statewide transportation improvement program summary...2020/09/24  · 01 sdn6678 region 1 rockfall...

106
Statewide Transportation Improvement Program Summary Dollars in Thousands Data as of September 24, 2020 CDOT Region STIP ID STIP ID Description STIP WBS ID STIP WBS Description Funding Program Fund Source Fund Type STIP Phase 2019 Rolled 2020 Rolled 2021 2022 Future 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF C 547 SDN6678.007 SH74: Morrison to Evergreen RFM S SHF D 60 SDR5055 US 85: C-470 to Castle Rock SDR5055.999 US 85: C-470 to Castle Rock FR8 F NHFP C 5,050 S SHF C 1,049 FSA S FAS C 4,281 LOM L L C 2,500 RPP F NHPP C 14,488 F NHPP R 35 227 S SHF C 47 3,211 657 S SHF M 226 17 S SHF R 7 47 S SHF U 850 192 SUR F NHPP C 5,000 SDR6744 Region 1 CMAQ Pool SDR6744.023 Aurora Toll Gate Creek Trail: Chambers Rd to Montview Blvd CDR F AQC C 1,793 L L C 372 SDR6744.024 Aurora Westerly Creek Trail to Toll Gate Creek Trail Connect CDR F AQC C 6,858 L LO C 1,169 SDR6744.025 Arapahoe County y Iliff Ave Operational Improvements: Parker CDR L L C 5,688 L LO C 1,657 SDR6744.029 Arapahoe County Gun Club Rd and Quincy Ave Operational Impro CDR F AQC C 4,828 L L C 184 SDR6744.034 Denver - S. Platte Greenway Access Sidewalk Imp. Iowa Ave RR CDR L L C 486 L LO C 2,104 SDR6744.036 Thornton Traffic Signal Uprgade PH 5 CDR F AQC C 544 SDR6744.037 FY18 AURORA TRAVEL TIME MONITORING CDR F AQC C 118 L L C 28 Report ID: STIP02 1 of 106 Last Refresh: 09/24/2020 11:57 AM

Upload: others

Post on 08-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF C 547

SDN6678.007 SH74: Morrison to Evergreen RFM S SHF D 60

SDR5055 US 85: C-470 to Castle Rock SDR5055.999 US 85: C-470 to Castle Rock FR8 F NHFP C 5,050

S SHF C 1,049

FSA S FAS C 4,281

LOM L L C 2,500

RPP F NHPP C 14,488

F NHPP R 35 227

S SHF C 47 3,211 657

S SHF M 226 17

S SHF R 7 47

S SHF U 850 192

SUR F NHPP C 5,000

SDR6744 Region 1 CMAQ Pool SDR6744.023Aurora Toll Gate Creek Trail: Chambers Rdto Montview Blvd CDR F AQC C 1,793

L L C 372

SDR6744.024Aurora Westerly Creek Trail to Toll GateCreek Trail Connect CDR F AQC C 6,858

L LO C 1,169

SDR6744.025Arapahoe County y Iliff Ave OperationalImprovements: Parker CDR L L C 5,688

L LO C 1,657

SDR6744.029Arapahoe County Gun Club Rd and QuincyAve Operational Impro CDR F AQC C 4,828

L L C 184

SDR6744.034Denver - S. Platte Greenway AccessSidewalk Imp. Iowa Ave RR CDR L L C 486

L LO C 2,104

SDR6744.036 Thornton Traffic Signal Uprgade PH 5 CDR F AQC C 544

SDR6744.037FY18 AURORA TRAVEL TIMEMONITORING CDR F AQC C 118

L L C 28

Report ID: STIP02 1 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 2: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SDR6744.038 FY18 Superior Mcasalin Monitoring System CDR L L C 183

L LO C 380

SDR6744.039 Broomfield Call-n-ride CDR L L C 69

L LO C 52

SDR6744.040 US85: Highlands Ranch Pkwy to Cty Line CDR L L C 617

SDR6744.043 19th St Bridge and Trail CDR L L C 694

SDR6744.044 Second FasTracks Commitment CDR L L C 369

SDR6744.045 30th St/ Colorado Ave Bike/Ped Underpass CDR L L C 679

SDR6744.047 Centennial MEPP CDR L L C 60

SDR6744.048SH-157/ Foothills Pkwy Bike/Pedunderpass at Colorado Ave CDR L L C 413

SDR6744.049 Adams County Signal System CDR L L C 245

SDR6744.050Littleton Dynamic Lane AssignmentSystem CDR L L C 6

L LO C 1

SDR6744.051 Denver Bicycle Detection CDR F AQC C 346

L L C 10 86

L LO C 276

SDR6744.052 Denver CCTV Netowrk Upgrade CDR F AQC C 634

F AQC M 184

L L C 150 131

L L D 3

S SHF M 46

SDR6744.053 Denver Multijurisdictional Monitor CDR L L C 25

SDR6744.054 Denver Signal Performance Measures CDR F AQC C 434

L L C 53 108

SDR6744.055Denver ITS Device Performance,Measurement CDR L L C 171

SDR6744.056 Aurora Traffic Signal System Equip Upgra CDR F AQC C 1,077

L L C 123

Report ID: STIP02 2 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 3: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SDR6744.057CDOT R1 Traffic Addaptive FeasibilityStudy CDR F AQC C 146

L L C 168

SDR6744.058Arvada Traffic Signal Interconnectupgrade/ Expansion CDR F AQC C 619

L L C 213

SDR6744.059 Aurora Bicycle Detection CDR F AQC C 597

L L C 102 149

SDR6744.060 Aurora CCTV Network Upgrade CDR F AQC C 254

L L C 43 63

SDR6744.061Broomfield Sheridan Blvd Traffic SignalInterconnect Upgrade CDR F AQC C 362

L L C 62

SDR6744.062 N. Metro Rail Stock Show Station Bike/Pe CDR L L C 410

SDR6744.063Parker / Quincy Smoky Hill IntersectionImprovements CDR F AQC C 3,044

L L C 860 640 1,627

SDR6744.064 Inverness Dr West Separated Bikeway CDR F AQC C 191 2,191 1,111

L L C 809 809 809

SDR6744.065Dry Creek Rd Oper Imp: EB Lane (I-25 toInverness Dr East) CDR F AQC C 1,000 1,665

L L C 719 720 416

SDR6744.066SH-79 and I-70 Interchange EastboundRamp Improvements CDR F AQC C 400 400

L L C 450 450

RPP S SHF C 250 250

SDR6744.067 I-76/Baseline Rd. Interchange Signalization CDR F AQC C 200 1,200

L L C 50 150

RPP S SHF C 150

SDR6744.068Havana St. Transit Improvements:Montview Blvd. to Dartmouth CDR F AQC C 100 440

L L C 25 92

SDR6744.069I-25 and Dry Creek Rd. SB On-RampOperational Improvements CDR F AQC C 380 1,000

L L C 320

Report ID: STIP02 3 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 4: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SDR6744.070Santa Fe Dr. and Mineral Ave. OperationalImprovements CDR F AQC C 1,000 500 1,286

L L C 250 125 322

SDR6744.071SH-86/5th St. and Founders Pkwy./RidgeRd. Intersection Oper CDR F AQC C 300 3,925

L L C 900 1,375

SDR6744.072Parker Rd. Operational Improvements:Lincoln Ave. to Pine Ln CDR F AQC C 1,750

L L C 1,750

SDR6744.073 Sheridan Blvd. Multimodal Improvements CDR F AQC C 1,500 2,000 2,000

L L C 500 1,000 500

RPP S SHF C 500 500

SDR6744.074 US-40 Complete Streets: Violet St. to I-70 MDR F STBG C 600 2,500 2,500

L L C 150 625 625

SDR6744.075120th Ave. Op. Imp: Washington St. toYork St. CDR F AQC C 400 500 1,000

L L C 228 285 568

SDR6744.076SH-83 Safety Improvements: Bayou GulchRd. to El Paso County CDR F AQC C 1,500

L L C 3,500

RPP S SHF C 2,000

SDR6744.077 City of Denver Bluetooth Expansion CDR F AQC C 635

L L C 158

SDR6744.078DRCOG RTO Program (RegionalTransportation Operations) CDR F AQC D 1,500

SDR6744.079 FY 20 City of Denver VMS Installation CDR F AQC D 80

L L D 20

SDR7066US6 and Wadsworth InterchangeReconstruction SDR7066.999

US6 and Wadsworth InterchangeReconstruction RPP S SHF E 40

SDR7091 Region 1 Local FASTER Transit Pool SDR7091.016 MINERAL PNR BRIDGE REHAB LOM L L C 564

TRG L LO C 14

S SHF C 56

SDR7091.017 Downtown Track and Switches STL L L M 287

S FAS M 1,150

Report ID: STIP02 4 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 5: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SDR7091.019 Colfax 15L Transit Imp: I-225 to I-25 TRG L L C 192

S FAS C 770

SDR7112 C-470: I25 TO WADSWORTH SDR7112.999 C-470: I25 TO WADSWORTH RMP S SHF C 14,000

TCI S SHF C 11,000

SDR7116 C-470: (Seg 2) Wadsworth to I-70 SDR7116.999 C-470: (Seg 2) Wadsworth to I-70 RMP F NHPP D 2

F NHPP E 1,005

S SHF E 209

SDR7117 Emergency Repairs on US-36 July 2019 SDR7117.999 Emergency Repairs on US-36 July 2019 TCC S SHF C 20,029

S SHF D 300

S SHF M 100

SIN6312I-70: Eisenhower-Johnson Memorial TunnelsRepairs & Upgrades SIN6312.999

I-70: Eisenhower-Johnson MemorialTunnels Repairs & Upgrades CTP F NHPP C 82

S SHF C 4,427 4,877

S SHF D 234

S SHF M 25

RPP S SHF C 1,116

SIN6313 R1 CTP Pool SIN6313.002 US 6 Tunnels Lighting and Liner CTP F NHPP D 50

S SHF D 639 4,618 2,681

SR11987I-25 Capacity Improvements: Castle Rock toEl Paso Cnty Line SR11987.999

I-25 Capacity Improvements: Castle Rockto El Paso Cnty Line 7PX L L C 10,000

S 267 C 133,000

FSA S FAS C 7,244 3,909

LOM L L C 10,050 50

SUR F NHPP C 2,582

S SHF C 248

SR12221 Denver Smart City Program SR12221.001 Denver Smart City Program ATC F MISC C 6,000

SR12244 SR12244 SR12244.001 I-70 Picadilly Interchange LOM L L D 50

SR12266 EMR- Emergency Relief Pool SR12266.001PR SH72 Flood Repair- FRO ApprovedImp EMR F ER C 7,245

S SHF C 1,506

Report ID: STIP02 5 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 6: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

TCC S SHF C 2,064

SR13322 R1 SB-1 Pool and Gap INFRA SR13322.001 I-25 Gap 7PX S 267 C 54,400

FR8 F NHFP C 2,500 7,296

S SHF C 253

S SHF D 450

SB1 S SB1 C 92,000

S SB1 D 2,000

SR13322.002 I-25: Speer and 23rd Bridges SB1 S SB1 D 1,695

SR13322.005 I-25 North: 84th Ave to Thornton Pkwy Wi SB1 S SB1 D 600

SR13322.006 I-25 North: TEL Expansion/ 3A Re-PKG CBP F NHPP C 235

FSA S FAS C 1,800

HAZ F HSIP C 5,180

ITI S SHF C 500

LOM L L C 2,909

RMP F NHPP C 1,019

RPP F NHPP C 8,299 1,166

SAE F HSIP C 85

S HSIP C 8

SB1 S SB1 D 760

SGN S SHF C 30

SUR F NHPP C 7,423

SR13322.007 I-70 West: Floyd Hill SB1 S SB1 D 3,800

SR13322.008I-70 WB PPSL- CR314 RoadwayReconstruction RPP S SHF R 175

SR13322.009I-270: Widening from I-76 to I-70 (TrafficStudy) SB1 S SB1 D 300

SR13322.010 I-25 South Gap INFRA DIS F GRNT C 65,000

SR13322.013 North Program Design and PM Support FR8 S SHF D 120

SB1 S SB1 D 340

Report ID: STIP02 6 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 7: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR14412 R1 TDM Pool SR14412.001 Oxford Ave First and Last Mile Connect CDR L L C 14

SR14412.002 Bicycle Colorado: It's As Easy as ABC CDR L L C 14

SR14412.003 Bike Denver: Neighborhood Navigator Prog CDR L L C 14

SR14412.004 Lakewood West Cooridor TMA Start Up CDR L L C 43

SR14412.005Smart Commute Metro North: AdCo BikeSha CDR L L C 40

SR14412.006 Transportation Solutions: Networked Mobi CDR L L C 42

SR15098 R1 Transportation Alternatives Program Pool SR15098.031I-70 EB: Silver Plume to GeorgetownExpress RR Rec. Path TAP F TAP C 400

L L C 100

SR15098.037Jeff Co: Peaks to Plains: Mouth of ClearCreek Canyon Segmen TAP F TAP C 480

F TAP D 308

L L C 120

L L D 77

SR15098.038 Evergreen North Lake Trail TAP F TAP D 199

L L D 49

SR15098.039Denver: 47th and York Safe CrossingProject TAP F TAP C 1,283

L L C 320

L LO C 4,260

SR15098.040 Georgetown Argentine Gateway Project RPP S SHF C 88

TAP F TAP C 479

L L C 119

SR15098.045Sheridan Blvd Multiuse Path: W. 6th Ave toW. 10th Ave HAZ F HSIP C 236

S SHF C 26

TAP F TAP C 800

L L C 200

SR15215R1 Surface Treatment Program Pool(Unassigned) SR15215.000

R1 Surface Treatment Program Pool(Unassigned) SUR S SHF C 17,000

SR15215.082 SH67 Rampart Range Road to Sedaila CBP F NHPP C 388

S SHF C 80

Report ID: STIP02 7 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 8: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

HAZ F HSIP C 227

S SHF C 22

SUR F NHPP C 621 3

S SHF C 129

SR15215.097SH 177 Arapahoe to HampdenResurfacing CBP F NHPP C 450

S SB1 C 1,000

SUR F NHPP C 57

S SB1 C 3,829

SR15215.117 Wadsworth Bear Creek to 4th SUR F STBG C 5,629 283

S SHF C 1,170 58

SR15215.118 C-470: S Rooney Rd. to Ken Caryl CBP S SB1 C 184

SR15215.119 US-6 Loveland Pass to I-70 CCP S SHF C 100

SUR F NHPP C 5,221

S SHF C 1,045

SR15215.120 I-25 County Line Road to Belleview RDX F NHPP C 1,026

SUR S SB1 C 9,552

SR15215.122 I-225 I-25 to Parker Road CBP F NHPP C 456

S SHF C 43

HOT F NHPP C 164

S SHF C 15

PRI F GRNT C 75

SUR F NHPP C 7,544 3,349

F NHPP D 25 6

S SHF C 876 171

S SHF D 2

SR15215.124Hampden Dahlia to Parker Rd (wasYosemite) CBP F NHPP C 156

S SHF C 32

Report ID: STIP02 8 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 9: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

FSA S FAS D 1,250

LOM L L C 500

SUR F NHPP C 4,198 3,965

S SHF C 11

S SHF R 7 2

SR15215.126 US-85 - Hampden to Florida CBP F NHPP C 147 685

S SHF C 30 142

RPP F NHPP C 1,200

S SHF C 249

SUR F NHPP C 5,760

F STBG D 52 62

S SHF C 1,197

S SHF D 11 12

SR15215.127 Resurfacing Preventive Maintenance SUR F STBG C 2,388 5,599

F STBG D 191

S SHF C 496 539

S SHF D 30

SR15215.128 I-70 32nd to 44th Resurfacing FSA S FAS C 366

SUR F NHPP C 169

F STBG D 1,212

S SHF D 116

SR15215.129 PR SH72A Flood - Permanent Repair SUR F STBG C 1,205

F STBG D 46

F STBG R 49

S SHF C 251

S SHF D 9

S SHF R 10

Report ID: STIP02 9 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 10: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR15215.132 SH-74, I-70 to CR-65 Sur and Br SUR F NHPP C 2,742

F NHPP D 6

S SHF C 685

S SHF D 1

SR15215.133 US-6, SH-119 to SH-58 HAZ F HSIP D 450

S SHF D 50

SUR F NHPP D 165

S SHF D 34

SR15215.134 I-70 EJMT Resurfacing: portal to portal CTP S SHF C 300

SUR F NHPP C 5,349

F NHPP D 406

S SHF C 515

S SHF D 84

SR15215.135SH 88 Belleview, University to I-25 SURand BR SUR F NHPP C 1,773 2,282

F STBG D 248

S SHF C 368 474

S SHF D 51

SR15215.138SH83 (Leetsdale): Mississippi to Colorado(SH2) Overlay HAZ F HSIP C 486

S SHF C 54

SUR F NHPP C 4,201

F NHPP D 62

F NHPP R 84

S SHF C 873

S SHF D 12

S SHF R 17

SR15215.141 SH85: Florida to I-25 SUR F NHPP D 240

S SHF D 49

Report ID: STIP02 10 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 11: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF R 68

SR15215.143 I-70: EMJT West Portal to East Portal IST F STBG C 2,484

S SHF C 516

SR15215.157 SH88: Alameda Ave to Hampden Ave SUR F STBG D 403

S SHF D 38

SR15215.164 US287: Colfax Ave to I-70 SUR F STBG D 622

S SHF D 129

SR15215.167 I-70: Floyd Hill to Chief Hosa SUR F NHPP D 63

S SHF D 6

SR15215.169 US36: 28th St to Table Mesa Dr SUR F NHPP D 29

S SHF D 3 6

SR15215.171 SH7: I-25 to US85 SUR F NHPP D 662

S SHF D 137

SR15215.172 'SH121: I-70 to 65th Ave SUR F NHPP D 345

S SHF D 71

SR15215.173 US40: Genesee to CR-93 SUR F NHPP D 58

S SHF D 12

SR15215.176 FY20-22 Materials Support SUR F STBG D 264

S SHF D 55

SR15500 SB1 MMOF Funds - DRCOG Controlled SR15500.001Peaks to Plains Trail - SH-6 Tunnel 1 toHuntsman Gulch IMF L L C 2,125 8,810

S SHF C 2,125 4,050

SR15500.002High Plains Trail/Cherry Creek TrailConnector IMF L L C 4,625

S SHF C 2,375

SR15500.004Parker Rd. Multi-Use Trail/Sidewalk:Twenty Mile Rd. to Hess IMF L L C 1,000

S SHF C 1,000

SR15500.005 Front Range Trail Study MTF L L M 150

S SHF M 100

Report ID: STIP02 11 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 12: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR15500.006 Evergreen Lake Trail Improvements RPP S SHF C 200

SR16682 R1 Hazard Elimination Pool SR16682.073 Various Intersection Improv. Aurora HAZ F HSIP D 192

LOM L L D 21

SR16682.075 Arapahoe County Local Road Safety Plan HAZ F HSIP M 117

L L M 13

LOM L L M 13

SR16682.078136th Ave Between Tejon St and WEntrance to Legacy High Sch HAZ F HSIP D 139

L L D 15

LOM L L D 11

SR16682.080 CCD FY18 HSIP Pkg 1 HAZ F HSIP D 103

LOM L L C 48

L L D 11

SR16682.081 CCD FY18 HSIP PKG 2 HAZ F HSIP D 404

F HSIP R 40

S SHF D 44

S SHF R 4

SR16682.082 CCD FY18 HSIP PKG 3 HAZ F HSIP C 540

L LO C 604

LOM L L C 60

SR16682.083 CCD FY18 HSIP Pkg 4 HAZ F HSIP D 198

F HSIP R 4

S SHF D 22

SR16682.084 CCD FY18 HSIP Pkg 5 HAZ F HSIP D 126

F HSIP R 9

S SHF D 14

S SHF R 1

SR16682.085Ramp Metering on I-70 and I-25(Installation) FSA S FAS C 411

Report ID: STIP02 12 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 13: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

HAZ F HSIP C 3,213

SR16682.087 R1 Intersection Safety Study HAZ F HSIP C 1,621

S SHF C 180

SGA S SHF C 611

SR16682.089 R1 West Traffic SIG IMP FY18 FSA S FAS C 70

SR16682.090 R1 WEST PRO SIG IMP FY19 FSA S FAS D 84 470

HAZ F HSIP D 126 735

SR16682.092SH225 AND 17TH PLACEIMPROVEMENTS HAZ F HSIP C 141

S SHF C 15

SR16682.094Signal Upgrade @ Multi Locations onSH391 & Wadsworth FSA S FAS D 55

HAZ F HSIP D 19

S SHF D 2

SR16682.096 E Arapahoe Rd @ York St Safety Imp HAZ F HSIP C 99

LOM L L C 11

SR16682.097 South Federal Blvd Safety (Median) Proj HAZ F HSIP C 2,520 1,200

F HSIP D 156

S SHF C 280

S SHF D 17

SR16682.098 R1- TSMO South Package HAZ F HSIP C 1,488

S SHF C 165

SR16682.100 Ramp Metering Phase 2 Const (I-25 Only) HAZ F HSIP C 4,375

S SHF C 486

SR16682.101 Aurora Signals 2019 FSA S FAS D 40

HAZ F HSIP D 35

SR16682.102 Federal HSIP Signal Improvements HAZ F HSIP D 264

S SHF D 29

SR16682.103I-70 @ Ward Rd Ops & SafetyImprovement HAZ S SHF D 180

Report ID: STIP02 13 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 14: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR16682.104 R1 FY19 HSIP Pkg 1 HAZ F HSIP D 343 126

