August-
1909 AIRPORT ROADDBP02 8 August-
4023 SHIRLEY DRIVEDBP03 8 August-
1607 CHURCH STREETDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF KAPLAN WATER SYSTEM LA1113009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2913 N HERPINDBP01 11 November-
512 CHENEAU RDDBP02 11 November-
4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF LAKE CHARLES WATER SYSTEM LA1019029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4908 DESOTO STREETDBP01 8 August-
209 HELEN STREETDBP02 8 August-
2437K ORY ROADDBP03 8 August-
4260 INDIGO PLACEDBP04 8 August-
Wednesday, February 7, 2018 Page 27 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF LEESVILLE WATER SYSTEM LA1115019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
GILLIES & TEXAS HIGHWAYDBP02 8 August-
1ST & ALLEN AVEDBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF MANY WATER SYSTEM LA1085016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POE LAB TREAT PLANTDBP04 6 June-
FISHER ROADDBP05 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF MARKSVILLE WATER SYSTEM LA1009011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
105 HILDA LANEDBP02 8 August-
WASHINGTON STREET EXTDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF OAKDALE WATER SYSTEM LA1003006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
352 PINE LANEDBP01 6 June-
107 N HOSPITAL DRIVEDBP02 6 June-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF PINEVILLE WATER SYSTEM LA1079016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BAYOU MARIE RDDBP01 6 June-
COLLEGE DRIVEDBP02 6 June-
SUSEK DRIVEDBP03 6 June-
WOODWIND DRIVEDBP04 6 June-
Wednesday, February 7, 2018 Page 28 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF PLAQUEMINE WATER SYSTEM LA1047005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
25315 DICKINSON STDBP01 5 May-
ISLAND GOLF COURSEDBP03 5 May-
ANTHONY ST @ BAYOU ROADDBP04 5 May-
59335 WW HARLEAUX BLVDDBP05 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF RAYNE WATER SYSTEM LA1001007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 35 LIFT STATIONDBP01 8 August-
CEMETARY ON BETTY STDBP02 8 August-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF SCOTT WATER SYSTEM LA1055026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1010 DELHOMMEDBP02 5 May-
424 LAURENDBP03 5 May-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF ST MARTINVILLE WATER SYSTEM LA1099007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2598 CATAHOULA HWYDBP01 9 September-
CYPRESS ISLAND ROADDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF VIDALIA WATER SYSTEM LA1029011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MURRAY STREETDBP02 8 August-
ALABAMA STREETDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF VILLE PLATTE WATER SYSTEM LA1039010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ACORIEL / 1750 E. MAIN STDBP02 7 July-
211 MOREIN STDBP03 7 July-
Wednesday, February 7, 2018 Page 29 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF WINNFIELD WATER SYSTEM LA1127012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FAIRGROUNDS ROADDBP01 7 July-
1107 EAST LAFAYETTE STREETDBP02 7 July-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
CITY OF YOUNGSVILLE PURCHASE WS LA1055195
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
105 FIELDCREST PKWYDBP01 8 August-
706 LAFAYETTE STDBP02 8 August-
1011 LANGLINAIS STDBP03 8 August-
310 BURLEY RDDBP04 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
CITY OF YOUNGSVILLE WATER SYSTEM LA1055035
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
310 RAILROADDBP04 8 August-
635 BEACONDBP05 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CLARENCE WATER SYSTEM LA1069002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MS. BANKS HIGHWAY 84 EDBP02 3 March-
436 HIGHWAY 6DBP03 3 March-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CLARKS WATER SYSTEM LA1021001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 547 & HESTER RDDBP01 7 July-
232 OUCHITA AVEDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CLEARVIEW MOBILE HOME PARK LA1019122
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 26DBP02 8 August-
LOT 50DBP03 8 August-
Wednesday, February 7, 2018 Page 30 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COLLINSTON WATER SYSTEM LA1067005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
GEORGE FRANKLIN AND SWAN LAKEDBP01 8 August-
MAIN STREET AND DOWD STREETDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COLUMBIA HEIGHTS WATER DISTRICT LA1021003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8521 HWY 165 SDBP02 6 June-
7184 HIGHWAY 165 SDBP03 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COLUMBIA WATER SYSTEM LA1021002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
774 FISHERDBP01 7 July-
PEARL AT BANNISTERDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COLWORTH PLACE WATER SUPPLY LA1017073
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
10310 SCOUT DRIVEDBP01 6 June-
10380 SCOUT DRIVEDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COLYELL COMMUNITY WATER LA1063003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
28312 S SATSUMADBP01 8 August-
18955 MCCOY ROADDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CONCORD WATER SYSTEM LA1111022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
802 HWY 348DBP01 8 August-
2597 HWY 551DBP02 8 August-
Wednesday, February 7, 2018 Page 31 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
CONCORDIA WATERWORKS DISTRICT 1 LA1029003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1877 DOTY ROADDBP02 7 July-
19078 HWY 15DBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CONSOLIDATED WATERWORKS DISTRICT 2 LA1067012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
12831 CROSSETT ROADDBP01 8 August-
COOPERLAKE ROAD AND YELDELL ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CONSOLIDATED WWKS DISTRICT 1 OF BOSSIER LA1015026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BLACKWOOD CIR @ APPLEWOOD TRAILDBP03 8 August-
3423 GINGER DRIVEDBP04 8 August-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
CONVERSE WATER SYSTEM LA1085007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
790 S FRONT STDBP01 8 August-
106 W DESOTODBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CORNEY WATER SYSTEM LA1111002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
578 PRICE RDDBP01 8 August-
BEHIND 585 UNION CROWDBP02 8 August-
4/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
COTTON PLANT WATER SYSTEM LA1021009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 126 @ SHORT HATTEN ROADDBP02 5 May-
CHILDRESS ROADDBP03 5 May-
Wednesday, February 7, 2018 Page 32 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COTTON VALLEY WATER SYSTEM LA1119004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ADKINS AND WEST ROADDBP01 8 August-
HWY 160 AND COX ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COUNTRY CLUB TRAILER PK LA1103010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
144 RAINEYDBP02 8 August-
162 RAINEYDBP03 8 August-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
COUNTRY ESTATES WATER SYSTEM NORTH LA1073011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
148 EVANS ROADDBP02 8 August-
191 PICKETT LANEDBP03 8 August-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
COUNTRY ESTATES WATER SYSTEM SOUTH LA1073118
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
113 HICKORY HILLSDBP01 8 August-
VINWOOD @ HWY 139DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COUNTRY LIVING ESTATES WATER SYSTEM LA1017076
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 110DBP01 8 August-
LOT 53DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COUNTRY LIVING TRAILER PARK WATER SYSTEM LA1019102
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6100 CENTRAL CT., LOT 1DBP01 9 September-
LOT 15DBP02 9 September-
Wednesday, February 7, 2018 Page 33 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COUNTRY PINES SUBDIVISION WATER SYSTEM LA1019083
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2150 W. TANK FARM ROADDBP02 8 August-
2504 SALMON STREETDBP03 8 August-
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
COUNTRY PLACE SUBD WATER SYSTEM LA1015005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ELMVIEW & SHERWOODDBP01 9 September-
COUNTRY LN & OAK RIDGEDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COUNTRYSIDE MOBILE HOME COURT LA1005119
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 30DBP02 8 August-
LOT 35DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COUNTRYVIEW MOBILE HOME COURT LA1005202
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 2DBP02 8 August-
LOT 26DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
COUSHATTA WATER SYSTEM LA1081001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 71 S @ HUCKABAY STDBP02 7 July-
1713 JONES STREETDBP03 7 July-
10/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
COVINGTON WATER SUPPLY LA1103011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OLD LANDINGDBP01 2 February-
MASSACHUSETTS AND N THEARDDBP07 11 November-
Wednesday, February 7, 2018 Page 34 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
COX FERRY WATER SYSTEM LA1111027
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
120 EASY LIVING LANEDBP01 6 June-
222 EASY LIVING LANEDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CRESTON WATER SYSTEM LA1069003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 156 & 153DBP01 6 June-
HWY 9 & W WIND CHURCH RDDBP02 6 June-
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
CROWLEY WATER SYSTEM (LAWCO) LA1001002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
183 FOREST DRIVEDBP01 2 February-
102 EAST PARK STREETDBP02 2 February-
175 HOYTDBP03 2 February-
800 ODD FELLOWS RDDBP05 2 February-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
CULBERTSON WATER SYSTEM LA1061024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1120 NORRIS RDDBP01 8 August-
1738 KENS LANDING RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CULI - BEAU VILLAGE LA1103113
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
26274 TRANQUILITY TRAILDBP01 8 August-
26367 CRESCENT DRIVEDBP02 8 August-
4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
CULLEN WATER SYSTEM LA1119005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1948 WALNUT ROADDBP02 5 May-
CITY HALL 405 COYLE AVEDBP03 5 May-
Wednesday, February 7, 2018 Page 35 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
CYPRESS BLACK BAYOU WATER SYSTEM LA1015040
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
357 LINTON BELLEVUE ROADDBP01 10 October-
RYAN RD & CYPRESS SHORESDBP02 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
CYPRESS WATER SYSTEM LA1013019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
184 PINEDBP01 7 July-
2713 LAKE ROADDBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
DALCOUR WATERWORKS DISTRICT LA1075004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 39DBP01 9 September-
WHITE DITCHDBP02 9 September-
10/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
DARBONNE WS NORTH LA1111024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOCKHARTDBP02 8 August-
SPEARSVILLEDBP03 8 August-
188 MCBROOM RDDBP04 8 August-
10/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
DARBONNE WS SOUTH LA1111023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1113 JONES CROSSINGDBP04 8 August-
1167 PINE GROVE CHURCH RDDBP05 8 August-
3139 EVERGREEN RDDBP06 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DAVID WADE CORRECTIONAL CENTER WS LA1027008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
INTERSECTION OF HWY 520 AND BELL HILLDBP02 8 August-
NEAR WELL HOUSEDBP03 8 August-
Wednesday, February 7, 2018 Page 36 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
DEEPWOODS UTILITIES INC LA1017058
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LONGBRANCHDBP01 7 July-
9840 DEEPWOODSDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DELHI WATER SUPPLY LA1083002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
22 HWY 609 - ELEVATED TANKDBP02 8 August-
910 FLORIDA STDBP03 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
DELTA DOWNS INC WATER SYSTEM LA2019021
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
PATIODBP02 9 September-
TAP AT BACK OFFICE (RACE MAINTENANCE)DBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DELTA WATER SYSTEM LA1065001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
END OF STAFFORD STDBP01 9 September-
301 THIRD STDBP02 9 September-
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
DELTECH CORPORATION LA2033025
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MAINTENANCE LUNCHROOM SINKDBP01 9 September-
POE-001DBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DENNY DRIVE WATER SYSTEM LA1017009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8502 DENNY DRIVEDBP01 6 June-
8429 DENNY DRIVEDBP02 6 June-
Wednesday, February 7, 2018 Page 37 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DEQUINCY WATER SYSTEM (LAWCO) LA1019008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1601 W 4TH STREETDBP01 8 August-
842 PULLARD STREETDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
DESOTO PARISH WATER WORKS DISTRICT 1 LA1031030
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
JENNY LOOPDBP02 10 October-
HWY 5 @ HWY 789DBP03 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER - BAYOU ESTATES LA1005005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
11294 TRACY STREETDBP02 8 August-
PENNY STDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER - CHINQUAPIN LA1063114
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
22828 CHENE BLANCDBP02 9 September-
23396 CHENE BLANCDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER - CYPRESS LAKES LA1005208
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8505 M'S COVEDBP02 8 August-
8502 FRANK DRIVEDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER - CYPRESS POINT LA1063118
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
15813 CYPRESS POINT LANEDBP02 8 August-
ENTRANCE ON LEFT SIDEDBP03 8 August-
Wednesday, February 7, 2018 Page 38 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER - MONTROSE SUBDIVISION LA1063103
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OAK FORREST ESTATESDBP02 8 August-
MONTROSE NORTH DRIVEDBP03 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER - OLD MILL SETTLEMENT LA1063115
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
14060 OLD MILL SETTLEMENT TRACEDBP01 8 August-
17575 COVE LNDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER - RIVER RUN ESTATES LA1005206
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
10005 RIVER RUNDBP02 8 August-
10079 RIVER RUNDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER - STONEHILL LA1063123
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
19992 FIELDSTONE RDDBP02 8 August-
19860 STONE HILL RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER - TERRY HARBOR CAMPSITES LA1063036
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
20475 FAIRWAY DRIVEDBP02 9 September-
YACHT SLIP 53DBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER- OLIVIA ROSE LA1063029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 25DBP02 8 August-
LOT 16DBP03 8 August-
Wednesday, February 7, 2018 Page 39 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIVERSION WATER- WATER FRONT WEST LA1063104
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HOMEPORT WELL SITEDBP02 8 August-
14468 BAYOU TERRACE DRIVEDBP03 8 August-
1/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
DIXIE GARDEN - KINGS HWY WATER SYSTEM LA1017087
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
7843 EAST KINGS HWYDBP01 8 August-
BRIDGE CLUBDBP02 8 August-
1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
DIXIE GARDEN WATER SUPPLY LA1017075
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4845 DIXIE GARDEN DRIVEDBP01 1 January-
4761 DIXIE GARDENS DRIVEDBP04 1 January-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIXIE INN WATER SYSTEM LA1119006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 80 @ SOUTHFIELDDBP01 8 August-
MCARTHUR STREETDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIXIE OVERLAND WATER SYSTEM LA1119007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HARVEYS BARBER SHOP ROAD @ STUCKEY ROADDBP02 8 August-
COUNTRY PINES @ HWY 80DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DIXON CORRECTIONAL INSTITUTE LA1037002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
COMPOUND 1 SALLY PORT 1DBP02 6 June-
BACHELOR OFFICERS QTR C3DBP03 6 June-
Wednesday, February 7, 2018 Page 40 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
DOMINO SUGAR LA2087001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WATER PLANTDBP01 8 August-
BOILER HOUSE (MRT)DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DORCHEAT ACRES WATER SYSTEM LA1119032
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
456 PERRY BURNS ROADDBP01 8 August-
WISE ROAD @ FRYE ROADDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
DOW USA, LA DIVISION LA2047003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BLOCK 110 NEW DOCK SITE #1DBP01 8 August-
CONF CENTER SUPPLY HEADER SITE #8DBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
DOWNSVILLE WATER SYSTEM LA1111004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SUE CALHOUN RD & HWY 145DBP02 3 March-
4787 HWY 151DBP03 3 March-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DOYLINE WATERWORKS DISTRICT 1 LA1119008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SCOTT AND MAINDBP01 7 July-
259 STRONG STREETDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DREAM COURTS MOBILE HOME PARK LA1103174
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 1DBP01 7 July-
LOT 10DBP02 7 July-
Wednesday, February 7, 2018 Page 41 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
DUBACH WATER SYSTEM LA1061003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
236 FULLER LOOPDBP02 12 December-
8925 HWY 167SDBP03 12 December-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DUBBERLY WATER SYSTEM LA1119009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
156 STUCKEY ROADDBP01 9 September-
146 PERO CHURCH ROADDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DUNCAN HEIGHTS MOBILE HOME PARK LA1045039
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3107 OLIVIA RD. WAREHOUSEDBP01 6 June-
3107 OLIVIA RD. LOT #5DBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
DUNHAM PRICE GROUP WATER SYSTEM LA2019134
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SW TAP AT OFFICEDBP01 9 September-
NW TAP AT OFFICEDBP03 9 September-
Wednesday, February 7, 2018 Page 42 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
E JEFFERSON WW DISTRICT 1 LA1051001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1520 CHICKASAW AVEDBP01 9 September-
5249 VETERANS HWYDBP04 9 September-
5304 JANICE AVENUEDBP05 9 September-
3600 JEFFERSON HIGHWAY, BLDG EDBP06 9 September-
5028 WILSON DRIVEDBP07 9 September-
4524 CHATEAU DRIVEDBP08 9 September-
6201 FLAGLER STREETDBP09 9 September-
8900 SHELDON STDBP10 9 September-
2215 CLEARY AVEDBP11 9 September-
4936 YORKDBP12 9 September-
118 GLENWOOD AVEDBP13 9 September-
3404 ARKANSAS AVEDBP14 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EAGLE LAKE MOBILE HOME PARK LA1103110
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1210 EAGLE LANE BLVD LOT 210DBP01 8 August-
1210 EAGLE LANE BLVD LOT 19DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EAGLE WATER SYSTEM LA1017012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
10131 FREEDOMS WAYDBP02 6 June-
10005 WOOLWORTH ROADDBP03 6 June-
4/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
EAST ALLEN PARISH WATER WORKS LA1003011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 190 AND HIGHWAY 995DBP01 6 June-
COTTON GINDBP02 6 June-
Wednesday, February 7, 2018 Page 43 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
EAST CARROLL WS NORTH LA1035006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
183 HOPEWELL RDDBP06 7 July-
2637 LA 596DBP07 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EAST CARROLL WS SOUTH LA1035007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2555 HWY 581DBP02 7 July-
9672 HWY 65 SDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EAST CENTRAL VERNON WATER SYSTEM LA1115117
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 117 & HIGHWAY 465DBP01 7 July-
HIGHWAY 489 AND SAN HILLDBP02 7 July-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
EAST COLUMBIA WATER SYSTEM LA1021004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HORSE SHOE LN @ HWY 559DBP02 9 September-
HOT SHOT RD @ HWY 559DBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EAST CROSS WATER SYSTEM LA1081002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
END OF LINE HWY 515DBP01 7 July-
2618 HWY 71DBP02 7 July-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
EAST DESOTO WATER SYSTEM LA1031005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 84DBP02 7 July-
SLOAN ROADDBP03 7 July-
Wednesday, February 7, 2018 Page 44 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
EAST FELICIANA RURAL BLUFF CREEK WS LA1037015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
285 SCOTT-BARR RDDBP02 8 August-
39696 HWY 37DBP05 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
EAST FELICIANA RURAL GURLEY RD WS LA1037004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3615 GREENBRIAR RDDBP07 8 August-
13008 HWY 955DBP08 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
EAST FELICIANA RURAL HWY 964 WS LA1037016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4751 LA 68DBP01 8 August-
313 HWY 964DBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
EAST FELICIANA RURAL PLANK-GROSS BATTLE LA1037017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
9027 HWY 958DBP01 8 August-
4210 LA 63DBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
EAST FELICIANA RURAL TURNER RD WS LA1037018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1212 HWY 67DBP01 8 August-
8530 SHAFFETTDBP02 8 August-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
EAST FELICIANA RURAL-REEVES-MORGAN LA1037011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LAWSON 1610 HWY 952DBP01 8 August-
JACKSON ROP 4349 HWY 952DBP02 8 August-
Wednesday, February 7, 2018 Page 45 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EAST FELICIANA WWKS DISTRICT 7 LA1037014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
9670 HWY 422 (POC#1)DBP01 7 July-
5965 GILEAD RD (POC#6)DBP03 7 July-
1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
EAST HODGE WATER SYSTEM LA1049006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1816 BROWN STDBP02 8 August-
6008 EBONY STDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EAST JENA WATER SYSTEM INC LA1059017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
9539 HWY 84 EASTDBP02 8 August-
3205 HWY 459DBP03 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
EAST PARK SUBDIVISION WATER SYSTEM LA1019079
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6701 RALIEGHDBP02 8 August-
2601 EVA LNDBP03 8 August-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
EAST RICHLAND WW DISTRICT LA1083003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MCHAND AND HWY 854DBP02 9 September-
129 COLLEGEDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EASTERN HEIGHTS WATER WORKS LA1105003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
115 HWY 1054DBP02 7 July-
15748 HWY 16DBP03 7 July-
Wednesday, February 7, 2018 Page 46 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
EASTERN LOUISIANA MENTAL HEALTH SYSTEMS LA1037005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FRONT GATEDBP01 8 August-
SEWER PLANTDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EASTSIDE WATER SYSTEM LA1039003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4332 WHITEVILLE ROADDBP01 8 August-
2003 BELAIRE COVE RDDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
EBARB WWKS DIST # 1 - AIMWELL AREA LA1085059
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
327 DOGWOOD DRIVEDBP03 9 September-
HWY 191 AND HWY 474DBP04 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
EBARB WWKS DIST # 1 - N EBARB/BELMONT LA1085058
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 1218 AT NOBLE/CARDINAL ROADDBP01 9 September-
YOUNGS ROAD AT WRIGHTS LANDINGDBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
EBARB WWKS DIST #1 - NORTH EBARB LA1085043
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 3229 AT N TOLEDO BEND ST PARKDBP02 6 June-
HWY 482 & PINK PANTHERDBP03 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EBENEZER WATER SYSTEM LA1049026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CANEY STDBP01 8 August-
RAMSEY RD AT CLIFF RAMSEY RD (POC#1)DBP02 8 August-
Wednesday, February 7, 2018 Page 47 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
EDEN ISLES WATER SUPPLY LA1103013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4782 PONTCHARTRAINDBP03 7 July-
102 CYPRESS LAKEDBP05 7 July-
