RFP for Elevator Works at Electropreneur Park, UDSC 1 Electropreneur Park Electropreneur Park Electropreneur Park Electropreneur Park Electropreneur Park Electroprenur Park Electropreneur Park Electropreneur Park Electropur Park Electropreneur Park Electropreneur Park Electropreneur Park Electropreneur Park Electropreneur Park University of Delhi, South Campus, Library Building, Benito Juarez Road, New Delhi 110021 TENDER FOR “Elevator Works at Electropreneur Park, University of Delhi South Campus” Tender No.: STPI/EPP/DU/IESA/015 dated 05/06/2015 Pre-bid meeting 10.06.2015 at 12:30 hrs. Last date of submission of bids 15.06.2015 up to 15.00 hrs. Date of opening of the technical bids 15.06.2015 up to 15.30 hrs. Time and date of opening of financial bids 19.06.2015 at 11:00 hrs. PLANNERS GROUP- SCO 4, Sector 17-E, Chandigarh, www.plannersgroup.net Request for further information: [email protected] OR CALL - (0172) 2703917, 2741010

Upload: trantu

Post on 21-Mar-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

RFP for Elevator Works at Electropreneur Park, UDSC 1

Electropreneur Park

Electropreneur Park

Electropreneur Park

Electropreneur Park

Electropreneur Park

Electroprenur Park

Electropreneur Park

Electropreneur Park

Electropur Park

Electropreneur Park

Electropreneur Park

Electropreneur Park

Electropreneur Park

Electropreneur Park

Electropreneur Park

University of Delhi, South Campus, Library Building,

Benito Juarez Road, New Delhi 110021

TENDER FOR

“Elevator Works at Electropreneur Park, University of Delhi South

Campus”

Tender No.: STPI/EPP/DU/IESA/015 dated 05/06/2015

Pre-bid meeting 10.06.2015 at 12:30 hrs.

Last date of submission of bids 15.06.2015 up to 15.00 hrs.

Date of opening of the technical bids 15.06.2015 up to 15.30 hrs.

Time and date of opening of financial bids 19.06.2015 at 11:00 hrs.

PLANNERS GROUP- SCO 4, Sector 17-E, Chandigarh, www.plannersgroup.net

Request for further information: [email protected]

OR CALL - (0172) 2703917, 2741010

RFP for Elevator Works at Electropreneur Park, UDSC 2

CONTENTS

SECTION-1 : NOTICE INVITING TENDERS

SECTION-2 : FORM OF TENDER

SECTION-3 : GENERAL CONDITIONS

SECTION-4 : ARTICLES OF AGREEMENT

SECTION-5 : TECHNICAL SPECIFICATIONS

SECTION-6 : DIMENSIONAL PARAMETERS

SECTION-7 : PRICE BID

RFP for Elevator Works at Electropreneur Park, UDSC 3

SECTION-I

NOTICE INVITING TENDERS

Name of work Estimated

Cost

Bid

Document

cost

Bid

Security

(EMD)

Contract

Duration

Elevator Works for

Electropreneur Park,

University of Delhi,

South Campus, Library

Building, Benito Juarez

Road, New Delhi

110021. Installation,

Designing, Engineering,

Manufacturing,

Erecting, testing and

commissioning of One

No. Ten Passenger

Elevator.

20 Lacs NIL Rupees

Forty

Thousand

only

16 weeks

1) Officer inviting bids: Project Co-Ordinator– Electropreneur Park, University of Delhi, IIC Lab, DUWA Building, Near Cafeteria, Delhi University South Campus, Benito Juarez Road, New Delhi – 110021.

2) Date of downloading bid document: from the date of publishing to 15.06.2015 up to 15:00 hrs.

3) Last date of receipt of bids 15.06.2015 up to 15.00 hrs.

4) Date of opening of the technical bids: 15.06.2015 Time 15:30 hrs. in the presence of tenderers who may choose to be present at the above address as given in point 1. One authorized representative of the tenderer may be present for the purpose.

5) Time and date of opening of financial bids: 19.06.2015 at 11:00 hrs. in the presence of tenderers who may choose to be present at the above address as given in point 1. One authorized representative of the tenderer may be present for the purpose.

6) Tender Documents can be downloaded from following websites

RFP for Elevator Works at Electropreneur Park, UDSC 4

www.electropreneurpark.com

www.noida.stpi.in

www.stpi.in

www.du.ac.in

www.iesaonline.org

www.cmrindia.com

All the information/ corrigendum/addendum related to the project shall be published on the

above mentioned websites.

7) Place of submission of bid

Project Co-Ordinator– Electropreneur Park

University of Delhi,

IIC Lab, DUWA Building, Near Cafeteria

Delhi University South Campus, Benito Juarez Road, New Delhi – 110021.

o Tender (Bid) documents shall be prepared by typing or writing with inedible black/blue ink, documents must be duly signed at every Stage.

o The tenderers rubber Stamp shall be affixed at required places o The tender (Bid) documents shall be submitted in the duplicate o The sealed cover shall be super scribed as follows o Covering letter, if any, shall be in duplicate and shall be submitted in a separate cover

along with EMD. “TENDER FOR Elevator Works

at

Electropreneur Park”

Tender No.: STPI/EPP/DU/IESA/015 dated 05/06/2015

University of Delhi, South Campus, Library Building, Benito Juarez Road, New Delhi 110021

8) Bid validity: 90 days

9) The time allowed for the completion of the work is 16 weeks from the 7th day after the date of

written order to commence work. The time shall be considered the essence of contract.

Liquidated damages @1% per week of contract value subject to maximum of 10% per week.

RFP for Elevator Works at Electropreneur Park, UDSC 5

10) Submission of Tender:

i) Every tender shall be accompanied by Earnest Money of Rs. 40,000/- (Rupees Forty

Thousand) only in the form of Demand Draft of Schedule Bank drawn in favor of

Electropreneur Park, University of Delhi South Campus payable at New Delhi. No interest

will be payable on E.M.D.

ii) The following shall be adopted for submission and opening of tender. The sealed

envelopes shall be submitted as follows:

Envelope No. 1:

Part-I containing the earnest money deposit will be opened first and if the earnest money deposit

is not found as prescribed the tender shall be rejected and other sealed envelope will be returned

unopened to representative of the concerned tenderer is present.

Part-II: containing the covering letter depicting terms and conditions.

ALONG WITH Technical bid shall be opened if earnest money is in order. The same will be

scrutinized and comments/conditions which have financial implications will be evaluated and

discussed with the tenderer if deemed necessary.

Envelope No. 2:

Containing the price bid shall be opened on a separate date which will be intimated to the tenders

subsequently.

Delay in submission of any part arising out of postal irregularities or for any reason, whatsoever

at any stage, will not be considered. There will be no consideration for damage in transit in case

of postal delivery.