S SHF D 38 14

SR16682.106 I-70/SH 72 Ramp and Intersection Upgrade HAZ S SHF D 259

SR16682.108Wrong Way Driver Traffic Control Enh -Phase 1 HAZ F HSIP C 2,250

S SHF C 250

SR16683 R1 Hot Spots Pool SR16683.999 R1 Hot Spots Pool HOT F NHPP C 83 496

F NHPP D 39

S SHF C 17 103

S SHF D 3

SR16684 R1 Traffic Signals Pool SR16684.031 West Package Signals Multiple Locations SGA S SHF R 150

SR16684.032North Signal Package: SH 128, SH 287and SH 121 FSA S FAS D 103

SGA S SHF C 57

SR16684.033Signal Replacements FY20, MultipleLocations incl SH8@SH74 FSA S FAS D 85

HAZ F HSIP D 85

SR16684.034 SH72: 64th / Indiana Signal Replacement SGA S SHF C 50

SR16684.035Traffic Signal Cabinet Repl Phase III -Various Loc SGA S SHF C 2,406 3,365

S SHF D 38

S SHF R 20

SR16684.038 US85: Sedalia to Daniel#s Park RPP S SHF R 19 40

SR16684.040 SH30 & Tower Road Imp FSA S FAS C 856 1

S FAS R 201

SGA S SHF D 84

SR16684.041 Traffic Signal Cabinet Replacement PH IV SGA S SHF R 40

SR16684.044 R1 Signal Package HAZ F HSIP C 1,856

S SHF C 206

SGA S SHF C 1,300

SR16684.048 SH 53 & SH 58 Signal Upgrades SGA S SHF D 209

Report ID: STIP02 14 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 15: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SGN S SHF D 481

SR16712 R1 Bridge On System Pool SR16712.003 R1 Critical Culvert Repairs CCP F NHPP C 246

S FAS C 1,001

S SB1 C 1,530

S SHF D 299

S SHF R 1

SR16712.031 Girder Cleanout and Form Removal CBP F NHPP C 130 1,265 547

S SHF C 44 121 52

SR16712.044 Douglas County Scour Repairs CBP F STBG C 3,206

S SHF C 666

SR16712.045 WB I-70 to SB I-225 Flyover CBP F NHPP C 2,008

S SHF C 193

SR16712.056 Package A (I-25 / I-70 / I-76) CBP F NHPP C 1,806 1,316

S SHF C 174 126

SR16712.070 Expansion Joint Replacement / Repair CWP S SHF C 655

S SHF D 30

SR16712.081 US-40 (US-6 to Beaver Brook) CBP F NHPP C 15

S SHF C 3

SR16712.091 US-285 Deck Rehab (FY17) CBP F NHPP C 631 692 117

S SHF C 131 144 24

SR16712.092 SH 74 Evergreen Parkway Overlay CBP F NHPP C 322

S SHF C 67

SR16712.093Bridge bearing repairs MP 244.2 & MP249.0 CBP F NHPP C 39

S SB1 C 433

S SHF C 3

SR16712.094 SH 103 CULVERT REPAIR AND DITCH RPP S SHF R 6

SR16712.095 I-70 Silverplume Soundwall and Drainage CWP S SHF C 786 969 244

Report ID: STIP02 15 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 16: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

HAZ F HSIP C 710

RPP S SHF C 1,129

SR16719 R1 Regional Priority Program (RPP) Pool SR16719.025 I-25 S PEL and Gap Project RPP F NHPP D 456

S SHF D 43

S SHF R 12

SR16719.027 I270 Interchanges Study LOM L L D 600

SR16719.028 I-25 Central PEL RPP F NHPP M 912

S SHF M 87 1,000

SR16719.043 US85 and 104th Ave Improvements RPP S SHF R 338

SR16719.045I70 WB PPSL (Veteran's Mem Tunnel toEmpire) FSA S FAS C 274

S FAS E 30

RPP S SHF R 2

SR16719.050 ADA R1 Curb Ramps Design ADA S SHF D 1,580 250

SR16719.054 ADA Curb Ramps Phase 3 ADA S SB1 C 1,900

S SHF C 300 1,800

S SHF R 1,047

SR16719.056I-70 SYSTEM LVL STUDY: E470 TOSTRASBURG RPP S SHF E 500

SR16719.057 WB PPSL Greenway Trail RDP S SHF R 46

RPP S SHF R 33

SR16719.062 SH 121 and morrison road RPP S SHF D 724

SR16719.064 Frontage Road Enforcement: I-25 South RPP S SHF M 209

SR16719.065 I-70 Economic Development Study RPP S SHF M 16

SR16719.067 I-70 CSM Tunneling Research RPP S SHF M 88 11

SR16719.068 R1 Central LOMR Payment to UDFCD RPP S SHF M 40

SR16719.069 Georgetown Lake Dredging RPP S SHF C 250

SR16719.071 CCC Jordan House Water Line RPP S SHF M 70 6

SR16719.072 Broomfield Bikepath at Frank Varra Park RPP S SHF D 150

Report ID: STIP02 16 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 17: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR16719.073 I-70 Mountain Corridor EIS Reassessment RPP S SHF E 700 400 300

SR16719.074 R1 ADA CMGC PROJECT ADA S SHF D 370

SR16719.075 I-70 Mountain Corridor TDM RPP S SHF M 66

SR16719.076 C-470 Noise Wall West of Lucent RPP F NHPP C 4,354

S SHF C 905

SR16719.077 23514- I-70 Noise Monitoring RPP S SHF E 90

SR16720US-85/Vasquez Blvd. from I-270/E. 56th Aveto E. 64th Ave. SR16720.999

US-85/Vasquez Blvd. from I-270/E. 56thAve to E. 64th Ave. CDR F AQC C 500 800

L L C 637

FR8 F NHFP D 1,368

F NHFP R 2,006

S SHF D 131

S SHF R 193

RPP S SHF C 1,750

SR17001 R1 Bridge Off System Pool SR17001.014 Evergreen Lake Road Over Bear Creek BRO F BRO C 164 12

L L C 41 3

SR17001.016 SOUTH PLATTE RIVER Rehab BRO F BRO C 1,222

L L C 305

SR17001.019 Jolly Rd. (CR34) Bridge Over First Creek BRO F BRO C 380

L L C 95

HAZ F HSIP C 450

LOM L L C 50

SR17002 R1 FASTER Safety Projects Pool SR17002.014FASTER US 6 & SH 119 Fiber OpticsBackbone FSA S FAS D 105

SR17002.058SH 177 Mineral Ave to Orchard Rdsidewalks FSA S FAS C 416

LOM L L C 104

SR17002.062SH83: Mississippi Ave Bike/Ped PathGrade Sep FSA S FAS C 2,800

SR17002.074 US 285 Kings Valley Turn Lanes FSA S FAS D 784

SR17002.076I-70: VSL (Variable Speed Limit) Conceptof Operations FSA S FAS D 20 528

Report ID: STIP02 17 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 18: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR17002.077 SB I-25 Bottleneck: I-76 to I-70 FSA S FAS C 1,661

S FAS D 70 31

SR17002.080SH-287 @ Midway, Traffic SignalReplacement FSA S FAS C 859

SGA S SHF C 570

SR17002.086'Long mast arm signal design (3 locations),88 @ Revere, 121 FSA S FAS D 337

S FAS R 27

SR17002.087 Aurora Signal Package, I-70 at Tower FSA S FAS C 591

S FAS R 2

SR17002.089SB I-225 Off-ramp to Parker Rd safetyimprovements FSA S FAS D 250

SR17002.091 I-25 Plum Creek Improvements FSA S FAS C 1,602 14

S FAS D 12

SR17002.092EB I-70 Aux Lane from Ward Rd to KiplingSt FSA S FAS C 2,673

S FAS D 79

SR17002.093 Founders Pkwy/Crowfoot Valley Rd Recon FSA S FAS C 1,602

SR17002.095 Lakewood Safety Package FY20 FSA S FAS D 445

SR17002.096Region 1 6" Lane Lines PavementMarkings FSA S FAS C 9,174 362

SR17002.098 I-70 & Kipling Interchange North Phase FSA S FAS C 270

S FAS D 70

SR17002.099 SH75: Bowles & Mineral Intersection Imp HAZ F HSIP D 158

S SHF D 17

SR17002.100 SH121: Signal Imp, Girton to Yale FSA S FAS C 200

SR17002.104 I-70 at Sheridan and Harlan Safety FSA S FAS D 300

HAZ F HSIP D 154

SR17002.105 C470 Ken Caryl Intersection Imp FSA S FAS D 640

SR17012 R1 STP-Metro Pool - DRCOG MPO Area SR17012.012Northglenn North Metro Rail 112th AveCorridor MDR F STBG C 678

L L C 169

SR17012.019Denver I-25 & Broadway InterchangeReconstruction MDR F STBG C 4,400

Report ID: STIP02 18 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 19: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 1,100

SR17012.022Arvada Ralston Rd Reconst: Yukon St toUpham St: FX Pilot MDR L L C 193

S SHF C 965 281

SR17012.026Castle Rock Founders Pkwy and AllenWay Intersection Improve FSA S FAS C 280

MDR F STBG C 1,584

F STBG R 191

L L C 396

SGN F STBG C 132

SR17012.028Lone Tree RidgeGate PkwyWidening:Havana, Lone Tree FX Pilot MDR L L C 1,101

L LO C 7,481

S SHF C 6,400

SR17012.037North Metro Rail 72nd Ave and ColoradoBlvd Station Sidewalk MDR F STBG C 1,328 81

L L C 332 20

L LO C 548

SR17012.040Martin Luther King Jr Blvd Extension:Havana St to Peoria St MDR F STBG C 7,172

L L C 1,793

L LO C 3,390

SR17012.041 Westminster Quiet Zones MDR F STBG C 800

S SHF C 200

SR17012.042 Broomfield Quiet Zones MDR F STBG C 863

F STBG D 80

L L D 20

S SHF C 215

SR17012.043 56th Ave Quebec St to Pena Blvd LOC F STBG C 3,843

L L C 960

SR17012.044 Oxford Ave: First and Last Mile Connect MDR F STBG C 81

F STBG M 5

Report ID: STIP02 19 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 20: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 16

L L M 1

SR17012.045 Wads Blvd Widening 35th to 48th MDR F STBG D 320

F STBG E 600

L L D 80

L L E 150

SR17012.056 US 285 / Broadway Interchange Op Imp MDR F STBG C 800 600 2,500

L L C 200 150 225

RPP S SHF C 400

SR17012.057I-270 Environmental Assessment &Preliminary Design MDR F STBG E 1,800

L L E 1,750 1,750

SR17012.058 US-85 PEL Study: C-470 to I-25 MDR F STBG M 1,500

L L M 450 300

RPP S SHF E 750

SR17012.059US-6/Heritage Rd. Interchange:Preconstruction Activities MDR F STBG D 600 1,800

L L D 150 450

SR17012.060US 85 / 120th Ave InterchangePreconstruction Activities MDR F STBG D 4,200 2,100

L L D 3,200 2,100

RPP S SHF D 1,000

SR17012.06188th Ave Widening: I-76 to Hwy 2 -Preconstruction Activitie MDR F STBG C 1,500 500

L L C 1,500 500

SR17012.062104th Ave. Widening: Colorado Blvd. toUS-85 Preconstruction MDR F STBG D 1,600

L L D 400

SR17012.064 Bridge St & I-76 Interchange MDR F STBG D 300

L L D 700

SR17012.06613th Avenue Corridor Multimodal MobilityStudy MDR F STBG M 295

L L M 205

Report ID: STIP02 20 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 21: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR17012.067Parker Rd. (SH-83) PEL Study - MissippiAve. to Hampden Ave. MDR F STBG M 1,000

L L M 500

RPP S SHF E 500

SR17012.068Nine Mile Pedestrian and Bicycle Bridgeover Parker Rd MDR F STBG C 1,000 1,075 2,291

L L C 1,110 1,075 849

SR17012.069 US-285 Congestion Management Study MDR F STBG M 680 600

L L M 120

RPP S SHF M 50 150

SR17012.070 Oxford Ave. Pedestrian Bridge MDR F STBG C 200 1,091

L L C 50 273

TDR F STBG C 309

L L C 77

SR17012.071US-287/120th Ave. Multimodal & SafetyStudy MDR F STBG M 240 240

L L M 30 30

RPP S SHF M 30 30

SR17012.072US-36 Bike-N-Ride Shelters, Amenities,Operations, and Marke MDR F STBG C 48 384 44

L L C 12 96 11

SR17012.073Broomfield Transit Needs Assessment &Pilot Project MDR F STBG M 120 200 160

L L M 30 50 40

SR17012.074Midway Blvd. Multimodal Corridor ActionPlan MDR F STBG M 160 240

L L M 40 60

SR17012.075 Active Transportation Wayfinding Pilot MDR F STBG M 120 160

L L M 30 40

SR17012.076Industrial Ln. & Nickel St./Commerce St.Intersection Oper MDR F STBG D 320

L L D 80

SR17012.077Transit Speed & Reliability on FederalBlvd. MDR F STBG M 700 800 800

L L M 400 200 100

Report ID: STIP02 21 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 22: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR17012.082Ward Rd./BNSF Grade Separation:Preconstruction Activities MDR F STBG D 800

L L D 200

SR17012.083JC-73: SH-74 to Buffalo Park Rd.Operational Improvements MDR F STBG C 2,375

L L C 1,875

SR17012.085 Evergreen Lake Trail Improvements MDR F STBG C 2,284 330

L L C 371 579

RPP F NHPP C 200

SR17012.086SH-7 Preliminary and EnvironmentalEngineering MDR F STBG E 1,600 3,200 2,400

L L E 200 400 300

RPP S SHF D 200 400 300

SR17013 R1 Safe Routes to School Program SR17013.003 Branter Elementary School Trail PWQ S SHF C 99

SR17013.010Thornton- Westgate Community SchoolSidewalk SRTS SAR F STBG D 84 19

F STBG M 2

L L D 21 4

SR17013.011 Edgewater- Pierce St. SRTS Imp SAR F STBG D 8

F STBG M 2

L L D 2

SR17013.013 McAuliffe Inter Schl Ped Impr, Denver SAR F STBG C 413

F STBG D 50

L L C 86

L L D 12

SR17013.014 1st Av Sdwk Rt to Creighton Middle- Lkwd SAR F STBG C 360

L L C 74

SR17015 R1 DRCOG TAP Pool (TDR) SR17015.001Lakewood Multi-use path D10:Wads BlvdZephyr Kipling to Oak TDR F STBG C 1,600

L L C 400

SR17015.004Cherry Hills Village High Line Canal TrailUnderpass TAP F TAP C 1,000

TDR F STBG C 2,250

Report ID: STIP02 22 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 23: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 812

SR17015.007High Line Canal Trail - East Colfax Ave toI-70 TDR F STBG C 3,301

L L C 650 900

SR17015.008 Aurora Missing Sidewalk Program TDR F STBG C 295

L L C 138

SR17015.009Industrial Ln. Bikeway Phase 2: DesignOnly TDR F STBG C 614

L L C 154

SR17015.010Colfax Ave. Multi-use Path: I-70 to PoppySt. TDR F STBG C 875

L L C 375

SR17015.011C470 Grade Separated Trail Over AcresGreen Drive TDR F STBG C 2,000

L L C 2,000

SR17015.012 Jefferson County Bike Master Plan Update TDR F STBG M 200

L L M 75

SR17029 I25 and Arapahoe Rd Interchange SR17029.999 I25 and Arapahoe Rd Interchange LOM L L C 36 1,111

SR17030I-25 Santa Fe Alameda InterchangeReconstruction SR17030.999

I-25 Santa Fe Alameda InterchangeReconstruction MDR F STBG C 5,000 11,000 8,000

L L C 750 750 1,500

RPP S SHF C 500 2,000 500

SR17038 R1 Permanent Water Quality Pool SR17038.006SH85/BOWLES SKUNK HOLLOW PWQFAC PWQ S SHF D 60

SR17041US 287 & 69TH AVE LA BRIDGEENHANCEMENTS SR17041.999

US 287 & 69TH AVE LA BRIDGEENHANCEMENTS RPP S SHF C 171

SR17044 I-25: Valley Highway Phase 3 and 4 SR17044.999 I-25: Valley Highway Phase 3 and 4 RPP S SHF D 500

S SHF E 75

SR17070 ROAD X Pool SR17070.002 Smart 25 Tirtl Installation RDX S SHF C 2,400

SR18775 Hot Spots Pool SR18775.001 SH025A North TIMP from 58th to SH7D HOT F NHPP D 149

S SHF D 14

SR18871 R1 FR8 Pool SR18871.000 R1 FR8 Pool FR8 S SHF C 180

SR19112 R1 ADA Pool SR19112.000 R1 ADA Pool ADA S SHF C 4,722 7,486 8,346

SR19112.002 R1 CURB Ramps Phase 4 ADA S SHF C 2,338 753

Report ID: STIP02 23 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 24: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR19112.003 R1 ESB ADA Curb Ramps PH 5 ADA S SHF C 1,560 1,624

HAZ S SHF C 26

SSP1126 I-70: WB PPSL Package SSP1126.001Westbound Peak Period Shoulder Lane(WB PPSL) 7PX S 267 C 18,506

DIS F GRNT C 23,103

RPP S SHF C 7,572

SB1 S SB1 C 25,000

SUR S SHF C 7,000

SSP1126.002 Fall River Road Bridge 7PX S 267 C 1,311

DIS S 267 C 1,896

RPP S SHF R 12

SSP4126I-70 Mountain Corridor: DIA to Eagle CountyAirport SSP4126.999

I-70 Mountain Corridor: DIA to EagleCounty Airport RPP F NHPP E 456

S SHF E 43

02 SCF3658 Canon City Rural PM10 Nonattainment Area SCF3658.999Canon City Rural PM10 NonattainmentArea CMA F AQC C 704

L L C 146

SPB3865 I-25 through Pueblo SPB3865.999 I-25 through Pueblo FR8 F NHFP D 683 440

FSA S FAS C 19 10 96

RDP S SHF D 916 58

RPP F NHPP C 206

S SHF C 43

SPB7004 US 50 West SPB7004.999 US 50 West 7PX S 267 C 37,000

PWQ F STBG C 3,800

F STBG D 465 5

F STBG R 20

S SHF D 97

S SHF R 4

RPP F NHPP C 2,415 2,016

F NHPP R 4 499

Report ID: STIP02 24 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 25: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 419

SPP0543 Woodmen Rd: I-25 to Powers Blvd SPP0543.999 Woodmen Rd: I-25 to Powers Blvd MPP F STBG C 800

L L C 200

SPP6156Pikes Peak Region TransportationEnhancements Pool SPP6156.018 Canon Avenue Bridge MPP F STBG C 407

F STBG D 248

L L C 84

L L D 51

SPP6156.027 Pikes Peak Greenway MPP F STBG C 411

L L C 85

TPP F TAP C 534

L L C 133

SPP6156.029Rock Island Trail const from Sand Creek toConstitiution TPP F TAP C 613

L L C 153

SPP6156.030MMT Route 8 Ped/Transit accessimprovments CPP F AQC C 22

TPP F TAP C 1,008

L L C 252

SPP6156.033MMT routes 1 & 7 ped/transit accessimprovements TPP F TAP C 534

L L C 133

SPP6156.034Sand Creek Trail: Palmer Pk toConstilitution TAP F TAP C 172

L L C 43

TPP F TAP C 552

L L C 148

SPP6156.041 Douglas Ave MPP F STBG C 519

L L C 108

SPP6156.042 Monument Lincoln Front 1 st sidewalks MPP F STBG C 280

L L C 58

SPP6156.043 Beacon Sidewalks MPP F STBG C 33

Report ID: STIP02 25 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 26: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 6

SPP6156.044 FMT pedestrian and ADA enhancements TPP F TAP C 120

L L C 30

SPP6156.045 Route 9 Phase 4 CPP F AQC C 53

L L C 11

TPP F TAP C 374

L L C 93

SPP6156.046 Creek Walk Trail Phase 3 and 4 MPP F STBG C 19

L L C 4

TPP F TAP C 424

L L C 106

SPP6156.047 El Paso County Wetland Bank: Akers TPP F STBG C 405

F TAP C 173

L L C 43 101

SPP6449 CMAQ Pool SPP6449.005 Falcon Area Park & Ride CPP F AQC C 617 2,234

L L C 128 464

MPP F STBG C 290

L L C 60

SPP6449.015Round-about construction at Tejon,Cascade, Ramona, Cheyenne CPP F AQC C 1,263 314