274 NICKLAUS DRDBP06 7 July-
204 LORELEI CIRCLEDBP07 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EDGEFIELD WATER SYSTEM LA1081003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
7741 HWY 371DBP02 9 September-
525 EDISTODBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EDWARDS MILLCREEK WATER SYSTEM LA1013010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
26385 HWY 9DBP02 7 July-
27209 HWY 9DBP03 7 July-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
EGAN WATER CORPORATION LA1001025
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FERNEST RD @ REED RDDBP02 7 July-
HWY 97 @ RIVERSIDE WEST RDDBP03 7 July-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
EGAN WATER CORPORATION NO 2 LA1001026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1718 SWIFT ROADDBP01 7 July-
CHESTER LEE @ THIRD STREETDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ELM POINT ESTATES WATER SYSTEM LA1099024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2300 ATCHAFALAYA R HWY LOT 106DBP01 8 August-
2300 ATCHAFALAYA R HWY LOT 1DBP02 8 August-
Wednesday, February 7, 2018 Page 48 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EMC WATER SYSTEM INC LA1079006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8019 TWIN BRIDGES ROADDBP01 8 August-
235 RICHMOND ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EMPIRE POINT COMMUNITY WATER SYSTEM LA1115047
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1612 OAKRIDGE DRIVEDBP01 7 July-
175 LAKEVIEW DRIVEDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ENON ELEMENTARY SCHOOL LA2117015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC #5 - GYMDBP01 6 June-
POC #3 - MAIN BUILDING 1DBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ENTERGY GULF STATES LOUISIANA LLC LA2019103
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
EAST SIDE OF TURNER SHOPDBP01 7 July-
TAP-COAL MAINTENANCE SHOPDBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ENTERPRISE WATER SYSTEM LA1025003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ROSIN CREEK CHURCHDBP02 11 November-
JIM BOWIEDBP03 11 November-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
EPPS WATER SYSTEM LA1123001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 134 WDBP02 8 August-
HWY 17 AND PECAN STREETDBP03 8 August-
Wednesday, February 7, 2018 Page 49 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EQUISTAR CHEMICAL LP LA2019094
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MAIN GATE GUARD HOUSEDBP02 7 July-
EAST GATE GUARD HOUSEDBP03 7 July-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
EROS COMMUNITY WATER SYSTEM LA1049022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2311 HWY 548DBP02 8 August-
290 CENTURY LOOPDBP03 8 August-
4/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
EROS WATER SYSTEM LA1049007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1510 THIRD STDBP02 8 August-
4608 OKALOOSA RDDBP05 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
EUNICE WATER SYSTEM (LAWCO) LA1097022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
I E MILLER & SONS - HWY 190 EDBP01 8 August-
455 RUE NORMANDIEDBP02 8 August-
901 SITTIG RDDBP03 8 August-
1447 NILEDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EVANGELINE OAKS WATER SYSTEM LA1015009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
EVANGELINE DRIVE SOUTHDBP02 7 July-
EVANGELINE DRIVE NORTHDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EVANGELINE PARISH INDUSTRIAL PARK W S LA1039014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
IRON WORKS ON HOLLOWAYDBP01 6 June-
REGION A PARISH YARDDBP02 6 June-
Wednesday, February 7, 2018 Page 50 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EVANGELINE WW DISTRICT 1 - PINE PRAIRIE LA1039004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1189 BIG VICK ROADDBP01 6 June-
1968 BEAVER ROADDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EVANS SCHOOL LA2115003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
PROCESSING PLANTDBP02 8 August-
HIGH SCHOOLDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EVERGREEN ESTATES WATER SYSTEM LA1017051
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 6133DBP02 8 August-
LOT 6112DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
EXXONMOBIL CHEMICAL BATON ROUGE POLYMER LA2033003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
KITCHEN IN PPOC BUILDINGDBP02 7 July-
ADMIX BUILDINGDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FAIRVIEW MOBILE ESTATES NORTH WS LA1019080
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BEHIND OFFICEDBP01 8 August-
LOT 105DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FAIRVIEW MOBILE ESTATES SOUTH WS LA1019096
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 301DBP01 8 August-
LOT 588DBP02 8 August-
Wednesday, February 7, 2018 Page 51 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
FAIRVIEW UNION WATER SYSTEM LA1081012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 784 AND HWY 71DBP02 6 June-
DAVIS SPRINGS TANKDBP03 6 June-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
FAITH DAY SCHOOL & ACADEMY LA2005231
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
EAST EXTERIOR OF PRINCIPAL'S OFFICEDBP01 8 August-
BETWEEN EAST & WEST BUILDINGS ON BREEZEWDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FALSE RIVER WATER COMPANY LA1077041
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
14295 HWY 416DBP01 9 September-
8027 FALSE RIVER ROADDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FAMILY COURT MOBILE HOME PARK LA1005118
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 14DBP01 8 August-
LOT 1BDBP02 8 August-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
FARMERVILLE WATER SYSTEM LA1111005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
121 PREAUS STREETDBP02 8 August-
1912 PARK BAY DRIVEDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FELLOWSHIP WATER SYSTEM LA1061004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 563 NORTHDBP02 9 September-
MCGUIRE AT EAVESDBP03 9 September-
Wednesday, February 7, 2018 Page 52 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FIFTH WARD JR HIGH W S LA2103042
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
GYM SAMPLE TAPDBP02 8 August-
SAMPLE TAP AT OFFICEDBP03 8 August-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
FIFTH WARD WATER SYSTEM LA1009007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MARCELS & HIGHWAY 1DBP01 5 May-
512 RV ROADDBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FISHER WATER SYSTEM LA1085009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
729 4-L DRIVEDBP01 8 August-
633 LAUREL STDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FISKE UNION WATER SYSTEM LA1123002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
COOK RD & HWY 879, 1559 COOK RDDBP02 7 July-
4603 HWY 2DBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FLORIDA PAR JUV DETENTION CENTER LA1105081
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
28528 HWY 190 NEW ADDITION (SOUTH MOD)DBP02 6 June-
28528 HWY 190 ORIGINAL BLDG ( ADMIN AREADBP03 6 June-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
FLORIEN WATER SYSTEM LA1085011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 474 - LIONS CLUBDBP01 8 August-
NORTH OF LEWING CIRCLE @ N NOLANDBP02 8 August-
Wednesday, February 7, 2018 Page 53 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FLUKER CHAPEL WATER WORKS LA1105005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
66433 HWY 51DBP01 9 September-
66136 SMITH ROADDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FOLSOM WATER SUPPLY LA1103014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
81555 ANTHONY RDDBP01 9 September-
12430 SOUTH HAY HOLLOW RDDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FORDOCHE, TOWN OF LA1077009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6754 HWY 77DBP03 5 May-
4306 FORDOCHE RDDBP04 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FOREST GLEN SD LA1103137
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
25691 WEST JACKSONDBP01 7 July-
26170 EAST BEECHDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FOREST HILL UTILITIES LA1079009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2862 HWY 112DBP01 5 May-
INTERSECT HWY 165 / BARTON RDDBP02 5 May-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
FORMOSA PLASTICS CORPORATION LA2033102
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
VCM1 CONTROL ROOMDBP01 9 September-
Wednesday, February 7, 2018 Page 54 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FORT POLK NORTH HOUSING WATER SYSTEM LA1115087
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
16401 RIVERTON & PINEHURSTDBP01 7 July-
15009 VAN TINE COURTDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FORT POLK NORTH WATER SYSTEM LA1115064
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
7400 BLOCK @ MONTICELLO & H AVENUEDBP01 7 July-
8501 @ NORTH SIDE OF MEMPHISDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FORT POLK SOUTH WATER SYSTEM LA1115065
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BLDG 2501DBP01 7 July-
PALMETTO TERRACE - TRAILER PARKDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FOSTER POULTRY FARMS (ARCADIA FEEDMILL) LA2013012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OUTSIDE TAP @ SE CORNER TRUCK RECEIVINGDBP01 8 August-
TAP IN BOILER ROOM IN ARCADIA FEEDMILLDBP02 8 August-
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
FOUNTAINBLEAU SCHOOL LA2103380
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
JR HIGH GYM TAPDBP02 9 September-
SEWER PLANT TAPDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FOUR FORKS WATER SYSTEM LA1017062
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SPRINGRIDGE @ HWY 169DBP01 7 July-
PAULA STREETDBP02 7 July-
Wednesday, February 7, 2018 Page 55 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FOURTH WARD WATER WORKS LA1063005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
PEA RIDGE @ OLD CCDBP01 9 September-
HORSESHOE RD W @ HWY 43DBP02 9 September-
1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:
FRANKLIN WATER SUPPLY LA1101003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CAYCE & MAIN STREETDBP03 1 January-
528 MORRIS STDBP04 1 January-
107 TYLER LNDBP05 1 January-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FRIENDSHIP WATER SYSTEM LA1013007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6475 HWY 155 - SCALLIONSDBP01 8 August-
1949 DANVILLE RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FROST TOWN WATER SYSTEM LA1073014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
557 WEEMS ROADDBP01 8 August-
1247 GARLAND GIN ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC - FRENCH SETTLEMENT LA1063019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
14360 RUE DE FLEURDBP02 8 August-
HWY42 & HWY 16DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC - HAMMOND HEIGHTS LA1105010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
46074 N. CHERRY STREETDBP01 6 June-
HWY 442 & WHISKEY LANEDBP02 6 June-
Wednesday, February 7, 2018 Page 56 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC - OAKRIDGE LA1063058
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NW CORNER OF PRIMROSE CTDBP01 8 August-
BETWEEN 10970& 11000 OAKRIDGE DRIVEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC - OAKWOOD ESTATES LA1105017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
39789 OAKWOOD ESTATESDBP02 8 August-
39627 OAKWOOD ESTATESDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC- BRADY PLACE LA1105091
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NE CORNER OF N BRADLEY CT & HWY 445DBP01 8 August-
NE CORNER OF W BRADLEY CT & S BRADLEY CTDBP02 8 August-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
FSWC- COYELL HOMESITE LA1063124
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
20023 AYDELL LNDBP01 8 August-
19545 AYDELL LNDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC- PINE HEAVEN LA1063089
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
15861 RUTH DRIVEDBP02 6 June-
16146 RUTH DRIVEDBP03 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC- SPRINGFIELD AREA LA1063024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
30340 CATHOLIC HALL RDDBP01 6 June-
SW HWY 42 AT HWY 43DBP02 6 June-
Wednesday, February 7, 2018 Page 57 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC -STONEBRIDGE LA1063121
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NE CORNER OF HWY 1032 & STONEBRIDGE CTDBP01 8 August-
21240 DEBBIE LANEDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC- VELMA LA1105078
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SE CORNER OF HUCK RD & LARUSSA LNDBP01 6 June-
13137 BRICKYARD RDDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC- VINCENT PLACE LA1063041
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
20320 HWY 16DBP01 8 August-
BTWN 14335-14361 VINCENT PLACEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC- WHITEHALL/ HEAD OF ISLAND LA1063028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
18724 OLD FERRY RD.DBP01 6 June-
27255 VAMPRAN RD.DBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC-BANKSTON LA1105036
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
58239 OLD US 51DBP01 8 August-
13120 STOREY ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC-JUSTIN HEIGHTS LA1063101
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CUL DE SAC ON BRITTANY CTDBP01 8 August-
13866 BRITTANY COURTDBP02 8 August-
Wednesday, February 7, 2018 Page 58 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
FSWC-SANDY RIDGE LA1063110
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
18012 RYAN STREETDBP01 8 August-
18036 W RIVERVIEWDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
G AND J MOBILE HOME ESTATES WATER SYSTEM LA1055014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
200 JOHN WAYNE DRDBP01 7 July-
D206 JOHN WAYNE DRDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
G AND R MOBILE HOME PARK WATER SYSTEM LA1055013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
307 PECAN GROVE LOT #81DBP01 8 August-
307 PECAN GROVE LOT #5DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GARDEN HEIGHTS SUBD WATER SYSTEM LA1055138
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
100 ST NERI LANEDBP01 6 June-
100 ST BLEISE LANEDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GARDEN HEIGHTS WATER SYSTEM LA1019018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BLANCO 7329DBP01 8 August-
CHRIS LANEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GARDNER COMMUNITY WATER SYSTEM LA1079010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RACHAL ROADDBP01 8 August-
10793 HWY 28 WDBP02 8 August-
Wednesday, February 7, 2018 Page 59 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GEORGIA PACIFIC CORPORATION LA2073042
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CORRUGATED RESTROOMDBP02 8 August-
HYDROPNEUMATIC TANKDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GERMANTOWN WATER SYSTEM LA1119011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NORTHWOOD @ HWY 159DBP02 8 August-
WOODARD @ ASPENDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GIBSLAND WATER SYSTEM LA1013008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
934 CEDAR STDBP01 7 July-
COLEMAN STDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GIFFORD MOBILE HOME PARK I LA1019101
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 34DBP01 8 August-
LOT 49DBP02 8 August-
1/1/2018 YR Monitoring Begin Date: Frequency of Sampling:
GIFFORD MOBILE HOME PARK II LA1019115
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 57DBP01 8 August-
LOT 86DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GILARK WATER SYSTEM LA1119012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1541 METHODIST CAMP RDDBP01 5 May-
INTERSECTION OF FRENCH DELANEY AND ALLENDBP02 5 May-
Wednesday, February 7, 2018 Page 60 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GILBERT WATER SYSTEM LA1041002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
200 OLD HIGHWAY 15DBP01 8 August-
7752 GILBERT STREETDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GIL-GAL WATER SYSTEM LA1119034
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FINCHER CREEK @ HARRIS ROADDBP01 8 August-
HWY 80 @ BECK CURVE ROADDBP02 8 August-
4/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
GILLIS LONG CENTER LA1047008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BLDG 165DBP01 9 September-
TRAILER 40DBP02 9 September-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
GIVING HOPE RETREAT LA1103062
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FIRST BLDG ON RIGHT PASS GATEDBP04 8 August-
BLDG ON LEFT PASS WELLDBP05 8 August-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
GLEN LEAF MOBILE HOME COMMUNITY LA1017089
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
STOCKDALE RD (LOT#46)DBP01 9 September-
PENNINGTON RD (LOT#166)DBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
GLENCOE COMMUNITY WATER SYSTEM LA1101004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
121 GEORGETOWNDBP02 7 July-
151 CHAPEL LANEDBP03 7 July-
Wednesday, February 7, 2018 Page 61 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GOLDONNA WATER SYSTEM LA1069004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
814 N. GOODWILLDBP01 8 August-
248 ASH STREETDBP02 8 August-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
GOODWILL WATER SYSTEM LA1123004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2356 HWY 588DBP02 8 August-
543 WARDLINE RDDBP04 8 August-
4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
GRAMBLING STATE UNIV WEST LA1061016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WEST WILLOW STDBP02 8 August-
PINE STREETDBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
GRAMBLING STATE UNIVERSITY WS LA1061005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LAB SCHOOLDBP02 5 May-
ALMA J. BROWNDBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GRAMBLING WATER SYSTEM LA1061006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
118 COVE VIEW RDDBP01 8 August-
1030 W MARTIN LUTHER KINGDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
GRAMERCY WATERWORKS LA1093002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LA 3125DBP02 5 May-
WATER TOWERDBP03 5 May-
Wednesday, February 7, 2018 Page 62 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GRAND CANE WATER SYSTEM LA1031006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BLUNT MILL ROADDBP02 8 August-
WEST K JON ROADDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GRAND ISLE SHIPYARD WATER SYSTEM LA2113279
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TEST POINT 1DBP01 6 June-
TEST POINT 2DBP02 6 June-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
GRAND PRAIRIE WATER SYSTEM LA1097002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
308 LOPEZ RDDBP01 9 September-
1164 PEACHTREE LNDBP02 9 September-
4/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
GRAPHIC PACKAGING INTERNATIONAL INC - A LA2073043
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RESERVOIR TAPDBP01 8 August-
R & D BUILDINGDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GRAPHIC PACKAGING INTERNATIONAL INC - B LA2073044
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
EI SHOPDBP01 8 August-
#6/#7 PAPER MACHINE MAIN SHOPDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GRAYSON WATER SYSTEM LA1021005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8765 HWY 165DBP01 8 August-
HWY 850 & MIXON LANEDBP02 8 August-
Wednesday, February 7, 2018 Page 63 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GREATER WARD 1 WATERWORKS DISTRICT LA1061007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RABB AND VZ TOP ROADDBP01 7 July-
COOK AND CHANDLER ROADDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GREEN ACRES SUBDIVISION WATER SYSTEM LA1011004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1634 LAKEVIEW STDBP01 8 August-
1935 N PINE STDBP02 8 August-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
GREEN ACRES SUBDIVISION WS LA1073016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BUCKHORN BEND AND ARNOLDDBP01 8 August-
BUCKHORN BEND AND JACKSONDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GREENBRIAR PRAIRIE BASSE WATER SYSTEM LA1097032
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
127 HIGHWAY 182DBP01 8 August-
535 DON GUILBEAU ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GREENSBURG WATER SYSTEM LA1091004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
13775 HWY 37DBP02 8 August-
329 HWY 1042DBP03 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
GRETNA WATERWORKS LA1051003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
VIGIL AT THEARDDBP05 8 August-
GRETNA BLVD AT CREAGANDBP06 8 August-
GRETNA LAB TAPDBP07 8 August-
FREDERICHS AT WHITNEYDBP08 8 August-
Wednesday, February 7, 2018 Page 64 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
GULF STREAM MANOR WATER SYSTEM LA1019123
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 34DBP02 8 August-
LOT 248DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - AUTUMN HAVEN LA1103190
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
127 MISTY CREEK DRIVEDBP02 8 August-
RECREATION DR OFF HAVEN WAYDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - BLEU LAKE HILLS LA1103132
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
114 HIGHLAND CREST DRDBP02 8 August-
39 GREEN HILLS DRDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - GRANDE PALMS LA1103142
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NORTH SIDE OF BLDG 5DBP01 8 August-
WEST SIDE BLDG 1DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - GREENLEAVES UTILITIES LA1103118
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
129 REMINGTON DRIVEDBP02 8 August-
1472 WOODMERE DRIVEDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - GUSTE ISLAND WATER SU LA1103189
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
452 BELLE POINTEDBP02 8 August-
240 GRAND OAKS DRIVEDBP03 8 August-
Wednesday, February 7, 2018 Page 65 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - I59 MOBILE HOME PARK LA1103179
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
101 COMMERCIAL DRIVEDBP01 8 August-
CONCORD LOOP 4TH HYDRANTDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - MONEY HILLS ESTATES LA1103164
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
592 NORTHWOODS DRDBP02 8 August-
713 PLANTATION DRDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - MONTEREY SUBDIVISION LA1103148
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1421 CAROLINE STREETDBP02 8 August-
1215 LABARRE STREETDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - PENN MILL LAKES LA1103185
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
464 STEEPLE CHASE RDDBP01 8 August-
112 PENN MILL LAKES BLVDDBP02 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - RIVER PARK LA1103198
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
75575 JOYCE DRDBP01 11 November-
75184 CRESTVIEW HILLS LOOPDBP02 11 November-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
H2O SYSTEMS INC - WHIPPOORWILL GROVE LA1103165
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
25513 RED ROBIN DRIVEDBP02 8 August-
81111 BLUE HERON DRIVEDBP03 8 August-
Wednesday, February 7, 2018 Page 66 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
HABERSHAM SUBDIVISION WATER SYSTEM LA1055174
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
300 KIPPSFORDDBP02 7 July-
103 SCRIBNERDBP03 7 July-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
HAGEWOOD WATER SYSTEM LA1069005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC 5 POSEY ROADDBP01 2 February-
6464 HIGHWAY 6DBP02 2 February-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
HALFWAY-CARROLL WATER SYSTEM LA1081005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
#3 124 JOE PRICE RDDBP01 7 July-
#5 LA HWY 515DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HALL SUMMIT WATER SYSTEM LA1081004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 783 AND MT ZION ROADDBP01 8 August-
NORTH STREETDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HAMMOCK WATER SUPPLY LA1079030
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
PILGRIM ROAD AT HIGGINS HOUSEDBP01 6 June-
NORTH MERCHANT ROADDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HANCOCK HAVEN WATER SYSTEM LA1049033
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
360 3 FINGERS ROADDBP01 9 September-
452 HAVEN LOOPDBP02 9 September-
Wednesday, February 7, 2018 Page 67 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HAPPY ACRES MOBILE HOME PARK LA1117024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
19900 CRAPE MYRTLE RDDBP01 7 July-
19811 HAPPY ACRES RDDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HAYNESVILLE WATER SYSTEM LA1027002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
199 HAYNESDBP01 8 August-
915 FRANCES DRDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HEBERT WATER SYSTEM LA1021006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6276 HWY 133DBP01 6 June-