11) The Earnest Money will be retained in the case of the successful tenderer as part of the security

for the due fulfillment of the contract. In case the successful tenderer does not accept work order

or does not start the work physically within 10 days from the work order, the Earnest Money will

be forfeited.

12) The tenderer will submit his tender after carefully examining the whole of the tender documents

and the conditions of tender, and of contract, the drawing and specifications, the bill of quantities.

13) The Notice Inviting Tenders, the conditions of tender and the duly completed form of tender will

form part of the agreement to be executed by the successful tenderer with the Employer.

RFP for Elevator Works at Electropreneur Park, UDSC 6

14) The tender shall be kept valid for a period of 90 days from the date of opening of tender.

15) LANGUAGE OF THE BID

All information in the bid shall be in English failure to comply with this may disqualify a tender.

16) FURTHER INFORMATION

Any further information queries or concerns may be mailed to

[email protected], [email protected] and copy to

[email protected]

17) SIGNATURE OF TENDERS

i. The Tenderers must contain the name, residence and place of business of the person or persons

making the Tender and must be signed and sealed by the Tenderer with his usual signature. The

names of all persons signing should also be typed or printed below the signature.

ii. Tender by a partnership firm must accompany a list of full names of all partners and a copy of

partnership deed and tender shall be separated by each partner thereof or in the event of absence

of any partner, it must be signed on his behalf by a person holding a power of attorney. The power

of attorney shall be enclosed with the tender.

iii. Tenderers by Corporation / Company must be signed with the legal name of the Corporation /

Company by the President / Managing Director or by the Secretary or other person or persons

authorized to tender on behalf of such Corporation / Company in the matter.

iv. Tender by a person who affixed to his signature the word President, Managing Director, Secretary,

Agent or other designation without disclosing his principal will be liable to be rejected.

v. Satisfactory evidence of authority such as power of attorney of the person signing on behalf of

the Tenderer shall be furnished with the bid.

vi. The tenderers name stated on the proposal shall be the exact legal name of the person.

vii. Erasure or other changes in the Tender Documents shall be attested with the initials of the

persons signing the Tender.

viii. Tenders not conforming to the above requirements of signing the tenders may be disqualified.

18) UNDERSTANDING & CLARIFICATION ON DOCUMENTS & SPECIFICATIONS

i. The tenderer is required to carefully examine the specifications and documents and fully inform

himself so as to all the conditions and matter which may in any way affect the works or the cost

thereof. In any case Tenderer finds discrepancies or omissions in the specifications and

documents or is in doubt as to the true meaning of any part, he shall at once request in writing

RFP for Elevator Works at Electropreneur Park, UDSC 7

for an interpretation/ clarifications from the Architect. The Architect will furnish clarification in

writing within 4 days of receipt of such request to all the tenderers. All such interpretations and

clarifications shall form a part of the specifications and documents and accompany the Tender.

ii. Verbal clarification and information giving Architect or his employee(s) or his representative(s)

shall not in any way be binding on the Architect/Employer.

19) The employer does not bind itself to accept the lowest tender and reserves to itself the right to

reject any or all the tenders received without assigning any reason/s thereof. The notification of

award of contract will be made to successful tenderer by the Architect.

20) Eligibility Criteria and conditions:-

a) Proof of approval/Registration with appropriate authority. b) The firm should have satisfactorily completed similar works, as stated below during the last 5 years ending last day of the month of May 2015. (Similar work Means: - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PASSENGER LIFT (8 or more passengers) & COMPREHENSIVE MAINTENANCE)

(i) The firm shall have at least 6 similar installations in any city in India for any Central / State Government, Central Autonomous Body, Central Public Sector undertaking with satisfactory. Proof from appropriate authority for having successfully completed the Installation in last 3 years.

(ii) Maintenance record for the past 3 years and adequate, Bidder should submit at least 6 No. similar O & M Contracts successfully completed during last Five years

(iii) Maintenance/service setup in Delhi / NCR.

c) The bidder should have average turn-over (gross) of Rs. 10 CR for installation of elevator /maintenance work during last five years ending March, 2015. The copy of the duly audited statement checked by chartered Accountant be added.

d) Proof of registration under Delhi/ NCR value added Tax (D-VAT) Act 2004 and undertaking that up-to-date returns submitted to Trade and Taxes Deptt. Delhi/NCR. The bidders registered with other Govts. at the time of tendering shall produce the proof of same. However, successful bidder has to get himself registered with Trade and Taxes Deptt. Delhi/NCR before any payment is made to the agency.

e) The bidder should not be black-listed by any govt./PSU/Autonomous bodies/banks etc. An undertaking in this regard should be furnished on the company letter head duly signed and stamped by the authorized signatory.

f) The bidder should have sufficient T & P to cope up with heavy duty elevator work & must submit the list of such T & P.

g) The bidder should submit the structure of his organization including details of technical, administrative & Maintenance personnel to be employed for work.

h) Registered under EPF, ESI Act

RFP for Elevator Works at Electropreneur Park, UDSC 8

21) Performance guarantee:

i) The contractor shall submit an irrevocable PEFRORMANCE GUARANTEE of 5% (Five percent) of the contract amount in addition to other deposits mentioned elsewhere in the contract for his performance of the contract agreement, (not withstanding and/or without prejudice to any other provisions in the contract) within 7 days of issue of letter of intent. This period can be further extended by Electropreneur Park, UDSC up to a maximum period of 7 days on written request of the contractor stating the reason for delays in procuring the Performance Guarantee, to the satisfaction of the Electropreneur Park, UDSC. This guarantee shall be in the form of fixed deposit receipts or Guarantee Bonds of any Scheduled Bank in accordance with the form annexed hereto.

ii) A letter of intent shall be issued in the first instance informing the successful bidder of the decision of the competent authority to accept his tender and the award letter shall be issued only after the Performance Guarantee in any of the prescribed form is received. In case of failure by the contractor to furnish the performance guarantee within the specified period, the Electropreneur Park shall without prejudice to any other right or remedy available in law, be at liberty to forfeit the earnest money absolutely.

iii) The Performance Guarantee shall be initially valid up to the stipulated date of warranty and AMC period plus 120 days beyond that. In case the time for completion of work gets enlarged, the contractor shall get the validity of performance Guarantee extended to cover such enlarged time for completion of work. After recording of the completion certificate for the work by the competent authority and after furnishing Statutory approvals to be submitted by the contractor after obtaining from the concerned department, the performance guarantee shall be returned to the contractor, without any interest.

iv) Electropreneur Park, UDSC shall not make a claim under the Performance Guarantee except for amounts to which the Electropreneur Park is entitled under the contract (notwithstanding and/or without prejudice to any other provisions in the contract agreement) in the event of :