L L C 262 65

SPP6449.016Metro Rides Reg travel demand progcarpool/van pool programs FTA F AQC M 509

L L M 29

SPP6449.017Advanced Traffic Detection at 77intersections CPP F AQC C 761

L L C 158

SPP6449.020 MMT Route 12 Phase 4 CPP F AQC C 459

L L C 95

SPP6726 Metro Pool SPP6726.002Colorado Springs Transit Planning &Admin FTA F STBG M 77 62

Report ID: STIP02 26 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 27: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L M 16 12

MPP F STBG M 149 149 149

L L M 31 31 31

SPP6726.013Academy Blvd ped imprmts at Wentworthand Fountain to Airpor MPP F STBG C 267

L L C 55

SPP6726.017 MMT route 6 ped/transit improvements MPP F STBG C 167

L L C 34

TPP F TAP C 106

L L C 26

SPP6726.018MMT route 12 ped/transit accessimprovements phase 3 MPP F STBG C 77

L L C 16

SPP6726.019Platte Ave Bridge replacement at SandCreek MPP F STBG C 6,654

L L C 1,383

SPP6726.021SH 105 imprvmts fr Woodmoore Dr to LakeWoodmoore Dr MPP F STBG C 4,235

L L C 880

SPP6726.023Manitou Ave West end ped and drainageimpr MPP F STBG C 3,275

L L C 680

SPP6726.024 Indiana Ave BNSF Crossing Impr MPP F STBG C 1,550

L L C 322

SPP6726.029 BRRTA Payback MPP F STBG C 1,083

SPP6726.030 Hancock-Academy Multimodal Imp Ph 1 MPP F STBG C 1,617

F STBG D 447

L L C 336

L L D 92

SPP6726.031 South Academy Blvd MPP F STBG C 4,000

L L C 831

SPP6726.03230th Street Roadway and Safetyimprovemetns MPP F STBG C 4,755 4,162 1,250

Report ID: STIP02 27 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 28: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 988 865 260

SPP6726.033Ruxton Avenue Ped and DrainiageCorridor Imp MPP F STBG D 688

F STBG R 161

L L D 143

L L R 33

SPP6726.034 Jackson Creek Pkway Expansion MPP F STBG C 1,119

F STBG D 480

L L C 232

L L D 99

SPP6726.035 Ute Pass trail MPP F STBG C 828

L L C 172

SPP6726.038 Charter Oak Ranch Road MPP F STBG C 1,718 1,302 3,792

L L C 357 270 788

SPP6726.039 Statewide Household Survey MPP F STBG M 1,000

SPP6726.040 Fountain Creek Regional Trail MPP F STBG C 105

F STBG D 86

L L C 22

L L D 17

TPP F TAP C 199

L L C 41

SPP7003 Bridge off system Pool in the PPACG area SPP7003.001Cheyenne Canon Rd 3 bridges repl west ofEvans MPP S SHF C 1,570

SPP7003.002Paseo Road box culvert repl over ShooksRun So of jefferson MPP F STBG C 462

F STBG R 38

L L C 96

L L R 7

SPP7003.003 Arnold Ave Br repl west of Mitchell Ave MPP F STBG C 1,039

L L C 216

Report ID: STIP02 28 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 29: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SPP7003.005Elbert Rd Bridge rehab fr Black squirrel toLatigo Cr MPP F STBG C 296

L L C 61

SPP7004Congestion Relief Pool in PPACG (STPMetro) SPP7004.001 Traffic System Upgrades CPP F AQC C 1,289

L L C 286

MPP F STBG C 1,047

L L C 217

SPP7006 Sh 21 Intersection/Interchange Improvemetns SPP7006.999Sh 21 Intersection/InterchangeImprovemetns HAZ F HSIP D 500

MPP F STBG C 2,690

RPP F NHPP C 1,165

S SHF C 255

SPP7007 Us 24 West Improvemetns SPP7007.999 Us 24 West Improvemetns MPP F STBG C 783

RPP F NHPP D 13 180

S SHF D 3 20

SR25079Region 2 Transportation EnhancementReserves SR25079.016

Santa Fe Ave Streetscape Ph 1B - 1ststreet and I-25 LOM L L C 600

TAP F TAP C 239

L L C 59

SR25079.035 Pueblo Wayfinding Ph II TAP F TAP C 30

F TAP D 4 4

L L D 1

SR25079.048 Southern Rockies Wayfinding Project TAP F TAP C 39 180

L L C 9 451

SR25079.051 Cripple Creek Teller 1 ped project TAP F TAP C 87

L L C 21

SR25079.058 Arkansas River Trail Phase 4 TAP F TAP C 616

L L C 154

SR25079.064 City of Trinidad-Sopris trail LOM L L C 108

TAP F TAP C 484

Report ID: STIP02 29 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 30: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 121

SR25079.067 Pueblo West-Industrial to Plateville TAP F TAP C 416

L L C 104

SR25079.068 Pueblo west-SDS Trail N Park TAP F TAP C 449

L L C 112

SR25079.070 Canon City - Main Street TAP F TAP C 160

L L C 40

SR25079.075Sidewalk and Trail Improvements in City ofCripple Creek TAP F TAP C 684

L L C 171

SR25079.076 City of Lamar Streetscaping Project TAP F TAP C 400

L L C 100

SR25079.078 City of Pueblo Northern Avenue Phase 3 TAP F TAP C 260 239

L L C 65 59

SR25079.079 Joe Martinez Trail in Pueblo West TAP F TAP C 537

L L C 134

SR25079.082 Arkansas Levee Construction TAP F TAP C 500

L L C 125

SR25079.083 Ute Pass Trail Project TAP F TAP D 200 480

L L D 50 120

SR25164 Bridge-On Pool SR25164.049 Rainbowfalls Bridge rehab CBP F NHPP C 933

S SHF C 194

SR25164.058 SH94 I-18-AX Realignment and Repair CBP F NHPP C 8

S SHF C 2

SR25164.060 SH 71 over Arkansas River L-22-J CBP F NHPP C 1,096 225

F STBG R 2

S SHF C 227 46

SR25216 Region 2 Surface Treatment Projects SR25216.036 Surface Treatment PE SUR F STBG D 95

Report ID: STIP02 30 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 31: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF D 2,766

SR25216.075 SH167 NE, Through, SW of Fowler CBP F NHPP C 662 186

S SHF C 137 38

SUR F STBG C 1,982

S SHF C 319

SR25216.081 SH96 A: MM 55.40 to 58.70 CBP S SB1 C 229

SR25216.091US287 MP 74.4 to 76.1, & 76.1 to 77.64Cedar to Jct US 50 RPP F NHPP C 1,159 1,106

S SHF C 240 229

SUR F STBG D 21

S SHF D 4

SR25216.096SH24 MP 225 to 234, SH285 MP 161 to172 CBP F NHPP C 154

S SHF C 45

SR25216.106 SH45 MP 4.9 to 8.7 SUR S SB1 C 4,491

SR25216.110 SH96 C MP 143.7 to 166 Haswell to Eads SUR F STBG C 1,720

S SHF C 357

SR25216.112 I-25A MP 7.5 to 12.9 Trinidad South ITI F NHPP C 125

S SHF C 12

SUR F STBG C 1,288

S SB1 C 364

S SHF C 47

SR25216.114 US287 A MP 73 to 76.5 SUR F STBG D 165

S SHF D 34

SR25216.120 SH160 C MP 383 to 405 Jct SH389 east SUR F STBG C 147

S SHF C 30

SR25216.126 US24 - 8th Street to west Manitou Springs CBP F NHPP C 1,565 1,254

SUR F STBG C -188 437

F STBG D 6,468 53

Report ID: STIP02 31 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 32: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 41 90

S SHF D 592 11

SR25216.128 SH67 Divide to Cripple Creek SUR F STBG C 95

S SB1 C 1,668

S SHF C -105

SR25216.131SH69 A Huerfano/Custer County LineSouth SUR F STBG C 88 1,007

S SB1 C 3,780

S SHF C -88 209

SR25216.132US 24 west of Manitou to west of Chipitapark SUR F STBG C -203 4,801

F STBG D 204 51

S SHF C -42 987

S SHF D 42 10

SR25216.133I-25 North of Colorado City to HousemanRd SUR F STBG C 8,549 562

S SHF C 777 64

SR25216.134I-25 South Academy South North BoundOnly SUR F STBG C 13,163

F STBG D 1,241

F STBG R 17

S SHF C 2,736

S SHF D 258

S SHF R 3

SR25216.135 Elizabeth-US 50 to Ridge Dr SUR F STBG C 1,324

S SHF C 275

SR25216.136 US50A West of Texas Creek East 7PX S 267 C 9,000

SUR F STBG C 4,180

S SHF C 869

SR25216.139 SH 69 Mp 69.1 to 76.2 CBP F STBG C 165

S SHF C 34

Report ID: STIP02 32 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 33: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SUR F STBG C 3,202 186

S SHF C 550 153

SR25216.141 Us 285 Passing lanes and Overlay SUR F STBG C 8,742 460

SR25216.142SH 116 from US 287A to Kansas BorderMp 0 to 33 7PX S 267 C 13,800

SR25216.143 SH 69A from Mp 58 to Fremont County 7PX S 267 C 6,500

SR25216.144 SH 10 west of La Junta west SUR F STBG C 7,658

S SHF C 1,591

SR26644 Hazard Elimination Pool SR26644.048 Printers Parkway and Parkside Dr HAZ F HSIP C 391

LOM L L C 43

MPP F STBG C 257

L L C 53

SR26644.058 SH96 safety project HAZ F HSIP C 412

F HSIP D 29

S SHF C 45

S SHF D 3

SR26644.069 Region 2 Guardrail Project HAZ F HSIP C 2,070 630

S SHF C 230 70

SR26644.076SH 21 Signal Replacement Bradley &Mesa Ridge LOM L L C 18

L L M 7

SR26644.079 Sh 94 and Peyton Highway HAZ F HSIP C 2,115

F HSIP R 45

S SHF C 235

S SHF R 5

SR26644.085 Sh 16 and Sneffels new signal HAZ F HSIP D 60

S SHF D 6

LOM L L D 19

SR26644.088 El Paso Cty local roads safety plan HAZ F HSIP M 270

Report ID: STIP02 33 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 34: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

LOM L L M 30

SR26644.089 I-25 ramp metering project FSA S FAS C 3,163

HOT S SHF D 164

SR26644.090 Plattvillie Blvd Turn Lanes HAZ F HSIP C 207 66

F HSIP D 29

LOM L L C 23 7

L L D 3

SR26644.091 Spaulding Round-about HAZ F HSIP C 366

F HSIP D 83

LOM L L C 40

L L D 9

SR26644.092 Capistrano Ave Turn lanes HAZ F HSIP C 307

F HSIP D 34

LOM L L C 34

L L D 3

SR26644.093 Region2 Wrong-way Prevention Project HAZ F HSIP C 1,624

S SHF C 245

RPP F NHPP C 579

S SHF C 120

SR26644.096Fy 2019 Pikes Peak Area SignalReplacement Project HAZ F HSIP C 400 37

HOT F NHPP C 100

SGA S SHF C 52 2,790

SR26645 Hot Spot Pool SR26645.999 Hot Spot Pool HOT F NHPP D 211 26

S SHF D 43 169

SR26646 Traffic Signal Pool SR26646.999 Traffic Signal Pool SGA F STBG C 1,034

S SHF C 544

S SHF D 68 76

Report ID: STIP02 34 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 35: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SGN S SHF C 245

SR26710 Bridge-on Maintenance & Repair Pool SR26710.003 ROCKRIMMON-PART 1 CBP F NHPP C 1,428

S SB1 C 449

S SHF C 180

FSA S FAS C 125

SUR F STBG C 500 147

S SB1 C 2,837

S SHF C 62

SR26710.005BRIDGE PREVENTATIVEMAINTENANCE 2017 CBP F NHPP C 3

SR26710.018 Arkansas River K-19-A-Sh231A CBP F NHPP C 27

S SHF C 5

SR26710.019Otero Cty Br Reprs M-21-C, M-22-U, M-22-Z CBP F NHPP C 1,424

S SB1 C 941

S SHF C 15 296

RPP S SHF C 289

SR26710.024 Critical Culverts in the SE TPR CCP S SB1 C 400 180

S SHF C 78

SR26710.028 i-25 n of Colo City l-18 A,BX,CB,CC, H CBP F NHPP C 200 27

S SHF C 19 2

SR26710.035 Bridge Repairs on P-17-L and P-17-A CCP S SB1 C 8

SR26710.044Us 50 Scour Critical Counter measuresK-18-BY,BZ CBP F NHPP R 37

S SHF R 7

SR26710.045 Critical Culver Repairs in the PPACG area CCP S SB1 C 310 115

S SHF C 213

S SHF M 11

SR26710.046 Fountain Creek Conservancy Dist CBP S SHF C 523

SR26710.047Emergency repair on I-25 at DouglasCreek Mp 144 CCP S SHF C 200 100

Report ID: STIP02 35 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 36: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

EMR F ER C 1,816

F ER R 37

TCC S SHF C 174

S SHF R 7

SR26710.048 2020 Critical Culvert Project Region wide CCP S SHF C 580 58

S SHF D 10 111

SR26867 Regional Priorities Pool SR26867.057 US East 24 PEL Study RPP F NHPP C 827

S SHF C 172

SR26867.058Sh 67/SH115 Drainage improvemets atintersection RPP F NHPP C 239 1,159 1,241

S SHF C 49 240 258

SR26867.059 US 50C Drainage Improvements CBP F NHPP C 88 28

S SHF C 22 6

RPP F NHPP D 444

F STBG C 414 188 1,344

F STBG D 82

S SHF C 86 39 279

S SHF D 93 17

SUR F STBG C 5,460 931 372

F STBG D 41

S SHF C 1,135 193 77

S SHF D 8

SR26867.060Sh 160A /I-25C Ped-bike improvements inWalsenburg RPP F NHPP C 145 817 496 115 278

S SHF C 30 170 103 24 57

SR26867.062I-25 Exit 11, Exit 8, Safety improvementsRaton Pass RPP F NHPP D 19 654 1,220

S SHF D 3 63 253

SR26867.064 US 287 passing lanes DIS F MISC C 3,000

FR8 F NHFP C 3,725

Report ID: STIP02 36 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 37: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 774

FSA S FAS C 1,800

RPP F NHPP U 54

S SHF U 11

SR26867.065 Us 50 B drainage improvements RPP F NHPP D 221 410

S SHF D 55 85

SR26867.066 US 50 B East EA/EIS RPP F NHPP C 8

S SHF C 1

SR26867.068SH115-Canon to Florence PedestrianImprovements RPP F NHPP C 206

S SHF C 43

SR26867.069 SH 21 corridor RPP F NHPP C 393 434

S SHF D 81 90

SR26867.070 Us 24 at 31st street HAZ F HSIP C 826

S SHF C 91

HOT F NHPP C 96

S SHF C 20

RPP F NHPP C 393

S SHF C 81

SR26867.073 US 50 PEDESTRIAN IMPROVEMENTS RPP F NHPP C 1,117

F NHPP D 41

S SHF C 232

S SHF D 8

TAP F TAP C 40 560

L L C 10 140

SR26867.075 City of Colo Spgs PWQ Ponds on US 24 LOM L L D 24

PWQ F STBG D 413

S SHF D 61

Report ID: STIP02 37 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 38: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR26867.076I-25 South from Circle to Fountain SH 94Imprmnts RDP F NHPP D 620

S SHF D 59

RPP F NHPP D 1,241

S SHF D 258

SR26867.077 Sh 12 Study RPP F NHPP D 620

S SHF D 129

SR26867.078 US 50 B EA/EIS design RPP F NHPP D 413 1,076

S SHF D 86 223

SR26867.079 SH 385 Relignment of Bridge MP 98 RPP F NHPP C 733

S SHF C 152

SR26867.080 US 50 east SE TPR RPP F NHPP C 827

S SHF C 172

SR26867.083 SH 67 Divide to Victor RPP F NHPP C 194

S SHF C 40

SR26867.086 I-25 Dillon Frontage Road RPP F NHPP C 993

S SHF C 206

SR26867.089 SH 69 widening and Rumble strips RPP F NHPP D 1,956

S SHF D 406

SR26867.090 US 24 to Harsel Drainiage Improvements RPP F NHPP C 1,655

S SHF C 344

SR26867.091US 24 Emergency Sink Hole Repair(Ruxton Ave) Aug 2018 TCC S SHF C 816

SR26867.092 Sh 115 Pedestrian Improvements RPP F NHPP C 447

F STBG D 49

S SHF C 92

S SHF D 10

SR26867.093 Bustang design for Pueblo Park and Ride SBT S SHF D 500

SR26867.094SH 21 -Powers and I-25 Water Qualityimprovements PWQ F STBG D 300 91

Report ID: STIP02 38 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 39: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF D 62 9,032 381

SR26867.095I-25 Castlerock to El Paso CountyConstruction 7PX S 267 C 25,000

LOM L L C 25,000

SR26867.096SH115 replacement of existing Railroadcrossing Florence RPP F NHPP C 48

S SHF C 9

SR26867.097Sh 115 at 9th street railroad crossingreplacement RPP F NHPP C 59

S SHF C 12

SR26867.099 Spring Creek Fire Mitigation TCC S SHF C 850

S SHF D 322

S SHF M 427

SR26868 Safe Routes to School Region 2 Pool SR26868.022 Van Buren Safe Routes to School Project SAR F STBG C 195

L L C 48

SR26868.025 Lewis Palmer Safe Routes Projects LOM L L C 9

SAR F STBG C 35 162

SR26868.026 Woodland Park Safe Routes Projects LOM L L C 49

SAR F STBG C 36

SR26868.027 Canon City Lincoln School Partnership LOM L L C 72

SAR F STBG C 290

SR26868.028 Florence Fremont Elementary LOM L L C 3

SAR F STBG C 12

SR26868.031 Westclife Safe Routes to school SAR F STBG D 24

L L D 6

SR27001 Region 2 Bridge off Pool SR27001.012 Crowley County 050.21 BRO F NHPP C 371

L L C 92

SR27001.016 Manzanola Beatty Ave over Catlin Canal BRO F NHPP C 252

L L C 63

SR27001.020Colorado Canal PUCO601A Cr611andBoone Rd BRO F NHPP C 683

Report ID: STIP02 39 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 40: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 170

SR27001.021 LMR-9 at Colonia and Commercial St BRO F NHPP C 343

SR27001.023 Huerfano County HU543-SO-S69 BRO F NHPP D 157

L L D 39

SR27001.024 Pueblo-PURHAR-0.1 FRNT BRO F NHPP C 418

L L C 104

SR27001.028 Big Sandy Creek Bridge Replacement BRO F NHPP C 360

L L C 90

SR27001.029Fremont County 4 mile creek bridgereplacement BRO F NHPP C 259

L L C 64

SR27002 Region 2 FASTER Safety Pool SR27002.011 Region 2 Guardrail Project FSA S FAS C 499

SAE S SHF C 3,245

SR27002.031US 50 B mp 352 to 357.45 add passinglane CBP F NHPP C 200

CBR F STBG C 24

S SHF C 5

FSA S FAS C 5,075

S FAS R 25

RPP F NHPP C 496

S SHF C 103

SUR F STBG C 10,405 500

S SHF C 340 89

SR27002.032US 24A mp 302.01 to 302.32 21st streetsafety improvements FSA S FAS D 1,500

RPP F NHPP C 165

S SHF C 34

SGA F STBG C 578

SR27002.034 Sh160A mp 294 to 297 add passing lane RPP F NHPP C 1,140

S SHF C 237

Report ID: STIP02 40 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 41: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR27002.036Us 287A mp 51.4 ton 58.9 Design andconstruct passing lanes FSA S FAS C 4,676

SR27002.037Us 285D mp182.9to 183.05 IntersectionImprov at SH 9 FSA S FAS C 5,000 253