PUCKETT BEND ROAD @ HIGHWAY 848DBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HEFLIN WATER SYSTEM LA1119013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 792 AND TED RISERDBP01 10 October-
HWY 371 AND WOODMILLDBP02 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HENDERSON NINA WATER SYSTEM INC LA1099006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3361 A GRAND POINT HWYDBP01 4 April-
1212 BORDELON ROADDBP02 4 April-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
HICKORY GROVE WATER SYSTEM LA1081010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC #5 HWY 787DBP01 3 March-
HIGHWAY 507DBP02 3 March-
Wednesday, February 7, 2018 Page 68 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
10/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
HICO WATER SYSTEM LA1061008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4853 HWY 151DBP03 10 October-
HWY 545 @ HWY 167DBP04 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HIDDEN HILLS SUBDIVISION WATER SYSTEM LA1097026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 16 HIDDEN HILLS COMMDBP02 6 June-
LOT 105 HIDDEN HILLS COMMDBP03 6 June-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
HIDDEN OAKS SUBDIVISION WS LA1073061
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
115 DOLLY DRIVEDBP01 8 August-
108 AYCOCKDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HIGHLAND WATER WORKS LA1015047
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 80 SAMPLE TAPDBP01 8 August-
816 EAGLE NESTDBP02 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
HIGHWAY 1148 WATER SYSTEM LA1047026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
20030 DANIEL LANEDBP02 8 August-
58830 HWY 1148DBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HIGHWAY 51 MHP LA1105088
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
STREET FLUSH TAPDBP01 8 August-
LOT CDBP02 8 August-
Wednesday, February 7, 2018 Page 69 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
HIGHWAY 513 WATER SUPPLY LA1031028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
513 CUTOFFDBP01 7 July-
METCALFDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HILLCREST / SNEAD APARTMENTS LA1103160
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
101 CDBP01 7 July-
104 DDBP02 7 July-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
HILLCREST MHP WATER SYSTEM LA1015012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 36DBP01 7 July-
LOT 103DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HILLSIDE PARK SUBDIVISION WS LA1073064
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
VALLEYHILL AND CONIFERDBP01 8 August-
101 LACROSSE DRIVEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HILLSIDE WATER AND SEWAGE LLC LA1017015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 97DBP01 7 July-
LOT 49DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HILLY-GREENWOOD WATER SYSTEM LA1061027
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NEW PROSPECT CHURCH RDDBP01 6 June-
WOODS ROADDBP02 6 June-
Wednesday, February 7, 2018 Page 70 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HINESTON WATER SYSTEM, INC LA1079012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2886 HWY 121DBP01 8 August-
HARPER @ HWY 112DBP02 8 August-
1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
HODGE WATER SYSTEM LA1049008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HUNT AND THIRD ST ALLEYDBP01 9 September-
WILLOW STREETDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HOLIDAY MOBILE HOME VILLA WATER SYSTEM LA1055015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2808 W PINHOOK OFFICEDBP02 7 July-
2808 W PINHOOK LOT 47DBP03 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
HOLMESVILLE WATER SYSTEM LA1111008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 15DBP01 4 April-
JONES AND PARDUE ROADDBP02 4 April-
10/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
HOLUM WATER SYSTEM LA1021007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LA849&WATERBIND RDDBP03 8 August-
3297 LA 126DBP04 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
HOMELAND HEIGHTS LA1103072
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
37651 RIO STDBP01 9 September-
37620 LOPEZ STDBP03 9 September-
Wednesday, February 7, 2018 Page 71 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HOMER WATER SYSTEM LA1027003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DIALYSIS CENTERDBP02 8 August-
EBENEZER CHURCH ROADDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HOOD CONTAINER OF LA, LLC LA2125008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SOUTH MILLDBP02 9 September-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
HORSE SHOE ROAD WATER SYSTEM LA1119015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
121 MATHESDBP01 8 August-
242 HORSESHOE LOOPDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HOSANNA LUTHERAN CHURCH LA2103413
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC 4DBP02 9 September-
POC 2DBP03 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
HOSSTON MIRA WATER SYSTEM LA1017016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
15669 HIGHWAY 71DBP02 7 July-
17655 HIGHWAY 71DBP03 7 July-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
HOUMA WATER TREATMENT SERVICE AREA LA1109001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WILLIAMS @ SIXTHDBP04 8 August-
DR BEATROUS ROADDBP05 8 August-
BENOIT PSDBP06 8 August-
FRANKLIN @ WHITEDBP07 8 August-
Wednesday, February 7, 2018 Page 72 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
HOUSE OF RAEFORD LA2013015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LEFT HAND WASH ON SOUTH SIDEDBP02 8 August-
HAND WASH BESIDE CHILLERDBP03 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
HOUSTON RIVER WATERWORKS DISTRICT 11 LA1019119
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FIRE STATION HWY 90 WDBP01 8 August-
2537 HWY 388DBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
HUDSON GAARS MILL WATER SYSTEM LA1127015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4036 HWY 34DBP01 9 September-
6653 HWY 126DBP02 9 September-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
HUNTINGTON MOBILE HOME PARK WATER SYSTEM LA1017084
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 89DBP01 8 August-
LOT 43DBP02 8 August-
4/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
HWY 84 WEST WATER SUPPLY LA1127007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC #5 377 SPILLWAY NEW JBP CHRCHDBP01 4 April-
SYLVAN MEADOWS LOOPDBP02 4 April-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
IBERIA PARISH WATER WORKS DISTRICT NO 3 LA1045002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
VALERY @ JEFFERSON ISLAND ROADDBP02 7 July-
4601 COTEAU ROADDBP03 7 July-
Wednesday, February 7, 2018 Page 73 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
IBERVILLE WATER WORKS DISTRICT 3 LA1047002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 404DBP03 9 September-
58200 BELLEVIEW ROADDBP04 9 September-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
IBERVILLE WATERWORKS DISTRICT #2 LA1047007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1125 HWY 991DBP01 7 July-
2005 BESSON ROADDBP02 7 July-
1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
IDA WATER SYSTEM LA1017017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
18766 CAROLINADBP01 7 July-
18120 MEANS ROADDBP02 7 July-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
INDEPENDENCE WATER SYSTEM LA1105012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
143 LAMARCA LANEDBP01 7 July-
145 W. 2ND STREETDBP02 7 July-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
INDIAN HILLS TRAILER PARK LA1103143
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SITE W-18DBP02 7 July-
SITE E-15DBP03 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
INDIAN VILLAGE WATER SYSTEM LA1073058
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 80 AND LANEY CROCKER RDDBP01 8 August-
2328 HWY 556 MRT-010DBP03 8 August-
Wednesday, February 7, 2018 Page 74 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
INGEVITY SOUTH CAROLINA - DERIDDER WS LA2011029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BOILER HOUSE RESTROOMDBP01 8 August-
GUARD SHACKDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
INNIS WATER CORPORATION INC LA1077013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LA HWY 417/COON RD (NORTH) BATCHELORDBP02 9 September-
LA HWY 418 CLOSE TO BUNGEE GRAIN PORT LEDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
INTERNATIONAL PAPER (MANSFIELD) LA2031009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NEW TRAINING CENTERDBP02 8 August-
ADMINISTRATION BLDGDBP03 8 August-
1/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
J E S T C LA1033132
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
JESTC WEST ENDDBP01 8 August-
JESTC EAST ENDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
JAMESTOWN FRYEBURG WATER SYSTEM LA1013022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 792 @ TODD ROADDBP01 8 August-
LA154 @ MADDEN MILLCREEK RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
JEFF DAVIS CENTRAL WATERWORKS DISTRICT LA1053012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
13490 POUSSON RDDBP01 8 August-
5396 PINE ISLAND HWYDBP02 8 August-
Wednesday, February 7, 2018 Page 75 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
JEFF DAVIS WATER AND SEWER COMMISSION 1 LA1053014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
E RACCA RD AND HIGHWAY 26DBP01 12 December-
KEYSTONE ROAD AND HIGHWAY 382DBP02 12 December-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
JEFF DAVIS WATER DISTRICT 4 LA1053013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SW CORNER OF BUCKLIN RD & PLACIDE RDDBP02 8 August-
NW CORNER OF HWY 102 & EMPIRE RDDBP03 8 August-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
JENKINS COMMUNITY WATER SYSTEM LA1119016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MELVIN THOMAS ROADDBP02 8 August-
FOREMAN ROADDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
JESSE DUB JAMES T P WATER SYSTEM LA1019028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 112DBP02 7 July-
LOT 11DBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
JIMMY BABIN APARTMENTS LA1005046
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
45147 TEDDY BABIN RD - APT 16DBP02 7 July-
45202 TEDDY BABIN RD - APT 22DBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
JIMS TRAILER PARK LA1063076
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 24DBP01 7 July-
LOT 38DBP02 7 July-
Wednesday, February 7, 2018 Page 76 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
JONES MCGINTY WATER SYSTEM LA1067017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 165 & KILBOURNEDBP01 6 June-
HOLLY RIDGEDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
JONES ROLLING RIDGE WATER COMPANY LA1017029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8962 ROLLING RIDGE DRIVEDBP01 9 September-
8908 FLINT HILLDBP02 9 September-
1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
JONESBORO WATER SYSTEM LA1049010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
650 FIREWOOD STDBP02 8 August-
GILBERT AND PINEDBP03 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
JOURNEY FELLOWSHIP CHURCH LA2103522
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SW REAR BUILDING TAPDBP01 11 November-
SE REAR BILDG TAPDBP02 11 November-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
JOYCE WATER SUPPLY LA1127008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6758 HWY 84DBP01 8 August-
340 LOUISIANADBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
JUNCTION CITY WATER SYSTEM LA1111009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
INTERSECTION OF PINE & AYCOCKDBP02 9 September-
718 EAST 5TH STREETDBP03 9 September-
Wednesday, February 7, 2018 Page 77 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
K & P MH & RV PARK WATER SYSTEM LA1019127
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 21DBP01 8 August-
LOT 1DBP02 8 August-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
KEATCHIE WATER SYSTEM LA1031007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1208 HWY 172DBP02 8 August-
WILLIE X ROADDBP03 8 August-
4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
KEITHVILLE ELEMENTARY AND MIDDLE SCHOOL LA2017018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC #2 FRONT NORTH C WINGDBP02 4 April-
POC #3 BACK SOUTH C WINGDBP03 4 April-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
KELLY WATER DISTRICT LA1021008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NEAR SOUTH TANKDBP02 8 August-
WOOTEN AND GRIUETTEDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
KENNEDY HEIGHTS SUBDIVISION LA1005017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1904 SOUTH EDWARDDBP01 8 August-
2513 S PENN BLVDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
KENTWOOD WATER SYSTEM LA1105014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 51 SDBP01 8 August-
900 I-55 SERVICE RDDBP02 8 August-
Wednesday, February 7, 2018 Page 78 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
KIDZ KLUBHOUSE LA2103461
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MAIN BUILDING AT PUMP HOUSEDBP01 9 September-
KITCHENDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
KILLIAN WATER SYSTEM LA1063030
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HENRY RD @ HWY 22DBP02 9 September-
20224 RIVERSIDE DR/HWY 22DBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
KINDERHAUS MONTESORRI LA2103304
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DAYCARE AREADBP01 9 September-
POINT OF ENTRYDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
KINGS COURT MHP WATER SYSTEM LA1055132
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
728 W GLORIA ST LOT 24DBP01 7 July-
728 W GLORIA ST LOT 8DBP02 7 July-
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
KIROLI DARBONNE WS LA1073020
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SHARON AND KIROLIDBP02 5 May-
2340 BAYOU DARBONNE DRDBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
KOLIN RUBY WISE WATERWORK DISTRICT 11 A LA1079023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ACROSS FROM 54 Q STOCKMAN RD (POC#1)DBP01 8 August-
202 HARRIS FERRY RDDBP02 8 August-
Wednesday, February 7, 2018 Page 79 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
KTERI APARTMENTS LA1103081
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
APT 202DBP01 7 July-
APT 113DBP02 7 July-
1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:
LA PETITE DAY CARE CENTER LA2005191
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
44077 STRINGER BRIDGE ROAD TAP 2DBP01 8 August-
44077 STRINGER BRIDGE ROAD TAP 1DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LACOMBE NURSING CENTRE LA1103018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NORTHWEST SIDE OF MAIN BLDGDBP01 7 July-
SOUTHEAST MAIN ENTRANCEDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LACOMBE-MANDEVILLE HEADSTART LA2103356
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BACK OF BUILDINGDBP02 8 August-
TAP IN BUILDINGDBP03 8 August-
1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
LAFAYETTE UTILITIES WATER SYSTEM LA1055017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
GLORIA SWITCH RD & ARBORDBP01 7 July-
VENNARD AND VALLEY VIEWDBP02 7 July-
WALKER ROAD AND DOC BONINDBP03 7 July-
AMBASSADOR CAFFERY AND W. CONGRESSDBP04 7 July-
THOMAS NOLAN AND BRIGANTEDBP05 7 July-
KALISTE SALOOM AND E. BROUSSARDDBP06 7 July-
Wednesday, February 7, 2018 Page 80 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
LAFOURCHE WATER DISTRICT 1 LA1057001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SITE 238 LEEVILLE TANKDBP01 6 June-
SITE 244 MAILBOX 464DBP02 6 June-
SITE 208 LAROSE FOOD MARTDBP03 6 June-
HWY 1 & WEST 121STDBP04 6 June-
SITE 278 PROSPECT & HWY 316DBP05 6 June-
SITE 270 BRAUD AUTOMOTIVEDBP06 6 June-
NORTH RACELAND TANKDBP07 6 June-
SITE 157 EMERY NICHOLASDBP08 6 June-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
LAKE BRUIN WATER DISTRICT #1 LA1107001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1318 HIGHWAY 606DBP01 2 February-
HIGHWAY 606 PLANTDBP02 2 February-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
LAKE CASTLE SCHOOL LA2103409
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WEST SIDE ON NORTH ENDDBP01 8 August-
SOUTH SIDE OF GYMDBP03 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
LAKE CHARLES HARBOR TERMINAL DISTRICT WS LA2019165
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SHIP BERTH 10DBP01 8 August-
WAREHOUSE 8 NEAR WELL 2DBP02 8 August-
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
LAKE PROVIDENCE WATER SYSTEM LA1035002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1708 HIGHLAND ROADDBP01 8 August-
6002 HWY 65 NDBP02 8 August-
Wednesday, February 7, 2018 Page 81 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
LAKE RAMSEY LA1103139
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
350 RAMSEY COURTDBP01 8 August-
14020 S LAKESHORE DRDBP02 8 August-
1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
LAKE SHREVE ESTATES WATER SYSTEM LA1017083
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC #5 9678 HERON SPRINGSDBP01 8 August-
POC #1 211 SPRINGLANDDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
LAKE ST JOHN WATERWORKS DISTRICT 1 LA1029006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
261 WILDLIFE AND FISHERIES RDDBP01 6 June-
5861 HWY 568DBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LAKESHORE ESTATES LA1103171
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1468 LAKESHORE BLVDDBP01 6 June-
1000 EAST END BLVDDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LAKESHORE HIGH SCHOOL LA2103498
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
GYMDBP02 9 September-
SAMPLE TAP AT AUTO SHOPDBP03 9 September-
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
LAKESHORE SWARTZ WATER SYSTEM LA1073071
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MCCAIN AND BALBOADBP02 5 May-
231 OLDS LNDBP04 5 May-
96 WHIPPOORWILL DRDBP05 5 May-
TOWN E DRDBP06 5 May-
Wednesday, February 7, 2018 Page 82 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LAKEVIEW ESTATES SUBD WS LA1067007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
11012 LAKEVIEWDBP01 7 July-
COPPERLAKE DRIVEDBP02 7 July-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
LAKEVIEW TRAILER PARK WATER SYSTEM LA1055067
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
119 ESPOSIE LOT 25DBP02 7 July-
119 ESPOSIE LOT 3-ADBP03 7 July-
1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
LAKEVIEW WATER SYSTEM LA1017019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NLS @ N CROSSDBP01 9 September-
NORTH LAKESHORE AT LORRAINEDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LASALLE WATERWORKS DISTRICT 1 LA1059002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
115 EBENEZER RDDBP02 7 July-
1093 WESTON STDBP03 7 July-
4/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
LATANIER WATER ASSOCIATION LA1079013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8705 HWY 1 SOUTHDBP02 8 August-
7603 HWY 1 SOUTHDBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
LAWCO MANSURA LA1009010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2588 LEGLISEDBP01 8 August-
6275 HIGHWAY 114DBP02 8 August-
Wednesday, February 7, 2018 Page 83 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LAWTELL WATER WORKS DISTRICT NO 1 LA1097004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
N. 6TH STREETDBP01 6 June-
9730 HWY 190DBP02 6 June-
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
LAZY WHEELS TRAILER PARK LA1103095
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC #3 LOT 33DBP01 8 August-
POC #2 LOT 46DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LE TRIOMPHE SUBDIVISION WATER SYSTEM LA1055162
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1113 LETRIOMPHE PKWYDBP02 6 June-
210 SAWGRASSDBP03 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LEATHERMAN CREEK WATER SYSTEM LA1027014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SHERRILL RD @ OLD ARCADIADBP02 8 August-
HWY 154 @ YOUNGBLOOD RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LEE ROAD WATER CORPORATION LA1103020
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
502 RUE DE BACDBP02 8 August-
78340 HWY 437DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LELAND WATER SYSTEM INC LA1025007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DOTY RD @ MOSSY LNDBP02 8 August-
4377 HIGHWAY 913DBP03 8 August-
Wednesday, February 7, 2018 Page 84 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LELEUX TRAILER PARK WATER SYSTEM LA1045027
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 52DBP01 6 June-
LOT 10DBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LENA WATER SYSTEM INC LA1079019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
9167 HWY 1DBP01 6 June-
905 CLIFTON ROADDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LETON WATER SYSTEM LA1119017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CROW ROADDBP02 7 July-
ANGI ROADDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LEWISBURG BELLEVUE WATER SYSTEM LA1097006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1555 HIGHWAY 35DBP02 5 May-
1462 HIGHWAY 178DBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LEWISBURG ESTATES LA1103156
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
#1 DAVID DRDBP01 7 July-
#123 NORTHLAKE DRDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LIDDIEVILLE WATER SYSTEM LA1041010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OTWELL ROAD AND HWY 135DBP02 7 July-
CORNER OF ERSKIN AND HWY 130DBP03 7 July-
Wednesday, February 7, 2018 Page 85 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LIL ANGELS DAYCARE LA2117196
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OUTSIDE SINK BEHIND BLDGDBP02 10 October-
KITCHEN (ACR)DBP03 10 October-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
LINCOLN HILLS SUBDIVISION WS LA1073090
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
109 BLUE JAYDBP01 8 August-
102 GREEN FORESTDBP02 8 August-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
LINCOLN PARISH WATERWORKS DISTRICT #1 LA1061009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BARMORE RD AND CRAWFORD RDDBP02 7 July-
3618 HWY 167DBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LINCOLN PARISH WATERWORKS DISTRICT #2 LA1061029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
END OF LINE LA HIGHWAY 167DBP01 8 August-
5553 LA HIGHWAY 167DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LINCOLN PARISH WATERWORKS DISTRICT #3 LA1061010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4035 HWY 80DBP02 8 August-
4TH STREETDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LINDA LANE WATER SYSTEM LA1017018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
5970 ATTAWAY HILL LANEDBP01 6 June-
5955 ACORN RDDBP02 6 June-
Wednesday, February 7, 2018 Page 86 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
LINVILLE-HAILE WATER SYSTEM LA1111010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
656 HAILE BAPTIST CHURCH RDDBP03 10 October-
2323 CROW FARM RD - FIRE STATIONDBP04 10 October-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
LIONS COPOLYMER GEISMAR LA2005167
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
PAINTERS SHACKDBP01 9 September-
POLY III CONTROL ROOMDBP02 9 September-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
LISBON WATER SYSTEM LA1027005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 518 & YOUNG RDDBP01 7 July-
GREEN ACRES & END POINT RDDBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
LITROE WATER SYSTEM LA1111025
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CROW FARM RDDBP01 9 September-
1336 E. PERRY MURRAY RDDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LIVONIA WATER SYSTEM LA1077022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
7759 AIRLINE HWYDBP02 8 August-
8389 AIRLINE HWYDBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
LOGANSPORT WATER SYSTEM LA1031008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SONAT (SP-11)DBP01 5 May-
THIRD STREETDBP02 5 May-
Wednesday, February 7, 2018 Page 87 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
LOLLIPOP RANCH LA2103319
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SE CORNER OF CHURCHDBP01 8 August-
SW CORNER OF DAYCAREDBP02 8 August-
1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
LOUISIANA CLARKLIFT LA2017020
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
STEAM CLEAN AREADBP01 7 July-
BREAKROOMDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LOUISIANA STATE PENITENTIARY LA1125005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CAMP DDBP01 8 August-
PRO SHOPDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LOUISIANA WAR VETERANS LA1037012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RESIDENT QUARTERSDBP01 8 August-