(a) Failure by the contractor to extend the validity of the Performance Guarantee as described herein above, in which event Electropreneur Park may claim the full amount of the Performance Guarantee. (b) Failure by the contractor to pay the Electropreneur Park any amount due, either as agreed by the contractor or determined under any of the Clauses/Conditions of the agreement, within 30 days of the service of notice to this effect by Engineer in Charge. (c) In the event of the contract being determined or rescinded under provisions of any of the clause/condition of the agreement, the performance guarantee shall stand forfeited in full and shall be absolutely at the disposal of Electropreneur Park

Yours faithfully,

For: Electropreneur Park

Project Co-Ordinator– Electropreneur Park

RFP for Elevator Works at Electropreneur Park, UDSC 9

SECTION -2

FORM OF TENDER Dated:……………………

Project Co-ordinator– Electropreneur Park University of Delhi, IIC Lab, DUWA Building, Near Cafeteria Delhi University South Campus, Benito Juarez Road, New Delhi – 110021. Dear Sir,

Reg: Tender for installation of One No. Ten Passenger Elevators at Electropreneur Park,

University of Delhi, South Campus, Library Building, Benito Juarez Road, New Delhi 110021

1. I/We refer to the tender notice issued on behalf of Project Coordinator– Electropreneur Park,

University of Delhi, IIC Lab, DUWA Building, Near Cafeteria, Delhi University South Campus, Benito

Juarez Road, New Delhi – 110021.

2. I/We do hereby offer to perform, provide, execute, complete and maintain the work in conformity

with drawings, conditions of contract, specifications, bill of quantities at the respective rates

quoted in the bill of quantities.

3. I/We have satisfied myself/ourselves as to the site conditions, examined the drawings and all

aspects of the tender conditions. Subject to above, I/We do hereby agree, should this tender be

accepted in whole or in part.

a) Abide by and fulfill all the terms and provisions of the said conditions annexed here to:

b) Complete the work within 16 weeks, as stipulated in two or three shifts if considered necessary

by the consultant at no extra cost to the Owner.

4. I/We have deposited earnest money of Rupees 40,000/- (Rupees Forty Thousand only) in the

form of DD and PBG of 5% (to be received from successful bidder) which I/We note, will not bear

any interest and is subject to forfeiture solely at Electropreneur Park’s discretion.

a) If the work is not commenced by me/us within 7 (seven) days from the date of issue of formal

work order.

b) If the offer is withdrawn within the validity period of acceptance.

Or

c) If the contract is not executed within 30 days from award of contract

RFP for Elevator Works at Electropreneur Park, UDSC 10

5. I/We understand that Electropreneur Park, UDSC is not bound to accept the lowest or any tender

received.

6. The acceptance of this tender shall constitute a binding of contract and any failure as mentioned

in item 4, above shall constitute a breach of contract by us and the tender accepting authority

shall be entitled to have the work executed at our risk and cost and to claim extra cost

/expenditure incurred by then from us.

7. Our Bankers are:

8. Name of partners/directors of our firm:

i)

ii)

iii)

iv)

Yours faithfully,

Signature _____________ Name of Partner/Director of the: firm authorized to

Name___________________ sign or Name of person having power of attorney to

Designation____________ sign the contract. (Certified true copy of power of attorney

should be attached)

Signature & Addresses of Witnesses:

a) Signature _____________

Name __________________

Address _______________

b) Signature _____________

Name __________________

Address _______________

RFP for Elevator Works at Electropreneur Park, UDSC 11

SECTION-3

GENERAL CONDITIONS

1.0 GENERAL

1.1 These conditions & specifications are intended to cover the complete installation of elevator plant in first

class workman like manner & shall include all work and materials in accordance with drawings and as per

specifications.

2.0 CODES/REGULATIONS

2.1 The work shall be carried out in accordance with regulations of any local codes/bye- laws & IS codes which

may govern the requirements of the elevators. The following codes/specifications shall be generally

adhered to:

a) IS: 1860 Code of practice for installation, operation and maintenance of electric passengers &

goods lifts.

b) IS: 3534 Outline dimensions of electric lifts.

C) IS: 4666 Specifications for electric passenger and goods lifts.

3.0 SINGULAR/PLURAL

3.1 In all cases where a device or a part of equipment is herein referred to in singular number, it is intended

that such reference shall apply to as many such devices as required to complete the installation.

4.0 DRAWINGS

4.1 Tender Drawing: The tender drawing enclosed with the tender is essentially diagrammatic & indicates the

lift well arrangement & sectional view. This drawing is intended only as guide to the tenderer for offering

his quotation.

4.2 Working Drawing: The lift well has already been constructed. (The elevator contractor shall prepare

detailed general arrangement drawing of the elevator plant including detailed machine room layout, cabling

and mechanical equipment layout, brackets, etc. and submit the same to the Architects within 14 days after

the award of work. All the drawings shall be submitted in quadruplicate).

4.3 The approval of elevator contractor’s drawings by the Architect shall not absolve the contractor from any

of his obligations as per this contract. The contractor shall point out any discrepancies in the approved

drawings within two weeks from the date of receipt of the approved drawing failing which the contractor

will be held responsible for any alterations, modifications or additions that may be required to be carried

out to the elevator well, machine room or pit.

5.0 LICENSE/ PERMIT/INSPECTION

RFP for Elevator Works at Electropreneur Park, UDSC 12

5.1 It shall be the elevator contractor's responsibility to arrange for inspection of elevator plant by the Inspector

or Local Authority. The owners/employer will only complete the application for inspection & deposit the

fees, if any, for the inspection. The contractor shall also be responsible for follow up action & obtain and

deliver to the Owner/ Employer the necessary license/ permit required under the local/provincial/national

regulations/byelaws.

5.2 The elevator contractor shall also carry out any tests/operations as required by the Inspector or Local

Authorities to obtain the approval of elevator installation and operation of the elevator plant. All such tests,

follow up action and liaison shall be included in the prices quoted and no extra payment on these accounts

will be made to the Contractor.

6.0. POWER SUPPLY

6.1 The entire plant & apparatus shall be designed to operate on 433 volts, 3 phase, 4 wire, 50 Hz AC supply.

6.2 The equipment shall be able to function satisfactorily under the following variations of power supply.

a) Voltage : ± 10%

b) Frequency : ± 3%

C) Combined voltage: ± 10%

& frequency

7.0 DUTIES/TAXES/OCTROI

7.1 The tenderer shall include all duties & taxes such as excise duty and sales tax in his prices at the prevailing

rates. The quantum of all such taxes & duties included shall be clearly indicated. It may be noted that if

prices are quoted exclusive of such taxes & duties, the owner/employer reserves his right to reject all such

tenders.

7.2 OCTROI

The quoted prices shall be inclusive of octroi charges & no extra claim on this account will be entertained.

8.0 PACKING/FORWARDING FREIGHT/TRANSIT INSURANCE

8.1 The prices shall be inclusive of all packing, forwarding freight & transit insurance charges. The extra claim

on this account will not be entertained.