SR27002.039 US 24G Passing Lane mp 326.3 to 329.3 FSA S FAS C 218 3,300

RPP S SHF C 2,000

SR27002.040 US 285D Passing Lane Mp 175 to 178 FSA S FAS C 254

SR27002.043 US 50 PASSING LANE E OF SALIDA FSA S FAS C 3,920 980

SR27002.044 US 24 Constitution to Garrett Rd CBP F NHPP C 286

SUR F STBG C 410

S SHF C 85

SR27002.045 US 285 and Sh 9 Intersection Improvement FSA S FAS D 270

SR27002.048 SH165A guardrail safety improvements FSA S FAS D 3

SR27002.054 SH83A Passing Lanes MP 28.79-29.78 FSA S FAS D 300

SR27002.055 SH115 at US 50 EB Ramp FSA S FAS C 120

SR27006 R2 2015 Flood Recovery pool SR27006.002 SH 115 Mp 34.7 TCC S SHF C 57

SR27006.004 US 24 Montessori Wall E15 F ER C 43

TCC S SHF C 137

SR27007 ADA Region2 Pool SR27007.001 ADA design project ADA S SB1 D 1,041

S SHF D 385 500

SR27007.002 ADA Construction in Divide ADA S SHF C 486

SR27007.003ADA improvements in the Pueblo TPRarea ADA S SHF C 2,000

SR27008 Wall Asset Mgt pool SR27008.001 Wall repair design pool CWP S SHF C 1,136 647 968

SR27010 SB 1-2018 Design funds SR27010.001Intersection improvements at exit 104 onI-25 Drew Dix SB1 S SB1 D 500

SR27010.002Us 50 Purcell Interchange WB wideningdesign SB1 S SB1 D 1,900

SR27010.003 SH 115 Rock Creek Bridge Design SB1 S SB1 D 500

SR27010.004 Design for SH 21 and Research Pkwy SB1 S SB1 D 1,100

SR27010.005 PEL for Sh 94 SB1 S SB1 D 500

SR27010.006US 24 West from 8th Street to Divide Mp278 to 304 SB1 S SB1 D 450

Report ID: STIP02 41 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 42: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR27010.007I25 Corridor Design through Pueblo Mp94-105 SB1 S SB1 D 450

SR27010.008 SH 115 Reconstruction Mp 26-34 SB1 S SB1 D 500

03 SGJ5028 I 70B 24 Rd. to 15 Street SGJ5028.999 I 70B 24 Rd. to 15 Street FSA S FAS D 635

RPP F NHPP C 2,053 1,241 2,069

S SHF C 426 258 430

SB1 S SB1 D 440

SIN3659ASPEN RURAL PM10 NONATTAINMENTAREA SIN3659.999

ASPEN RURAL PM10 NONATTAINMENTAREA CMA F AQC M 426 166

L L M 79 34

SIN7007 Pitkin County PM10 Nonattainment area SIN7007.999 Pitkin County PM10 Nonattainment area CMA F AQC C 276 166

L L C 34 34

SNW3660STEAMBOAT SPRINGS RURAL PM10Nonattainment Area SNW3660.999

STEAMBOAT SPRINGS RURAL PM10Nonattainment Area CMA F AQC M 183 493 83

L L M 17 102 17

SNW7001 Routt County Rural PM10 Nonattainment Area SNW7001.999Routt County Rural PM10 NonattainmentArea CMA F AQC C 41 83 415 83

L L C 7 17 85 17

SR35217 Region 3 Surface Treatment Project SR35217.010 I-70 GW Canyon Longitudinal Crack Repair SUR F NHPP C 27

S SB1 C 815

SR35217.019 I-70 Glenwood Canyon Concrete CBP F NHPP C 1,039 1,660

S SHF C 184 415

CTP S SHF C 52

CWP F NHPP C 91

S SHF C 208

OPN S SHF C 17

SUR F NHPP C 8,633 9,061

S SHF C 832 873

SR35217.023 Surface Treatment PE SUR F STBG D 709

S SHF D 435 1,000

SR35217.030 Craig RE Chip Seals SUR S SB1 C 47

Report ID: STIP02 42 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 43: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR35217.032 Montrose RE Chip Seals SUR F NHPP C 2,005 1,537 3,146

S SHF C 416 319 653

SR35217.078 US 24 Minturn LOM L L C 270

RFM S SHF C 50

RPP F STBG C 300

SUR F STBG C 4,300 706

S SHF C 508

SR35217.079 US 40 West of Steamboat SGA S SB1 C 500

SR35217.085 SH 9 Summit Boulevard Frisco SUR S SB1 C 3,395

SR35217.093 US 50 Windy Point West SUR F NHPP C 2,483

S SHF C 516

SR35217.095 I-70 Parachute to Rifle SUR S SHF D 140

SR35217.099 SH 131 Oak Creek Canyon SUR F STBG C 1,783

S SHF C 371

SR35217.100 SH 141 South of Divide Road RPP F NHPP C 1,655

S SHF C 344

SAE F STBG C 266

S SHF C 55

SUR F STBG C 5,059

S SHF C 1,051

SR35217.101 US 40 Rabbit Ears West SUR F STBG C 2,244

S SB1 C 6,000

SR35217.102 I-70 East Side of Vail Pass SUR F NHPP C 6,055

S SHF C 583

SR35217.103 SH133 Bowie Resurfacing SUR F STBG C 1,381

S SB1 C 8,000

SR35217.104 SH 139 Douglas Pass North SUR F STBG C 1,481

Report ID: STIP02 43 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 44: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SB1 C 4,465

SR35217.105 SH 330 SH 65 to Colbran CCP S SHF C 300

SUR F STBG C 3,123

S SHF C 677

S SHF R 35

SR35217.108 US 40 Elk Springs SUR F NHPP C 2,437

S SHF C 506

SR35217.109 SH 82 GWS to Carbondale CBP F STBG C 124

S SHF C 25

SAE F STBG C 868

S SHF C 180

SGA S SHF C 185 180

SGN F NHPP C 202

S SHF C 42

SUR F NHPP C 2,532 3,752

F NHPP R 129

S SHF C 524 780

S SHF R 26

SR35217.110 I-70 Debeque to Parachute CBP S SHF C 100

SUR F NHPP C 5,574

S SHF C 1,158

SR35217.111 I-70 Avon to Vail CBP F NHPP C 100

HAZ F HSIP C 200

RFM S SHF C 50 220

SAE F STBG C 1,824

S SHF C 175

SUR F NHPP C 9,539

Report ID: STIP02 44 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 45: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 919

SR35217.113 US 6 Mack to Fruita SAE F STBG C 68

S SHF C 14

SUR F NHPP C 3,332

S SHF C 692

SR35217.114 SH 13 Hamilton South SUR F STBG D 380

S SHF D 79

SR35217.115 US 24 Leadville SGA S SHF C 67 550

SUR F STBG C 2,641 1,573

F STBG R 256

S SHF C 549 326

S SHF R 53

SR35217.116 I-70 Frisco to Silverthorne CBP F NHPP C 351 177

S SHF C 33 17

SUR F NHPP C 6,384

S SHF C 615

SR35217.117 Region 3 ADA Improvemets ADA S SB1 C 1,300

S SHF C 1,455 3,248 144 3,103

SR35217.118 US 50 West of Delta Resurfacing SAE F STBG C 151

S SHF C 31

SUR F STBG C 4,511 1,612

S SHF C 937 335

SR35217.119 I-70 East and West CBP F NHPP C 867

S SHF C 103

CCP S SHF C 350

S SHF D 60

SAE F STBG C 1,459

Report ID: STIP02 45 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 46: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 140

SUR F NHPP C 9,871

S SHF C 951

S SHF D 375

SR35217.120 US 6 Avon to Dowd LOM L LO C 60

SGA S SHF D 75

SUR S SHF D 375

SR35217.122 SH 92 Crawford East 7PX S 267 C 7,800

SR35217.123 SH 64 Meeker West 7PX S 267 C 8,800

SR35217.124 SH 34 Grand Lake 7PX S 267 C 11,500

SR35771 R3 BRIDGE OFF SYSTEM SR35771.020 Fraser-002 Over the Fraser River BRO BRO F BRO C 882

L L C 220

SR35771.021 GLNWD-27th Street Bridge BRO F BRO C 1,616

L L C 404

L LO C 7,038

SR35771.024 GRJ-F.5-30.8 Lewis Wash BRO F BRO C 145

L L C 36

SR35771.025 Green Truss (1076702.9) Near Hayden BRO F BRO C 852

L L C 213

L LO C 107

SR35771.027 Mesa County MESA34-F.9A CY 17 BRO F BRO C 761

L L C 190

SR35771.028 Montrose County 8500.00000 CY2017 BRO F BRO C 952

SR35771.029 Turkey Creek Bridge (RDCLF) BRO F BRO C 310

L L C 77

SR35771.030Castle Creek bridge Pitkin CountyPIT-015-09.0 BRO F BRO C 124

SR35771.031 Grand Co - CR3 Williams Fork Bridge BRO F BRO C 765

Report ID: STIP02 46 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 47: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 191

SR35771.032 Mesa County County Rd 22 and J.9 BRO F BRO C 641

L L C 160

L LO C 525

SR36607 Region 3 Region Priority Program SR36607.001 UPGRADE I-70 INTERCHANGES RFM S SHF C 125

RPP F NHPP C 55

SR36607.002 SH 340, Fruita to West Monument Corridor CCP S FAS C 265

RPP F NHPP C 1,655 1,655

F NHPP D 248

F NHPP R 33

S SHF C 344 344

S SHF D 51

S SHF R 6

SR36607.003 SH 50 PE Corridor Montrose to Sargents FR8 F NHFP C 410

S SHF C 127

RPP S SHF D 75

SR36607.008 SH 13 7PX S 267 C 15,915 8,584

RPP F NHPP C 18 413

S SHF C 3 86

SB1 S SB1 C 10,800

SUR F NHPP C 1,000

SR36607.010 SH 13 S. OF WYOMING FSA S FAS D 500

S FAS R 290

SB1 S SB1 C 9,200

SR36607.011 US 40 Craig East to I-70 RPP L LO R 463 292

SB1 S SB1 D 500

SR36607.012Region Wide Non Project Description forPE/Enviro RPP S SHF D 3,575

Report ID: STIP02 47 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 48: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR36607.014 I-70 Exit 26, I-70B HAZ F HSIP C 998

S SHF C 96

SR36607.016 I-70 Utah State Line East Garfield County FR8 F NHFP C 3,636

S SHF C 350

SR36607.020 I-70 G Edwards Spur Road FSA S FAS C 5,637 6,197

S FAS D 88

LOM L L C 9,458

RPP F NHPP C 886

F NHPP D 221

S SHF D 45

SR36607.024 US 6A Fruita to I-70B RPP F NHPP C 41 1,655

S SHF C 8 344

SB1 S SB1 D 200

SR36607.025 Region 3 Envirnmental Remediation LOM L L D 200

RPP S SHF D 30

SR36607.027 US 6 Clifton I-70B to Palisade FSA S FAS R 51

SB1 S SB1 D 490

SR36607.028 I-70 West Mountain Corridor PE RPP S SHF D 250 750

SB1 S SB1 D 500

SR36607.030 SH 13 Rifle North PE FSA S FAS D 1,200

SR36607.035 SH 9 Frisco to Breckenridge 7PX S 267 C 15,500

RPP F NHPP R 827 827

S SHF R 172 172

SR36607.036 US 550 Montrose South Impv HOT S SHF D 26

RPP F NHPP C 910 2,069

S SHF C 189 430

SR36607.038 I-70 Garfield County Interchanges SB1 S SB1 D 1,000

Report ID: STIP02 48 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 49: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR36608 Region 3 Bridge On System Program SR36608.007 Essential Repairs CBP S SHF C 487 59

S SHF D 297

SR36608.010 R3 - Culvert Repairs CCP S FAS C 537 1,081 1,681

S SB1 C 65

S SHF D 573

S SHF R 65

SR36608.012R3 - Bridge Planned PreventativeMaintenance CBP F STBG C 2,410 676

S SHF C 602 33

SR36608.023 US 6 Castle Creek (F-09-K) CBP F STBG C 63 3

S SHF C 13

SR36693 Region 3 Hazard Elimination Program SR36693.035 Mesa County Guardrail HAZ F HSIP C 224

SR36693.036 GJ Horizon Drive Crosswalks HAZ F HSIP C 225

L L C 25

LOM L LO C 25

SR36693.037 US 40 Craig & Crescent Dr. Sidewalk impv HAZ F HSIP C 837

L L C 66

S SHF C 93

SR36693.038 I-70 Wrong Way Detection HAZ F HSIP C 166

S SHF C 18

SR36697 Region 3 Hot Spots Program SR36697.999 Region 3 Hot Spots Program HOT S SHF C 511 417

SR36700 Region 3 Traffic Signals Program SR36700.999 Region 3 Traffic Signals Program LOM L LO C 445

OPN S SHF C 162

SGA F NHPP C 913 1,330 2,000

S SHF C 916 189 200

SGN S SHF R 140

SR36711 Region 3 Rockfall Mitigation Program SR36711.999 Region 3 Rockfall Mitigation Program CWP S SHF D 100

RFM F NHPP C 3,724 368

Report ID: STIP02 49 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 50: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 507 210

S SHF D 165

SR36828 R3 Maint Traf Ops SR36828.999 R3 Maint Traf Ops OPN S SHF R 5

SR37000 R3 Transportation Comm Contingency SR37000.011ER I-70 Glenwood Canyon Rockfall MP125 TCC S SHF C 90

S SHF M 56

SR37000.020 SH 325 Slide repair RFM S SHF C 235

TCC S SHF C 489

S SHF M 461

SR37000.026 I-70 Debeque Rockfall RFM S SHF C 445

TCC S SHF C 1,500

SR37002 Tunnels-R3 SR37002.002 I-70 Hanging Lake Tunnel CTP S SHF C 1,383 1,650

SR37002.004 R3 Tunnel Lighting CTP F NHPP C 1,732 2,599

S SHF C 2,272 167 250

S SHF D 64

SR37002.005 R3 Beaver Tail Tunnel CTP S SHF C 130

SR37003 Region 3 Safe Routes to School Pool SR37003.013 US 40 Fraser Trail HAZ F HSIP C 225

S SHF C 25

SR37003.015 Lake School Gunnsion SRTS SAR F STBG C 350

L L C 87

L LO C 47

SR37006 Region 3 FASTER Safety Projects SR37006.010 Regional Intersection Improvement FSA S FAS C 405

S FAS D 75

HAZ F HSIP D 470

S SHF D 40

RPP F NHPP C 2,020

SGA F NHPP C 248

S SHF C 51

Report ID: STIP02 50 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 51: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR37006.011 I-70 Game Fence FSA S FAS C 1,649

SR37006.019 I-70 GW Canyon Variable speed signing HAZ F HSIP C 413

RMP F NHPP C 315

SR37006.022 I-70 Palisade Curves SB1 S SB1 D 10

SR37007 R3 FASTER Transit Projects SR37007.010 Summit County - Frisco Transit Center SBT L L C 625

S SHF C 2,500

SR37007.011 Stmbt Chinook Walton Creek Transit TRG S FAS C 96

SR37008 Region 3 Operations Funding SR37008.999 Region 3 Operations Funding HQI S SHF M 756

SR37010 Region 3 Trans Alternative Program SR37010.002 SSUT-Fish Creek US 40 Underpass TAP F TAP C 252

L L C 63

L LO C 403

SR37010.017 SH 24 South Minturn Bike/Ped Lane LOM L L C 1,042

TAP F TAP C 1,150

L L C 287

SR37010.018 Redston Coke Ovens PhII-Pitkin County TAP F TAP C 254

L L C 63

SR37010.020 Town of Gunnison US 50 Main Street TAP F TAP C 394

L L C 78 78

SR37010.021 Town of Frisco 2nd & Belford Connector TAP F TAP C 391

L L C 97

L LO C 1

SR37010.022 Frisco SH9 Underpass TAP F TAP C 1,200

L L C 300

SR37011 Region 3 Wall Asset Management SR37011.999 Region 3 Wall Asset Management CWP F NHPP C 1,474 720

S SHF C 306 149

S SHF M 17 125

SSP4326I-70 Mountain Corridor:Eagle County Airport toDIA SSP4326.999

I-70 Mountain Corridor:Eagle CountyAirport to DIA RMP L L C 6,760

Report ID: STIP02 51 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 52: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 518

04 SDR6717 DRCOG STP-Metro Pool - R4 SDR6717.00920710-Boulder Slough Multiuse Path: 30thSt-3100 Pearl MDR F STBG C 397

L L C 82

L LO C 1,700

SDR6717.01020711-Broadway Reconst: Violet Ave-US36 (FUNDX) IMD L L C 795

S SHF C 3,825

SDR6717.014 21670-City of Boulder Quiet Zone MDR F STBG C 890

L L C 185

L LO C 31

SDR6717.015 21673-Louisville-Lafayette Quiet Zones MDR F STBG C 1,266

L L C 263

L LO C 580

SDR6717.016 21669-Boulder County Quiet Zones MDR F STBG C 1,033

L L C 214

L LO C 287

SDR6717.017 22791-1st and Emery Quiet Zones Project IMD F STBG C 1,056

L L C 219

MDR F STBG C 559 496

L L C 116 103

L LO C 680

SDR6717.01823386-SH119 Bikeway: Boulder toLongmont IMD F STBG C 1,106

L L C 277

SDR6717.01923388-Downtown ADA SidewalkConnections: Nederland IMD F STBG C 150 450 150

L L C 10 30 10

IMF S MTF C 150 450 150

SDR6717.02023382-SH66 Improvements:Hover St toMain St. IMD F STBG C 450

L L C 100

Report ID: STIP02 52 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 53: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

RPP S SHF C 100

SDR6717.02123384-Multimodal Imp: Empire Rd/Lock Stto SH7 IMD F STBG C 350

L L C 150

SDR6717.02223380-SH7 Multimodal Imp: 38th toCherryvale IMD F STBG C 38 152

L L C 57 228

SDR6717.02323393-South Boulder Road At-GradeCrossing Improvements IMD F STBG C 200 803

L L C 225 205

SDR6717.02423372-Downtown Boulder StationImprovements IMD F STBG C 77

L L C 76

L LO C 50

SDR7007 Region 4 - DRCOG Area CMAQ Pool SDR7007.01420714-Superior Trail: McCaslin BRT-Davidson Mesa Underpas CDR F AQC C 556

L L C 115

L LO C 155

SDR7007.01520708-30th St & CO Ave Boulder Bike/PedUnderpass CDR F AQC C 3,950

L L C 821

L LO C 8,050

SDR7007.01721737-19 St Trail+Bridge Boulder Ck Trailto CU Main Campus CDR F AQC C 4,036

L L C 839

L LO C 1,600

ICD F AQC C 3,880

L L C 806

SDR7007.01821738-SH157: Foolhills Pkwy Bike/PedUnderpass:n/s of CO Ave CDR F AQC C 2,400

L L C 610

L LO C 874

SDR7007.02223381-SH7 & 119th Ave IntersectionImprovements ICD F AQC C 500 2,105

L L C 1,400 6,243

SDR7007.02423377-Traffic Signalization: Erie Pkwy &WCR7 ICD F AQC C 54 426

Report ID: STIP02 53 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 54: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 14 106

SNF3392 23073-SH 402: US 287 to I-25 SNF3392.999 23073-SH 402: US 287 to I-25 RPP S SHF R 1,800

SNF5095 NFR Transp Alternative Program SNF5095.002 20613-Great Western Trail TNF F TAP C 808

L L C 202

L LO C 270

SNF5095.00321993-North LCR 17 Expansion (WilloxLane to US287/SH14) MNF F STBG C 496

L L C 343

L LO C 1,155

TNF F TAP C 5 258

L L C 1 64

SNF5095.00421992-Little Thompson River Corridor Trail- Phase 1a TNF F TAP C 250

L L C 63

SNF5173 CMAQ Pool- North Front Range TPR SNF5173.015 16525-Jefferson ST/SH 14 Improvements CNF F AQC C 435

L L C 90

SNF5173.04619561-US287 (N College) Ped Bridge &Path CNF F AQC C 175

L L C 36

L LO C 1,035

SNF5173.04920153-US287 & US34 VMS signs(Loveland) CNF F AQC R 497

L L R 103

SNF5173.051 20617-Loveland Traffic Optimization CNF F AQC C 380

SNF5173.05221990-Central System & ControllerReplacement-Greeley CNF F AQC C 431

L L C 90

L LO C 4

SNF5173.053 21991-CNG Fast Fill Stations Larimer Cty CNF F AQC C 499 329

L L C 103 71

L LO C 200

SNF5173.05421997-Traffic Signal Progression Imp-US34 CNF F AQC C 640

Report ID: STIP02 54 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 55: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 138

L LO C 22

SNF5173.055 22260-Weld County Fast Fill Station CNF F AQC M 315

L L M 65

SNF5173.056 23046-N Taft Ave & US 34 Intersection Imp CNF F AQC C 3,330

L L C 692

L LO C 1,224

SNF5173.058 20345-Phase 3 Fiber CNF F AQC C 309

SNF5788 NFR STP Metro Pool SNF5788.031 18403-US85 @ 31st Access Cntr (Evans) MNF F STBG C 643

L L C 133

L LO C 68

SNF5788.03520389-US34(10th ST): 35th to 23rd(Greeley) CNF F AQC C 336

L L C 69

SNF5788.037 19741-35th Ave: Prairie View to 37th ST MNF F STBG C 1,115

L L C 232

L LO C 1,113

SNF5788.04020618-US34 Widening Loveland: DenverAve to Boyd Lake Ave MNF F STBG C 2,320