OLD MAINTENANCE BLDGDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LPWD NORTH PRODUCTION FACILITY LA1055171
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
123 FROEBADBP02 9 September-
MAGELLAN & LA HWY 1252DBP03 9 September-
1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
LPWD SOUTH LA1055156
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RIDGE ROAD/S. RICHFIELDDBP01 8 August-
ALTHEA/S. FIELDSPANDBP02 8 August-
3203 GOLDEN GRAINDBP03 8 August-
900 LEBLANCDBP04 8 August-
Wednesday, February 7, 2018 Page 88 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
LPWDN NORTH REGION LA1055191
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
315 VATICAN ROADDBP02 9 September-
LARUE BLANC AND RENAUDDBP03 9 September-
HESPER ROAD AND BRAQUETDBP04 9 September-
1712 WILDERNESS TRAILDBP05 9 September-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
LPWDN PURCHASE WEST SCOTT LA1055172
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LANDRY ROAD AND FACILE ROADDBP01 5 May-
504 HOLLIER ROADDBP02 5 May-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
LPWDN SOUTH REGION LA1055192
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
END OF CAMUSDBP02 9 September-
328 VIVIAN DRIVEDBP03 9 September-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
LSU AT ALEXANDRIA LA2079009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WATER TOWERDBP02 5 May-
AGROMAY SHOPDBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
LUCKY WATERWORKS LA1013009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC #5DBP01 7 July-
POC #3DBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
LUTCHER WATERWORKS LA1093003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LUTCHER TOWN HALLDBP04 5 May-
TAP AT OXIDATION PONDDBP05 5 May-
Wednesday, February 7, 2018 Page 89 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
M A PATOUT AND SON SUGAR MILL W S LA2045057
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3512 J PATOUT TAP @ ENGINEER OFFICEDBP01 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MADISONVILLE ON THE LAKE LA1103176
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
END OF SOUTH CHENIER ROADDBP01 8 August-
463 S CHENIER RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MADISONVILLE WATER SUPPLY LA1103022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
306 PINE STDBP01 7 July-
CORNER OF CEDAR AND RENEDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MAGNOLIA PLANTATION WATER SYSTEM INC LA1113032
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
629 CHEMIN AGREABLE RDDBP01 7 July-
LA HWY 89 (85' SOUTH LUCIEN RD)DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MAITLAND WATER WORKS DISTRICT LA1025011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8727 LEE BAYOU ROADDBP02 8 August-
3725 HWY 921DBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
MAMOU ROAD WATER DISTRICT, INC LA1097018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1327 MILTON ROADDBP02 10 October-
1395 TRANSCO ROADDBP03 10 October-
Wednesday, February 7, 2018 Page 90 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
MANCHAC LA2105124
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
30316 HIGHWAY 51DBP02 9 September-
30248 HIGHWAY 51DBP03 9 September-
4/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
MANDEVILLE WATER SUPPLY LA1103023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BOWLING GREEN - 701 FLORIDA STREETDBP01 2 February-
800 HEAVENS DRIVEDBP02 8 August-
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
MANGANOS MOBILE HOME PARK LA1103071
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT #132DBP02 8 August-
LOT #144DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MANGHAM WATER SYSTEM LA1083005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
847 BROADWAY OFF HWY 15DBP01 9 September-
186 EGYPT ST OFF HWY 576DBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MANIFEST RHINEHART WATER SYSTEM LA1059014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BAILEY ROADDBP01 8 August-
HWY 8 @ HWY 126DBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
MANSFIELD WATER SYSTEM LA1031009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
INT STARKS & PARK SW CNR (7UWB)DBP01 6 June-
HIGHWAY 175 SOUTHDBP03 6 June-
Wednesday, February 7, 2018 Page 91 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MARANATHA ACRES SUBDIVISION LA1005153
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
10314 MARANTHA ACRESDBP01 8 August-
10362 MARANTHA ACRESDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
MARATHON PETROLEUM COMPANY LLC LA2095008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ZONE 6 KITCHEN SINKDBP01 10 October-
NEW ADMINISTRATION BLDGDBP02 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MARINA DEL RAY WATER SYSTEM LA1103123
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
108 MARINA DEL RAYDBP02 7 July-
100 MARINA DEL RAYDBP03 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
MARION WATER SYSTEM LA1111011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
245 ALICEDBP01 3 March-
3019 TAYLORDBP02 3 March-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MARKRIDGE PARK SUBDIVISION WATER SYSTEM LA1055137
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
238 AUBURN (TCR004)DBP02 8 August-
101 ROJEAN (MRT008)DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MARSHS WATER AND SEWER LA1085041
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
205 PAUL STREETDBP01 9 September-
56 PAUL STREETDBP02 9 September-
Wednesday, February 7, 2018 Page 92 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MARTIN WATER SYSTEM LA1081006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
EVANS ROADDBP02 10 October-
HWY 507DBP03 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MAXIES MOBILE VALLEY WATER SYSTEM LA1055021
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4350 HWY 90 EAST SITE 41ADBP01 8 August-
4350 HWY 90 EAST SITE #3DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MAYFIELD ELEMENTARY SCHOOL LA2103505
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BACK OF BUILDING AT CAFETERIADBP01 7 July-
FRONT WEST SIDE OF BUIKDINGDBP02 7 July-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
MCCLENDON COMMUNITY WATER WELL LA1073028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HORNE LANEDBP02 8 August-
BLAZIER LANEDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MCDONALD WATER SYSTEM LA1049011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1000 COUNTRY ROADDBP01 8 August-
145 FOLKS ROADDBP02 8 August-
1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:
MCGAHA APARTMENTS LA1005085
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TAP 2DBP01 8 August-
TAP 1DBP02 8 August-
Wednesday, February 7, 2018 Page 93 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
MCINTYRE WATER SYSTEM LA1119019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1169 HWY 80DBP02 8 August-
125 MILFORD RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MEADOWWOOD ESTATES WATER SYSTEM LA1017063
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
10484 MEADOW VIEWDBP01 6 June-
10361 MEADOW VIEW DRIVEDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MER ROUGE WATER SYSTEM LA1067009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
9300 HWY 133DBP01 6 June-
HWY 165 ACROSS FROM KENNEDY RICE DRYERSDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MIDDLE FORK WATER SYSTEM LA1027012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HEBRON ROADDBP02 8 August-
GREER ROADDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MIDWAY WATER SYSTEM LA1119020
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
COX ROADDBP01 5 May-
BENNETT ROADDBP02 5 May-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
MIDWAY WATER SYSTEM INC LA1097008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
367 ATKINS BAYOUDBP01 8 August-
9099 HWY 105DBP02 8 August-
Wednesday, February 7, 2018 Page 94 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MILES MOBILE HOME PARK LA1019125
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NE TRAILER BY WWTPDBP01 8 August-
NW TRAILER AT LAST LOTDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MILLCREEK WATER SYSTEM LA1013021
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HOUGHTON RDDBP01 8 August-
BIS LAKE RDDBP02 8 August-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
MILTON PURCHASE WATER SYSTEM LA1055196
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1320 GALLETDBP01 8 August-
1409 E BROUSSARDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MILTON WATER SYSTEM INC LA1055046
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
101 RIVER BIRCHDBP01 8 August-
429 ESPASIEDBP02 8 August-
1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
MINDEN WATER SYSTEM LA1119021
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 531 AND INDUSTRIALDBP01 8 August-
119 N TANGLEWOOD DRDBP02 8 August-
1108 PINE STREETDBP03 8 August-
404 INDUSTRIAL DRIVEDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MINERAL SPRINGS WATER SYSTEM LA1061013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ROCK CORNER CHURCHDBP01 8 August-
1540 PEG RIDGE ROADDBP02 8 August-
Wednesday, February 7, 2018 Page 95 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MIRE BRANCH WATER CORPORATION LA1001024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
173 DR. PARROTT AVEDBP01 6 June-
5037 MIRE HIGHWAYDBP02 6 June-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
MJS ESTATES LLC WATER SYSTEM LA1045040
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3701 KEVIN DR LOT 7DBP01 6 June-
3701 KEVIN DR LOT 2DBP02 6 June-
4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
MONROE WATER SYSTEM LA1073031
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MONROE CONFERENCE CENTER FRONT ENTRANCEDBP01 8 August-
NORTH 7TH AT K STREETDBP05 8 August-
OLIVE AT NORTH 6TH STREETDBP06 8 August-
JEFFERSON JR HIGH SCHOOLDBP07 8 August-
NORTHEAST AT FILHIOLDBP08 8 August-
WOODS AT 14TH STREETDBP09 8 August-
G.M. PLANTDBP10 8 August-
POINT OF ENTRYDBP11 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MONTELEONE JR HIGH SCHOOL LA2103489
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SAMPLE TAP AT GYMDBP02 9 September-
SAMPLE TAP AT WOODSHOPDBP03 9 September-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
MONTEREY RURAL WATER SYSTEM INC LA1029007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1076 MCCALL RDDBP01 5 May-
2881 HWY 29DBP02 5 May-
Wednesday, February 7, 2018 Page 96 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MONTICELLO WATER SYSTEM LA1035004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2803 HWY 579 BURGESDBP01 7 July-
7837 HWY 582 DRIVERDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MONTPELIER WATER SUPPLY LA1091006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
630 DURBIN LANEDBP02 8 August-
36031 HWY 16DBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
MOORINGSPORT WATER SYSTEM LA1017023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FRANCIS & AGURSDBP01 7 July-
BROWN STREETDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MOREHOUSE CENTRAL WS LA1067010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DENT COCKRELL ROADDBP02 8 August-
9160 GRABAULT RDDBP03 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
MORGAN CITY WATER SYSTEM LA1101005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FEDERAL AND ADAMSDBP01 11 November-
1114 FRONT STREETDBP02 11 November-
MCDERMOTT AND LESLEYDBP03 11 November-
REC DEPARTMENTDBP04 11 November-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MORGANZA WATER SYSTEM LA1077025
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
882 CROCHET STDBP01 7 July-
LA 3050 AND BEAUVIASDBP02 7 July-
Wednesday, February 7, 2018 Page 97 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MORROW WATER SYSTEM INC LA1097009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
13707 HWY 71 (POC#6)DBP01 5 May-
856 FISHER RD (POC#4)DBP02 5 May-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
MORTON SALT INC WATER SYSTEM LA2045053
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CHANGE HOUSEDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MOSSVILLE WW DISTRICT NO 2 LA1019052
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3911 WEST HWY 90DBP03 7 July-
810 ISABELLA STREETDBP04 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MOUNT CALM WATER SYSTEM LA1013018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LA 147 AND GIRLSCOUT RDDBP01 8 August-
389 HWY 797DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MOUNT HERMON WATER DISTRICT LA1117021
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 38 @ MT PISGAH ROADDBP01 6 June-
VERNON SCHOOL RD & THOMAS CRYER ROADDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MT LEBANON WATER SYSTEM LA1013011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LA HIGHWAY 154 @ LA HIGHWAY 795DBP01 7 July-
OAK GROVE CHURCH ROADDBP02 7 July-
Wednesday, February 7, 2018 Page 98 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
MT MORIAH WATER SYSTEM LA1049036
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2157 HWY 148DBP01 8 August-
3077 RISER RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MT OLIVE WATER SYSTEM LA1013012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LA HWY 508DBP01 7 July-
GASKIN ROADDBP02 7 July-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
MT OLIVE WATERWORKS DISTRICT LA1061014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MITCHAM ORCHARD RD & CRESTHAVEN BLVDDBP02 8 August-
992 GARR RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MT ZION WATER SYSTEM LA1061015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
151 N 500 YDS SOUTH OF JARMAN RD INTERSEDBP01 7 July-
WALNUT CREEK RD AT TEST SITE ACROSS FROMDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
MY PLACE MOBILE HOME PARK WATER SYSTEM LA1099025
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1367-A CHES BROUSSARDDBP01 9 September-
1369-I CHES BROUSSARDDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NATCHITOCHES PARISH WWKS DISTRICT 2 LA1069006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
139 BRIARWOOD COURTDBP02 6 June-
2971 OLD RIVER ROADDBP03 6 June-
Wednesday, February 7, 2018 Page 99 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
NATCHITOCHES WATER SYSTEM LA1069007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WTP 24 EFFLUENTDBP01 6 June-
4383 HWY 1DBP02 6 June-
COLLEGE AVENUEDBP03 6 June-
109 MORGAN LANEDBP05 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NEBO WATER SYSTEM INC LA1059005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8227 HWY 127 SOUTHDBP02 7 July-
213 HARVEY BRADFORD ROADDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NEESE INDUSTRIES, INC LA2005267
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OFFICE KITCHENDBP01 9 September-
EMPLOYEE KITCHENDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NEW CARROLL WATER SYSTEM LA1123005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
9031 LA 2DBP02 11 November-
15744 LA 585DBP03 11 November-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
NEW HOPE ST CLAIR WATER SYSTEM LA1049024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC# 4 HWY 146- NEW HOPE CHURCHDBP02 7 July-
INTERSECT LELAND PARDUE AND LELAND RDDBP03 7 July-
Wednesday, February 7, 2018 Page 100 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
10/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
NEW IBERIA WATER SYSTEM (LAWCO) LA1045009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ELTON & SANDAGERDBP01 3 March-
3611 BROKEN ARROWDBP02 3 March-
AI DELI STOREDBP05 3 March-
414 BOUTTE RDDBP06 3 March-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NEW LLANO WATER DEPARTMENT LA1115022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OAK STREETDBP01 7 July-
STANTON ROADDBP02 7 July-
4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
NEW ORLEANS CARROLLTON WW LA1071009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
20711 OLD SPANISH TR (VIS)DBP01 10 October-
4330 ST CLAUDE (FSX)DBP02 10 October-
5600 FRANKLIN (E12)DBP03 10 October-
14434 CHEF MENTEUR HIGHWAYDBP05 10 October-
6900 DOWNMAN ROADDBP06 10 October-
2920 MAGAZINE STREETDBP07 10 October-
7300 CHEF MENTEUR HIGHWAYDBP08 10 October-
449 ESPLANADE AVENUEDBP09 10 October-
1211 ARABELLA STREETDBP10 10 October-
9600 HAYNE BLVDDBP11 10 October-
5550 CROWDER BLVDDBP12 10 October-
7223 PONCHARTRAIN BLVDDBP13 10 October-
Wednesday, February 7, 2018 Page 101 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
NEW ORLEANS ALGIERS WATER WORKS LA1071001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4115 WOODLAND (AN)DBP02 4 April-
3663 BEHRMAN (AA)DBP03 4 April-
3340 GEN. MEYER (AL)DBP04 4 April-
425 OPELOUSAS STREETDBP05 4 April-
13101 PATTERSON DRIVEDBP06 4 April-
123 1/2 OAK ALLEY DRIVEDBP07 4 April-
2501 MEMORIAL PARK DRIVEDBP08 4 April-
2914 VESPIAN STREETDBP09 4 April-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NEW ROADS WATER SYSTEM LA1077026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1208 OLINDE STDBP01 7 July-
801 MORNINGSIDE STDBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
NEWELLTON WATER SYSTEM LA1107003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
117 POINT DRIVEDBP01 11 November-
130 MELTON STREETDBP02 11 November-
4/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
NOBLE WATER SYSTEM LA1085017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 1218 @ RED OAKDBP01 6 June-
KNOTT DRIVEDBP02 6 June-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
NORANDA ALUMINA, LLC LA2093002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2ND FLOOR - DIGESTION BLDGDBP01 4 April-
HIGH TANK / WATER TOWERDBP02 4 April-
Wednesday, February 7, 2018 Page 102 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NORTH CROWLEY WATER CORPORATION LA1001023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
148 VICKSBURGDBP01 3 March-
4354 BRANCH HWYDBP02 3 March-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NORTH DESOTO WATER SYSTEM LA1031011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1229 STONEWALLDBP01 8 August-
120 CHURCH ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NORTH FRANKLIN WATER WORKS LA1041003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
453 HIGHWAY 610DBP01 8 August-
HIGHWAY 17 @ NATURES ACRES RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NORTH HODGE WATER SYSTEM LA1049012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOOP ST AT WEST 3RDDBP02 7 July-
5732 QUITMAN HWYDBP03 7 July-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
NORTH IBERVILLE WATER SYSTEM LA1047024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
22940 HWY 386DBP01 8 August-
21305 SIDNEY ROADDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
NORTH LAKE ST JOHN WATER SYSTEM LA1029014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
899 HWY 570DBP01 11 November-
5574 HWY 568DBP02 11 November-
Wednesday, February 7, 2018 Page 103 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:
NORTH MONROE ET AL WATER SYSTEM LA1073035
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
22 MARTHA DRIVEDBP03 5 May-
296 BAYOU BANKSDBP04 5 May-
579 PARROTS BEAKDBP05 5 May-
1332 KEYSTONE RDDBP06 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NORTH OAKS MEDICAL CENTER LA2105051
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DIAGNOSTIC RMDBP01 7 July-
BOILER ROOMDBP02 7 July-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
NORTH WEBSTER PARISH INDUSTRIAL PARK LA2119011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
B AND R DRIVEDBP02 8 August-
HWY 371DBP03 8 August-
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
NORTHMINSTER PRESBYTERIAN MONTESSORI LA2103357
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
END OF SOUTH WINGDBP01 8 August-
DISTRIBUTION SYSTEMDBP02 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
NORTHSHORE 1 COMMERCIAL CONDO ASSOC LA2103412
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FRONT RIGHT SIDE OF BLDGDBP02 8 August-
LEFT SIDE OF BLDG TOWARDS REARDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
NORTHWEST ALLEN WWD WATER SYSTEM LA1003003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 26 & 201 VIZARDS RDDBP01 8 August-
6 MILE PENTACOSTAL ROAD & HWY 377 NDBP02 8 August-
Wednesday, February 7, 2018 Page 104 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
NORTON SHOP WATER SYSTEM LA1027010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1862 HWY 521DBP01 9 September-
263 STATE LINE RDDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
OAK GROVE WATER SYSTEM LA1123006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2880 FISKE UNION ROADDBP01 8 August-
HWY 17 SDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
OAK MEADOWS SUBDIVISION WATER SYSTEM LA1019076
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6902 MEADOW VIEW LOOPDBP01 8 August-
7121 SHADOW LANEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
OAK PINE MOBILE HOME PARK WATER SYSTEM LA1019112
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
726 TALLOWDBP01 8 August-
932 TALLOW LOT 29DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
OAK RIDGE WATER SYSTEM LA1067014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
106 N OAKDBP02 8 August-
DOGWOOD @ OAK STDBP03 8 August-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
OAK RIVER ESTATES LA1103159
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
20125 OAK RIVER PLACEDBP02 8 August-
20055 OAK RIVER PLACEDBP03 8 August-
Wednesday, February 7, 2018 Page 105 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
OAK VILLA TRAILER PARK LA1103152
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OFFICEDBP01 8 August-
LOT 128DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
OAK VILLAGE MOBILE HOME PARK WS LA1005171
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 15DBP01 9 September-
LOT 29DBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
OCCIDENTAL CHEMICAL CORPORATION LA2005042
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CO-GEN CONTROL ROOM SINKDBP02 8 August-
5CP CONTROL ROOM SINKDBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
OIL CITY WATER WORKS LA1017026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 1 & HWY 538DBP02 4 April-
10011 HIGHWAY 1 NORTHDBP03 4 April-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
OLD SALINE COMMUNITY WATER SYSTEM LA1013020
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RIDGE ROAD BY FLUSHDBP02 8 August-
HWY I55DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
OMNI GEOPHYSICAL LLC WATER SYSTEM LA2055086
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MENS LAVATORYDBP01 8 August-
KITCHEN SINKDBP02 8 August-
Wednesday, February 7, 2018 Page 106 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
OPELOUSAS CITY OF WATER SYSTEM LA1097010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1602 BLUE STDBP02 8 August-
2624 POWERS STREETDBP04 8 August-
1014 JUDSON WALSHDBP05 8 August-
123 MEMORY LANEDBP06 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
OXBOW CALCINING, LLC LA2033052
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ADMINISTRATION BLDGDBP01 6 June-
LUNCHROOM BLDGDBP02 6 June-
MAINTENANCE SHOP SINKDBP03 6 June-
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
PACKAGING CORP OF AMERICA - DERIDDER LA2011002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BLASTYARDDBP02 9 September-
NURSES STATIONDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PALMETTO ADDICTION RECOVERY LA1083017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CABIN 8DBP01 8 August-
CABIN 1DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PALMETTO WATER WORKS INC LA1119022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
493 LAKEVIEW DRDBP01 7 July-
195 PINE CIRCLEDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PARADISE POINT WATER SYSTEM LA1049032
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
119 EDEN DRDBP01 8 August-
141 PARADISE DRIVEDBP02 8 August-
Wednesday, February 7, 2018 Page 107 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
10/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
PARISH UTILITIES OF ASCENSION LA1005035
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
EVANGELINEDBP03 9 September-
3227 GARRISON TURNAROUNDDBP05 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PARKLAND TRAILER PARK WATER SYSTEM LA1055048
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TAP #1 AT HOUSEDBP01 8 August-
TAP #5 LOT 33DBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
PATTERSON WATER SYSTEM LA1101006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
729 KEM STREETDBP01 10 October-
508 TAFT STREETDBP03 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PAVESTONE LA2103507
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
29095 KRENTEL RD-OFFICE AREADBP01 9 September-
29095 KRENTEL RD-BAG PLANTDBP02 9 September-
7/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
PEACEFUL PINES MHP WATER SYSTEM LA1015036
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 1DBP02 9 September-