9.0 RECEIVING/UNLOADING/HANDLING/STORING/SAFE CUSTODY

9.1 Receiving/Unloading/Handling: The contractor shall receive all the materials, dispatched from his works, at

site & unload, handle and store them in his site storage.

9.2 Storage: The elevator contractor shall arrange to construct his own storage at the site on the space

earmarked for the purpose. The owner/employer will only provide space, all partitions, doors, ventilation,

lighting etc. shall be arranged by the contractor at his own cost.

9.3 SAFE CUSTODY: The elevator contractor shall be responsible for storage & safe custody of materials brought

to the site till the entire elevator plant is completed, tested & handed over to the employer/owners. The

RFP for Elevator Works at Electropreneur Park, UDSC 13

elevator contractor shall arrange for security guard to protect the materials stored in his stores/installed at

the site from pilferage, damage, etc. at his own cost.

10.0 COMPLETION TIME

10.1 The entire elevator plant/installation shall be completed within 16 weeks from the 7th day after the date

of written order to commence the work.

11.0 LIQUIDATED DAMAGES

11.1 A liquidated damages of 1 % per week subject to a maximum of 10% of the value of work shall be paid by

the Contractor to the employer if the completion of the work is delayed beyond the agreed completion

date and authorized extension of time if any.

12.0 EXTENSION OF TIME

12.1 Extension of time for completion of the work will be granted in case the work is delayed due to reasons

beyond the control of the contractor such as:

i) Force majeure

ii) Delays on the part of the owner

13.0 LIABILITY FOR ACCIDENTS/DAMAGES

13.1 This contract, the contractor shall be responsible for loss or damage to the plant/equipment/materials

unless the installation is taken over by the Employer/owner

14.0 CONTRACTOR LIABLE FOR DAMAGE DONE

14.1 Any damage done to the property/life/structure due to contractor's operation or neglect will be charged to

the contractor

15.0 INSURANCE

15.1 The contractor shall arrange, secure and maintain insurance as may be necessary and for all such amounts

to protect his interests and the interests of the employer against all risks as detailed herein

The form and the limit of such insurance as defined herein together with the underwritten thereof in each

case shall be acceptable to the employer.

However, irrespective of such acceptance, the responsibility to maintain adequate insurance coverage on

comprehensive all risks basis at all times during the period of contract or extended period if any.

16.0 DAMAGE TO PERSONS AND PROPERTY, INSURANCE, ETC.

16.1 The Contractor shall be responsible for all injury to the work or workmen to persons, animals or things and

for all damages to the structural and/or decorative part of property which may arise from the operations

or neglect of himself or of any Sub contractor or of any of his or a Sub Contractor's employees, whether

such injury or damage arise from carelessness, accident or any other cause whatsoever, in any way

RFP for Elevator Works at Electropreneur Park, UDSC 14

connected with the carrying out of this contract. The clause shall be held to include inter-alia, any damage

to buildings whether immediately adjacent or otherwise, and any damage to roads, streets, foot-paths or

pathways as well as damage caused to the buildings and the work forming the subject of this contract by

rain, wind or any other inclemency of the weather. The contractor shall indemnify the Employer and hold

harmless in respect of all and any expenses arising from any such injury or damages to persons or property

as aforesaid and also in respect of any claim made in respect of injury or damage under any acts of

compensation or damage consequent upon such claim.

16.2 The contractor shall reinstate all damage of every sort mentioned in this clause, so as to deliver the whole

of the contract work, complete and perfect in every respect and so as to make good or otherwise satisfy all

claims for damages to the property or third parties.

16.3 The contractor shall obtain a policy covering under Workmen Compensation Act, a third party insurance as

well as any other insurance and indemnify the Employer entirely from all responsibility in this respect. The

insurance must be placed with a company approved by the Employer and must be effected jointly in the

name of the contractor and the Employer and the policy lodged with the latter. The scope of insurance is

to include damage or loss to the contractor itself till this is made over in complete state.

16.4 Insurance is compulsory and must be effective from the very initial stage. The Contractor shall also be

responsible for anything which may be excluded from damage to any property arising out of incident

occurrence or defective carrying out of this contract.

16.5 The Employer shall be at liberty and is hereby empowered to deduct the amount of any damages,

compensations, costs. Charges and expenses arising or accruing from or in respect of any such claim or

damages from any sums due or to become due to the contractor.

16.6 INSURANCE: All risk Insurance Policy and Workman's Compensation Policy.

Unless otherwise instructed the Contractor shall insure the work and keep the insured until the virtual

completion of the contract against loss or damage by fire and/or earth quake, flood or damages from

whatever cause by an All Risk Insurance Policy for the full value of the contract and Workmen's

Compensation Policy of adequate value. The insurance must be placed with a company approved by the

Employer, in the joint names of the Employer and the contractor for such amount and for any further sum

being allowed to the Contractor as an authorize extra.

16.7 The Contractor shall deposit the policy and receipt for premiums paid with the Employer within 21 days

(Twenty one days) from the date of issue of work order unless otherwise instructed. In default of the

contractor insuring as provided above, the Employer on his behalf may so insure and may deduct the

premiums paid from any money due, or which may become due to the contractor. The contractor shall as

soon as the claim under the policy is settled or the work reinstated by the Insurance Company should they

elect to do so, proceed with due diligence with the completion of work in the same manner as though the

fire has not occurred and in all respects under the conditions of the contract. The Contractor in case of

rebinding or reinstatement after fire shall be entitled to extension of time for completion as the Employer

may deem fit.

17.0 VARIATIONS/RESTRICTIONS OF WORK

RFP for Elevator Works at Electropreneur Park, UDSC 15

Employers/ owners reserve their rights to alter/ delete any item of work as also restrict or increase the

quantum of work to the carried out by the contractor. Such variations shall not vitiate the contract. The

contractor shall not be eligible for any compensation for such variations. However, the quantum of work

carried out will be paid the contract rates.

18.0 PRICE VARIATION

18.1 Prices quoted shall be held firm throughout the period of contract. No price variation on any account, shall

be allowed.

19. PERFORMANCE

19.1a) The Elevator contractor shall guarantee that all the machines/plants/ installations covered under this

contract will yield contract rating and results.

b) The elevator contractor upon the completion of the work shall perform all the tests required to establish,

that the elevator plant is performing as per the contract rating, especially with regards to the load, speed,

systems and controls.

c) If the performance tests do not yield the contract ratings, then the elevator contractor shall rectify/ replaces

free of cost such equipment/materials/ plants and re-conduct the tests to demonstrate their correctness

within one month from the date of written notice from the employer/architect

d) If the elevator contractor fails to carry out modifications required and establish the contract rating of the

plant, the owner/employer reserves the right to get the work done at risk and cost.