L L C 482

L LO C 2,622

SNF5788.04220389-10th St Access Control Implem.(Greeley) MNF F STBG C 2,010

L L C 418

L LO C 1,236

SNF5788.044 21998-US34: Widening Boise Ave to I-25 IMN F STBG C 85

MNF F STBG C 335 350 400

L L C 70 74 82

SNF5788.04521995-SH257 & Eastman Park DriveIntersection MNF F STBG C 1,000

L L C 266

Report ID: STIP02 55 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 56: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L LO C 280

SNF5788.046 21989-37th St Overlay, Evans MNF F STBG C 982

L L C 219

L LO C 69

SNF5788.04721996-Timberline Road CorridorImprovements MNF F STBG C 2,203

L L C 1,033

L LO C 2,764

SNF5788.04821994-O St Widening - 11th Ave to WCR37 MNF F STBG C 1,329

L L C 276

L LO C 5,308

SR45001 Ramp Projects SR45001.00820978-Boulder Canyon MultiModal Improv(4-58) LOM L L C 1,019

RMP F NHPP C 4,067

SR45001.01912372-US287: SH1 to LaPorte Bypass (FtCollins) 4-20 RPP F STBG C 582

S SHF C 20

SR45218 Region 4 Surface Treatment SR45218.001 21979-Project Admin (Pre-Con Activities) SUR F STBG D 543 1,592

S SHF D 1,005 1,198 1,758 1,831

SR45218.105 17018-US85: Ault to Wyo state line SUR F NHPP C 250

SR45218.11320586-SH60A: US287 (Campion) to I-250-4.96 SUR F STBG C 1,324

S SHF C 275

SR45218.114 21369-SH60B: I-25 to Milliken MP 6-14 SUR F NHPP C 4,894

S SB1 C 86 25

S SHF C 827

SR45218.12919164-US34/85 Interchange Bridges &Surface SB1 S SB1 D 500

SR45218.13218966-ETPR Pit ClosuresCook,Dollerschell,Etchison,Pedroni SUR S SHF M 37

SR45218.140 19357-SH119: Longmont East 60.8-63.7 SUR F STBG C 601

S SHF C 124

SR45218.16321089-SH7:SHO PH II, Estes Park-JctSH72 Non-Flood FSA S FAS C 157 215

Report ID: STIP02 56 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 57: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SUR F STBG C 2,856

S SB1 C 876 1,440

SR45218.169 20978-SH119A Nederland E mp 22.8-37.4 FSA S FAS C 1,983

SUR F NHPP C 7,100 4,008

S SHF C 1

SR45218.17320656-US85C:N/of Ft Lupton NB only242.6-245.7 SUR F NHPP C 2,433

S SHF C 505

SR45218.17420845-US85L: O St to Ault 270.5-280Include SH392 Inters Im LOM L L C 640 11

SUR F NHPP C 6,083 1,370

S SB1 C 10,961

S SHF C 684 231

SR45218.176 20840-SH6J: East of Sterling 407-429 SUR F STBG C 2,304

S SB1 C 4,303

SR45218.17719723-SH24G: El Paso CL East Part 1357-365 SUR F STBG C 1,350

S SHF C 280

SR45218.17820856-SH24G: El Paso CL EAST Part 2351-357 SUR F STBG C 4,041

S SHF C 840

SR45218.17920844-US34D: US85 East to 34A-IncludeBR C-18-J CBP S SB1 C 1,288

SUR S SB1 C 1,313

SR45218.182 21305-US287: Berthoud Bypass Repair SUR F NHPP C 136

S SHF C 28

SR45218.18320945-SH14C: Ft Collins East Lemay toI-25 mp135.7-139.5 CBP S SB1 C 168

LOM L L C 53

SUR F NHPP C 1,572 26

S SB1 C 4,997

S SHF C 326

SR45218.186 20986-SH7: 28th St - US287 mp52-60.2 CBP F NHPP C 198

Report ID: STIP02 57 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 58: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 41

SUR F NHPP C 4,224 3,311

S SHF C 878 688

SR45218.18721217-SH263: US85 to Greeley Ariport .63-2.7 SUR S SHF M 3,000

SR45218.18820853-SH71 S of Limon Surface &Structures CBP F NHPP C 654

S SHF C 135

CCP S SHF C 65

SUR F NHPP C 10,419 8,699

S SHF C 2,165 1,808

SR45218.189 21209-SH14: New Raymer West 194-203 SUR F NHPP C 3,238 3,053

S SHF C 673 634

SR45218.19020518-SH59A Siebert to Cope mp41.07-67.14 7PX S 267 C 17,122

CBP F NHPP C 752

S SHF C 156

SR45218.191 22845-US85: South of Platteville NB & SB SUR F NHPP C 69 1,122 3,145 8,108

S SHF C 14 233 653 1,685

SR45218.19321850-I-76 & US 34 Ft Morgan AreaResurfacing ADA F NHPP C 45

S SHF C 9

CBP F NHPP C 456

S SHF C 43

FSA S FAS C 2,200

SUR F NHPP C 12,830 4,967

S SHF C 2,667 1,032

SR45218.194 21861-SH71: Woodrow North 156-174.4 SUR F NHPP C 965 827

S SHF C 200 172

SR45218.19521849-SH79: Prospect Valley South toAdans CCL 18.926-23.892 CCP S SHF C 250

SUR F NHPP C 1,530 1,034

Report ID: STIP02 58 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 59: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 271 215

SR45218.19621851-US36D: Last Chance West130-135.8 CBP F NHPP C 178

S SHF C 37

SUR F NHPP C 2,503 1,241

S SHF C 520 258

SR45218.197 21852-SH52: New Raymer South 95-111.6 SAE F NHPP C 20

S SHF C 4

SUR F NHPP C 5,289 1,670

S SHF C 1,099 347

SR45218.199 10002-I-70: Resurfacing Design RDP S SHF D 500

SB1 S SB1 D 946

SR45218.200 18611-SH86 I-70 West CBP F STBG C 160 230

S SHF C 33 47

SAE F NHPP C 41

S SHF C 8

SUR F NHPP C 3,565 1,025

S SHF C 741 281

SR45218.201 21878-I-70 SMA Failure Reconstruction 7PX S SHF C 33,100

SB1 S SB1 C 24,053

SR45218.204 22961-Estes Park Paving US34 to Moraine SUR S SHF C 500

SR45218.205 22468-SH 6 Merino to Atwood 7PX S 267 C 6,134

SUR F NHPP C 1,102

S SHF C 229

SR45218.207 23169-SH 52:Prospect Valley E Phase 1 SUR F NHPP C 4,837 3,311

S SHF C 1,005 688

SR45218.208 23009-US 34 & WCR17 SB1 S SB1 D 475

SR45218.209 23011-US 34 & 35th Ave Interchange LOM L L D 750

Report ID: STIP02 59 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 60: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SB1 S SB1 D 750

SR45218.210 23013-US 34 & 47th Ave Interchange LOM L L D 750

SB1 S SB1 D 750

SR46598 Region 4 Bridge On System Pool SR46598.014 20191-Region Four Critical Culvert Repair CCP S SHF C 572

SR46598.04220862-SH113A: Bridge replacement (A-24-L,AO) CBP F NHPP C 869 921

S SHF C 180 191

S SHF R 1

SR46598.04420768-SH138A: CBC Lodgepole Creek mp50.758 CBP F STBG C 5

S SB1 C 706

SUR S SB1 C 1,779

SR46598.04520865-US34B: Republican River (D-28-S/D-28-P) 248-249 ADA S SHF C 121

CBP F NHPP C 730 1,918

F NHPP D 152 53

F NHPP R 28

S SHF C 151 398

S SHF D 31 11

S SHF R 6

SR46598.04720866-US36D: Bridge Replacement (F-22-E/F-23-F) CBP S SB1 C 664

SR46598.05420952-I-25 RR Bridge PreventativeMaintenance CBP F NHPP C 1,704 608

F NHPP D 23

S SHF C 302 58

S SHF D 2

SR46598.05721608-US385: S/O Julesburg Bridge Scourmp 309-310 CBP F NHPP C 378

S SHF C 78

SR46598.059 22227-I-76: Repair Damaged MSE Wall CWP S SB1 C 80

SR46598.06123053-FY20 Culvert Prioritization &Repairs CCP S SHF D 916

SR46598.06223014 -Eastern Plains Timber BridgesNon-BE CBP F NHPP D 440

Report ID: STIP02 60 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 61: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF D 91

SR46598.06322529-Timber Bridge Replacements B-27-A and B-27-F CBP F NHPP D 484

S SHF D 100

SR46600 Region 4 RPP Non-Regionally Significant SR46600.03921657-SH66: WCR 7 IntersectionImprovements RPP F STBG C 827

S SHF C 172

SR46600.04021003-SH66: Lyons to I-25 Access andPEL RPP F STBG D 1,272 248

S SHF D 264 51

SR46600.04220854-SH86: West side of ElizabethIntersection LOM L L C 493

RPP F STBG C 133 4,023

S SHF C 27 343

SR46600.04320855-US385 @ Cheyenne Wells 90degree Curve RPP F NHPP C 1,788

F NHPP R 153

S SHF C 413

S SHF R 32

SR46600.051 22437-US385 Intersection & Safety Imp RPP F NHPP C 1,045

S SHF C 217

S SHF D 335

SR46600.054 21541-Fort Collins CBC Underpass SUR S SHF C 100

SR46600.05521432-I-76/SH52 Hudson InterchangeImprovements FSA S FAS C 251

RPP F NHPP C 1,239 2,917

F NHPP D 1,342 4,928

S SHF C 160 606

S SHF D 149 547

SR46600.059 US85: Signal at WCR 76 N. of Eaton LOM L L D 8

RPP L L C 150

SR46600.06221877: SH-71 Super-2 Design Limon toNeb. RDP S SHF D 325

RPP S SHF D 500

Report ID: STIP02 61 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 62: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SB1 S SB1 D 135

SR46600.06321465-PR US34 Big Thompson CanyonCedar Cove LOM L L C 139

TCC S SHF C 445

SR46600.064 20298-Estes Park Loop CFL LOM L LO R 2,000

RPP S SHF R 580

SR46600.066 22340-US385: ETPR Corridor Study SB1 S SB1 D 263

SR46600.068 23160-SH71: Intersection & Safety Imp RPP F STBG C 206

S SHF C 43

S SHF D 250

SR46600.07121907-Peckham Grade SeperatedIntersection FR8 F NHFP D 1,060

F NHFP R 939

FSA S FAS C 3,850

RGS F RRX D 3,853

S SHF D 428

RPP F NHPP D 1,445

S SHF D 559

S SHF R 195

SR46600.072 10008-US85 Upper ROW Settlement RAG F RRX U 180

S SHF U 20

TCI S SHF D 900 35

S SHF M 33,937

S SHF U 27

SR46600.075 23199-US 85 and WCR 14.5 Interchange SB1 S SB1 D 1,200

SR46600.07622781-I-25 Mead Frontage RoadDevolution RPP S SHF M 75

SR46600.077 22262-SH 402 Access Control Plan LOM L L M 182

SR46600.07822896-Weld County Defense AccessRoads DIS F GRNT M 35

SR46600.07922897-Logan County Defense AccessRoads DIS F GRNT M 39

Report ID: STIP02 62 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 63: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR46600.080 22957-Owl Canyon Route Feasibility Study RPP S SHF D 500

SR46600.081 22911-I-25 E Parallel Arterial:SH66-US34 7PX S SHF D 1,000

SR46600.082 22999-I-25 Wetland Mitigation SVSP RPP S SHF M 325

SR46600.08323100-I-76 Frontage Road DevolutionKeensburg RPP S SHF C 300

SR46600.084 23172-US 40 & US 287 TIMS Study RPP S SHF M 200

SR46600.08522975-US40/US 287 Passing Lane Design& Construction FR8 F NHFP C 3,642

F NHFP D 82

S SHF C 757

S SHF D 17

SR46600.087 23155-SH119B Tolling & Revenue Study RPP S SHF M 200

SR46600.089 23158-I-25 & SH119 Advanced ROW 7PT S 267 R 2,500

SR46600.090 10001-R4 Interstate Funding Program RPP F NHPP D 2,154 2,154

S SHF D 207 207

SR46601 Region 4 Bridge Off System Pool SR46601.02620826-West Mutual Ditch/CR44(WEL044.0-033.0A) BRO F NHPP C 465

L L C 116

L LO C 173

SR46601.02720825-Spring Ck at Riverside (FCRVSDE-S.2PRST) BRO F NHPP C 1,155

L L C 288

L LO C 1,375

SR46601.03022628-Logan County StructureLOG93-60.5-243 BRO F NHPP C 308 145

L L C 77 36

SR46601.031 21895-8th St Bridge (LOV1825W.8th St) BRO F NHPP C 837

L L C 209

SR46601.032 23137-Little Thompson (WEL019.0-046.5) BRO F NHPP C 500

L L C 125

SR46601.033 23491-1st St Irrigation Canal (LOV180W) BRO F NHPP C 436

F NHPP D 64

Report ID: STIP02 63 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 64: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 109

L L D 16

SR46601.034 23493-Blake St/N Fork of Rep River-Wray BRO F NHPP C 547

F NHPP D 80

L L C 136

L L D 20

SR46606 Region 4 Faster Safety Pool SR46606.031SH 42: Ped/Bike Underpass south ofPaschal Street FSA L LO C 2,450

SR46606.045 19664-SH14 "S" Curve in Sterling FR8 F NHFP C 7,500

FSA S FAS C 3,883 76

S FAS D 100

S FAS R 620

RPP F STBG C 3,311

S SHF C 888

SUR F NHPP C 2,440 2,211

S SHF C 516 464

SR46606.064 20715-SH52: Antelope Creek Drainage RPP S SHF C 71

SR46606.070 10004-Intersection Safety Improvements FSA S FAS C 3,523 817 3,280

S FAS D 205 438

S FAS U 80

IFS S FAS C 6,525

SR46606.07221866-SH14:B Safety AssessmentProjects mp 62-103 FSA S FAS C 850 1,450

SR46606.07321863-I-25A: Median cable n/o Ft Collins270-279 FSA S FAS C 42 3,346 2,331

SR46606.083 21876-SH60 & WCR 40 Intersection Imp FSA S FAS C 873

SR46606.084 10005-R4 Rumble Strip Pool FSA S FAS C 596 594

SR46606.085 22473-US287 & Pike Rd Intersection Imp FSA S FAS C 2,200 1,400

SR46606.087 22704-I-76 VMS Boards East & West FSA S FAS C 2,056

SR46606.088 22760-Centerline Skip Striping I-76 FSA S FAS C 1,171

Report ID: STIP02 64 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 65: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S FAS D 200

SR46606.08922461-College &Troutman SignalUpgrades FSA S FAS C 250

SR46606.09022443-Canyon and Folsom SignalUpgrades FSA S FAS C 550

SR46606.091 22934-Pike Rd Improv. West Of US 287 FSA S FAS C 685

SR46666 Region 4 Hazard Elimination Pool SR46666.05319060-US287: Orchards Shopping Center(Loveland) HAZ F HSIP C 45

S SHF C 5

SR46666.059 21967-Loveland Left Turn Signals various HAZ F HSIP C 597

LOM L LO C 66

SR46666.060 21966-US287 (College Ave) & Trilby Road FSA S FAS C 1,500

HAZ F HSIP C 2,025

S SHF C 225

SR46666.06221964-SH1 & CR54 IntersectionImprovements HAZ F HSIP C 303

F HSIP D 42

S SHF C 33

S SHF D 4

IHE L L C 31

L LO C 183

SR46666.063 21961-Baseline Rd & 29th St HAZ F HSIP C 72

LOM L L C 8

SR46666.064 21961-Colorado Ave & Regent Drive HAZ F HSIP C 733

LOM L L C 81

SR46666.065 21963-I-25 NB Ramp & SH52A HAZ F HSIP C 370

S SHF C 41

SR46666.066 21968-WCR2 & I-76 Frontage Road HAZ F HSIP C 416

L LO C 1,493

S SHF C 46

SR46666.068 21961-SH93 (Broadway) & Rayleigh Intc HAZ F HSIP C 20

Report ID: STIP02 65 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 66: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 2

SR46666.06921969-Isabelle Rd at US287 Intersect.Impvment HAZ F HSIP C 2,065

S SHF C 229

SR46666.070 22571-Intersection Prioritization Study PHII HAZ F HSIP M 17

S SHF M 1

SR46666.071 22456 US 287 & SH 52 Intresection Impv. HAZ F HSIP C 980 2,655

F HSIP D 733

S SHF C 50 295

S SHF D 81

SR46666.072 23015-R4 Signal Head Backplate Install HAZ F HSIP C 630

S SHF C 70

SR46667 10009-Region 4 Hot Spots Pool SR46667.999 10009-Region 4 Hot Spots Pool HOT S SHF M 132 362

SR46668 10006-Region 4 Traffic Signals Pool SR46668.999 10006-Region 4 Traffic Signals Pool FSA S FAS C 750

PRI S SHF D 160

SGA S SB1 C 1,114 1,625

S SHF C 1,352 624 2,500

S SHF D 1

S SHF M 132

SGN S SHF C 366 245

SR47001 Region 4 Safe Routes to School SR47001.02420814-19th St Multi-modal Improvements -City of Boulder SRI F STBG C 350

L L C 87

TAP F TAP C 511

L L C 127

SR47001.02622054-Frederick Thunder Valley K-8Multipurpose Trail SAR F STBG C 245

L L C 61

L LO C 350

SR47001.02722055-Loveland 4th St Bike/Ped SafetyImprovements LOM L L C 75

Report ID: STIP02 66 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 67: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SAR F STBG C 299

L LO C 201

SR47001.028 22549-Connecting Pathways to Ponderosa SAR F STBG D 65

L L D 16

SR47001.02923025-Hampshire Bikeway ArterialCrossing SAR F STBG C 495

L L C 123

SR47001.030 23026-N Wilson Ave Sidewalk SAR F STBG C 500

L L C 125

SR47001.031 23028-Bethoud Safe Routes Phase 1 SAR F STBG C 300

L L C 75

SR47001.032 23027-Graves Ave Sidewalk & Brodie Spur SAR F STBG C 500

L L C 125

SR47001.03323135-4th Ave Pedestrian Bridge &Connection SAR F STBG C 500

L L C 125

SR47001.03423092-Mesa Elmntry Walking & Biking,City of Boulder SAR F STBG C 192

L L C 48

SR47001.03522550-S Heatherwood Inters & Sidewalk(SRTS) SAR F STBG C 350

L L C 87

L LO C 63

SR47001.036 22548 - Brodie Ave Sidewalks (SRTS) SAR F STBG C 336

L L C 84

L LO C 698

SR47005 Region 4 FASTER Transit Pool SR47005.018 Greeley/Evans Transit Bus Yard IFT L L C 40

S SHF C 160

SR47006 2015 Flood Recovery Pool SR47006.00321289-PR SH55:near Crook Flood Repairmp .5-1.5 E15 F ER R 11

TCC S SHF C 9

S SHF R 3

Report ID: STIP02 67 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 68: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR47006.00621358-PRLA North Creek Rd South(CU212C) E15 F ER C 367 630

F ER D 37 22

L L C 76 131

L L D 7 4

SR47006.00721380-PRLA North Creek Rd South(CU212A) E15 F ER C 362 496

F ER D 46 17

L L C 75 103

L L D 9 3

SR47006.008 21360-PRLA Overton Rd E15 F ER C 1,445

F ER D 98

L L C 300

L L D 20

SR47007 Region 4 MMOF Pool SR47007.00123937-Greenway Trail: CR37 toStagecoach Ave IMF L L C 100 350

S MTF C 100 350

SR47007.00223930-Table Mesa Dr MultiusePath&Access IMF L L C 165 660

S MTF C 110 440

SR47007.00323924-St Vrain Greenway Phase 13SH119 IMF L L C 250 1,250

S MTF C 250 1,250

SR47007.00423923-Rock Creek & Coal Creek TrailConnection IMF L L C 75 400

S MTF C 75 400

SR47007.005 23390-Hokestra Trail Pedestrian Bridge IMF L L C 100

S MTF C 100

SR47020 R4 Transportation Alternatives Pool SR47020.002 20673-Williams Fork Trail 4-23 TAP F TAP C 632

L L C 158

L LO C 630

SR47020.007 20668-Sedgwick County South Platte Trail TAP F TAP C 351

L L C 87

Report ID: STIP02 68 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 69: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L LO C 750