LOT 16DBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PEARL PLANTATION TOWNHSE LA1103131
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
APT 377DBP01 8 August-
OUTSIDE PUMP HOUSEDBP02 8 August-
Wednesday, February 7, 2018 Page 108 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
PECAN ISLAND WW DISTRICT NO 3 LA1113029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
24304 FRONT RIDGE RDDBP01 9 September-
32228 W LA HWY 82DBP02 9 September-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
PECAN LAKE SUBDIVISION WS LA1073063
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
122 PECAN LAKE ESTATESDBP02 8 August-
100 PECAN LAKE ESTATESDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PEG LEG COVE WATER SYSTEM LA1085018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 2 FOXCROFT ROADDBP02 7 July-
LOT 59 BOUNTY TRAILDBP03 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
PENDLETON WATER ASSOCIATION LA1085046
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
QUEENS ROADDBP01 7 July-
HWY 6DBP03 7 July-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
PHILLIPS 66 LAKE CHARLES REFINERY LA2019017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TANK FARM CONTROL ROOM SINKDBP01 8 August-
SOUR CRUDE CONTROL ROOM SINKDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PHOENIX MHP OF LAKE CHARLES LLC W S LA1019109
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT #28DBP02 8 August-
LOT #55DBP03 8 August-
Wednesday, February 7, 2018 Page 109 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
PILOT STREET WATER SUPPLY LA1103193
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
23514 PILOT STREETDBP01 6 June-
72689 5TH AVEDBP03 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PINE CREST TRAILER PARK LA1103078
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OFFICE TAPDBP01 8 August-
LOT 110DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PINE HILL WATER SYSTEM LA1027007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
802 CAMP RDDBP02 8 August-
188 WINKLER RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PINE PRAIRIE CORRECTIONAL FACILITY WS LA1039018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
INTAKEDBP02 10 October-
TOOL ROOMDBP03 10 October-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
PINE TRAILER PARK LA1005152
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 11DBP01 9 September-
LOT 9DBP02 9 September-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
PINECREST MOBILE HOME VILLAGE LA1017092
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MRT LOCATIONDBP01 9 September-
MIDPOINTDBP02 9 September-
Wednesday, February 7, 2018 Page 110 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
PINEHILL WATERWORKS DISTRICT LA1017027
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WOMACK RDDBP01 12 December-
SHEPARD ROADDBP02 12 December-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PINEY RIDGE TRAILER PARK LA1103028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 51DBP02 8 August-
LOT 4DBP03 8 August-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
PINNACLE PLACE SUBDIVISION WATER SYSTEM LA1055175
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
105 PINNACLEDBP02 7 July-
138 PINNACLEDBP03 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
PINNACLE POLYMERS LA2095041
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LAB SINKDBP02 8 August-
WAREHOUSEDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PIONEER DARNELL WATER SYSTEM LA1123007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2268 HURT ROADDBP02 7 July-
HWY 588DBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PITKIN WATER SYSTEM LA1115026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
385 LARRY COOK RDDBP01 6 June-
109 HILL STDBP02 6 June-
Wednesday, February 7, 2018 Page 111 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PLAISANCE WATER SYSTEM LA1097012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DUPRE ROADDBP01 6 June-
7941 I49 SOUTHDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PLANET KIDS ACADEMY #2 LA2103484
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
317 HWY 21 - FRONT OF BLDG NE CORNERDBP02 7 July-
317 HWY 21 - FRONT OF BLDG SE CORNERDBP03 7 July-
1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:
PLANTATION MOBILE HOME VILLAGE LA1005148
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TAP 2DBP01 8 August-
TAP 1DBP02 8 August-
1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
PLANTATION TRACE MOBILE HOME PARK LA1015006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
61 DAVIDSONDBP01 8 August-
74 DAVIDSON DRIVEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PLEASANT HILL WATER SYSTEM, TOWN OF LA1085021
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 175DBP01 8 August-
STODDARD STDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
PLEASANT HILLS-CROSSROADS WATER SYSTEMS LA1127023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
5016 HWY 124DBP02 7 July-
3939 HWY 84DBP03 7 July-
Wednesday, February 7, 2018 Page 112 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
PLEASANT RIDGE WATER SYSTEM LA1059006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1647 HWY 124 EASTDBP05 8 August-
536 JOHN HENRYDBP06 8 August-
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
PLEASANT RIDGE WATER SYSTEM SOUTH LA1059019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
240 TROYVILLE RDDBP01 8 August-
195 CRUSE RDDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
PLEASANT VALLEY WATER SYSTEM LA1119023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
14330 HWY 371DBP02 8 August-
NETLES ROAD@FULLER ROADDBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
PLEASURE BEND WATER SUPPLY LA1095006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
213 RUE ST MARTINDBP02 8 August-
318 DES ALLEMANDS BLVDDBP03 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
PNO 3401 JOURDAN ROAD LA2071121
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WEST END, NORTHWALLDBP01 8 August-
CITY-SIDE, US OF ADMIN BLDGDBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
PNO ALABO STREET WHARF LA2071120
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BELLE CHASSE TRANSPORT METERDBP01 8 August-
COMFORT STATION, SECTION 12DBP02 8 August-
Wednesday, February 7, 2018 Page 113 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
PNO CRUISE TERMINALS LA2071117
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SHIP SERVICE CONNECTION AT FP 5DBP01 8 August-
SHIP SERVICE CONNECTION BLUE BOX 3DBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
PNO ELAINE STREET WHARF LA2071125
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
COMFORT STATION OF WHARFDBP01 8 August-
7501 TERMIANL RD - DEDICATED FAUCETDBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
PNO GOV NICHOLLS WHARF LA2071126
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SHIP SERVICE METERDBP01 8 August-
COMFORT STATIONDBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
PNO HARMONY ST. WHARF LA2071122
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SHIP SERVICE CONNECTION HARMONY OPENDBP01 8 August-
SHIP SERVICE CONNECTION SECTION 14DBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
PNO LOUISIANA NEXT COTTON WAREHOUSE LA2071119
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
COASTAL CARGO OFFICE BLDG CITY-SIDEDBP01 8 August-
SHIP SERVICE CONNECTION, SECTION 45DBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
PNO UPTOWN FACILITIES LA2071118
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HENRY CLAY COLD STORAGE COMFORT STATIONDBP01 8 August-
NAPOLEON C COMFORT STATIONDBP02 8 August-
Wednesday, February 7, 2018 Page 114 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
POINT BLUE WATER SYSTEM INC LA1039006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3365 CHATAIGNIER RDDBP01 7 July-
6558 PINE PT RDDBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
POINT WILHITE WS LA1111012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CURTIS DEANDBP02 8 August-
MT. ARARAT CHURCH HWY 553DBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
POINTE A LA HACHE WATER SYSTEM LA1075005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TABONYDBP01 9 September-
PLANTDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
POINTE COUPEE DETENTION CENTER LA1077046
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WORK RELEASE BUILDINGDBP01 8 August-
BLUE CELLSDBP02 8 August-
10/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
POINTE COUPEE WATER WORKS DISTRICT 1 LA1077043
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
15415 CHENAL ROADDBP01 9 September-
9296 ISLAND RD (HWY 413)DBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
POINTE COUPEE WWKS DISTRICT 2 - HWY 10 LA1077047
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6947 HIGHWAY 81 EASTDBP02 9 September-
7992 BAYOU FORDOCHE ROADDBP03 9 September-
Wednesday, February 7, 2018 Page 115 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
POINTE COUPEE WWKS DISTRICT 2- BATCHELOR LA1077045
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
12348 HWY 417DBP01 9 September-
5010 HWY 419DBP02 9 September-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
POLAND WATER ASSOCIATION LA1079025
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2563 HWY 457DBP02 8 August-
6 HATHORNE ROADDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
POLLOCK AREA WATER SYSTEM INC LA1043017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
476 HARDWATER LAKE ROADDBP02 7 July-
8893 HWY 165DBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PONCHATOULA WATER SYSTEM LA1105019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
S 9TH & HWY 22 WDBP02 7 July-
COLVER & ESTERBROOK ROADDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PONDEROSA RANCHES SUBDIVISION LA1103077
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
102 STALLION RUNDBP02 7 July-
774 BUCK RUNDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PORT ALLEN WATER SYSTEM LA1121014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OAKS AT S JEFFERSONDBP01 9 September-
CORNER 7TH & BURBRIDGEDBP02 9 September-
Wednesday, February 7, 2018 Page 116 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PORT LOUIS TOWNHOMES LA1103153
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CONDO 5 @ RUE DE SUD DRDBP02 7 July-
CONDO 49 @ RUE DE SUD DRDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PORT OF GREATER BATON ROUGE LA2121007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2161 HWY 1 SOUTHDBP01 8 August-
1300 ERNEST WILSON DRDBP02 8 August-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
PORT OF WEST ST MARY LA1101013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
100 KIM LANEDBP01 9 September-
324 ALICE B ROADDBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
PORT SULPHUR WATER DISTRICT LA1075006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TIGER PASSDBP04 9 September-
SHELL HELIPORTDBP06 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PORT VINCENT WATER SYSTEM LA1063033
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CORNER LEE 7 HWY 16DBP01 9 September-
OFF GOURDON LNDBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
POWHATAN WATER SYSTEM LA1069008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 485 @ GOOCH COMMUNITY CENTERDBP02 9 September-
HWY 562 AND HWY 485DBP03 9 September-
Wednesday, February 7, 2018 Page 117 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
PRAIRIE ROAD WATER DISTRICT LA1073040
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
UNDERWOODDBP02 5 May-
375 PRAIRIE ROADDBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PRAIRIE RONDE WATER SYSTEM INC LA1097014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WHITE CHAPEL ROADDBP01 6 June-
MINI ROADDBP02 6 June-
1/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
PROGRESSIVE WASTE SOLUTIONS LA2103511
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NORTH SIDE OF MAINT BUILDINGDBP01 8 August-
SCALE HOUSEDBP02 8 August-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
PROVENCAL WATER SYSTEM LA1069009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RUTH RACHELDBP02 9 September-
MCCAIN TIBBETT HWY 117 NDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
PUNKIN CENTER HILLTOP WS LA1049013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3829 BEECH SPRINGS ROADDBP01 7 July-
705 LOCKHART DRIVEDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
QUAIL RIDGE ESTATES WATER SYSTEM LA1019105
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 102DBP01 8 August-
AT GULLYDBP02 8 August-
Wednesday, February 7, 2018 Page 118 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
QUITMAN WATER SYSTEM LA1049014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ANDERSON ROAD AND BEAR KNOLL RDDBP02 7 July-
DENTON RD AND MT OLIVE RDDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
R & D PROPERTIES, LLC, MOBILE HOME PARK LA1045041
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2815 DAGO LANEDBP01 9 September-
2905 BUCKSKIN RDDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RAMBIN-WALLACE WATER SYSTEM LA1031012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SAM BOOKER ROADDBP02 8 August-
HIGHWAY 483DBP03 8 August-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
RAMSEY WATER SYSTEM LA1073025
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
137 MUSIC ROADDBP03 10 October-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
RANDOLPH WATER SYSTEM LA1111018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1201 HWY 167DBP01 7 July-
874 BETHEL CHURCH RDDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RAPIDES ISLAND WATER ASSOCIATION INC LA1079020
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 1 & HWY 121DBP01 8 August-
428 BELGARD BENDDBP02 8 August-
Wednesday, February 7, 2018 Page 119 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
RAPIDES PARISH WATERWORKS DISTRICT 3 LA1079017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RIFLE RANGE RDDBP02 6 June-
TIOGA RD & ADAMS DRDBP03 6 June-
POINT OF ENTRYDBP05 6 June-
DONAHUE FERRY & WHITTINGTONDBP06 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RAVENWOOD SUBDIVISION LA1103080
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
101 FOREST STDBP01 8 August-
118 CHARWOOD DRDBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
RAW POWER INDUSTRIES MHC WATER SYSTEM LA1017001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BARBER SHOPDBP02 4 April-
LOT 50DBP03 4 April-
10/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
RAYVILLE WATER SYSTEM LA1083006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MCGOWEN AND COTTONLANDDBP02 7 July-
LOUISA AND PEACH STREETDBP03 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
RED HILL WATERWORKS INC LA1043018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
513 HWY 123DBP03 8 August-
146 GENE KEEN RDDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
REDDELL VIDRINE WATER DISTRICT LA1039007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MILLER LIKE ROADDBP01 8 August-
7616 VETERAN'S MEMORIAL HWYDBP02 8 August-
Wednesday, February 7, 2018 Page 120 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RESOLVE WHISPERWOOD ESTATES SD WS LA1103046
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
60451 DIXIE ROADDBP01 9 September-
310 PALERMODBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RICHLAND HEIGHTS SUBD WATER SYSTEM LA1083015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
25 BAKER LNDBP01 8 August-
14 BAKER LNDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RINGGOLD WATER SYSTEM LA1013013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SUSAN DRIVEDBP02 8 August-
HALL @ BATESDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RISER ROAD WATER SYSTEM LA1061021
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2017 RISER ROADDBP01 8 August-
MASTER METER AT RISER ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RIVER PINES PLANTATION UTILITIES LA1063018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
31765 RIVER PINES DRIVEDBP02 8 August-
31722 INDIAN MOUND ROADDBP03 8 August-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
RIVER POINT WATER SYSTEM LA1015030
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BARN NO. 7DBP01 8 August-
5223 RUE ROYALE DRDBP02 8 August-
Wednesday, February 7, 2018 Page 121 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RIVER RIDGE ESTATES WATER SYSTEM LA1099023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2913 ATCHAFALAYA LOT 2DBP01 9 September-
LOT 20DBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
RIVER ROAD WATER SYSTEM LA1083008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
952 SCALES ROADDBP01 9 September-
752 FERGUSON ROADDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RIVERSCAPE @ CLIO SUBDIVISION LA1063106
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
17030 COLES CREEKDBP02 8 August-
1700 PEACE POINTDBP03 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ROBELINE MARTHAVILLE WATER SYSTEM LA1069010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TRULY FREE ROADDBP01 6 June-
2491 ROBELINE PROVENCAL ROADDBP02 6 June-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
ROBINSON CHAPEL WATER SYSTEM LA1049027
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
662 ROBINSON CHAPELDBP01 9 September-
4371 HWY 144DBP02 9 September-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
ROCKY BRANCH WATER SYSTEM LA1111013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BILL BROWN & HIGHWAY 143DBP02 5 May-
1158 CHAPMAN ROADDBP03 5 May-
Wednesday, February 7, 2018 Page 122 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:
RODDY ROAD VILLAGE ASCENSION, LLC LA1005112
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 23DBP01 8 August-
TAP 1DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RODESSA WATER SYSTEM LA1017028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
PITTS ROADDBP01 7 July-
10053 WEST MAIN STDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ROGERS COMMUNITY WATER SYSTEM INC LA1059013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
111 BODIE ROADDBP01 8 August-
150 HWY 776DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RON SON BEAR LA1117022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
END OF WATER LINEDBP01 9 September-
2 CONNECT FROM WELLDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ROSELAND WATER SYSTEM LA1105022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
63127 WASHINGTON STDBP02 8 August-
61569 BENNETT RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ROYAL MOBILE ESTATES WATER SYSTEM LA1055074
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
7727 CAMERON ST LOT 48DBP01 8 August-
7727 CAMERON ST LOT 5DBP02 8 August-
Wednesday, February 7, 2018 Page 123 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ROYAL VISTA MHP WATER SYSTEM LA1055123
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
100 DULA STREETDBP01 8 August-
104 RANA STREETDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
RURAL FRANKLINTON WATER LA1117003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
46175 JENKINS ROADDBP01 6 June-
STORAGE TANKDBP02 6 June-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
RUSTON WATER SYSTEM LA1061017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SANTIAM RD & MCDONALD AVEDBP04 4 April-
MINDEN ST AND CAROLINA STDBP06 4 April-
3600 ST. TRENTON STREETDBP07 4 April-
BARRETT SPRINGS AND LAKEVIEWDBP08 4 April-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
RUTHERFORD TRAILER PARK WATER SYSTEM LA1019124
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 13DBP01 8 August-
LOT 3DBP02 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
S AND J RV PARK LA1103175
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT #26DBP01 8 August-
BETWEEN LOT#1&LOT#2DBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SABINE PARISH WATER DISTRICT 1 LA1085036
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1682 SHADY HILLDBP03 6 June-
1027 LEE JORDANDBP04 6 June-
Wednesday, February 7, 2018 Page 124 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
SALEM WATER SYSTEM LA1111014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TURKEY CREEK RD AND PLATT RDDBP02 8 August-
LANDFILL RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SALINE WATER SYSTEM LA1013014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FIRE STATIONDBP01 8 August-
MILL CREEK ROADDBP02 8 August-
1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:
SALMON & ASSOCIATES LA2033131
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
626 BLDG LUNCH ROOM SINKDBP02 8 August-
MEN'S ROOM SINKDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SALT WORKS WATER SYSTEM LA1119024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8836 HWY 371DBP02 8 August-
851 YELLOW PINE RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SANDERSON FARMS, INC LA2105004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WASTE WATER OFFICEDBP01 8 August-
NURSE'S OFFICEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SANDSTONE LAKE WATER SUPPLY LA1117127
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 77DBP01 7 July-
LOT 35DBP02 7 July-
Wednesday, February 7, 2018 Page 125 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SANDY HILL WATER & SEWER LA1115090
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC 3DBP02 9 September-
#249DBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SANDY LAKE WATER SUPPLY LA1025008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
165 ERNEST RDDBP02 7 July-
129 BROWN RDDBP03 7 July-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
SANDY POINT 480 WATER SYSTEM LA1069013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DALTON RANCHDBP01 8 August-
SANDY POINT ROAD AND M. SALINE ROADDBP02 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SARDIS WATER SYSTEM LA1111021
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
917 FLORENCE WILLIAMS ROADDBP01 4 April-
2046 HICKS/FRASIER RDDBP03 4 April-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SAREPTA WATER WORKS DISTRICT LA1119025
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CHURCH STREETDBP01 7 July-
HIGHWAY 371 SOUTHDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SAVOY SWORDS WATER SYSTEM INC LA1097024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1085 BEAUGH STDBP02 9 September-
BOULET ROADDBP03 9 September-
Wednesday, February 7, 2018 Page 126 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
10/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
SCHRIEVER WATER TREATMENT SERVICE AREA LA1109002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TEXACO MASTER METER,DBP01 6 June-
BAYOUSIDE DR @ SARAHDBP02 6 June-
RHETT PUMPING STATIONDBP03 6 June-
CROSSTEXDBP05 6 June-
LOISDBP06 6 June-
HUMBLEDBP07 6 June-
SENIOR CITIZENSDBP08 6 June-
WESTSIDEDBP09 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SHADOW LAKE MHP WATER SYSTEM LA1017082
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SHOPDBP01 5 May-
LOT 23DBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SHADY GROVE WATER SYSTEM LA1049016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
327 LINDEY LANEDBP01 7 July-
187 RED STEWART LOOPDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SHADY OAKS ESTATES WATER SYSTEM LA1055125
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
241 BASIN RD LOT 2DBP01 6 June-
241 BEAU BASIN RD @ SHOPDBP02 6 June-
1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:
SHADY OAKS MOBILE HOME PARK WATER SYSTEM LA1005114
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TR 1DBP01 8 August-
TAP 1DBP02 8 August-
Wednesday, February 7, 2018 Page 127 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
SHADY PINES TRAILER PARK LA1103040
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT #136DBP02 8 August-
LOT #131DBP03 8 August-
1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SHELL CHEMICAL COMPANY LA2005034
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
EAST ADMIN KITCHENDBP01 2 February-
EYEWASH/SAFETY SHOWER @ UTILITIES PUMPDBP02 2 February-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SHERWOOD APARTMENTS WATER SYSTEM LA1017066
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TAP @ APARTMENT 25DBP01 8 August-
TAP BEHIND OFFICEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SHILOH WATERWORKS DISTRICT LA1013016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
745 SHILOH ROADDBP01 8 August-
1069 BAILEY ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SHONGALOO WATER SYSTEM LA1119026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1060 BAKER ROADDBP01 8 August-
963 FIRE TOWER ROADDBP02 8 August-
Wednesday, February 7, 2018 Page 128 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
SHREVEPORT WATER SYSTEM LA1017031
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6900 RICE RDDBP01 6 June-
400 HOMALOT@BITTDBP02 6 June-
NORRIS FERRY RDDBP03 6 June-
4575 N MARKET @ FS2DBP04 6 June-
LONGLAKE @ OVERTON BROOKSDBP05 6 June-
6600 LONGTIMBERS @ KINGFISHDBP06 6 June-