19.2 DEFECTS LIABILITY

The elevator contractor shall guarantee that the entire plant/ materials are of brand new quality and the

plant/ materials and workmanship of the apparatus installed by him under this contract are first class in

every respect, and that the plant/material and workmanship shall be free from all the defects. The elevator

contractor also guarantee that he shall rectify/replace free of cost all defective material/plant/

apparatus/workmanship for a period of one year from the date of handing over of the plant. If the

performance of the plant is found to be unsatisfactory during the period of defects/liability, the guarantee

shall be extended till the plant is rectified and satisfactory performance is established for a period of not

less than 6 months.

20.0 MAINTENANCE

20.1 After completion of the installation of the elevator plant by the elevator contractor, he shall furnish, free of

cost, maintenance service for the entire plant for a period of 12 months from the date of handing over. The

maintenance service shall include regular examination of the plant during the regular working hours by

trained personnel, and shall include all necessary adjustments, greasing, oiling, cleaning, supplies and

genuine standard parts to keep the equipment/plant in proper operation.

21.0 PAINTING

RFP for Elevator Works at Electropreneur Park, UDSC 16

21.1 All exposed metal work finished under these specifications shall be properly spray painted after installation

to the entire satisfaction of the employer.

22. PROVISION BY ELEVATOR CONTRACTOR

22.1 Elevator contractor shall provide/carryout the following works at his own cost.

a) Necessary scaffolding in the hoist-way required during the erection of the elevators. It shall be responsibility

of the contractor to provide safe and strong scaffolding duly fastened/ securely fixed to building to prevent

it from swaying.

b) Minor builders work comprising of cutting holes and making good for car and counter weight rail brackets,

hall buttons and indicators including laying of sill in position.

C) Steel items such as machine beams, bearing plates, buffer support channels, and any insert plates/sleeves

etc. required for installation of these items.

d) Hoisting beam in the machine room

e) Necessary sill projection in aluminum / steel at all landings. The contractor shall provide any other work as

may be required to complete the work.

f) The scaffolding constructed by the lift contractor, shall be made available to the electrical contractor and

other contractors, involved in providing other services in the lift shaft.

23.0 PROVISION BY CLIENT

23.1 The following work shall be excluded from scope of work of elevator contractor.

a) A hoist-way, properly framed, enclosed and plastered and painted including a pit of proper depth with

drains and water proofing, if required.

b) Vertical iron ladder for access to the pit.

C) Properly lighted ventilated shaft, including floors, access door, ladders, trap doors and guards as required.

d) Pouring and finishing of shaft floor after the machine and relevant equipment have been set in place by

elevator contractor.

e) Guard for hoist way & temporary barricades at hoist way openings.

f) Main electric supply to machine room including wiring up to the elevator machine controllers, lights in the

midpoint of hoist way, light with switch in the pit & hoist way etc. as required.

g) Electric power for erection, testing & commissioning of the elevator plant.

h) Architraves & door frames at all hoist way entrances.

24.0 TERMINATION OF CONTRACT

24.1 Owners/Employers may terminate the contract if the contractor commits any act of insolvency or shall be

adjudged insolvent or if he suffers any payment under this contractor be attached by or on behalf of any

creditors of the contractor or has abandoned the contract or has filed to commence the work or had without

RFP for Elevator Works at Electropreneur Park, UDSC 17

any lawful excuse under the conditions suspended the progress of work for 14 days after receiving

instructions from the employer to proceed with the work or has failed to proceed with work with the

diligence & failed persistently to observe & perform all or any of the acts required for performance of the

contract.

25.0 ELECTRICITY FOR ERECTION

It shall be the elevator contractor's responsibility to arrange for electricity required for erection work. He

shall also arrange to pay for the electricity consumed by him for the erection work, directly to the electricity

supplier.

26.0 24 HOUR CALL BACK SERVICE

The contractor shall be able to provide to the owner 24 hours emergency call back service at installation

site.

27. The proposed work covered under this tender during its progress can also be inspected by the Chief

Technical Examiner or Technical Examiner or by an Officer of Vigilance cell of the authority on behalf of

Engineer-in-charge/ Architect.

28. AGREEMENT:

The successful tenderer will be required to enter into an agreement, draft of which is attached and shall

pay for all stamps and legal expenses incidental thereto.

29. VALIDITY:

The tenderer shall note that his tender shall remain open for consideration for a period of 90 days from the

date of opening of tender.

30. LAW GOVERNING CONTRACT:

This shall be governed by Indian Law for the time being enforce. All dispute arising out of this work shall be

subject to jurisdiction of Delhi Courts only.

31. EARNEST MONEY

The tenderers will have to deposit an amount of Rs. 40,000/- (Rupees Forty Thousand only) in the form of

DD in favor of Electropreneur Park, University of Delhi South Campus New Delhi at the time of submission

of tender as an earnest money.

32. PAYMENT TERMS

Against supply of Material at site - 50%

Erection - 10%

Commission - 10%

End of installation & satisfactory performance &

Statuary approval – 20%

On Expiry of warranty period & AMC - 10%

RFP for Elevator Works at Electropreneur Park, UDSC 18

On successful expiry of the defect liability period and the contractor having removed all the defects from

the work to the satisfaction of employer, the Architect shall on demand from the contractor, recommend

to the Employer to refund performance bank guarantee provided that there is no other demand

outstanding against the contractor. The contractor shall also have to give in writing while applying for

refund that he has no claim against the employer in connection with the work completed by him, failing

Bank Guarantee may be withheld.

33. ARBITRATION SETTLEMENT OF DISPUTES

ARBITRATION:

33.1 All disputes or differences of any kind whatsoever which shall at any time arise between the parties hereto touching or concerning the works or the execution or maintenance thereof of this contract or the construction remaining operation or effect thereof or to the rights or liabilities of the parties or arising out of or in relation foreclosure or breach of the contract (other than those in respect of which the decision of any person is by the contract expressed to be final and binding) shall after written notice by either party to the contract to the other of them and to the Appointing Authority who shall be appointed for this purpose by the Employer be referred for adjudication to a sole arbitrator to be appointed as hereinafter provided.

33.2 For the purpose of appointing the sole arbitrator referred to above, the Appointing Authority will send within thirty days of receipt by him of the written notice aforesaid to the contractor a panel of three names of persons who shall be presently unconnected with the organization for which the work is executed.

33.3 The contractor shall on receipt by him of the names as aforesaid, select any one of the persons named to be appointed as a sole arbitrator and communicate his name to the Appointing Authority within thirty days of receipt by him of the names. The Appointing Authority shall thereupon without any delay appoint the said person as the sole arbitrator. If the contractor fails to communicate such selection as provided above within the period specified, the Appointing Authority shall make the selection and appoint the selected person as the sole arbitrator.