SR47020.009 20660-Elizabeth Trails TAP F TAP C 407

L L C 101

L LO C 9 350

SR47020.01020672-Cheyenne Wells US385 Bike PedTrail TAP F TAP C 326

L L C 22

SR47020.013 20666-Ft Morgan SH52 ADA Ramps ADA S SHF C 40

LOM L L C 10

TAP F TAP C 56

L L C 14

L LO C 25

SR47020.016 20667-Sheep Draw Trail 2015 project TAP F TAP C 216

L LO C 109

TNF F TAP C 200

L L C 104

L LO C 739

SR47020.01720620-LCR17 Expansion & Bike Lanes(Larimer Cty & Berthoud) MNF F STBG C 1,865

L L C 388

L LO C 1,893

TAP F TAP C 1,000

L L C 250

SR47020.01920827-Secure Bike Parking DRCOG &NFR-at Transit Centers/PnR TAP F TAP C 30

L L C 7

SR47020.02120713-E Lafayette Multimodal PathConnectn:Commerce Ct to La IMD F STBG C 999

L L C 207

TAP F TAP C 400 800

L L C 205 200

Report ID: STIP02 69 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 70: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR47020.02220709-71st St Trail: Winchester-IdylwildTrail ITD F TAP C 860

L L C 215

SR47020.02621888-Power Trail Grade Separation atHarmony Rd TAP F TAP C 800

L L C 1,500

SR47020.028 21886-Namaqua Ave Trail Underpass TAP F TAP C 540 60

L L C 227 15

L LO C 546

SR47020.02921889-West Alice & Inez Blvd PedImprovements TAP F TAP C 333

L L C 83

SR47020.031 21884-Sterling East Chestnut Trail TAP F TAP C 428

L L C 107

SR47020.032 21885-Hugo Roundhouse 2018 TAP F TAP C 275

L L C 68

SR47020.033 21883-Kersey Centennial Trail TAP F TAP C 719

F TAP R 55

L L C 179

L L R 13

L LO C 14

SR47020.03523383-SH66 & WCR7 PedestrianUnderpass ITD F STBG C 320

L L C 80

SR47020.03623376-US36 Bikeway Extension: Superiorto Broomfield ITD F STBG C 200 849

L L C 50 213

SR47021 Region 4 ADA Pool SR47021.003 22441-Greeley ADA Curb Ramps Phase 1 ADA S SB1 C 110

S SHF C 260

SR47021.00422442-Loveland ADA Curb Ramps Phase1 ADA S SHF C 341

S SHF D 50

S SHF R 5

Report ID: STIP02 70 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 71: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR47021.005 22771-Longmont ADA Curb Ramps ADA S SB1 R 100

S SHF C 1,264 385

S SHF R 125

SR47021.006 22901-Windsor ADA Curb Ramps ADA S SHF C 589

S SHF D 81

SR47021.007 22759-Boulder ADA Curb Ramps Phase 1 ADA S SHF C 1,175 400

S SHF D 360 150

SR47021.008 23062-Limon Residency ADA Curb Ramps ADA S SHF C 2,637

S SHF D 402

SR47021.009 23037-US 34 Curb Ramps Akron to Wray ADA S SHF C 1,895

S SHF D 314

SSP4428 I-25 North Corridor - Denver to FC SSP4428.001 10001-NFR I-25 EIS Design & ROW RPP F NHPP D 2,297

S SHF D 1,737

SSP4428.002 10001-DRCOG I-25 EIS Design & ROW RPP F NHPP D 375

S SHF D 78

SSP4428.003 19626-I-25: 120th Ave (SH128) to SH7 PWQ F NHPP C 1,348

SSP4428.012 21506-I-25: SH60 to SH14 Design Build 7PT S 267 C 993 6,006

CNF F AQC C 3,013

CUF F AQC C 627

L L C 135

DIS F GRNT C 5,000 6,970 5,000

FSA S FAS C 4,500

LOM L L C 16,287 36,318 32,000

L L R 666

PWQ F STBG C 2,000 3,347

SBT S 228 C 6,006

SSP4428.013 22547-I-25 & SH 119 Park-N-Ride 7PT S 267 D 400

Report ID: STIP02 71 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 72: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SSP4428.01422831-N I-25: WCR 38 to SH 402 mp247-255.23 7PX S SHF C 2,869 72,330

7TH F NHPP C 80,994

S SHF C 7,805

DIS F GRNT C 20,000

IFS S FAS C 5,000

ITM S SHF D 1,300

LOM L L C 500

MNF F STBG C 2,000

PWQ F NHPP C 1,234

SB1 S SB1 C 3,500 16,500

S SB1 D 19,000

SBT S 228 C 700

SUF5001 CMAQ Pool Upper Front Range SUF5001.006 23040-US36/Community Drive Int Imp CUF F AQC C 750

L L C 149

L LO C 540

05 SR55062 R5 Enhancement Pool SR55062.020 Buena Vista Arz. St. Bike Lane & Trail TAP F NHPP C 544

L L C 136

SR55062.047 Salida US 50 Sidewalks Phase IV TAP F NHPP C 401

L L C 100

SR55062.050 Pagosa Spgs Harman Hill Trail Ph 1 & 2 CMA F AQC C 114 358 141 75

L L C 23 74 29 15

TAP F NHPP C 708

L L C 177

SR55062.055 Needham Connect III Project TAP F NHPP C 228 323

L L C 57 80

SR55062.056 Roosa Avenue ADA TAP F NHPP C 948

L L C 236

Report ID: STIP02 72 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 73: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR55219 Region 5 Surface Treatment Pool SR55219.014 Resurfacing Design SB1 S SB1 D 100

SUR S SHF C 634 720 1,000

SR55219.057 Chips/Oil for Maintenance SUR S SHF C 500

SR55219.094 Highway 24 Enhancement Project SUR F NHPP C 407

S SHF C 84

SR55219.102 US 491 CR M to SH 184 SUR F NHPP C 7,190

S SHF C 1,494

SR55219.107 US 491 SH 184 to Cahone PH1 FSA S SHF C 300

SUR F NHPP C 10,357 827 413

S SHF C 2,153 172 86

SR55219.110 US 160 Mesa Verde Chipseal SUR F NHPP C 2,508 165

S SHF C 521 34

SR55219.117 US 160 SH 84 to Treasure Falls SUR S SB1 C 7,063

SR55219.120US 160 S FORK TO M VISTA CHIP SEALPH II SUR F NHPP C 124

S SHF C 25

SR55219.121 SH 145 Lizard Head North Chipseal SUR F NHPP C 1,001

S SHF C 208

SR55219.122SH 41 SURFACE TREATMENT US 160TO UTAH SUR F NHPP C 1,630

S SHF C 339

SR55219.123 US 550/160 PCCP DIAMOND GRINDING SUR S SB1 C 4,605

SR55219.124 SH 112 FROM US 285 TO SH 17 SUR F NHPP C 4,290 496

S SHF C 890 103

SR55219.126 US 160 SH 172 to Bayfield Resurfacing SUR F NHPP C 2,160

S SHF C 449

SR55219.127 R5 Guardrail Replacement/Upgrades SUR S SHF C 961 341

SR55219.128 SH 159 San Luis to Fort Garland SUR F NHPP C 4,828 4,526

S SHF C 1,003 940

Report ID: STIP02 73 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 74: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR55219.129 US 285 Antonito to Estrella Chipseal SUR F NHPP C 2,036 82

S SHF C 423 17

SR55219.130 US 24 Johnson Village East Chipseal SUR F NHPP C 910 165

S SHF C 189 34

SR55219.131 US 160 WC Tunnel East Resurfacing SUR F NHPP C 4,785 1,423

S SHF C 994 296

SR55219.132 SH 141 & 145 Slickrock & Redvale 7PX S 267 C 14,000

SUR S SHF C 2,000 2,000

SR55219.133 SH17 MP 84.5 to 118.5 7PX S 267 C 14,000

SUR F NHPP C 14,500 4,650

SR56157 R5 Bridge Pool SR56157.008 R5 Culvert Pool CCP F NHPP C 48

S SHF C 10

SR56157.025R5 Bridge, Culvert, Wall Repair, andRehab CBP F NHPP C 1,581 1,769 1,051

S SHF C 328 367 218

CCP F NHPP C 589 147

S SB1 C 253

S SHF C 607 1,345

S SHF D 250

HAZ F NHPP D 225

S SHF D 25

HOT S SHF C 25

RDX S SHF D 35

SR56157.026 R5 Tunnel Pool CTP S SHF C 125

SR56157.027 R5 Wall Pool CWP F NHPP C 548 272 873

S SB1 C 32

RFM S SHF C 500

SR56689 R5 RPP Non-Regionally Significant Pool SR56689.001R5 Engineering Studies and EnvironmentalCompliance RPP S SHF M 72

Report ID: STIP02 74 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 75: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SR56689.037US 160 at SH 17 in Alamosa, IntersectionPriority FSA S SHF C 70

SR56689.045 US 160 Dry Creek Passing Lane RDP S SHF U 105

SB1 S SB1 U 35

SR56689.053 US 285 Passing Lane, SB 143-145 FSA S SHF C 67

SUR F NHPP C 127

SR56689.054 US 50 Pull-out, EB 231 FSA S SHF C 810

SR56689.056 ADA Improvement- Region wide HOT S SHF C 18

SR56689.057 SH 145 Passing Lane at Deep Creek CWP F NHPP C 1,144 97

S SHF C 237 20

FSA S SHF C 1,125

RDP F NHPP C 23

S SHF C 183

RPP F NHPP C 1,665 238 1,160

S SHF C 346 49 241

SUR F NHPP C 496

S SHF C 103

SR56689.066 US 160 Elmores Crnr to Gem Vil SB1 S SB1 D 50

SR56689.067 US 160 Passing Lanes MP 126.2 to 128.5 LOM L L C 1,000

L L D 300

SB1 S SB1 D 150

SUR S SHF D 375

SR56689.068 US 160 Wolf Creek Safety Improvements FR8 F NHPP C 19

S SHF C 7

SR56689.069 R5 Mountain Pass Chain Up and Safety FR8 F NHPP C 1,052

F NHPP D 20

S SHF C 219

S SHF D 4 120

Report ID: STIP02 75 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 76: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF R 3

SR56689.070 US160 550 Connection South Design Build 7PX S 267 C 7,900

7TH S SB1 R 203

FSA S SHF D 1,278

SB1 S SB1 D 6,300

SR56689.072 US 550 Billy Creek North SB1 S SB1 D 75

SR56689.073 US 160 Rest Area Truck Parking FR8 F NHPP C 1,229

S SHF C 492

S SHF D 51

SR56689.074 US160 Rio Grande River Bridge to SH17 SB1 S SB1 D 170

SR56690 R5 Bridge Off System Pool SR56690.015San Miguel County 55P-0.2-27 BROReplacement BRO F BRO D 563

L L D 140

SR56690.016 Archuleta CR 500 Pagosa Junction BRO BRO F BRO D 170

L L D 42

SR56691 R5 CMAQ Pool SR56691.044 FY 16 Pagosa- Crest View Paving CMA F AQC C 390

L L C 80

SR56691.045 FY 17 Telluride Street Sweeper CMA F AQC D 103

L L D 21

SR56691.047CDOT MTCE Telluride/Mtn Village SpringsDe-icer CMA F AQC M 25 25 25

SR56691.048 CDOT MTCE Pagosa Springs De-icer CMA F AQC M 25 25 25

SR56691.052 FY19 Pagosa Springs De-icer CMA F AQC M 8

L L M 1

SR56691.053 FY19 Mtn Village De-icer CMA F AQC M 8

L L M 1

SR56691.054 San Miguel R&B CR K69 Paving CMA F AQC C 176

L L C 36

SR56691.055Pagosa Springs Paving- 200 Block PagosaAlley CMA F AQC C 177

Report ID: STIP02 76 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 77: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L C 37

SR56691.056Pagosa Springs Paving 3rd St Norht ofHermosa CMA F AQC C 182

L L C 37

SR56691.057 SMART Bicycle Racks CMA F AQC M 4

L L M 1

SR56691.058 SMART Telluride-Montrose Service CMA F AQC M 29

L L M 6

SR56691.059 FY20 Pagosa Springs De-icer CMA F AQC M 8

L L M 1

SR56691.060 FY20 Mtn Village De-icer CMA F AQC M 8

L L M 1

SR56691.061 FY21 Pagosa Springs De-icer CMA F AQC M 8

L L M 1

SR56691.062 FY21 Mtn Village De-icer CMA F AQC M 8

L L M 1

SR56691.063 SMART Telluride Bike Share CMA F AQC M 105

L L M 21

SR56691.064 Mtn Village Vacuum Sweeper CMA F AQC M 82

L L M 17

SR56702 R5 Hazard Elimination Pool SR56702.012 R5 Hazard Elimination Pool HAZ F NHPP C 630

S SHF C 70

SAE S SHF C 122

SR56702.013US 550 Red Mtn Parking & GeohazardCFL HOT S SHF C 10

SR56703 R5 Hot Spots SR56703.999 R5 Hot Spots HOT S SHF C 110

OPN S SHF C 474

SR56704 R5 Rockfall Mitigation Pool SR56704.007 US 550 Red Mtn Pass Ruby Walls Rockfall EMR F NHPP M 1,250

SR56704.008 SH 145 MP 21 Emergency Rockfall TCC F NHPP C 1,066

Report ID: STIP02 77 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 78: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 221

SR56705 R5 Signals - Traffic SR56705.999 R5 Signals - Traffic HOT S SHF C 80 221

SGA S SHF C 2,246 2,407 500

SGN S SHF C 246 245

SR57001 R5 Safe Routes to Schools Pool SR57001.005 Needham Elementry Connect II LOM L L C 72

SAR S SHF C 291

SR57001.006Pagosa Springs, North NeighborhoodSafety Improvements LOM L L C 68

SAR F NHPP C 272

SR57004 R5 FASTER Highway Safety Pool SR57004.019 US 550 Design MP 2.7 to CR 302 LOM L LO D 6

SR57004.021US160 Passing Lane between Durangoand Bayfield RPP F NHPP C 1,254

S SHF C 260

SB1 S SB1 D 299

SR57004.023US160/US491 Passing Lane South ofCortez DIS F NHPP C 2,000

RDP S SHF R 115

SB1 S SB1 C 9,000

S SB1 D 374

SUR S SHF C 445

SR57004.030 US 550 Connection to US 160 DIS F NHPP C 12,312

FSA S SHF C 4,230 5,128

LOM L L C 2,000

PRI S SHF C 350

RPP F NHPP C 1,764 2,413 2,924

F NHPP D 165

S SHF C 889 366 526 608

S SHF D 34

SB1 S SB1 C 54,400

SUR F NHPP C 2,000 6,000 14,272

Report ID: STIP02 78 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 79: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 2,200

SR57004.032 FY15 R5 FASTER Design Pool ADA S SHF C 182

S SHF D 550

HOT S SHF C 20

SR57004.036 R5 Intersection Projects SGA S SHF C 142

SR57004.040 FASTER R5 Planning and Studies LOM L L D 65

SR57008 ADA Pool SR57008.000 ADA Pool OPN S SHF C 422

SR57008.001 ADA Pool ADA S SHF C 2,162

S SHF D 736

SR57010 Local Project Misc. SR57010.001 Local Project Misc. LOM L L M 56 12

OPN S SHF C 199

ST SST5269 On-System Bridge Pool SST5269.999 On-System Bridge Pool BBP F STBG M 4,330 3,556

S SHF M 697 741

BCP F STBG M 927

S SHF M 192

BWP F NHPP M 927

S SHF M 192

CBP F STBG D 5,780 3,276 347

S SHF D 1,252 624 72

SST5270 Off-System Bridge Inspection SST5270.008TUNNEL OFF-SYS STATEWIDEINSPECT FY19 BRO F BRO M 80

S SHF M 22

SST5270.999 Off-System Bridge Inspection BIO F BRO M 2,986

S SHF M 746

BRO F BRO M 3,553

S SHF M 888

SST5273Statewide Intelligent Transportation SystemsProgram (TSMO) SST5273.063

NETWORK EQUIPMENT I-25 NORTH(120TH-WY) ITI S SHF M 33

SST5273.102 ITS Fiber Cable on US24 (I25 - Woodland) ITI F STBG C 64 100

Report ID: STIP02 79 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 80: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF C 13

SST5273.105 ITS FIBER AND CAMERAS ON I-76 FY 19 ITI F STBG C 5,673

F STBG D 36

S SHF C 546

S SHF D 3

SST5273.107 ITS DSRC on I-25 and I-70 ITI F STBG C 1,573

F STBG D 282

S SHF C 326

S SHF D 37

S SHF U 40

SST5273.108 ETHERNET AND CCTV UPGRADE FY 18 ITI S SHF C 37

ITM F STBG C 2,374

S SHF C 499

SST5273.109 FY 19 ITS VMS UPGRADE ITI F STBG C 1,249

F STBG U 6

S SHF C 197

S SHF D 10

ITM F STBG C 2,763

S SHF C 266

SST5273.110 TS FIBER TO STATE BUILDINGS ITI F STBG C 3,486

S SHF C 407

S SHF D 10

SST5273.111FY 20 ITS CAPITAL REPLACEMENTPROJECT ITI S SHF D 10

SST5273.112ITS FIBER ON MISC HIGHWAYS IN R1AND R2 ITI S SHF D 10

SST5273.113ITS FIBER TO STATE BUILDINGS INR1&R4 ITI F STBG C 3,725

S SHF C 774

S SHF D 10

Report ID: STIP02 80 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 81: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST5273.114ITS CAMERAS ON I70(BENNETT-BURLINGTON) ITI F STBG U 13

S SHF D 10

S SHF U 1

SST5274 Statewide Metro Planning Program SST5274.000 Statewide Metro Planning Program MPH F MPL M 5,356

L L M 1,113

MPT F MPL M 1,760

L L M 365

TRN F 5303 M 1,921 1,961 1,921 2,001

SST5274.002 DTD DRCOG CPG MPH F MPL M 2,977 2,946

L L M 619 612

MPT F MPL M 1,760 1,891

L L M 365 393

SST5274.004 DTD PPACG CPG MPH F MPL M 996 968

L L M 207 201

SST5274.006 DTD NFRMPO CPG MPH F MPL M 681 707

L L M 141 147

SST5274.007 DTD PACOG CPG MPH F MPL M 289 298

L L M 60 62

SST5274.008 DTD GVMPO CPG MPH F MPL M 273 281

L L M 56 58

SST5496 Rockfall Program Administrative Funds SST5496.999 Rockfall Program Administrative Funds RFM S SHF M 3,850 4,075

SST6577 Safety Statewide SST6577.055 CDOT SAFETY SUMMIT SUPPORT HAZ F HSIP M 14

S SHF M 1

SST6577.056 US HWY 34 & 6, BRUSH, CO 057578C HAZ S SHF M 20 1

SST6577.057 SAFETY CIRCUIT RIDER 2019 HAZ F HSIP M 290

S SHF M 32

SST6577.058 2019 COLORADO SHSP UPDATE HAZ F HSIP M 450

Report ID: STIP02 81 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 82: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S SHF M 50

SST6727 5310 Rural SST6727.000 5310 Rural TRN F 5310 M 559 199 651 664 677 14,375

L L M 127 99 101 103 4,186

SST6728 Statewide Transit USC Section 5304 Pool SST6728.000 Statewide Transit USC Section 5304 Pool TRN F 5304 M 350 387 395 403 30,839

L L M 87 96 98 100 20,109

SST6728.005NFR - Larmier County Snr TransportationImplementation Plan TRN F 5304 M 40 474,931

L L M 10 238,337

L LO M 31 101

SST6728.006PPACOG - Development of 2045 TransitPlan TRN F 5304 M 40 4,259,990

L L M 10 1,814,222

SST6728.007PPACOG - Analysis of Transit Needs andOptions on N Nevada TRN F 5304 M 40 6,653,151

L L M 10 10,680,857

SST6729 Statewide Transit USC Section 5311 Pool SST6729.000 Statewide Transit USC Section 5311 Pool TRN F 5311 M 12,944 644 13,202 13,466 13,736 287,807

L L M 9,129 400 9,312 9,498 9,688 3,080,583

SST6729.043 Pueblo - SRDA Admin and Operating TRN F 5311 M 100 100 100 2,829,900

L L M 28 28 29 5,531,113

SST6731 5310 Large UZA SST6731.000 5310 Large UZA TRN F 5310 M 142,657

SST6731.002 SRC - Operating TRN F 5310 M 273 385 1,041,028

L L M 273 385 5,188,968

SST6731.004 Douglas County - Mobility Management TRN F 5310 M 375 395 5,965,404

L L M 93 98 15,265,360

SST6731.005 Via Mobility - Mobility Management TRN F 5310 M 227 191 6,192,836

L L M 56 47 7,267,261

SST6731.007 CNDC - DRMAC Regional Mobility Mgmt TRN F 5310 M 250 287 544,635

L L M 62 71 10,007,056

SST6731.008 DRCOG - Easter Seals BOC Expansion TRN F 5310 M 49

L L M 12

Report ID: STIP02 82 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 83: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST6731.014 SRC - Mobility Management TRN F 5310 M 248 438 1,462,558