4200 REILY LANEDBP07 6 June-
10439 KINGSTON RDDBP08 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SIBLEY WATER SYSTEM LA1119027
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CORPORATE DRIVEDBP02 7 July-
9090 HWY 371DBP03 7 July-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
SID RICHARDSON CARBON PLANT LA2121008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NEW CONTROL BUILDINGDBP02 9 September-
OLD CONTROL BUILDINGDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SIEPER AREA WATER SYSTEM LA1079032
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RIVER RIDGE RDDBP01 8 August-
OWEN MILLER RDDBP02 8 August-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
SILENT CEDARS MHP WATER SYSTEM LA1017035
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 12DBP01 8 August-
LOT 5DBP02 8 August-
Wednesday, February 7, 2018 Page 129 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SIMSBORO WATER SYSTEM LA1061018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 80 EDBP01 9 September-
LOUISA STDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SIXTH WARD CAFETERIA LA2103378
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MAIN BUILDINGDBP02 7 July-
FIRE TANKDBP03 7 July-
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
SIXTH WARD JR HIGH W S LA2103239
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CONCESSION STANDDBP02 8 August-
REAR OF MAIN BLDGDBP03 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SLIDELL WATER SUPPLY LA1103041
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CARUSO BLVD - MRO OUTLET MALLDBP01 8 August-
4141 PONTCHARTRAINDBP02 8 August-
58516 PEARL ACRES ROADDBP03 8 August-
505 ROBERT BLVDDBP04 8 August-
1/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
SLIDELL WATER SUPPLY SYSTEM NO. 2 LA2103284
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
102 NORTHSHORE BLVDDBP02 12 December-
MALL NORTH/NW CORNER OF NORTHSHORE MALLDBP03 12 December-
10/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
SLIGO WATER SYSTEM INCORPORATED LA1015044
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
365 SLIGO ROADDBP02 6 June-
245 CANE BENDDBP03 6 June-
Wednesday, February 7, 2018 Page 130 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SMITH MOBILE HOME VILLAGE WATER SYSTEM LA1019085
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 109DBP01 9 September-
LOT 20DBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SOCIAL SPRINGS WATER SYSTEM NORTH LA1081009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC #10DBP01 9 September-
POC #6DBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SOCIAL SPRINGS WATER SYSTEM SOUTH LA1081011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1546 HWY 507DBP02 5 May-
6541 HWY 371DBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SORRENTO LUMBER COMPANY LA2005255
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
KITCHENDBP02 7 July-
OLD BATHROOM#1DBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SOUTH BAYOU MACON WS LA1041008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 4 @ HIGHWAY 128DBP02 8 August-
4328 RIVER ROADDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SOUTH BONNE IDEE WATER SYSTEM LA1067020
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
KOVAC 6263 OAK RIDGE HWTDBP01 8 August-
5183 VINEY WOODS RDDBP02 8 August-
Wednesday, February 7, 2018 Page 131 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SOUTH BOSSIER WATER SYSTEM LA1015029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POOLE RD AND HWY 71DBP01 6 June-
HWY 154 AND HWY 157DBP02 6 June-
10/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
SOUTH CALCASIEU ESTATES SUBDIVISION W S LA1019098
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1812 MCHUGH M BLDG 1DBP02 8 August-
1821 MONAGHAN BLDG 16DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SOUTH CLAIBORNE WATER SYSTEM LA1027006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HOOD TOWNDBP01 9 September-
HIGHWAY 79DBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SOUTH DESOTO WATER SYSTEM LA1031029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LULA LANEDBP02 9 September-
SPRINGFIELD ROADDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SOUTH GRANT WATER CORPORATION LA1043008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
100 IRENE DRIVEDBP01 9 September-
469 MUNDY LOOPDBP02 9 September-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
SOUTH MANSFIELD WATER SYSTEM LA1031014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
KYLE PORTER ROADDBP01 8 August-
COOPER ROADDBP02 8 August-
Wednesday, February 7, 2018 Page 132 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
SOUTH MONROE WS GOWC LA1073046
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
109 MARY STDBP04 5 May-
328 AUDUBONDBP05 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SOUTH OAKDALE WATER SYSTEM LA1003008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LEROY MEAUX COTTINGIN RDDBP01 6 June-
4143 NORRIS AND WARD RDDBP02 6 June-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
SOUTH RAYNE WATER CORPORATION LA1001022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8178 E WHITNEY HWYDBP02 8 August-
126 LLAMA RDDBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SOUTH TOLEDO BEND WATER DISTRICT LA1085055
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RIDGECREST & PINECRESTDBP02 9 September-
BETH STREETDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SOUTH VERNON PARISH WATERWORKS DISTRICT LA1115118
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DIAMOND CHURCH ROADDBP01 6 June-
HWY 3226 AND BROAD STDBP02 6 June-
7/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
SOUTHEAST BIENVILLE WATER SYSTEM LA1013017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1601 SHIVELY ROADDBP01 8 August-
2234 PINE GROVE RDDBP02 8 August-
Wednesday, February 7, 2018 Page 133 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SOUTHEAST GRANT WATER SYSTEM LA1043015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3501 CAMP HARDTNER ROADDBP02 6 June-
7450 HIGHWAY 165DBP03 6 June-
4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
SOUTHEAST HODGE WATER SYSTEM LA1049017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
451 LOCKHART DRIVEDBP01 9 September-
771 HWY 813-3DBP02 9 September-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
SOUTHEAST WW DISTRICT NO 2 LA1113031
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
STATE HWY 330 EASTDBP02 8 August-
HWY 82DBP03 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
SOUTHEASTERN MILLS WATER SYSTEM LA2099094
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MAINTENANCE SHOP SINKDBP01 8 August-
QA LABDBP02 8 August-
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
SOUTHERN MANOR M H P LA1103111
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 36DBP01 8 August-
LOT 147DBP02 8 August-
4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
SOUTHGATE MHP WATER SYSTEM LA1015024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 1DBP02 8 August-
LOT 64DBP03 8 August-
Wednesday, February 7, 2018 Page 134 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SOUTHTOWNER MOBILE ESTATES WATER SYSTEM LA1019039
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 3DBP01 8 August-
LOT 117DBP02 8 August-
4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
SOUTHVIEW ESTATES WATER SYSTEM LA1017070
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OFFICEDBP02 4 April-
LOT 4DBP03 4 April-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
SOUTHWEST ALLEN WW DISTRICT NO 2 LA1003009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 165 @ PARISH LINE RDDBP01 8 August-
210 KILBURN CAMPDBP03 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SOUTHWEST AVOYELLES WATER DISTRICT LA1009015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4234 HWY 71 SDBP01 6 June-
2732 HWY 1176DBP02 6 June-
1/1/2018 QT Monitoring Begin Date: Frequency of Sampling:
SOUTHWEST OUACHITA WATERWORKS, INC LA1073047
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
PHILPOT RD & CHARLIE MCCAIN RDDBP02 8 August-
TISDALE RD & BUD BAUGH RDDBP03 8 August-
SIMMIE WOODS @ CROWELLDBP04 8 August-
MARION SIMS AT LIBERTY GROVE CHURCHDBP05 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SPICEWOOD MOBILE HOME PARK WATER SYSTEM LA1067022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4434 DOWD ROAD TAP 4DBP01 7 July-
4434 DOWD ROAD POC 1DBP02 7 July-
Wednesday, February 7, 2018 Page 135 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
SPILLWAY ESTATES WATER SYSTEM LA1049030
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SUANNA ROADDBP02 8 August-
211 SPRUCE DRIVEDBP03 8 August-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
SPRING BAYOU WATER WORKS DISTRICT LA1009020
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
312 DR MICHEL RDDBP01 9 September-
2164 LITTLE RIVER RDDBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SPRING CREEK SUBDIVISION WATER SYSTEM LA1049028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC#4 299 SANDY POINT DRDBP02 6 June-
POC#1 518 COLBY JEAN RDDBP03 6 June-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SPRINGHILL COMMUNITY WATER SYSTEM LA1013023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LA 783 AND BOYETTDBP02 7 July-
SPRINGHILL CHURCH AND BOIESDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SPRINGHILL WATER SYSTEM LA1119028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
22150 LA HIGHWAY 157DBP02 7 July-
800 7TH STREET SEDBP03 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SPRINGLAKE MHP WATER SYSTEM LA1017033
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8970 DIXIE BLANCHARD ROADDBP02 6 June-
6192 PINE TREE LOOPDBP03 6 June-
Wednesday, February 7, 2018 Page 136 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST AMANT BAPTIST CHURCH SCHOOL LA2005268
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
AT CEMETERYDBP01 6 June-
BEHIND GYMDBP02 6 June-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
ST AMANT TRAILER PARK LA1005210
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
PRIVATE RD PRIOR TO LOT 2DBP02 6 June-
PRIVATE RD LOT #23DBP03 6 June-
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
ST BERNARD PARISH WATERWORKS LA1087001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TOCA BOOSTER STATIONDBP05 11 November-
SOUTHLAKE FOOD STOREDBP06 11 November-
WATER TREATMENT PLANTDBP07 11 November-
5401 PARIS ROADDBP09 11 November-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST CHARLES MOBILE HOME PARK LA1105067
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 27DBP01 7 July-
LOT 1DBP02 7 July-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST CHARLES WATER DISTRICT 1 EAST BANK LA1089001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TEAL ST-JAMES BUSINESS PKDBP01 9 September-
EVANGELINE OF ORMOND NURSING HOME ORMONDDBP03 9 September-
THOROUGHBRED AVENUEDBP05 9 September-
ORMOND AVE AND L&A RAILROADDBP06 9 September-
Wednesday, February 7, 2018 Page 137 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST CHARLES WATER DISTRICT 2 WEST BANK LA1089002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BAYOU GAUCHEDBP01 9 September-
ANNA ST@T&P BRIDGEDBP04 9 September-
DES ALLEMANDS SCHOOLDBP05 9 September-
HAHN STREETDBP06 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST JAMES WATER DISTRICT 1 LA1093004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HYMEL PROPERTYDBP01 11 November-
PAULINA PARKDBP02 11 November-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST JAMES WATER DISTRICT 2 LA1093005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
VACHERIE WELCOME TOWERDBP01 10 October-
PARISH UTILITY OFFICEDBP02 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST JAMES WATER SYSTEM LA1119035
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SCOOTER ROACH ROADDBP01 8 August-
HATTEN ROBERTSDBP02 8 August-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
ST JOHN WATER DISTRICT 3 LA1095007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1300 EAST AIRLINE AT COLONIALDBP01 9 September-
434 ELM STREETDBP02 9 September-
301 RUE DE SANTEDBP03 9 September-
2247 PINE VALLEYDBP04 9 September-
Wednesday, February 7, 2018 Page 138 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
ST JOHN WATER DISTRICT 1 LA1095003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
473 CENTRAL AVEDBP03 6 June-
3772 HWY 44DBP05 6 June-
4080 HWY 44 - MT AIRYDBP09 6 June-
731 BELLE POINTDBP10 6 June-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST JOHN WATER DISTRICT 2 LA1095002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
GOODWILL PLANTATIONDBP03 8 August-
EDGARD COURT HOUSEDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST JOSEPH ABBEY LA1103032
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FRONT OF STP BUILDINGDBP01 8 August-
REAR OF BAKERY BUILDINGDBP02 8 August-
4/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
ST JOSEPH WATER SYSTEM LA1107004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
131 LEVEE STREETDBP01 5 May-
306 MARTHA STREETDBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST LANDRY WATER WORKS DISTRICT 2 RURAL LA1097033
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1056 HWY 356DBP01 8 August-
HIGHWAY 754 @ ROBERT DAILEY ROADDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST LANDRY WWD 2 RURAL PURCHASE LA1097038
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
321 MENDELL RDDBP01 8 August-
825 SUPERIOR ROADDBP02 8 August-
Wednesday, February 7, 2018 Page 139 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST LANDRY WWD 3 PORT BARRE AREA A LA1097034
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NORTH END OF NEZAT ROADDBP01 8 August-
1142 LA HWY 743DBP02 8 August-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
ST LANDRY WWD 3 PORT BARRE AREA B LA1097035
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FIRE DISTRICT NO 2 WAXIA SUB STATIONDBP01 8 August-
4954 LA HWY 103DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST LANDRY WWD 3 PORT BARRE AREA C LA1097036
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3135 COURTABLEU ROADDBP02 8 August-
EAST OF WHITE FENCE ON COURTABLEUDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST LANDRY WWD 3 PORT BARRE AREA D LA1097037
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
EAST OF 2 O'CLOCK BAYOUDBP01 8 August-
HWY 190 AND PERNIE BAILEY ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST MARTIN PARISH INDUSTRIAL PARK WS LA1099029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1004 ST JOHN BRIDGE RDDBP01 7 July-
1036 MOORE AVEDBP02 7 July-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
ST MARTIN PARISH WW DISTRICT 3 - CADE LA1099028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
7190 MAIN HWYDBP01 6 June-
1086 MARION DRIVEDBP02 6 June-
Wednesday, February 7, 2018 Page 140 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
ST MARTIN PARISH WW DISTRICT 4 CATAHOULA LA1099004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1637 BURTON PLANTATION HWYDBP03 9 September-
2958-B CATAHOULA HWYDBP04 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST MARTIN WATER AND SEWER COMMISSION 1 LA1099010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
T-MAN BAILEY'S BOOSTER STATION HWY 70DBP01 2 February-
FOUR MILE BAYOUDBP02 2 February-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST MARY PAR JT WATER SEWER COMMISSION 5 LA1101012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1773 HWY 83DBP02 9 September-
1572 CYPREMORT ROADDBP03 9 September-
10/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
ST MARY PARISH W&S #2 BAYOU VISTA LA1101015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
504 VICTORIE RIVERSIDEDBP01 7 July-
100 PLUTO&HWY182DBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST MARY PARISH WATER SEWERAGE COMM 1 LA1101009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1117 SIRACUSA ROADDBP03 7 July-
9752 HIGHWAY 182DBP04 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST MARY WATER & SEWER COMM #3 LA1101010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3600 HWY 90DBP02 7 July-
11517 HIGHWAY 182DBP03 7 July-
Wednesday, February 7, 2018 Page 141 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ST MARYS WATER SYSTEM LA1015023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
233 HWY 2DBP01 8 August-
1111 HWY 2 WESTDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - CHRISTWOOD LIVING LA1103158
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
80 CHRISTWOOD BLVDDBP01 8 August-
391 CHRISTWOODDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - NORTHLAKE BEHAVIORAL LA1103039
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
N. ROBIN RD @ CHILD KITCHENDBP02 5 May-
CARDINAL COVE @ ADU BUILDINGDBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - ST GERTRUDE LA1103154
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
17240 ST. GERTRUDE DRDBP01 8 August-
17204 ST. GERTRUDE DRDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - ABITA LAKES LA1103173
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
237 THORNWOOD DRDBP01 8 August-
284 KISSENA PARK CTDBP02 8 August-
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - ALTON LA1103145
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
38276 N 5TH AVE (ALTON ELEM)DBP01 8 August-
61471 N 7T STDBP02 8 August-
Wednesday, February 7, 2018 Page 142 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - BRIARWOOD TERRACE LA1103079
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SW CORNER OF HWY 1088 & FOREST BROOKDBP03 11 November-
220 WESTWOOD DRDBP04 2 February-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - CROSS GATES SD LA1103053
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
521 DOCKSIDE DRDBP02 8 August-
575 WINBOURNE DRDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - INDIAN TRACE LA1103162
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
612 STILLWOOD DRDBP01 8 August-
201 GAGE CTDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - LAKE HILLS VILLAGE LA1103128
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
AT LOT OF WASTEWATER TREATMENT PLANTDBP01 8 August-
15209 HWY 1078DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - MEADOWLAKE SUBDIVISION LA1103146
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BRIDGEWATER DRIVEDBP02 8 August-
204 RUE JONATHANDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - MEDCATH (LA HEART) LA2103476
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NEAR METER NEAR NORTH OFFICE BLDGDBP02 8 August-
NEAR METER FOR SOUTH OFFICE BLDGDBP03 8 August-
Wednesday, February 7, 2018 Page 143 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - RIVER OAKS LA1103180
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2004 MARPLE LANEDBP01 8 August-
1017 CLAIRE DRIVEDBP02 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH - TAMANEND LA1103199
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
65278 HWY 434 (CORONER'S OFFICE)DBP01 8 August-
65556 CENTERPOINT BLVD (NTCC)DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH- BEN THOMAS RD LA1103105
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
37274 POWELL DRDBP01 8 August-
37290 BEN THOMASDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH -NORTHRIDGE ESTATES LA1103181
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
199 NORTHRIDGE DRDBP02 8 August-
317 BEE BALM CIRCLEDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH PINELAND PARK SUBD LA1103093
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DELOAKS RD & DELOAKS DRDBP02 8 August-
201-A LIBRA DRDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH SALVATION MANOR ST JOE LA1103184
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NW CORNER OF ST JOE APARTMENT BLDGDBP01 8 August-
SE CORNER OF SALVATION MANOR BLDGDBP02 8 August-
Wednesday, February 7, 2018 Page 144 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH-BEDICO CREEK LA1103191
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
716 SUGAR PINE CR. LOT 22DBP01 8 August-
177 ST CALAISDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH-FAUBOURG-COQUILLE LA1103149
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
640 PINEY RIDGE CIRCLE - RUELLE DU CHENEDBP02 8 August-
END OF INNWOOD DR - CULDESACDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM PARISH-MADISONVILLE WOODS LA1103147
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
102 WOODS DRDBP01 8 August-
121 WOODS DRDBP02 8 August-
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
ST TAM SCHOOL BOARD EDUCATION CENTER LA2103389
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OFFICE BATHDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAMMANY WATER DIST 2 LA1103033
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
72481 KUSTENMACHER RDDBP03 6 June-
21418 LOWE DAVIS ROADDBP04 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
ST TAMMANY WATER DISTRICT 3 LA1103056
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
20 DENI COURTDBP01 7 July-
8 PAILET DRIVEDBP02 7 July-
Wednesday, February 7, 2018 Page 145 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2018 YR Monitoring Begin Date: Frequency of Sampling:
STARC FREAMAUX LA2103525
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MRTDBP01 7 July-
KITCHEN SINK (ACR-003)DBP02 7 July-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
START WATER SYSTEM LA1083007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
42 LAFOURCHE ROADDBP02 7 July-
25 CLEAR LAKEDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
STATE LINE WATER SYSTEM LA1119029
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
135 VAUGHAN DAVIS AND HWY 157DBP02 8 August-
1467 WILLOW ROADDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
STATE OF LA MILITARY DEPT - CAMP MINDEN LA1119018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SHIPPING AND RECEIVINGDBP01 8 August-
DINING FACILITYDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
STATE POLICE TROOP L LA2103094
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
OUTSIDE MECHANIC SHOP- WEST SIDEDBP01 8 August-
UNTHREADED TAP SW CORNER BLDGDBP02 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
STONEGATE MANUFACTURED HOME COMMUNITY LA1017091
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 32DBP01 8 August-
LOT 83DBP02 8 August-
Wednesday, February 7, 2018 Page 146 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
SULPHUR CITY OF WATER SYSTEM LA1019044
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1528 WEEKLY ROADDBP01 8 August-
1009 CASS STREETDBP02 8 August-
901 PRATER ROADDBP03 8 August-
1317 MEADOWDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SUMMERFIELD SUBDIVISION LA1005036
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
17596 N SUMMERFIELDDBP01 8 August-
17458 N SUMMERFIELDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SUMMERFIELD WATER SYSTEM LA1027011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
964 HORSESHOE RDDBP02 7 July-
SID LEWIS RDDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SUMMERVILLE WATER SYSTEM LA1059009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 124 & DEAN RDDBP02 8 August-
HWY 126 & FIRE TOWER RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SUN WATER SUPPLY LA1103038
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
28666 HWY 16DBP02 8 August-
31336 COOPER RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
SUNRISE ADDITION TRAILER PARK WS LA1055103
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 9DBP02 7 July-
LOT 4DBP03 7 July-
Wednesday, February 7, 2018 Page 147 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TABIS HOUSE LA2103494
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BATHROOM INSIDE DAYCAREDBP01 8 August-
OUTSIDE MAIN BUILDING SAMPLE TAPDBP02 8 August-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
TALLULAH WATER SYSTEM LA1065003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
101 PARISH RDDBP01 9 September-
1015 WEST GREEN STDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TAMMANY MOBILE HOME PARK LA1103042
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
130 BOSWORTH STDBP02 8 August-
100A ALFORD STDBP03 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
TAMMANY SUPPLY WATER SYSTEM LA2103521
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NE SIDE CENTER OF BLDGDBP01 11 November-
TAMMANY SUPPLY OFFICEDBP02 11 November-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TANGI MOBILE HOME PARK LA1105042
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 3DBP01 7 July-
LOT 227DBP02 7 July-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
TANGIPAHOA (SECOND WARD) WATER DISTRICT LA1105077
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 10 @ HWY 1061DBP04 8 August-
HWY 1055 @ SPRING RDDBP05 8 August-
Wednesday, February 7, 2018 Page 148 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
TANGIPAHOA PARISH WATER DISTRICT LA1105008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
15062 CLUB DELUXEDBP02 8 August-
15062 CLUB DELUXEDBP02 11 November-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