33.4 If the Appointing Authority fails to send to the contractor the panel of three names as aforesaid within the period specified, the contractor shall send to the Appointing Authority a panel of three names of persons who shall all be unconnected with either party. The appointing Authority shall on receipt by him of the names as aforesaid select any one of the persons named & appoint him as the sole arbitrator. If the Appointing Authority fails to select the person and appoint him as the sole arbitrator within 30 days of receipt by him of the panel and inform the contractor accordingly, the contractor shall be entitled to appoint one of the persons from the panel as the sole arbitrator and communicate his name to the Appointing Authority.

33.5 If the arbitrator so appointed is unable or unwilling to act or resign his appointment or vacates his office due to any reason whatsoever another sole arbitrator shall be appointed as aforesaid.

33.6 The work under the contract, shall however, continue during the arbitration proceedings & on payment due or payable to the contractor shall be withheld on account of such proceedings.

33.7 The arbitrator shall be deemed to have entered on the reference on the date he issued notice to both the parties fixing the date of the first hearing.

33.8 The arbitrator may from time to time with the consent of the parties, enlarge the time for making and publishing the award.

RFP for Elevator Works at Electropreneur Park, UDSC 19

33.9 The arbitrator shall give a separate award in respect of each dispute or difference referred to him. The arbitrator shall decide each dispute in accordance with the terms of the contract and give a reasoned award. The venue of arbitration shall be such place as may be fixed by the Arbitrator in his sole discretion.

33.10 The fees, if any, of the Arbitrator shall, if required to be paid before the award is made and published, be paid half and half by each of the parties. The costs of the reference and of the award including the fees, if any, of the Arbitrator who may direct to and by whom and in what manner, such costs or any part thereof shall be paid and may fix or settle the amount of costs to be so paid.

33.11 The award of the Arbitrator shall be final and binding on both the parties.

33.12 Subject to aforesaid the provisions of the Arbitration Act 1940 or any statutory modification of reenactment thereof and the rules made thereunder, and for the time being in force, shall apply to the Arbitration proceeding under this clause.

RFP for Elevator Works at Electropreneur Park, UDSC 20

SECTION – 4

ARTICLES OF AGREEMENT

ARTICLES OF AGREEMENT made this .......................................................... day of

................................................. between Electropreneur Park, University of Delhi, IIC Lab, DUWA Building,

Near Cafeteria a company incorporated under the Act, 1955 and having its Local Head Office at New Delhi,

160 017, (hereinafter referred to as the “EMPLOYER” which expression shall include its successor or

successors and assigns) of the ONE PART.

AND

M/s.................................................................................................................................................................

having its registered office at .............................................................................(hereinafter referred to as

the ‘CONTRACTOR’ of the OTHER PART,

WHEREAS the Employer is desirous of executing Elevator Works for EP, University of Delhi, South

Campus, Library Building, Benito Juarez Road, New Delhi 110021 as stated to the General

Conditions (hereinafter called the WORK).

AND WHEREAS the Employer in order to effectively carry out the said work at University of Delhi, South Campus, Library Building, Benito Juarez Road, New Delhi 110021, engaged. M/s. PLANNERS GROUP, SCO-4, Sector -17-E, Chandigarh 160 017 hereinafter referred to as (the ARCHITECT/CONSULTANT) to prepare plans, drawings and specifications describing the to be executed for Employer, to call for tenders from contractors for the job, to open tenders received at the office of the employer, to scrutinize and recommend to the Employer the name or names of the Contractor or Contractors from whom the tenders were received.

AND WHEREAS the Employer has caused the plans, drawings as per list attached. Specifications, priced schedule of quantities for the Work as per instruction to tenderers, general conditions of contract and special conditions of contract prepared with the assistance of the said Architect/Consultant, subject to which the offer of the Contractor shall be accepted.

AND WHEREAS the tender of the Contractor for Elevator WORKS of the said work at New Delhi has been approved by the Employer.

RFP for Elevator Works at Electropreneur Park, UDSC 21

AND WHEREAS the contractor has deposited with the owner Rs. _____________________

(Rupees ____________________ only) (PBG of 5%) as security deposit for the due performance

of the Agreement.

AND WHEREAS work order has been released to the Contractor.

AND WHEREAS the relevant drawings inclusive of the specifications. priced schedule of quantities,

instruction to tenderer, general conditions of contract and Special Conditions and letters exchanged by &

between the parties from submission of tender up to acceptance including letter of order (hereinafter

collectively referred to as "the said conditions') have been signed by the parties hereto and the contractor

has agreed to execute upon and subject to the said conditions.

NOW IT IS HEREBY AGREED AS FOLLOWS:

1: In consideration of the payments to be made to the Contractor as hereinafter provided the

Contractor shall upon and subject to the said conditions execute and complete the work as

described in the said specifications and the said priced Schedule of Quantities.

2: The Employer will pay to the Contractor the sum of Rs.................................. (Rupees

…………....................................................................................................) (Hereinafter called the

‘Contract Sum’) or such other sum as shall become payable hereunder at the times and in the

manner specified in the said conditions.

3: The terms 'Architect/Consultant' in the said conditions shall mean the said M/s. PLANNERS

GROUP and in the event of the said Architect/Consultant ceasing to be the Architect/Consultant

for the purpose of this contract such other person or persons as shall be nominated for the

purpose by the Employer, provided always that no person subsequently appointed to be the

Architect/Consultant under this contract shall be entitled to disregard or over rule any decision

or approval expressed in writing by the outgoing Architect/Consultant for the time being if the

same had been done under instruction from the Employer.

4: The agreement and documents mentioned above shall form the basis of this contract and all

disputes to be decided in the manner prescribed in the conditions attached hereto.

RFP for Elevator Works at Electropreneur Park, UDSC 22

5: The said contract comprises Elevator Works as mentioned above and in the tender documents

and all subsidiary work connected therewith within the same site as may be ordered to be done

from time to time by the said Employer through the Architect/Consultant or other Archi-

tect/Consultants the case may be even though the said work may not be shown on the drawings

or described in the said specifications or the priced schedule of quantities.

6: Notwithstanding what is stated herein before or hereinafter or in the instruction to the tenderer,

general conditions of contract, special conditions, the Employer through the Architect/ Consultant

reserves to himself the right to alter the nature of the work and of adding to or, omitting any

items of work from the contract or of having portions of the same carried out departmentally or

otherwise and such alterations or variations shall be carried out without prejudice to this contract.

7. The above conditions shall be read and be treated as forming part of this agreement and the parties

hereto will respectively be bound hereby and to abide by themselves to the conditions and

stipulations and perform the same on their parts to be respectively observed and preferred.

8: Any dispute arising under this agreement between the parties hereto shall be referred for

adjudication to a sole arbitrator in New Delhi in the manner and in terms of the provisions laid

down in Clause 45 of the General Conditions of Contract. The award of the arbitrator shall be final

and binding on both the parties.