L L M 62 109 4,376,374

SST6731.020 DRCOG - SRC Vehicle Replacement TRN F 5310 M 42

L L M 10

SST6731.022 DRCOG - Broomfield Vehicle Expansion TRN F 5310 M 61

L L M 15

SST6731.024NFR - Goods and Services for Snrs andIndv with Disabilities TRN F 5310 M 195 220 425 220 220 -255,143

L L M 49 55 95 55 55 -1,724,965

SST6731.027 PPACG - MMT Program Administration TRN F 5310 M 45 45 46 46 -1,326,888

SST6731.029MMT-PPACG Improve Mobility for Snrsand Indv w Disabilities TRN F 5310 M 407 411 415 419 4,564,768

L L M 101 102 103 104 -3,476,506

SST6731.030 PPACG - MMT Barrier Removal Phase IV TRN F 5310 M 7,006,474

L L M 8,040,463

SST6731.031 5310 - Denver Aurora TRN F 5310 M 4,013 -8,493,342

L L M 1,003 -8,849

SST6731.032DRCOG - Easter Seals VehicleReplacement TRN F 5310 M 38 55 -1,020,789

L L M 10 14 5,755,901

SST6731.033DRCOG - Senior Resource Center BusReplacement TRN F 5310 M 408 196 -4,692,479

L L M 102 49 -4,368,889

SST6731.034 NFR - Cutaway Purchase TRN F 5310 M 128 -1,497,003

L L M 32 3,250,602

SST6731.035 NFR - Travel Training Salary TRN F 5310 M 61 -5,477,673

L L M 15 6,648,343

SST6731.036PACOG - City of Pueblo Replacement of 3<30' BOC's TRN F 5310 M 11,681,833

L L M -3,307,853

SST6731.037DRCOG - Continuum of ColoradoOperating TRN F 5310 M 150 -1,626,423

L L M 150 14,985,195

Report ID: STIP02 83 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 84: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST6731.038DRCOG - Continuum of ColoradoReplacement Vehicle TRN F 5310 M 67

L L M 16

SST6731.041 DRCOG - Douglas County Van Expansion TRN F 5310 M 48

L L M 12

SST6731.042 DRCOG - Broomfield Equipment TRN F 5310 M 25

L L M 6

SST6731.043DRCOG - Adams County MobilityManagement TRN F 5310 M 108

L L M 27

SST6731.044DRCOG - Laradon Hall Society VanReplacement TRN F 5310 M 80

L L M 20

SST6732 5310 Small UZA SST6732.000 5310 Small UZA TRN F 5310 M -2,435,633

SST6732.002 Via Mobility - Mobility Management TRN F 5310 M 703 418 4,360,257

L L M 175 104 5,853,211

SST6732.006GVMPO Mesa County FTA 5310 BusPurchase TRN F 5310 M 325 1,121,418

L L M 81 -72,993

SST6732.007 NFRMPO Mobility Management TRN F 5310 M 27 -4,576,402

L L M 7 6,083,593

SST6732.010 Via Mobility Operating TRN F 5310 M 168 247 976,654

L L M 168 247 5,308,399

SST6732.012 PACOG - SRDA Vehicle Replacements TRN F 5310 M 54 56 58 1,494,335

L L M 18 18 19 -7,536,074

SST6732.013 NFR - Vehicle Replacement : Cutaway TRN F 5310 M 83 -2,177,460

L L M 21 -3,263,710

SST6732.015 Pueblo - SRDA Operating TRN F 5310 M 83 84 -6,829,246

L L M 83 84 -15,278,669

SST6732.016Hope West Bus Purchase Van & MinivanExpansion 2019 TRN F 5310 M 130 -7,008,032

L L M 32 6,945,749

Report ID: STIP02 84 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 85: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST6732.017 DRCOG - Via Mobility Bus Replacements TRN F 5310 M 105 97 677,787

L L M 26 25 1,078,837

SST6732.018 DRCOG - Continum of Colorado Operating TRN F 5310 M 5,713,164

L L M -3,045,112

SST6732.019 PACOG - Pueblo Vehicle Replacement TRN F 5310 M 156 -6,819,906

L L M 39 4,740,797

SST6732.020 GVMPO - Mesa County MOB TRN F 5310 M 57 57 3,822,563

L L M 14 14 -3,575,200

SST6732.021 NFR - ADA Gas MV Replacement TRN F 5310 M 39

L L M 10

SST6732.022 PACOG - SRDA Capital Projects TRN F 5310 M 65

L L M 16

SST6741 Statewide Transit USC Section 5307 Pool SST6741.014 Mesa County - 5307 - Capital DIR F 5307 M 220

L LO M 55

TRN F 5307 M 210

L LO M 54

SST6741.015 Mesa County - 5307 - Operating DIR F 5307 M 2,200

L LO M 2,200

TRN F 5307 M 1,800

L LO M 1,800

SST6741.016RTD-Preventitive Maintenance: TransitVehicle Overhaul & Mai DIR F 5307 M 64,300 66,200

L LO M 16,075 16,600

TRN F 5307 M 62,400

L LO M 15,600

SST6741.018 RTD Enhancements-ADA/PED/Bus Shelter DIR F 5307 M 595 601

L LO M 120 121

TRN F 5307 M 578

Report ID: STIP02 85 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 86: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L LO M 116

SST6741.028 Pueblo - Transit Operating Assistance DIR F 5307 M 2,038 2,038 2,038

L LO M 2,038 2,038 2,038

TRN F 5307 M 2,092

L LO M 2,092

SST6741.086NFR - Fort Collins Demand ResponseParatransit Service DIR F 5307 M 437 437 437

L LO M 656 656 656

TRN F 5307 M 450

L LO M 675

SST6741.101NFR - Transfort Fixed Route Bus ServiceIncluding FLEX DIR F 5307 M 2,136 2,136 2,136

L LO M 2,136 2,136 2,136

TRN F 5307 M 2,116

L LO M 2,116

SST6741.111NFR - Fort Collins Maintain, Repair andReplace Assets DIR F 5307 M 1,934 1,934 1,934

L LO M 483 483 483

TRN F 5307 M 1,936

L LO M 484

SST6741.112NFR - Greeley GET Operating Assistance50/50 TRN F 5307 M 1,777

L LO M 1,777

SST6741.113 NFR - Greeley GET ADA Operations 80/20 TRN F 5307 M 286

L LO M 72

SST6741.114NFR - Greeley GET PreventativeMaintenance 80/20 TRN F 5307 M 925

L LO M 231

SST6741.124 PPACG - MMT Operating DIR F 5307 M 1,297

L LO M 1,297

TRN F 5307 M 1,271

L LO M 1,271

Report ID: STIP02 86 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 87: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST6741.125 PPACG - MMT Planning Projects DIR F 5307 M 344

L LO M 86

TRN F 5307 M 200

L LO M 50

SST6741.126PPACG - MMT Facility/VehicleMaintenance DIR F 5307 M 4,108

L LO M 1,027

TRN F 5307 M 3,088

L LO M 772

SST6741.127 PPACG - MMT Vehicle Purchase (7) DIR F 5307 M 1,297

L LO M 324

SST6741.128PPACG - MMT Vehicle Storage FacilityExpansion DIR F 5307 M 1,280

L LO M 320

TRN F 5307 M 2,400

L LO M 600

SST6741.129 PPACG - MMT Downtown Transit Center DIR F 5307 M 5,802 7,170

L LO M 1,450 1,792

SST6741.130 NFR - GET Paratransit Bus Replacement DIR F 5307 M 314 314 202

L LO M 31 31 20 1,054

TRN F 5307 M 648

L L M 7,243,936

L LO M 65

SST6751 Safe Routes to School Pool SST6751.052SRTS NON-INF EDUCATIONPROGRAMS SAR F MISC M 45

L L M 11

SST6752 Statewide Railroad Crossing Pool SST6752.064S130 804855W WELD COUNTY, 5TH STEATON RAG F RRX C 403

S SHF C 44

SST6752.065 S130 BNSF 057551T Morgan CR W7 RAG F RRX C 234

S SHF C 26

Report ID: STIP02 87 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 88: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST6752.066 S130 BNSF 057241Y MORGAN CR15 RAG F RRX C 444

S SHF C 49

SST6752.067 S130 BNSF 057554N Morgan CR X5/10 RAG F RRX C 245

S SHF C 27

SST6752.068 S130 BNSF 057243M Morgan CR 17 RAG F RRX C 201

S SHF C 22

SST6752.069 S130 BNSF 057240S Morgan CR 14 RAG F RRX C 248

S SHF C 27

SST6752.070 S130 BNSF 057224H Weld CR 75 RAG F RRX C 209

S SHF C 22

SST6752.072S130 UPRR 804342X WELD COUNTY CR34 RAG S SHF D 20

RRC F RRX C 382

S SHF C 42

SST6752.073RTD WELTON STREET CORRIDORPROJECT RAG F RRX C 1,350

S SHF C 150

SST6752.074S130 KYLE 594720H KIT CARSON,BETHUNE RAG F RRX C 138

S SHF C 15

SST6752.075S130 KYLE 594732C KIT CARSON,STRATTON RAG F RRX C 170

S SHF C 18

SST6752.076 S130 KYLE 594737L KIT CARSON, VONA RAG F RRX C 152

S SHF C 16

SST6752.077S130 KYLE 594746K KIT CARSON,FLAGER RAG F RRX C 178

S SHF C 19

SST6752.078FY 19 RAILRAOD CROSSINGINVENTORY RAG F RRX M 89

S SHF M 9

SST6752.079 S130 RAILROAD INVENTORY WITH FHU RRC F RRX M 82

SST6803 DTD CMAQ Pool SST6803.014RAQC-Ozone Outreach and EducationCampaign CDR F AQC M 900

Report ID: STIP02 88 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 89: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L M 187

SST6803.015 DRCOG-TDM Program Pool CDR F AQC M 893

L L M 185

ICD F AQC M 5,700

L L M 500

SST6803.071 Advanced Fleet Technology Project CDR F AQC M 1,800 2,453

L L M 374 509

SST6803.090FLEX Route Extension Longmont toBoulder - Boulder County FTA F AQC M 1,156 250

L L M 289 50

TRN F AQC M 1,156

L L M 579 -1,523,121

SST6803.098 RTD Bus Purchases FTA F AQC M 90 1,000

L L M 15 200

TRN F 5339 M 7,500

L L M 7,500

SST6803.099RTD - Micro Transit Service & MobilityOptions: North I-25 CDR F AQC M 400 400

L L M 50 50

L LO M 50 50

FTA F AQC M 475

L L M 95

SST6803.100DRCOG Broomfield FlexRide Expansion &Marketing FTA F AQC M 360

L L M 72

SST7002 Statewide Planning and Research Funds SST7002.999 Statewide Planning and Research Funds SPR F SPR M 14,441 12,526 11,717 11,775

S SHF M 1,187 3,131 2,929 2,943

SST7003 Special Projects Pool SST7003.001 State Highway Research Project (SHRP) PRI F MISC M 7

SST7003.002Local Transportation Assistance Program(LTAP) PRI F MISC M 195

L L M 95

Report ID: STIP02 89 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 90: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST7003.007 Water Quality Program PRI S MISC M 634 600

SST7003.008CDOT Engineering Software Transition(CEST) HQI S SHF M 450 450

SST7003.009 Recreational Trails RCT F MISC M 1,591

SST7003.028 DTD Info Mgmt Projects HQI F MISC M 30

S SHF M 7

PRI S SHF M 1,000

SST7003.036 DTD SPECIAL PROJECTS PRI L L M 70

SST7003.063DTD-R1.8 REGIONAL WILDLIFEMOVEMENT RPP S SHF M 53

SST7003.064CORRIDOR OPER BOTTLENECKREDUCTION PRI S MISC M 250

SST7003.065 BULK FUEL METERING SYSTEM HQI S SHF M 258

SST7003.074 STIC GRANT HQI F MISC M 15

S SHF M 3

SST7003.080MDSS DIVISION OF HWYMAINTENANCE HQI S SHF M 1,199

SST7003.081MAINTENANCE ASSET DATACOLLECTION OPN S SHF M 800 800

SST7003.084 HEAVY FLEET AVL SYSTEMS OPN S SHF M 800

SST7003.086 AID DEMO GRANT E-CONSTRUCTION HQI F MISC M 18

S SHF M 4

SST7003.092 JOINT OPERATING AREA (JOA) OPN S SHF M 800 1,500

SST7003.093 AVALANCHE GAZEX EQUIPMENT OPN S SHF M 2,770

SST7003.095 MAINTENANCE TRAINING ACADEMY OPN S SHF M 292

SST7003.096 Chain Up area Chain Enforcement PRI S MISC M 245

SST7003.098 PERM WATER QUALITY JOC HQI S SHF M 3,350

SST7003.102GEOHAZARDS AND EXTREMEWEATHER EVENTS HQI F GRNT M 149

S SHF M 30

SST7003.103 2019 DBE SUPPORTIVE SERVICES CRI F MISC M 324

SST7003.104 2019 ESB STATE COMMISSION CRI S SHF M 131

SST7003.105 2019 SMALL BUSINESS CERTIFICATION CRI S SHF M 229

Report ID: STIP02 90 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 91: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST7003.106TSM&O EVALUATION SUPPORT &DEVELOPMENT PRI S MISC M 175 500

SST7003.107 2019 OJT SUPPORTIVE SERVICES CRI F MISC M 398

SST7003.108 ESB BOND GUARANTEE CRI S MISC M 2,500

SST7003.109 STREETCAR HISTORIC CONTEXT RPP L L M 15

S SHF M 30

SST7003.110 HQ STIC PROJECTS HQI F MISC M 70

S MISC M 17

SST7003.111 RISK AND RESILIENCY TCC F MISC M 81

S SHF M 20

SST7003.112TSM&O EVALUATION SUPPORT &DEVELOPMENT PRI S SHF M 145

SST7003.113 2019 OJT SUPPORTIVE SERVICES CRI F MISC M 78

S SHF M 171

SST7003.114STORMWATER FACILITIESCOMPLIANCE PH2 HQI S SHF M 2,960

SST7003.115 STIC GRANT - LEAN CONSTRUCTION PRI F MISC M 18

S SHF M 4

SST7003.116 Research Special Projects PRI S SHF M 208

SST7003.117 2020 DBE SUPPORTIVE SERVICES CRI F MISC M 250

SST7003.118 MANAGED LANES US36 HQI S SHF M 5,313

SST7003.119DMO - SHRP2 L38 RESEARCHPROJECT HQI F MISC M 88

SST7003.120 2020 SMALL BUSINESS CERTIFICATION CRI S MISC M 215

SST7003.121 2020 ESB STATE COMMISSION CRI S MISC M 40

SST7003.122 2020 OJT SUPPORTIVE SERVICES CRI F MISC M 250

SST7003.123 2019 NSTI PUEBLO CRI F MISC M 50

SST7003.124 I-25 GAP PROJECT WILDLIFE 7PX S MISC M 100

LOM L L M 50

SST7003.125 Innovative Mobility Projects RDX S SHF M 2,000

SST7005 DTD STP-Metro Pool SST7005.000 DTD STP-Metro Pool IMN F STBG M 1,700

Report ID: STIP02 91 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 92: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L M 353

SST7005.002 Transp Planning Studies NFRMPO MNF F MPL M 87

L L M 18

SST7007 CMAQ NORTH FRONT RANGE POOL SST7007.005 Transfort CNG eBus Replacement FTA F AQC M 776 3,189

L L M 324 663

SST7007.009 North Front Range CMAQ Non-Constr FTA F AQC M 950

L L M 178

SST7007.010 GET CNG Bus Replacement CNF F AQC M 757

L L M 157

FTA F AQC M 2,008 757

L L M 417 142

SST7007.011 COLT CNG Bus Replacement CNF F AQC M 726

L L M 150

FTA F AQC M 363

L L M 75

SST7007.013 Larimer County CNG Vehicle Replacement CNF F AQC M 96

L L M 19

SST7007.014 Weld County CNG Vehicles CNF F AQC M 1,050 1,050

L L M 218 218

SST7007.015 Transfort CNG Buses CNF F AQC M 950

L L M 197

SST7012 DTD STP-Metro Pool - DRCOG Area SST7012.004 Regional TDM Program Pool FTA F STBG M 200

L L M 34

MDR F STBG M 767 600

L L M 159 124

SST7012.013 City of Boulder - 55th and Arapahoe MDR F STBG M 200

L LO M 41

Report ID: STIP02 92 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 93: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST7012.014 City of Lakewood - West Colfax MDR F STBG M 100

L LO M 20

SST7012.015 City of Aurora - Havana Street MDR F STBG M 206

L LO M 43

SST7012.016 City of Englewood - Light Rail Corridor MDR F STBG M 200

L LO M 41

SST7012.017 City - County of Denver - Far NE Denver MDR F STBG M 206

L LO M 43

SST7012.018 Trans Solutions - SE Denver Study MDR F STBG M 200

L LO M 41

SST7012.019STAMP COMM SOL FIRST-LAST MILESTUDY MDR F STBG M 100

L LO M 20

SST7012.020RTD-Mobility as a Srvc:ImplementingOpen-Ticketing Platform FTA F STBG M 1,800

L L M 362

SST7012.021 RTD T2 - Reimagine RTD FTA F STBG M 1,400

L L M 284

SST7012.022RTD Multimodal Wayfinding System -CMPI Set-Aside FTA F STBG M 240

L L M 48

SST7018 Wetlands Bank Account for 13600 SST7018.999 Wetlands Bank Account for 13600 OPN S SHF M 12

SST7027 CMAQ - Upper Front Range SST7027.004 Weld County UFR CMAQ Program CUF F AQC M 502

L L M 104

SST7035 Faster Transit and Rail Division Funds SST7035.000 Faster Transit and Rail Division Funds STL S FAS M 3,000 3,000 3,000 18,000

TRG S FAS M 5,000 5,000 5,000

SST7035.046 SCCOG - Cutaway Replacement TRG L LO M 4

S FAS M 17

SST7035.047 Division of Transit and Rail Administration STL S FAS M 69 119 30,000

SST7035.199 RFTA - Regional Bus Operating BOP L LO M 200 200

Report ID: STIP02 93 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 94: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S FAS M 200 200

SST7035.214 Steamboat Springs - Regional Operating BOP L LO M 132 132

S FAS M 132 132

SST7035.220City of Fort Collins - Flex RegionalOperating BOP L LO M 200 200

S FAS M 200 200

SST7035.224RFTA - GMF Maintenance FacilityRenovation TRG L LO M 395

S FAS M 1,581

SST7035.260 STATEWIDE TRANSIT PLAN UPDATE STL S FAS M 139 48,000

TRN F 5304 M 525 -1,523,069

L L M 131 41,874

SST7035.263Statewide Cambridge Systematics Freight/Passenger Rail Plan STL S FAS M 118 102,000

SST7035.266Routt County Replacement Cutaway - SrCtr TRG L LO M 18

S FAS M 72

SST7035.270 RFTA - (4) 40' Bus Replacements STL L LO M 538

S FAS M 468 183,000

SST7035.289 Grand Valley - Bus Replacements STL L LO M 36

S FAS M 312,000

SST7035.291 Town of Platteville - Replace BOC TRG L LO M 15

S FAS M 62

SST7035.292 Lake County - Replace Van TRG L LO M 10

S FAS M 42

SST7035.293 Winter Park - 35' Diesel Bus TRG L LO M 98

S FAS M 393

SST7035.294 Steamboat - Shop Lift TRG L LO M 20

S FAS M 64

SST7035.295 NWCCI - Two Replacement Vans TRG L LO M 19

S FAS M 78

Report ID: STIP02 94 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 95: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST7035.296Fort Collins - Transfort Gas SupportVehicles TRG L LO M 50

S FAS M 200

SST7035.297 RTD - Bus Replacements STL L LO M 750 500

S FAS M 3,000 2,000 507,000

SST7035.298GVT - Downtown Facility Security CameraUpgrade TRG L LO M 7

S FAS M 28

SST7035.299 All Points - ADP Software TRG L LO M 37

S FAS M 148

SST7035.300All Points - Two Replacement CutawayBuses - Faster Match TRG L LO M 7

S FAS M 28

SST7035.301 All Points - One Replacement ADA Minivan TRG L LO M 2

S FAS M 8

SST7035.302Mountain Village - Gondola CabinRefurbishment - Phase 6 of TRG L LO M 29

S FAS M 118

SST7035.303 UAACOG - Vehicle Expansion TRG L LO M 2

S FAS M 10

SST7035.304Bent County - 2 Replacement CutawayBuses TRG L LO M 29

S FAS M 116

SST7035.305 SCCOG - Bus Replacement TRG L LO M 4

S FAS M 16

SST7035.306PPACOG - Envida Surveillance EquipmentPurchase TRG L LO M 5

S FAS M 23

SST7035.307PPACOG - Envida Expansion Bus LessThan 30' TRG L LO M 16

S FAS M 65

SST7035.308 PPACOG - Silver Key Van Replacement TRG L LO M 11

S FAS M 46

SST7035.309PPACOG - MMT 12 Replacement BusesLess Than 30' TRG L LO M 175

Report ID: STIP02 95 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 96: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S FAS M 700