TANNEHILL WATER SYSTEM LA1127017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
359 KVCL ROADDBP01 9 September-
4382 HIGHWAY 501DBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TAYLOR WATER SYSTEM LA1013015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
I-20 W AT REST STOPDBP02 8 August-
OSCAR KILPATRICK RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TCHEFUNCTA CLUB ESTATES LA1103043
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
101 RIVERDALE DRIVEDBP01 8 August-
#2 PINECREST DRIVEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TE MAMOU WATER DISTRICT LA1039009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3153 VIDRINE RDDBP01 7 July-
1971 CHICOT PARK RDDBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TENSAS WATER DISTRICT ASSOCIATION LA1107009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BETHANY - 1287 HWY 4DBP02 8 August-
MARY GADSPYDBP03 8 August-
Wednesday, February 7, 2018 Page 149 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TESI ATCHAFALAYA ACRES LA1099013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1041 VERMILIONDBP01 8 August-
1039 ACADIANADBP02 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI BEAU PARTERRE WATER SYSTEM LA1055164
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
143 WILLOW BENDDBP04 9 September-
208 FERN HOLLOWDBP05 9 September-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI BEAU PRE LA1103134
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
105 E MEADOWDBP02 8 August-
202 W BRIAR CTDBP03 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI CARENCRO VILLAGE LA1055088
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
242 LINDSEYDBP03 9 September-
127 LINDSEYDBP04 9 September-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI CHERRYWOOD LA1103129
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
216 CHERRYWOODDBP02 10 October-
155 S CHERRYWOOD LNDBP04 10 October-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI COACH HOUSE MANOR LA1055144
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
407 RUE PLAISANCEDBP02 8 August-
1009 CARRIAGE LIGHT LOOPDBP03 8 August-
Wednesday, February 7, 2018 Page 150 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI COTE GELEE LA1055131
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BUILDING HDBP04 8 August-
BUILDING NDBP05 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI COUNTRY LANE LA1055124
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
119 COUNTRY LANEDBP01 8 August-
102 & 104 COUNTRY LANEDBP03 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI COUNTRY PINES LA1055040
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 47DBP04 9 September-
LOT 43DBP05 9 September-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI FOX RUN LA1055043
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
124 BURROWDBP04 9 September-
129 TAMARACDBP05 9 September-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI GRANDE STAKES LA1055116
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
311 NASHUADBP04 8 August-
100 RUFFIANDBP05 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI HIGHLAND RIDGE LA1063087
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
21476 BONNIEDBP04 8 August-
21419 BONNIEDBP05 8 August-
Wednesday, February 7, 2018 Page 151 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI JACKSON SQUARE WATER SYSTEM LA1055101
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
314 MARIGNYDBP03 9 September-
608 MARIGNY CIRCLEDBP04 9 September-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI LAKE STREET LA1019091
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
5805 BERWICK LNDBP02 8 August-
1086 SPANISH MISSION TRAILDBP04 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI LAKESIDE EAST LA1063098
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
27270 LAKEFRONTDBP01 8 August-
27352 E LAKESIDE DRDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TESI LEXINGTON HEIGHTS LA1055147
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
100 KILBOURNEDBP02 8 August-
224 BLUE RIDGE DRDBP03 8 August-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
TESI OSSUN HEIGHTS LA1055140
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
100 GERMAN LANEDBP02 8 August-
104 LATINDBP03 8 August-
1/1/2012 YR Monitoring Begin Date: Frequency of Sampling:
TESI PLANTATION GARDENS LA1047028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
5505 ROSEDOWNDBP02 8 August-
1330 MADEWOODDBP03 8 August-
Wednesday, February 7, 2018 Page 152 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
TESI PORT EAST LA1045037
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3810 COULEEDBP03 8 August-
3518 COULEEDBP04 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TESI RIGOLETS ESTATES LA1103122
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
233 MARLIN DRDBP02 8 August-
110 MARLIN DRDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TESI RIGOLETS HARBOR LA1103144
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
APARTMENT 1DBP02 8 August-
BY THE BOAT WASHDBP03 8 August-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI SHENANDOAH LA1055155
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
109 BULL RUN CIRCLEDBP02 9 September-
219 JANIN RDDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TESI SOUTHFIELD SQUARE WATER SYSTEM LA1055128
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
111 & 113 SOUTHFIELD PARKWAYDBP02 9 September-
199 SOUTHFIELD PARKWAYDBP03 9 September-
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI TREWHILL LA1055148
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
205 TREWHILL PKWYDBP03 8 August-
239 CROOKED CREEKDBP04 8 August-
Wednesday, February 7, 2018 Page 153 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
TESI WINDY MEADOWS LA1055169
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
100 WIND SONGDBP02 8 August-
120 COUNTRY VILLAGEDBP04 8 August-
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
THE LITTLE ACADEMY LA2103318
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FRONT RIGHT OF BUILDINGDBP01 8 August-
RESTROOM INSIDE TAPDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
THE MEADOWS LA1103106
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
538 RED BUDDBP01 8 August-
1000 MADELINE LANEDBP03 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
THIBODAUX WATERWORKS LA1057003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
THIBODAUX LAB TAPDBP01 8 August-
OAKLEY STDBP02 8 August-
EAST 8TH STDBP03 8 August-
MELROSEDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
THOMASVILLE WATER SYSTEM LA1119030
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
5521 CVOC ROADDBP01 7 July-
22556 HWY 371DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TICKFAW WATER SYSTEM LA1105027
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
49181 HWY 51DBP02 9 September-
49459 PARDO LNDBP03 9 September-
Wednesday, February 7, 2018 Page 154 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
TIMBERLAND MOBILE HOME PARK LA1103194
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 20DBP01 8 August-
LOT 1DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TORBERT- FRISCO WATER WORKS LA1077037
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3890 HWY 978DBP01 9 September-
4931 MOSHER ROADDBP02 9 September-
4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
TOWN & COUNTRY SERVICE LA1073054
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
41 LESLIE LANEDBP03 8 August-
132 SHADY LANEDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF ALBANY WATER SYSTEM LA1063022
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
28571 HWY 43DBP01 8 August-
30509 LA 441 HOLDENDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF AMITE WATER SYSTEM LA1105001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
400 FOULKS LANEDBP02 7 July-
105 S DUNCANDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF ARNAUDVILLE WATER SYSTEM LA1099001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
339 MAGNOLIA STDBP01 6 June-
1027 ANNE DRIVEDBP03 6 June-
Wednesday, February 7, 2018 Page 155 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
10/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF BALDWIN WATER SUPPLY LA1101001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
612 LABUE STDBP01 7 July-
100 RESWEBER LANEDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF BASILE WATER SYSTEM LA1039001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1239 BEARCAT RDDBP01 5 May-
2921 STAGGDBP02 5 May-
4/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF BENTON WATER SYSTEM LA1015002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
572 HWY 162 EDBP01 1 January-
4606 PALMETTO RDDBP02 1 January-
10/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF BERWICK LA1101014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
950 RIVER ROADDBP01 7 July-
3007 HWY182DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF BOYCE WATER SYSTEM LA1079003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RYAN STREETDBP03 8 August-
DUBLINDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF BUNKIE WATER SYSTEM LA1009004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SHIRLEY RD & BRIARWOOD (SITE #1)DBP01 5 May-
SPRUCE & COTTONWOOD ST (SITE #5)DBP02 5 May-
Wednesday, February 7, 2018 Page 156 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF CHENEYVILLE WATER SYSTEM LA1079005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
167 & PRATT CEMETERY RDDBP01 8 August-
1245 SOUTH BAYOU RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF CHURCH POINT WATER SYSTEM LA1001001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
340 W MLK MIDDLE SCHOOLDBP01 9 September-
100 LILLE ST LOT 10DBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF CLAYTON WATER SYSTEM LA1029002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
154 CARTERDBP02 9 September-
LOOMIS STDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF CLINTON LA1037001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
10434 BANK STREETDBP01 7 July-
12305 JACKSON STREETDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF COLFAX LA1043002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
10 2ND STREETDBP02 8 August-
1208 MAINDBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF COTTONPORT WATER SYSTEM LA1009005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BAYOU EXPRESSDBP02 5 May-
WOMENS PRISONDBP03 5 May-
Wednesday, February 7, 2018 Page 157 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF DELCAMBRE WATER SYSTEM LA1113004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
506 KEN DRIVEDBP01 5 May-
507 E. HICKMANDBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF DUSON WATER SYSTEM LA1055011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NW CORNER OF SOUTH A & MOISEDBP01 6 June-
SW CORNER OF LA 90 & AUSTRIADBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF ELIZABETH WATER SYSTEM LA1003002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
11620 HIGHWAY 112 NDBP01 9 September-
PRESTON KINGDBP02 9 September-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF ELTON WATER SYSTEM LA1053001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
307 2ND STREETDBP02 9 September-
1003 YOAKUMDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF ERATH WATER SYSTEM LA1113005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1009 S. BROADWAYDBP01 7 July-
BARES CENTERDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF EVERGREEN WATER SYSTEM LA1009006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4182 HWY 29DBP02 5 May-
RICHE ROADDBP03 5 May-
Wednesday, February 7, 2018 Page 158 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF FERRIDAY WATER SYSTEM LA1029005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1427 HWY 568DBP01 11 November-
490 LINCOLN AVENUEDBP02 11 November-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF FRANKLINTON WATER SYSTEM LA1117002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SECTION LINE AND HIGHWAY 436DBP02 5 May-
506 RIVERSIDEDBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF GLENMORA WATER SYSTEM LA1079011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
KEPLER AND VICTOR RAMUS ROADDBP01 8 August-
1738 7TH AVENUEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF GRAND COTEAU WATER SYSTEM LA1097001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2085 I-49 SOUTH SERVICE ROADDBP01 5 May-
182 ACADEMY STREETDBP02 5 May-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF GREENWOOD WATER SYSTEM LA1017014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
10746 DEVERS ROADDBP02 10 October-
9381 HWY 80 TOWN HALLDBP03 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF GUEYDAN WATER SYSTEM LA1113006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SIMON ADDITIONDBP01 7 July-
ELEMENTARY SCHOOLDBP02 7 July-
Wednesday, February 7, 2018 Page 159 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
10/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF HAUGHTON WATER SYSTEM LA1015011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
815 W MCKINLEYDBP02 7 July-
139 HAYNES RDDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF HORNBECK WATER SYSTEM LA1115016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
INTERSECT GILLIAM & MAPLE NEAR PENTACOSTDBP01 9 September-
INTERESECT HWY 118 & HARRINGTONDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF IOTA WATER SYSTEM LA1001004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
J & W STORE - 5TH STREETDBP01 12 December-
ELEMENTARY SCHOOL - W KENNEDY STDBP02 12 December-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF IOWA WATER SYSTEM LA1019026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BROUSSARDDBP02 8 August-
SOUTH SHERMANDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF JACKSON WATER SYSTEM LA1037006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3866 COOKS LANEDBP01 8 August-
3036 CHURCH STDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF JENA WATER SYSTEM LA1059003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1806 E OAKDBP01 9 September-
3691 WEST OAKDBP02 9 September-
Wednesday, February 7, 2018 Page 160 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF JONESVILLE WATER SYSTEM LA1025006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
200 THIRD STREETDBP04 8 August-
800 AUDUBON STREETDBP05 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF KINDER WATER SYSTEM LA1003005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
106 S 17TH STREETDBP01 9 September-
108 W 6TH AVENUEDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF KROTZ SPRINGS WATER SYSTEM LA1097003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 105DBP02 3 March-
11TH STREETDBP03 3 March-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF LAKE ARTHUR WATER SYSTEM LA1053005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3RD AND PELICANDBP01 6 June-
625 IOWADBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF LECOMPTE (LAWCO) LA1079014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1211 LATANIER ROADDBP01 8 August-
3220 HWY 71 SDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF LEONVILLE WATER SYSTEM LA1097005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1742 HIGHWAY 742DBP02 6 June-
366 OVEY BENOIT ROADDBP03 6 June-
Wednesday, February 7, 2018 Page 161 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF LIVINGSTON WATER SYSTEM LA1063013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
14740 FLORIDA BLVDDBP01 9 September-
25410 RED OAK ROADDBP02 9 September-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF MAMOU WATER SYSTEM LA1039005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4038 VETERANS MEMORIAL BLVDDBP01 5 May-
HWY 104 @ T-BOYSDBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF MARINGOUIN LA1047003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NORTH IBERVILLEDBP01 6 June-
MAINTENANCE BARNDBP02 6 June-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF MELVILLE WATER SYSTEM LA1097007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1256 FIRST ST (POC#4)DBP01 5 May-
HWY 105 N (MRT-011)DBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF MERRYVILLE WATER SYSTEM LA1011007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 190 W-PARISH BARNDBP01 8 August-
HWY 389 - END OF TOWN LIMITDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF MONTGOMERY WATER SYSTEM LA1043005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3015 HWY 71DBP02 6 June-
431 EVA STDBP03 6 June-
Wednesday, February 7, 2018 Page 162 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF OBERLIN WATER SYSTEM LA1003007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
5497 HWY 26 EASTDBP02 6 June-
521 NORTH FUSELIER LANEDBP03 6 June-
1/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF OLLA WATER SYSTEM LA1059004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
5209 ROSFIELD ROADDBP01 9 September-
2853 HWY 127 (MRT)DBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF PEARL RIVER LA1103157
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
64105 HWY 3081DBP02 6 June-
39460 WILLIS ALLEYDBP03 6 June-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF PLAIN DEALING WATER SYSTEM LA1015016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
PALMETTO AND ARKANSAS ROADDBP01 5 May-
2189 HIGHWAY 2 EASTDBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF PLAUCHEVILLE WATER SYSTM LA1009013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2595 HWY 1181DBP01 7 July-
146 GIN STDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF POLLOCK WATER SYSTEM LA1043007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4858 HWY 8DBP02 7 July-
DYSON CREEK RD AND NORTH TOWER RDDBP03 7 July-
Wednesday, February 7, 2018 Page 163 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF PORT BARRE WATER SYSTEM LA1097013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
712 RAYNE ROADDBP02 9 September-
207 FRISCO STREETDBP03 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF RIDGECREST WATER SUPPLY LA1029009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
119 COTTONWOOD DRIVEDBP02 9 September-
800 FERRIDAY DRIVEDBP03 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF ROSEPINE WATER SYSTEM LA1115028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LEACH RD UNDER APPT SIGNDBP01 5 May-
HWY 171 S @ TILLEY RD NEAR TELEPHONE POLDBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF SIMMESPORT WATER SYSTEM LA1009014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SYCAMORE & N. MAINDBP02 5 May-
N. MLKDBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF SLAUGHTER WATER SYSTEM LA1037008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2087 MIDWAYDBP02 8 August-
137 HWY 19DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF ST FRANCISVILLE WATER SYSTEM LA1125006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
#2-ROSEDOWN APT, HWY 10DBP02 7 July-
#3 LEGION & WILCOXDBP03 7 July-
Wednesday, February 7, 2018 Page 164 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF SUNSET WATER SYSTEM LA1097015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1760 NAPOLEONDBP01 5 May-
855 NAPOLEON AVENUEDBP02 5 May-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF TULLOS WATER SYSTEM LA1059010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 125 SDBP01 6 June-
HWY 84 AND HWY 165DBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF URANIA WATER SYSTEM LA1059011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1401 N. PINE ROADDBP01 7 July-
7129 SOUTH PINE RDDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF VINTON WATER SYSTEM LA1019048
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1804 SHORT STREETDBP01 8 August-
1805 WEST STDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF WASHINGTON WATER SYSTEM LA1097016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CORNER OF ANDERSON & CARRIERDBP01 5 May-
FIRE STATION ON HWY 103 & CEDAR HILL DRDBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF WELSH WATER SYSTEM LA1053006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
113 PLANK ROADDBP01 8 August-
550 BEAUFORT STDBP02 8 August-
Wednesday, February 7, 2018 Page 165 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
TOWN OF WHITE CASTLE WATER SYSTEM LA1047009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
32015 HWY 1 BORDELON CHEVRONDBP02 8 August-
33660 BOWIE STDBP04 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF WOODWORTH WATER SYSTEM LA1079027
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
EOL BAYOU CLEAR RDDBP01 8 August-
699 HWY 457DBP03 8 August-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
TOWN OF ZWOLLE WATER SYSTEM LA1085032
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CORNER OF CANE & W OAKDBP01 9 September-
FESTIVAL GROUNDDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TREMONT WATER DISTRICT LA1061031
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CAMPBELL ROADDBP02 6 June-
HWY 80 AND WALKER ROADDBP03 6 June-
1/1/2016 3Y Monitoring Begin Date: Frequency of Sampling:
TREYVILLE COURTS TRAILER PARK LA1005175
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TAP 2DBP01 8 August-
TAP 1DBP02 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
TRINITY MARINE GROUP LA2103343
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HR OFFICE - EAST SIDEDBP03 8 August-
TRAINING OFFICE - WEST SIDEDBP04 8 August-
Wednesday, February 7, 2018 Page 166 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
TRI-WATER SYSTEM LA1111020
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
5707 HWY 549DBP03 8 August-
386 MASONIC ROADDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TRUNKLINE LNG CO WATER SYSTEM LA2019098
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TGC DIVISION OFFICE BLDGDBP01 9 September-
CONTROL BLDGDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TULANE UNIVERSITY PRIMATE CENTER LA2103216
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
QUARANTINE BLDG #19DBP02 8 August-
F BUILDING #6DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TUNICA WATER SYSTEM LA1125011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
12113 FARRIA DAVICE ROADDBP02 6 June-
17493 HWY 66DBP03 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TURKEY CREEK WATER SYSTEM LA1041012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 562 @ BRUSHY BAYOU ROADDBP02 8 August-
216 BLUE ROBERTS RDDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
TYS MOBILE HOME PARK WATER SYSTEM LA1097031
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 1DBP01 8 August-
LOT 22DBP02 8 August-
Wednesday, February 7, 2018 Page 167 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
TYSON COMMUNITY WATER SYSTEM LA1017036
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RODESSA CHURCH ROADDBP01 7 July-
8390 TYSON ROADDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UNION GROVE WATER SYSTEM LA1119031
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1623 PENAL FARM ROADDBP01 9 September-
CARVER ROADDBP02 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
UNION PARISH WATERWORKS DISTRICT 1 LA1111015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
158 DOGWOOD DRDBP02 8 August-
528 FOURWAY LOOP RDDBP04 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
UNION SPRINGS WATER SYSTEM LA1085044
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
252 HWY 191DBP01 7 July-
HWY 191 AND FLATWOOD RIDGE RDDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UNITED WATER SYSTEM LA1099009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1010 DIVISION RDDBP02 7 July-
1191 DECLOUET HWYDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UOP, LLC LA2033041
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NE SIDE OF WAREHOUSEDBP02 10 October-
Wednesday, February 7, 2018 Page 168 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UPPERROOM BIBLE CHURCH INC LA2103497
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FAR OUTSIDE WALLDBP01 8 August-
KITCHENDBP02 8 August-
4/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
US FISH & WILDLIFE HQ LA2103479
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LAW ENFORCEMENT OFFICEDBP01 8 August-
FAUCET AT RV SITEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
US FORESTRY - GUM SPRINGS LA2127003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HORSE TRAILHEADDBP01 8 August-
BIOMAXDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UTILITIES INC - GREEN BRIER WATER SUPPLY LA1103130
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
201 GREENBRIAR BLVDDBP02 8 August-
114 AMELIA LANEDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UTILITIES INC - HUNTWYCK VILLAGE LA1103073
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
536 QUEEN ANNE DRDBP01 8 August-
308 QUEEN ANNE DRDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UTILITIES INC - KINGSPOINT SUBDIVISION LA1103055
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
235 FOXBRIAR DRDBP01 8 August-
PH 55081 HWY 433DBP02 8 August-