9. The time allowed for the completion of the work is 16 weeks from the 7th day after the date of

written order to commence work. The time shall be considered the essence of contract. Liquidated

damages @1% per week of contract value subject to maximum of 10%.

AS WITNESS our hand this day of

SIGNED by the said Employer in the presence of

SIGNED by the said Contractor in the presence of

RFP for Elevator Works at Electropreneur Park, UDSC 23

SECTION -5

TECHNICAL SPECIFICATIONS

01 Passenger Elevator:

Passenger elevators shall include all elements conforming to specifications or as amended herein. Elevators

covered by this specification shall be provided, installed, tested, commissioned, certified, approved by all

agencies having jurisdiction including insurance carriers. Each agency having jurisdiction shall certify each

elevator fit for public use.

02 Service Elevators:

Elevator contractor shall provide short duration emergency lighting in each car which shall be supported by

central or local dry cell rechargeable battery and necessary relays.

03 Hoisting Machine

Hoisting machines for passenger elevators will normally be of the gearless traction with Machine room less

type based on the principle of A.C. Variable Voltage Variable Frequency. The unit should consist of an A.C.

Motor, reduction gear and traction sheave operating at 1.0m/sec.

Hoist Motor The hoist motor shall be a single speed, 3 phase A.C. motor of reversible type and designed for elevator service, repeated starts, high starting Torque & low starting current characteristics & within the limits acceptable to the electric supply Co. and E. 1. rates. All cater winding put be heaviest insulated adequately in pre-generated for tropical climate and mechanically strength. (Any structural steel required for installation in existing lift well will be provided by the Agency)

04 Construction:

The A.C. motor, reduction gear, Traction sheave and brake shall form a single compact unit. The stator core

design should be so to give efficient commutation in the most demanding operating conditions and

extended service life with minimum maintenance.

Substantially dimensioned roller bearings with good maintenance access should be provided for longer

bearing life and trouble free operation.

Bed plates with anti-vibration mountings should also be included for quiet and vibration free operation.

Motor windings:

The normal insulation class of the motor is 'F' Thermal protection of the motor should be provided by four

thermistors embedded in the stator of the winding. The motor should be cooled by an externally mounted

fan.

Brake: The D.C. operated brake should have two independent brake arms and should be capable of holding

a car stationery even at 100 percent over load.

05 Emergency Cranking

The hoisting machines shall be provided with a set of special tools including a hand crank or its equal to

allow release of hoist brake and provide for manual movement of the car in case of emergency. The elevator

system supplier shall qualify his bid with respect to manual cracking.

RFP for Elevator Works at Electropreneur Park, UDSC 24

06 Automatic Self Leveling

The elevator shall be provided with automatic self-leveling feature that shall bring the elevator car level to

with ± 3mm of the landing floor regardless of load or direction of travel. The automatic self-leveling feature

shall correct for over travel and rope stretch.

07 Car Top Station

A car top operating station comprised of Key operated switch and constant pressure up/down buttons shall

be provided on each elevator. Car shall respond to up/down command at inspection speed. The elevator

contractor shall provide with CFL type fixtures.

08 Sheaves

Sheaves shall be machined, balanced and shall maintain cable sheave ratio well within requirements.

Lubrication points shall be extended to a location that is easily accessible.

09 Car frame and Safety

A car frame fabricated from cold rolled formed steel numbers shall be provided with adequate bracing to

support the platform and car enclosures. The car safety shall be integral with car frame, or shall be mounted

on the bottom members of the car frame, and shall be of the flexible guide clamp type designed to stop

and hold a fully loaded car which exceeds descending safeties shall conform to local codes.

10 Speed Governor

Speed Governor operating the safety gear in case of over speeding of car in the down ward direction.

11 Wiring

All wiring and electrical intern connections shall comply with governing codes. Insulated wiring shall have

frame retardant and moisture proof outer covering, and shall be run in conduit, tubing or approved

electrical raceways. Travelling cables shall be flexible and suspended to relieve strain on individual

conductors. A minimum of 10% spare conductors shall be provided in travelling cable.

12 Pit Switch

An emergency stop switch shall be located in the pit accessible from the pit access door which when

operated shall stop the car regardless of position in the hoistway.

13 Buffers

Buffer shall be installed in the pit as a means for slowing and stopping the car and counter weight at the

bottom limits of travel, in compliance with local code.

14 Guide Rails

Steel elevator guide shall be installed to guide the car and counter weight, erected plumb and securely

fastened to the building structure, filled and field to ensure smooth joints.

15 Guide

Rubber encased oil spring tension adjusted roller guides shall be provided for passenger elevators with

speed of 1.00 MPS or greater, mounted on top and bottom of the car frame, and top and bottom of the

counter weight frame to engage their respective guide rails.

16 Travelling Cable

RFP for Elevator Works at Electropreneur Park, UDSC 25

Travelling cable shall be flat & flexible.

17 Inter locks

Hoist way shall be provided with electro mechanical locks.

18 Counter Weight

A structure steel frame with cast iron filler weights shall be furnished to provide proper counter balance for

smooth and economical operation.

19 Counterweight Guard

A metal counterweight guard shall be finished and installed at the bottom of the hoistway, and shall wrap

around counterweight rails for a height of no less than 1.80m in order to protect accidental contact.

20 Ropes

The hoist ropes shall be traction steel of size, construction and number of insure proper, operation of the

elevator and give satisfactory and safety assurance. Governor ropes shall be of steel. All ropes shall consist

of at least eight strands wound about a hemp core centre. All ropes shall conform to IS 2365-1963.

21 Acceleration /Deceleration

Shall be linear and smooth. Stops shall be without cable oscillations.

22 Sound Reduction

The contractor shall provide necessary sound insulation material, preferably neoprene pads of adequate

density to effectively absorb and isolate the machine from the beams and flooring.

23 Emergency Car Lighting

Provision shall be made in the car operation station. Necessary wires shall be included in the car travelling

cable. Communications equipment and connections to the building service system shall be furnished and

installed by others.

24 Elevator Movement

The traffic display should also include car position and car direction, car call registered, call allocations.

25 Hall Buttons

For elevators these shall be provided at each landing. A feather touch luminous button shall be provided at

top most and ground floor and basement landing, two feather touch luminous on a single plate shall be

provided at each intermediate floor. When a hall call is registered by momentary pressure on a landing

button, that button shall become illuminated and remain illuminated until the call is answered.

26 Call Button

Call button for elevator shall be as per Architect selection. Selection for service elevator shall be as per

manufacturer's standard selection. Emergency operation shall return the elevator's to a designated floor,

most commonly, the Lobby, by means of a signal from the automatic fire alarm system by and key operated

switch in the lobby panel.

RFP for Elevator Works at Electropreneur Park, UDSC 26

Car traveling toward lobby shall express to lobby ignoring all car and hall calls. Car parked on intermediate

floors shall close their doors and express to lobby. Car parked at lobby shall open their doors ignoring car

and hall calls. All hall and car buttons shall extinguish and shall accept no further hall or car registration.