SST7035.311PPACOG - Envida Two ReplacementBuses Less Than 30' TRG L LO M 29

S FAS M 118

SST7035.314Neighbor to Neighbor - Bustang OutriderOperating STL S FAS M 18 789,000

SST7035.315 NFR - GET Operating BOP L LO M 10

S FAS M 40

SST7035.316 All Points - One Replacement BOC TRG L LO M 3

S FAS M 12

SST7035.317 Lake County - One Van Replacement TRG L LO M 2

S FAS M 8

SST7035.318 SRC - Equipment Technology Upgrades TRG L LO M 8

S FAS M 35

SST7035.319Steamboat - Install Solar LED Lighting &Motion Detectors TRG L LO M 8

S FAS M 32

SST7035.320 Steamboat - GPS Phase III AVA System TRG L LO M 18

S FAS M 72

SST7035.321Mountain Express - Maint and StorageFacility Needs Assessme TRG L LO M 12

S FAS M 48

SST7035.322DRCOG - SRC Repave Evergreen ParkingLot TRG L LO M 11

S FAS M 45

SST7035.323 RFTA - On Route Electric Chargers TRG L LO M 120

S FAS M 480

SST7035.324Vail - Transit Facility Electric SrvcUpgrades,Chargers & In TRG L LO M 274

S FAS M 1,099

SST7035.325NFR - Transfort LPG FX CutawayReplacement TRG S FAS M 197

SST7035.326 DRCOG - VIA Microgrid Study for Facility TRG L LO M 40

S FAS M 160

Report ID: STIP02 96 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 97: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST7035.327PPACG - Colorado Springs MMT 3 BatteryElectric Buses TRG L LO M 175

S FAS M 700

SST7035.328PACOG-City of Pueblo ITS Equipment(Farebox & Mobile Ticket) TRG L LO M 58

S FAS M 233

SST7035.329Neighbor to Neighbor - Salida StationAdministration BOP S FAS M 18

SST7035.330GVMPO - Bus Stops and SafetyImprovements TRG L LO M 59

S FAS M 239

SST7035.331 SoCoCAA - Bustang Outrider Operating BOP S FAS M 90

SST7035.332 DRCOG - Operating Projects TRG S FAS M 474

SST7035.333 DRCOG - Mobility Management Projects TRG S FAS M 110

SST7035.334 DRCOG - Capital Projects TRG S FAS M 317

SST7035.335 DRCOG - Program Administration TRG S FAS M 97

SST7035.336NFR - GET Poudre Express Greeley - FortCollins BOP L LO M 365

S FAS M 200

SST7047 FTA 5339 Rural Grant Program SST7047.000 FTA 5339 Rural Grant Program TRN F 5339 M 5,310 1,900 1,600 3,500 3,500 73,500

L L M 1,327 475 400 875 875 2,077,749

SST7048 2013 Flood Recovery Pool SST7048.083PRLA E 124th Ave Brdge Over S PlatteRvr EMR F ER C 69

L L C 14

SST7048.118 PR SH60 & SH257 Structures EMR F ER C 82

TCC S SHF C 17 842

S SHF D 203

S SHF R 26

S SHF U 1

SST7048.136 PR US36 D-15-X & D-15-I EMR F ER C 124

TCC S SHF C 25

SST7048.142 PR SH 119A Boulder Canyon EMR F ER C 20,636

F ER D 313

Report ID: STIP02 97 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 98: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

TCC S SHF C 341

SST7048.146 PR SH 52 Flood Repair MP 6.9 to 7.2 EMR F ER C 945

TCC S SHF C 196

SST7048.149 PR SH7 Flood Repair MP 19-33 EMR F ER D 2,170

F ER M 735

TCC S SHF D 41

S SHF M 14

SST7048.152 PR US 287 & SH 14 North of Fort Collins EMR F ER C 1,261

TCC S SHF C 288

SST7048.155 ERLA Dillon Rd over Rock Creek T28 TCC S SHF C 50

S SHF D 1

SST7048.172 PRLA Fish Creek Rd Mp 0-4.8 TCC S SHF C 240

S SHF M 3

SST7048.181 PRLA 71st Street Pipe T23 TCC S SHF C 63

SST7048.186 PR US 36 Phase 3 MP 7.7-8 EMR F ER C 41 9,098

F ER D 201

TCC S SHF C 8 2,097

S SHF D 41

SST7048.197 PR US 34D MP 13.75 to MP 14.71 EMR F ER C 227

TCC S SHF C 57 321

SST7048.210 PR MONUMENT CREEK BRANCH TCC S SHF C 31

SST7048.212 FEMA Map Revisions for Flood Program EMR F ER M 2,764

TCC S SHF M 111

SST7050 CONGESTION RELIEF POOL SST7050.003 CDOT MOTORIST ASSIST COR F STBG M 5,094 5,340

S SHF M 1,355

SST7050.004TMC OPERATORS - DISPATCHING-NOC COR F NHPP M 711

S SHF M 148

Report ID: STIP02 98 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 99: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST7051 DRCOG CMAQ SIGNAL POOL SST7051.008 DENVER TIP FY15 CDR F AQC C 467

SST7051.026DENVER TSSIP 2016 SIGNAL SYSTEMUPGRADE CDR F AQC M 1,842

SST7051.037 FY18 ITS SIGNALS CCTV UPGRADE CDR F AQC C 23

SST7051.040FY18 AURORA TRAVEL TIMEMONITORING CDR L LO C 28

SST7051.041FY18 SUPERIOR MCCASLINMONITORING SYSTEM CDR F AQC C 142

L LO C 24

SST7051.042 FY18 DENVER BICYCLE DETECTION CDR L LO C 86

SST7051.043FY18 DENVER CCTV NETWORKUPGRADE CDR L LO C 150

SST7056 FTA 5329 (e) State Safety Oversight SST7056.999 FTA 5329 (e) State Safety Oversight TRN F 5329 M 649 662

L L M 162 166 12,424,941

SST7060FasTracks Eagle P-3 Corridors (Gold andEast Line) SST7060.999

FasTracks Eagle P-3 Corridors (Gold andEast Line) TRN F 5309 M 213,263

L L M 193,559 225,555

SST7061FasTracks Southeast Corridor Extension:Lincoln Ave to Rdgat SST7061.999

FasTracks Southeast Corridor Extension:Lincoln Ave to Rdgat TRN L L M 27,959 4,884 4,610,919

SST7063 SENATE BILL 228 TRANSIT SST7063.005 GVRTA - Replacement Commuter Bus SBT L LO M 146

S FAS M 571

SST7063.006 RFTA - 40' Bus Replace W/Electric (2) SBT L LO M 351

S FAS M 1,404

SST7063.007PPACG - Rocky Mtn Health Care BusReplacements SBT L LO M 20 1

S FAS M 82 5

SST7063.008PPACG - Rocky Mtn Health Care CutawayBus Replacement SBT L LO M 14 1

S FAS M 57 5

SST7063.009PPACG - Discover Goodwill BOC VehicleReplacement(s) SBT L LO M 14

S FAS M 56

SST7063.010PPACG - Community Services andSupports ADA Van Replacement SBT S FAS M 50

SST7063.011 Black Hawk - 33' Bus Replacement SBT L LO M 33

S FAS M 135

SST7063.012Community Options - 2 Vans and 1 BOCreplacement SBT L LO M 39

Report ID: STIP02 99 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 100: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S FAS M 157

SST7063.013DRCOG - Via Mobility Services BusReplacement SBT L LO M 21

S FAS M 87

SST7063.014 Winter Park - Bus Replacements SBT L LO M 182

S FAS M 729

SST7063.015Horizons Specialized Services MVReplacement SBT L LO M 9

S FAS M 36

SST7063.016PPACG - Rocky Mountain Health CareBOC Replacements (3) SBT L LO M 47

S FAS M 189

SST7063.017PPACG - Discover Goodwill BOCReplacements SBT L LO M 27

S FAS M 110

SST7063.018PPACG - Silver Key 3 MV and 1 BOCReplacement SBT L LO M 40

S FAS M 163

SST7064 FTA 5339 Small UZA SST7064.000 FTA 5339 Small UZA TRN F 5339 M 735,000

SST7064.006 GVMPO - Bus Replacement(s) TRN F 5339 M 430 300 5,390,000

L L M 108 75 -5,653,969

SST7064.022 RTD - Small UZA Vehicles TRN F 5339 M 4,459,000

L L M 7,713,258

SST7064.026 NFR - GET 40' Bus Replacement TRN F 5339 M 459 -1,655,500

L L M 115 -911,975

SST7064.027 DRCOG - Via Mobility Bus Replacement TRN F 5310 M 2,052,709

L L M 4,282,878

SST7064.028PACOG - City of Pueblo VehicleReplacement 35' Hybrid TRN F 5339 M 512 544 -850,500

L L M 128 136 -5,655,495

SST7064.029NFR - GET Cutaway Vehicle Replace &CNG Region Bus Expansion TRN F 5339 M 516

L L M 129

SST7064.030PACOG - City of Pueblo Replacement of30' BOC Vehicles TRN F 5339 M 158

Report ID: STIP02 100 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 101: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

L L M 39

SST7065 FTA 5339 RTD Large UZA SST7065.000 FTA 5339 RTD Large UZA TRN F 5339 M 5,800 6,440,000

L L M 1,450 -1,309,085

SST7066 FTA 5339 Fort Collins Large UZA SST7066.000 FTA 5339 Fort Collins Large UZA TRN F 5339 M 290,500

SST7066.005NFR - Facility Maint Concrete Repair atTransfort Facilities TRN F 5339 M 162 3,629,500

L L M 40 -2,964,278

SST7066.022 NFR - Transfort Bush Wash Replacement TRN F 5339 M 357 -5,544,000

L L M 89 860,818

SST7066.026 NFR - Transfort Pavers at MAX Stations TRN F 5339 M 10 -3,076,500

L L M 3 -7,239,520

SST7066.027NFR - Replacement of Non-Revenue PoolVehicles TRN F 5339 M 208 1,323,000

L L M 52 7,980,976

SST7066.028NFR - Repair/Replace/Enhance projectsrelated to Rolling Sto TRN F 5339 M 532 8,606,500

L LO M 133

SST7066.029 NFR - E-Faring Project TRN F 5339 M 51 843,500

L L M 13 3,964,016

SST7066.030 NFR - Bus Stop ADA Upgrades TRN F 5339 M 507 1,520 -1,354,500

L L M 127 380 2,270,979

SST7067 FTA 5339 Colorado Springs SST7067.000 FTA 5339 Colorado Springs TRN F 5339 M 6,790,000

SST7067.001PPACG - MMT Fixed Route VehiclePurchase DIR F 5339 M 701 708 715 364,000

L L M 175 177 179 1,991,200

TRN F 5339 M 694 6,373,500

L L M 173 -7,893,377

SST7067.002 PPACG - MMT Vehicle Purchase (10) DIR F 5339 M 701 708 715 570,500

L L M 175 177 178 113,218

TRN F 5339 M 694 8,253,000

L L M 173 2,504,595

Report ID: STIP02 101 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 102: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST7068 ROADX Program SST7068.002 COLORADO V2X PROGRAM RDX F MISC M 870

S SHF M 83

SST7068.003 SMART 25 MANAGED MOTORWAYS RDX F MISC M 553

S SHF M 33

SST7071FTA 5337 State of Good Repair - DenverAurora SST7071.000 FTA 5337 Denver-Aurora DIR F 5337 M 17,300 17,800 15,927

L L M 4,300 4,450 646,438

TRN F 5337 M 16,800

L L M 4,200 -1,448,021

SST7072 SB267 SST7072.001RFTA - AMF Renovation Phase 9:ReplaceFuel Tanks 7PX L LO M 250

S 267 M 1,000

SST7072.002Winter Park - Design New TransitMaintenance Facility 7PX L LO M 50

S 267 M 200

SST7072.003Cripple Creek - Design of TransitMaintenance Facility 7PX L LO M 30

S 267 M 120

SST7072.004Summit County - Transit Operations CenterDesign & Engineer 7PX L LO M 106

S 267 M 425

SST7073 5339 (b) Discretionary SST7073.000 5339 (b) Discretionary TRN F 5339 M 2,978 -6,751,500

L L M 744 8,940,330

SST7073.001 NFR - GET 2017 Vehicle Replacement TRN F 5339 M 759 759 6,450,500

L LO M 190 190

SST7073.002DRCOG - Replace Roof on Platte BusMaint Facility TRN F 5339 M 3,503

L L M 876

SST7074 5339 ( c) LoNo SST7074.000 5339 ( c) LoNo TRN F 5339 M 3,903 4,704,000

L L M 843 6,895,775

SST7075HPTE I-270 Express Lanes Direct ConnectSurvey SST7075.999

HPTE I-270 Express Lanes Direct ConnectSurvey HP6 S HPTE D 300

SST7076 Settlement Trust Funds SST7076.001Gunnison Valley RTA - CNG CoachReplacement STF S MISC M 183

SST7076.002Eagle County - Electric Bus Chargers withInfrustructure STF S MISC M 180

Report ID: STIP02 102 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 103: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST7076.003Eagle County - 40' Electric BusReplacements STF S MISC M 1,402

SST7076.004NFR - Transfort LPG FX CutawayReplacement STF S MISC M 116

SST7076.005 NFR - Transfort eBus Purchase STF S MISC M 937

SST7076.006 NFR - Transfort Charger Purchase STF S MISC M 200

SST7076.007DRCOG - RTD 12 Battery ElectricChargers w/Infrastructure STF S MISC M 1,200

SST7076.008DRCOG - RTD Purchase 15 BatteryElectric Bus Replacements STF S MISC M 7,342

SST7076.009PPACG - Colorado Springs MMT 3 BatteryElectric Buses STF S MISC M 1,633

SST7076.010PPACG - Colorado Springs MMMT 3Chargers STF S MISC M 300

SST7076.011 DRCOG - Boulder Electric Bus STF S MISC M 331

SST7077 Multi-Modal Options Fund Pool SST7077.001 RTD T2 Comprehensive Plan MTF L LO M 1,420 1,160

S MTF M 1,420

SST7078 5310 Enhanced Mobility Pilot Program SST7078.001 PPACG - Envida ICAM TRN F 5310 M 249

L L M 62

SST7100Asset Management - Bridge Culvert TunnelWall SST7100.999

Asset Management - Bridge Culvert TunnelWall BCP F STBG M 800

S SHF M 200

BTP F NHPP M 1,600

S SHF M 400

BWP F NHPP M 800

S SHF M 200

CCP F NHPP M 2,880

S SHF M 720

CTP F NHPP M 2,000

S SHF M 500

SST7102 Asset Management - Safety Funds SST7102.999 Asset Management - Safety Funds FSA S FAS M 64,867

HAZ F HSIP M 3,994

HOT F STBG M 1,733

S SHF M 433

Report ID: STIP02 103 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 104: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

RAG L L M 47

RGS F RRX M 1,393

S SHF M 348

SGN F NHPP M 1,178

S SHF M 294

SST8000 Bridge Enterprise FASTER pool SST8000.000 Bridge Enterprise FASTER pool SSR S FAS C 12,000

S FAS D 2,000 1,000

SST8000.033R3 F-07-V (F-07-A) SH 82 ML (Grand Ave)over I-70ML Garfield FBE L L C 178

SSR S FAS C 3,856

S FAS U 218

SST8000.069R3 D-13-A US 34 ML over N FK ColoradoRiver SSR S FAS C 5,281 284

SST8000.073R1 F-15-BL 1-70 WB over US 6, CLEARCREEK SSR S FAS D 591 1,000

S FAS E 63 1,000

SST8000.079US-85 LOUVIERS TO MP 191.75 BRIDGEENT. SSR S FAS C 3,621

SST8000.083 R3 US 34 Over North Fork Co River SSR S FAS D 134

S FAS U 338

SST8000.084 R2 SH71 L-22-L FASTER ROCKY FORD SSR S FAS C 7,412

SST8000.088 R4 SH 60 Over the South Platte River SSR S FAS R 131 50

SST8000.090 R4 I-25 at Vine Street Bridge Replacement SSR S FAS C 6,971

S FAS R 34

S FAS U 371

SST8000.091 R3 SH 82 Grand Ave Pedestrian Bridge SSR S FAS C 1,370

SST8000.100R2 N-17-BN & N-17-S I-25 overButteCreek SSR S FAS C 9,231 257

SST8000.103 R3 F-09-K US 6 ML over Castle Creek SSR S FAS C 4,195

SST8000.104 R3 F-10-L I 70 ML EBND over US 6 SSR S FAS C 18

SST8000.106 R3 I-05-V SH92 ML over Gunnison River SSR S FAS C 9,000

S FAS D 615

Report ID: STIP02 104 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 105: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

SST8000.119 R2 N-17-AD I-25 ML SB over Us 160 ML SSR S FAS C 10,500

S FAS D 150

SST8000.120R1 E-16-LU & E-16-LT I-76 over ClearCreek WB-NB SSR S FAS C 6,000

S FAS D 670

SST8000.121R3 I-70 over Forest Service Road in EagleCounty SSR S FAS C 5,000

S FAS D 1,505

S FAS M 311 5,000

SST8000.122R2 H-13-G U 285 over S. Fork S. PlatteRiver in Park County SSR S FAS C 5,719

S FAS D 443

SST8000.123R2 K-18-U I-25 SB over Draw in PuebloCounty SSR S FAS C 1,600

S FAS D 453

SST8000.124 R1 F-16-YZ LOMR payment to UDFCD SSR S FAS M 20

SST8000.125R1 10 structures on I-70 between ColfaxAve. and Harlan St. SSR S FAS C 15,664

S FAS D 4,000

SST8000.126R2: Concrete Box Culvert and Metal PipeCulvert Replacement FBE F BRO C 10,345

F BRO D 2,129

SSR S FAS D 1,471

SST8000.127R1/R4: Eastern Plains Timber BridgeReplacement Program SSR S FAS C 20,000

S FAS D 738 4,000

SST8000.128R4-US 34 ML over N FRK REPUBLICANRIVER SSR S FAS C 3,000

S FAS D 607 75

SST8000.129R1 H-17-CH & H-17-CI I-25 ML NB/SBover County Road SSR S FAS C 5,041

SST8000.130R1 E-16-EO/EW Speer over I-25 ML and23rd Ave in Denver SSR S FAS D 1,850 3,127 40,873

S FAS E 2,000

SST8000.131 R2 M-22-N SH71 Over Highline Canal SSR S FAS C 1,500

S FAS D 525

SST8000.132R2 M-24-A SH101 ML over Draw in BentCountyy SSR S FAS C 1,300

Report ID: STIP02 105 of 106 Last Refresh: 09/24/2020 11:57 AM

Page 106: Statewide Transportation Improvement Program Summary...2020/09/24  · 01 SDN6678 Region 1 Rockfall Mitigation Pool SDN6678.002 US 6: Clear Creek Canyon Rockfall Project RFM S SHF

Statewide Transportation Improvement Program Summary

Dollars in ThousandsData as of September 24, 2020

CDOTRegion STIP ID STIP ID Description STIP WBS ID STIP WBS Description

FundingProgram

FundSource

FundType

STIPPhase 2019 Rolled 2020 Rolled 2021 2022 Future

S FAS D 375

SST8000.133R2 M-24-I SH101 over Draw in BentCounty SSR S FAS C 1,300

S FAS D 375

SST8000.134R2 H-19-C US 24 over Draw in El PasoCounty SSR S FAS C 2,000

S FAS D 250

SST8000.135R5 P-12-A US285 over Rio ConejosOverflow in Conejos County SSR S FAS D 192

SST8000.136R2 I-17-GQ/GR I-25 ML Over S. AcademyBlvd in El Paso County SSR S FAS D 1,483

SST8000.137R3 D-04-G/A SH64 over Strawberry Creek& White River SSR S FAS C 7,000

S FAS D 621

SST8000.138R3 F-11-AD 1-70 ML over US6, RR, andEagle River SSR S FAS M 541

SST8000.139R2 H-17-CF COUNTY LINE ROAD overI-25 ML (South GAP Pkg. 4) SSR S FAS C 6,177

S FAS D 1,343

SST8000.140R4 D-28-P US 34 over REPUBLICANRIVER SSR S FAS C 3,569

SST8001 Central 70 - I-70 from I-25 to Colorado Blvd SST8001.999 Central 70 - I-70 from I-25 to Colorado Blvd CDR F AQC C 16,000 12,500 12,500

SSR S FAS C 16,000 46,000 60,000

S FAS E 2,696

S FAS U 11,215

Report ID: STIP02 106 of 106 Last Refresh: 09/24/2020 11:57 AM