Wednesday, February 7, 2018 Page 169 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UTILITIES INC - LAKE VILLAGE SD LA1103064
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1209 LAKE VILLAGE RDDBP01 8 August-
709 LAKE SUPERIORDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UTILITIES INC - MAGNOLIA FOREST SUBD LA1103054
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
915 TRANQUILITY DRDBP01 8 August-
427 PARLANGE DRDBP02 8 August-
10/1/2016 YR Monitoring Begin Date: Frequency of Sampling:
UTILITIES INC - NORTH FOLSOM HILLS LA1117026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
42984 RIVER BIRCHDBP01 8 August-
14538 SWEET OLIVE DRDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UTILITIES INC - NORTH PARK WATER SUPPLY LA1103124
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
188 CHEROKEE DRDBP01 8 August-
95 E FAIRWAY DRDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UTILITIES INC - OAKMONT SUBD LA1103108
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
212 RIVIERA DRDBP01 8 August-
113 OAKMONT DRDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UTILITIES INC - QUAIL RIDGE SUBDIVISION LA1103074
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
202 BLUE CRANE DRDBP01 8 August-
473 CLAYTON CRTDBP02 8 August-
Wednesday, February 7, 2018 Page 170 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UTILITIES INC - WOODRIDGE SUBDIVISION LA1103075
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
101 FOREST LOOPDBP01 8 August-
412 WATER OAKDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
UTILITY SERVICE OF LAKE CHARLES W S LA1019024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6503 MEADOW RIDGE LANEDBP02 8 August-
6701 SUN MEADOWDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VARNADO WATER WORKS LA1117006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
20301 MITCH ROADDBP02 5 May-
27268 HWY 21DBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VARNADO WATER WORKS - PINE LA1117025
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
30341 HWY 424DBP01 5 May-
26475 HWY 62DBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VERNON PARISH WATER AND SEWER COMMISSION LA1115071
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BOLTON'S TRAILER PARKDBP01 6 June-
CARNEY JEANESDBP02 6 June-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
VETERANS ADMINISTRATION LA1079028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BUILDING NO. 2DBP01 9 September-
BUILDING NO. 45DBP02 9 September-
Wednesday, February 7, 2018 Page 171 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLA FELICIANA MEDICAL COMPLEX LA1037009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RESIDENT #2DBP01 8 August-
ADMIN BUILDINGDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE GUTHRIE SUBDIVISION LA1103066
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
228 SECOND STREETDBP01 7 July-
408 FOURTHDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF ANACOCO LA1115001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CITY HALLDBP01 5 May-
114 EAST ROADDBP02 5 May-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF CALVIN WATER SYSTEM LA1127002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
108 ED CARPENTER ROADDBP02 8 August-
HIGHWAY 1233 @ YANKEE SPRINGSDBP03 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF CANKTON WATER SYSTEM LA1097025
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
619 HIGHWAY 93DBP02 2 February-
182 CREDEUR ROADDBP03 2 February-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF DODSON WATER SYSTEM LA1127005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
L.E. VINES RD AND 167 NORTHDBP02 8 August-
HWY 167 AND EAST MURPHYDBP03 8 August-
Wednesday, February 7, 2018 Page 172 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF DRY PRONG WATER SYSTEM LA1043003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2789 DYSON CREEK RDDBP01 8 August-
737 DRY PRONG CREEK RDDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF ESTHERWOOD WATER SYSTEM LA1001003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
124 N LEBLANCDBP01 6 June-
404 LOUISIANA STREETDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF FENTON WATER SYSTEM LA1053007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
KEYS ROADDBP01 8 August-
4TH AVENUEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF FOREST WATER SYSTEM LA1123003
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2187 FOREST CEM RDDBP01 7 July-
4322 HWY 589DBP02 7 July-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF GEORGETOWN WATER SUPPLY LA1043004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 500DBP01 9 September-
NEW TOWN HALLDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF GROSSE TETE WATER SYSTEM LA1047001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
18105 SIDNEY RDDBP01 7 July-
18360 HWY 77DBP02 7 July-
Wednesday, February 7, 2018 Page 173 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF HARRISONBURG WATER SYSTEM LA1025004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8733 HWY 8DBP01 8 August-
HWY 124DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF HESSMER WATER SYSTEM LA1009008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
VOICHEDBP01 5 May-
HIGHWAY 114 EDBP02 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF MAURICE WATER SYSTEM LA1113019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
E VINCENT & ANDRE AVEDBP01 6 June-
S LAFAYETTE & HWY 92DBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF MCNARY WATER SYSTEM LA1079015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
1735 EAST RIVER RDDBP02 9 September-
385 HESTER LANDING RDDBP03 9 September-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF MERMENTAU WATER SYSTEM LA1001005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FOURTH STREETDBP01 6 June-
104 7TH STDBP03 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF MOREAUVILLE WATER SYSTEM LA1009012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
618 MAIN STREETDBP02 8 August-
WATER TOWERSDBP03 8 August-
Wednesday, February 7, 2018 Page 174 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF MORSE WATER SYSTEM LA1001006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
334 COON RICHARD RDDBP01 6 June-
435 BRADFORDDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF NORWOOD WATER SYSTEM LA1037007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4472 AZALEADBP01 8 August-
13403 JAMES LANEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF PALMETTO WATER SYSTEM LA1097011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
13677 HWY 105 (POC#8)DBP01 5 May-
224 E. RAILROAD (POC#2)DBP02 5 May-
4/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF PARKS WATER SYSTEM LA1099008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3615 GRAND POINT HWY (POC #14)DBP01 5 May-
1187 NURSERY HWY (POC#15)DBP03 5 May-
1193 STEVEN WILTZ RDDBP04 5 May-
1021 RUSSO-MILAZZO RDDBP07 5 May-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF ROSEDALE WATER SYSTEM LA1047006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
14660 HIGHWAY 411DBP01 9 September-
14645 HIGHWAY 77DBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF SICILY ISLAND WATER SYSTEM LA1025009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
117 HIGHWAY 15DBP02 8 August-
101 SICILY STDBP03 8 August-
Wednesday, February 7, 2018 Page 175 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF SIKES WATER SYSTEM LA1127010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 499DBP02 8 August-
HWY 126 XBAPTISTCHURCHDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF SIMPSON WATER SYSTEM LA1115032
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HIGHWAY 465 CLECO POWERLINEDBP01 8 August-
DOGWOOD LANEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF TANGIPAHOA WATER SYSTEM LA1105026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
72098 HWY 1051DBP01 9 September-
69661 HWY 51DBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF TURKEY CREEK WATER SYSTEM LA1039013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3356 CROOKED CREEK PKWYDBP01 6 June-
1888 ST LANDRY HIGHWAYDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE OF WILSON WATER SYSTEM LA1037010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 68 & HWY 952DBP01 7 July-
7571 CURRUTH RDDBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VILLAGE QUEST SUBDIVISION WATER SYSTEM LA1055070
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
106 LA RUE BLANC(TCR008)DBP02 8 August-
136 LA RUE BLANC (MRT002)DBP03 8 August-
Wednesday, February 7, 2018 Page 176 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
VILLAGE WATER SYSTEM LA1015018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WHISP PINE & PINE CONEDBP01 8 August-
TAYLOR BEND & HUMPHREYDBP02 8 August-
676 PRINCETON ROADDBP03 8 August-
219 FLAGG DRIVEDBP04 8 August-
1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
VILLAGES OF BOCAGE- MADISONVILLE LA1103195
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
69597 TAVERNY COURTDBP01 8 August-
28669 VENETTE COURTDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
VIOLA MOBILE HOME PARK LA1105084
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MAILBOX SAMPLE TAPDBP01 7 July-
LOT ODBP02 7 July-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
VIVIAN WATER SYSTEM LA1017037
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HOSSTON RDDBP01 10 October-
959 S PINE STDBP02 10 October-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
VIXEN WATER SYSTEM EAST LA1021011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
JIM REEVES @ BELLE COTE RDDBP01 8 August-
HWY4 AT PALESTINE CHURCH RD (POC#1)DBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
VIXEN WATER SYSTEM WEST LA1049031
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 4 AT HARRIS LOOP RDDBP02 8 August-
END OF FLOYD JOHNSTON RDDBP04 8 August-
Wednesday, February 7, 2018 Page 177 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2012 QT Monitoring Begin Date: Frequency of Sampling:
W JEFFERSON WW DISTRICT 2 LA1051004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
857 TERRY PARKWAYDBP02 9 September-
650 LA HIGHWAY 1, GRAND ISLEDBP06 9 September-
4500 WESTBANK EXPRESSWAYDBP07 9 September-
500 SOUTH JAMIE BLVDDBP08 9 September-
9464 WESTBANK EXPRESSWAYDBP09 9 September-
616 WEST NIAGARA CIRCLE DRDBP10 9 September-
3470 MARTIN STREETDBP11 9 September-
2100 POTOMAC DRIVEDBP12 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WALKER COMMUNITY SYSTEM LA1049023
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
353 MIDWAY CHURCH RDDBP01 8 August-
5244 WALKER RDDBP02 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WALKER WATER SYSTEM LA1063017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BUDDY ELLIS AT HWY 447DBP01 5 May-
29762 WALKER S. RD (CARTER'S)DBP02 5 May-
ALVIN SIBLEY AT HWY 447DBP03 5 May-
14286 COURTNEY ROADDBP04 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WALMART DISTRIBUTION WATER SYSTEM LA2097051
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
NORTH SIDE OF SYSTEMDBP01 8 August-
SOUTH SIDE OF SYSTEMDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WALNUT BAYOU WATER ASSOCIATION LA1065004
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SHARKEY ROADDBP02 8 August-
BAILEY @ HIGHWAY 65 NDBP03 8 August-
Wednesday, February 7, 2018 Page 178 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WARD 3 WATER ASSOCIATION LA1067016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
5727 UP AND DOWN RDDBP02 7 July-
4404 DEW DROP RDDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WARD 5 WW DISTRICT 1 - LONE PINE LA1039017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2961 HWY 115DBP01 9 September-
BLOOD BEND ROADDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WARD 6 WATER ASSOCIATION OF RAPIDES LA1079037
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
FREEDOM CHURCH & HWY 113DBP02 6 June-
HOPEWELL CHURCH & CHESTER MACDBP03 6 June-
7/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
WARD II WATER DISTRICT LA1063039
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
KIDS CORNER AND EDEN CHURCH ROADDBP02 5 May-
JUBAN PARC JR HIGH @ BROWN ROADDBP03 5 May-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WARD IV WATER DISTRICT LA1039015
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
175 CALLAHAN ROADDBP01 9 September-
2054 CYPRESS CRDBP02 9 September-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
WARD NINE WATER SYSTEM LA1027013
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
SCOTLAND @ HOLLYDBP01 8 August-
HWY 9 & N. FELLOWSHIP ROADDBP02 8 August-
Wednesday, February 7, 2018 Page 179 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
10/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
WARDEN WATER SYSTEM LA1083011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
190 WADE ROADDBP02 10 October-
MCGOWAN AND DEARMAN ROADDBP03 10 October-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WARDS 4 & 5 WATER SYSTEM LA1021010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 3239 AND HWY 126DBP02 9 September-
HWY 846 AND HWY 4DBP03 9 September-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WARDS CHAPEL WATER SYSTEM LA1111016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 828 AND HWY 2DBP01 9 September-
1260 WEST PORT UNION RDDBP03 9 September-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
WARE YOUTH CENTER WATER SYSTEM LA2081007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BEHIND IR COTTAGE #3DBP01 7 July-
BETWEEN MP BLDG & COTTAGE 1DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WASTE MANAGEMENT LA2103373
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POC 7DBP01 6 June-
POC 2DBP02 6 June-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WATER & SEWER COMMISSION 4 OF ST MARY LA1101011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
975 ST PETER STREETDBP02 7 July-
207 YOKLEY ROADDBP03 7 July-
Wednesday, February 7, 2018 Page 180 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WATER WORKS DISTRICT #1 OF VERMILION LA1113034
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 167 @ RIVER RDDBP01 8 August-
HWY 35@CLINT DRDBP03 8 August-
KIRK RD @ BAUDOIN RDDBP04 8 August-
HWY 14 @ SPRINGHILLDBP05 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WATER WORKS DISTRICT 2 - CROSS ROADS LA1091001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6554 HWY 1042DBP02 8 August-
9216 HWY 10DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WATER WORKS DISTRICT 2 - PHASE 3 LA1091008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
19620 HWY 43DBP01 8 August-
14801 HWY 10DBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WATERPROOF WATER SYSTEM LA1107005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CHURCH STREETDBP01 12 December-
HWY 568DBP03 12 December-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WATERWORKS 1 OF MOREHOUSE, INC LA1067011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
9570 COOPER LAKE ROADDBP01 8 August-
RUSTIC ACRES ROADDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WATERWORKS DISTRICT 7 LA1017052
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MORTON ROADDBP02 5 May-
12117 PROVIDENCE ROADDBP03 5 May-
Wednesday, February 7, 2018 Page 181 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WATERWORKS DISTRICT NO 5 OF ST LANDRY PA LA1097039
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 190 OFF RAMPDBP01 8 August-
10963 HWY 105DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WBR DISTRICT 4 - ARBROTH LA1121026
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
10240 BUECHE ROADDBP01 6 June-
18525 N RIVER ROADDBP02 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WBR DISTRICT 4 - HOLIDAY INN LA1121024
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
553 LOBDELLDBP01 6 June-
5131 REBELLE LANEDBP03 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WBR DISTRICT 4 -SECTION ROAD WINTERVILLE LA1121027
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
8236 ROSEHILL DR - SECTION RDDBP01 6 June-
13921 ROSEDALE ROADDBP05 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WBR PUBLIC UTILITIES LA1121008
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4142 RIVERVIEW RDDBP05 6 June-
2180 PLANTATION AVENUEDBP06 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WESLEY CHAPEL WATER SYSTEM LA1061020
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
GRIGSBY AND RADIO TOWERDBP02 7 July-
4220 HWY 818DBP03 7 July-
Wednesday, February 7, 2018 Page 182 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WEST ALLEN PARISH WATER SYSTEM LA1003010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
11448 HWY 113DBP02 7 July-
108 S LYLES STREETDBP03 7 July-
7/1/2017 QT Monitoring Begin Date: Frequency of Sampling:
WEST BATON ROUGE WATER WORKS DISTRICT 2 LA1121018
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ELLWOOD ROADDBP01 7 July-
BIRD HEIGHTSDBP02 7 July-
5352 EUDORA DRDBP03 7 July-
5133 SOUTH FLORENCE STDBP04 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WEST FELICIANA CONSOL WWKS DISTRICT 13 LA1125010
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
6251 FREELAND RDDBP02 6 June-
5140 ROSEMOUND LOOPDBP03 6 June-
7/1/2015 QT Monitoring Begin Date: Frequency of Sampling:
WEST FRASER (SOUTH) INC LA2127009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOG SCALER'S OFFICEDBP01 8 August-
GUARD HOUSEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WEST GATE TRAILER PARK WATER SYSTEM LA1055149
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
3750 LANDRY RD LOT 6DBP02 9 September-
3750 LANDRY RD LOT 36DBP03 9 September-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
WEST GRANT WATER ASSOCIATION LA1043014
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
580 JD CAMP ROADDBP01 7 July-
BEA'S GROCERYDBP03 7 July-
Wednesday, February 7, 2018 Page 183 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WEST HWY 80 ARK ROAD WS LA1073055
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
104 WEST HIGHLANDDBP01 2 February-
HARRELL AND COUNTRY ESTATESDBP02 2 February-
202 PARKWOODDBP03 2 February-
2805 ARKANSASDBP04 2 February-
1/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WEST MONROE WATER SYSTEM LA1073056
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
411 FILHIOL STDBP01 4 April-
303 LUDWIGDBP02 4 April-
614 GRANTHAMDBP03 4 April-
102 REDWOODDBP04 4 April-
7/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
WEST OUACHITA IND PARK LA2073027
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
379 HUEY LENARD LOOPDBP01 8 August-
904 INDUSTRIAL PARKWAYDBP02 8 August-
7/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
WEST STERLINGTON WATER SYSTEM LA1111017
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
112 HILL ROADDBP01 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WEST VERNON PARISH WATERWORKS DISTRICT LA1115121
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
464 ROBERTS ROADDBP01 8 August-
HOLLY ESTATESDBP02 8 August-
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WEST WINN WATER SYSTEM INC LA1127011
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
POST OFFICEDBP01 5 May-
7354 HWY 84DBP02 5 May-
Wednesday, February 7, 2018 Page 184 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WEST WINNSBORO WATER SYSTEM LA1041009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HWY 4 @ RISER ROADDBP02 8 August-
HWY 128 @ HWY 876DBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WESTERN UTILITIES, INC LA1073097
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
100 YELLOWSTONE CIRCLEDBP02 8 August-
208 WINTERPARK DRIVEDBP03 8 August-
1/1/2017 YR Monitoring Begin Date: Frequency of Sampling:
WESTLAKE CHEMICAL CORP NATURE LAB WS LA2019164
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
HSE FIRST AIDDBP01 8 August-
SECL (TCR-001)DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WESTLAKE CHEMICAL CORP WATER SYSTEM LA2019016
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
RAILROAD TRACKS SILICA DITCHDBP01 8 August-
RIVERSIDE POWERHOUSEDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WESTLAKE CITY OF WATER SYSTEM LA1019054
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MOSSVILLEDBP03 8 August-
PELICAN DRIVEDBP04 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WESTLAKE VINYLS COMPANY, LP LA2005006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
MOMMENTIVE TANK FARMDBP01 8 August-
VCM KITCHENDBP02 8 August-
Wednesday, February 7, 2018 Page 185 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WESTON WATER SYSTEM LA1049019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
620 JOHN WATTS RDDBP03 4 April-
360 HALFWAY CREEKDBP04 4 April-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WESTVIEW WATER WORKS LA1105028
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
INTERSECTION HWY 1046 & WHEAT RDDBP02 7 July-
30036 HWY 16 WDBP03 7 July-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
WESTWEGO WATERWORKS LA1051005
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
WACDBP01 6 June-
PECAN AT CENTRALDBP05 6 June-
TOURIST INFODBP06 6 June-
AVENUE D AT WESTBANK EXPRESSWAYDBP07 6 June-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WEYERHAEUSER NR - ARCADIA OSB LA2061009
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ROLLING STOCK SHOPDBP01 8 August-
TAP NEAR SEPTIC PLANTDBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WHEELING WATER SYSTEM INC LA1127019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
CAMPGROUND HWY 71DBP01 9 September-
UNION CH. ON HWY 34DBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WHITE ROAD MOBILE HOME PARK LA1005147
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 12DBP01 8 August-
LOT 26DBP02 8 August-
Wednesday, February 7, 2018 Page 186 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WHITEHALL WATER SYSTEM INC LA1059012
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
332 FANNIN ROADDBP02 8 August-
281 OLD RIVER LOOPDBP03 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WILDWOOD FOREST SUBDIVISION WATER SYSTEM LA1017061
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
2258 J & J TRAILDBP02 6 June-
7248 N. TAMIDBP03 6 June-
1/1/2016 QT Monitoring Begin Date: Frequency of Sampling:
WILDWOOD MHP WS LA1073110
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
131 SWARTZ SCHOOL RD #63DBP02 10 October-
131 SWARTZ SCHOOL RD #21DBP03 10 October-
1/1/2014 QT Monitoring Begin Date: Frequency of Sampling:
WILDWOOD SOUTH WATER SYSTEM LA1017042
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
537 DIXONDBP02 7 July-
FIRE STATIONDBP03 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WILLA VILLA MOBILE HOME LA1117019
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT #32DBP02 8 August-
LOT #21DBP03 8 August-
1/1/2017 3Y Monitoring Begin Date: Frequency of Sampling:
WINDMILL NURSERY LA2117178
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
TAP BEHIND SHOPDBP02 8 August-
Wednesday, February 7, 2018 Page 187 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WINNSBORO WATER SYSTEM LA1041006
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
DAVIS PARK & HIGHWAY 15DBP01 7 July-
HWY 618 AND HWY 869DBP02 7 July-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WISNER WATER SYSTEM LA1041007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
169 MORGAN STDBP02 8 August-
2146 CALHOUNDBP03 8 August-
1/1/2014 YR Monitoring Begin Date: Frequency of Sampling:
WOODLAND INDUSTRIAL PARK WATER SYSTEM LA2075002
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
BC CABINETS 1500 WOODLAND HWYDBP01 9 September-
OMI 130 KEATINGDBP02 9 September-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WOODSIDE MHP LA1105090
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
LOT 1DBP01 8 August-
LOT 40DBP02 8 August-
1/1/2013 YR Monitoring Begin Date: Frequency of Sampling:
WWKS DISTRICT 2 OF ST HELENA LA1091007
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
ROHNER RD & HWY 449DBP01 8 August-
HWY 10 & LATHAN BRIDGES RDDBP02 8 August-
4/1/2013 QT Monitoring Begin Date: Frequency of Sampling:
ZACHARY WATER SYSTEM LA1033030
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
4348 HWY 19 @ RUSHDBP01 5 May-
8000 MCHOST ROADDBP02 5 May-
AVENUE A TOWERDBP03 5 May-
1080 PLAINS PORT HUDSON RDDBP04 5 May-
Wednesday, February 7, 2018 Page 188 of 189
Stage 2 D/DBP Sample Schedules
Yearly water systems are required to collect a TTHMs/HAA5 sample set during the PHM at each sample site.
Quarterly water systems are required to collect a TTHMs/HAA5 sample(s) every 90 days from your PHM after the MBD. (For Example: If
the PHM is September, and the MBD is 4/1/2013, the water system would begin monitoring in June of 2013 and every 90 days thereafter)
All public water systems must collect a TTHMs/HAA5 sample set at each sample site.
PHM = Peak Historical Month
MBD = Monitoring Begin Date
7/1/2015 YR Monitoring Begin Date: Frequency of Sampling:
ZONE 2 WATER SYSTEM INC LA1043001
Sample Point ID Sample Address/Location
PWS ID
PHM or Collection Month:
KATELAND ROADDBP02 8 August-
HIGHWAY 8DBP03 8 August-
Wednesday, February 7, 2018 Page 189 of 189