27 Fireman's Switch:

When the fireman switch is turned on, the lift shall rush to the particular pre-determined floor. The lift shall

also provide the necessary toggle switch facility required.

28 Inspection Operation — All Elevators

A switch shall be provided in the car to permit operation of the elevator from top of the car for inspection

purposes, with car and hall buttons inoperative. Car shall travel at inspection speed not exceeding 0.5 m/sec

29 Car Operating Panel

The car operating panel shall contain a bank of feather touch luminous buttons marked to correspond to

the landing serviced. It shall include a series of push buttons corresponding to the floors served, along with

an emergency stop and switches required. Operating panel shall incorporate the following floor buttons,

door, open/close, emergency stop/alarm, up/down in manual mode, man/auto key switch and fire

operation.

a) Auto/attendant/inspection key operated switch.

b) Up/down button.

C) Light and fan switches.

On sounding of general fire alarm, the elevator shall if in motion, express to the ground floor. If stopped,

the elevator shall open its doors and remain there until reset. Emergency phone shall be provided, installed

in integral cabinet and connected to the PABX by the low tension contractor.

30 Elevator Cab:

Car shall be detailed by the Architect or interior designer. The cab manufacturer shall make provisions for

ventilation inlets at the bottom of the cab (concealed from passenger's view) and blowers at ceiling,

emergency hatch with electrical interlock and anchors for hand rails, or per local code.

The car sill shall be flush with finish floor. Sill to floor space shall not exceed 25mm.

a) Doors shall be arranged to remain open for a time period sufficient to meet handicapped requirements

(Optional)

b) The time interval for which the elevator doors remain open when a car stops at a landing shall be

independently adjustable for response to car calls and response to hall calls.

c) An approved positive interlock shall be provided for each hoist way entrance which shall prevent operation

of the elevator unless all doors for that elevator are secured and shall maintain the doors in their closed

position while the elevator is away from the landing. Emergency access to the hoist way as required by

governing codes shall be provided.

RFP for Elevator Works at Electropreneur Park, UDSC 27

SECTION-6

ELEVATOR SPECIFICATION

TYPE - A

No. of Lifts 1

Type and capacity Machine room less passenger Elevator, Rated load 680 kg, 10 persons

Stops 3, [FLOOR DESIGNATION G,1,3]

Travel Height ~13.5m

Access Sides 2

Speed 1.0 meter per second

Type of Drive A.C. variable voltage variable frequency with 16 - bit microprocessor

Location of Machine room

Permanent magnet synchronous/asynchronous electric traction gearless motor to be hoisted on guide rail within the elevator hoist way.

Serving 3 floors3 stops 3 levels 2 openings (on the opposite side)

Hoist way available 1800mm(wide) x 2000mm (deep) clear dimensions

Car size 1100mm (wide) x 1300mm (deep)x2300 (high)

car enclosure Constructed out of hairline stainless stainless steel 304 grade finish.

Car entrance Center opening automatic doors in hairline stainless steel finish 304 grade with a clear opening of 800mm(wide) x 2100mm (high)

Hoist way entrance Centre Opening Automatic Doors in hairline Stainless Steel Finish 304 grade with provision of emergency Key Opening at all Landings with a clear Opening of 800 MM (wide) x 2100MM (high)

Door operation Automatic D.C. Door Operation with adjustable Door Opening and Closing timings

Control Simplex Full Collective with or without attendant.

Operation Automatic D.C. Door Operation with adjustable Door Opening and Closing timings

RFID RFID based elevator controller

RFP for Elevator Works at Electropreneur Park, UDSC 28

Power supply 415 Volts, 3 Phase, 50 Hertz Alternating Current

Fan Concealed Cross Flow Blowers for Mid Air Flow

Flooring Granite Flooring

Lighting Diffused LED Lighting in car

Indicators Dot Matrix Digital Direction and Position Indicators in both car and at all landings.

other features * Battery Operated emergency Light with Rechargeable Battery

* Battery Operated Emergency Alarm with Rechargeable Battery

* Adjustable Guide Shoes

* Micro Movement L.E.D. based Buttons

* Hands Free Press and Speak Intercom with EPABX for three way communications

* Load Weighing device with overload bypass feature

* Steel items such as Door Frames Sill Angles, Fascia Plates, Spring Buffers.

* Buttons-Call Registration-Red

* Braille Fixtures

* Full Height infrared Safety Curtain.

* System Capable of withstanding + 10% to - 10% Variation in Supply Voltage Fluctuations.

* Lift Announcement System

* Three Side Hand Rails

* Car Platform constructed out of a Cold Rolled Grain Oriented Formed Sheet of Steel

* 2 Phase Device Fire Man Drive

* Fire Man Switch at Main Lobby

* Heavy Duty Door Motor Fire Rating for Two hour as per IS 3809 : 1970

* Car False Ceiling in Stainless Steel in Plain Finish

Pit Ladder

* Motor Compatible for 180 Starts Per Hour

* Automatic Rescue Device to automatically bring the elevator to a landing in case of power failure.

All Signals Fixtures will be in Stainless Steel Face Plates.

RFP for Elevator Works at Electropreneur Park, UDSC 29

RFP for Elevator Works at Electropreneur Park, UDSC 30

SECTION -7 (VOLUME II)

(TO BE PUT IN SEPARATE SEALED ENVELOPE)

PRICE BID INSTALLATION OF TEN PASSENGER ELEVATOR AT I.I.C. BUILDING FOR Electropreneur Park University

of Delhi, South Campus, Library Building, Benito Juarez Road, New Delhi 110021

S.No Item of Work Qty. Amount

(To be quoted by the

contractor)

PART-A:

1 i) Supply, design, installation, testing and commissioning of TEN passenger

(without machine room) Elevator as per the terms and conditions. Technical

specifications and dimensional parameters enclosed in Volume 1 of the

Tender Document including obtaining statuary approval.

(Any structural steel required for installation in existing lift well will be

provided by the Agency)

Technical specifications: as per Elevator Specification TYPE - A

1 No.

ii) Taxes as applicable

TOTAL (Part-A) (includes (i) and (ii))

PART-B:

2 i) Comprehensive parts replacement annual maintenance charges for the

above elevator for a period of ONE year including supply of all spares as

required, after the defects liabilities period of 1 year. (As per clause 20 –

section 3 – General Conditions, first year is already covered under FOC basis,

so we require AMC for next 1 year)

ii) Taxes as applicable

TOTAL (Part B) (includes (i) and (ii))

SUMMARY:

Total of part A+B

GRAND TOTAL

Grand Total (in words) - Note:

1. Evaluation will be done on Grand Total. 2. While evaluation, in case of similar bid value, the contract will be awarded to the bidder

having highest turnover in last 3 years.