347 North Dunbndge Road Bowling Green, OH 43402-9398 p State of Ohio Environmental Protection Agency Northwest District Office TELE: (419)352-8461 FAX: (419) 352-8468 www.epa.stata.ah.us Ted Strickland, Governor Lee Fisher, Lieutenant Governor Chris Korleski, Director Re: Williams County Holiday City SSO NPDES Permit February 28, 2008 Ms. Pam Lucas, Manager Village of Montpelier 211 North Jonesville Street P. 0. Box 146 Montpelier, Ohio 43543 Dear Ms. Lucus: On January 4, 2008, Tanushree Courlas conducted an inspection of the Holiday City Sanitary Sewer Overflow (SSO). Mr. Patrick Oxender, Superintendent, was present and provided information regarding the events leading to and actions taken since the overflow occurred. During our visit, the following was observed: 1: A portable diesel powered pump was in place and directing wastewater from the Pump Station wet well to the discharge line to the Montpelier Sanitary Sewer, System. 2. Residual sludge was observed around the fenced area as well as down towards the ditch. Any remaining sludge, or other overflow debris, needs to be treated with lime and disposed of as required by your National Pollutant Discharge Elimination System (NPDES) permit. 3. Since all three available pumps, including the spare pump, were inoperable during this event, the maintenance plan for the pump station needs to be re- evaluated. A functioning spare pump must be available at all times. The failureof all three pumps needs to be investigated to determine the exact cause and to prevent future un-permitted discharges. The results of this investigation should be submitted to our office by March 28, 2008. 4. During further investigation, it was observed that the manhole upstream of the lift station had also overflowed. This SSO was not reported as required by your permit. This is a violation of your NPDES permit. A 5-day follow-up report should be sent separately for this SSO. Residual sludge was observed around the affected manhole. All sludge needs to be treated with lime and disposed of as required by your NPDES permit. Printed on Recycled Paper Ohio EPA is an Equal Opportunity Employer

Upload: others

Post on 21-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Station - Ohio EPAchagrin.epa.ohio.gov/edoc/images/62000/620000009.pdfOn January 4, 2008, Tanushree Courlas conducted an inspection of the Holiday City Sanitary Sewer Overflow (SSO)

347 North Dunbndge RoadBowling Green, OH 43402-9398

pState of Ohio Environmental Protection Agency

Northwest District OfficeTELE: (419)352-8461 FAX: (419) 352-8468

www.epa.stata.ah.usTed Strickland, Governor

Lee Fisher, Lieutenant GovernorChris Korleski, Director

Re: Williams CountyHoliday City SSONPDES Permit

February 28, 2008

Ms. Pam Lucas, ManagerVillage of Montpelier211 North Jonesville StreetP. 0. Box 146Montpelier, Ohio 43543

Dear Ms. Lucus:

On January 4, 2008, Tanushree Courlas conducted an inspection of the Holiday CitySanitary Sewer Overflow (SSO). Mr. Patrick Oxender, Superintendent, was presentand provided information regarding the events leading to and actions taken since theoverflow occurred.

During our visit, the following was observed:

1: A portable diesel powered pump was in place and directing wastewater from thePump Station wet well to the discharge line to the Montpelier Sanitary Sewer,System.

2. Residual sludge was observed around the fenced area as well as down towardsthe ditch. Any remaining sludge, or other overflow debris, needs to betreated with lime and disposed of as required by your National PollutantDischarge Elimination System (NPDES) permit.

3. Since all three available pumps, including the spare pump, were inoperableduring this event, the maintenance plan for the pump station needs to be re-evaluated. A functioning spare pump must be available at all times. The failureofall three pumps needs to be investigated to determine the exact cause and toprevent future un-permitted discharges. The results of this investigationshould be submitted to our office by March 28, 2008.

4. During further investigation, it was observed that the manhole upstream of the liftstation had also overflowed. This SSO was not reported as required by yourpermit. This is a violation of your NPDES permit. A 5-day follow-up reportshould be sent separately for this SSO. Residual sludge was observed aroundthe affected manhole. All sludge needs to be treated with lime and disposedof as required by your NPDES permit.

Printed on Recycled Paper Ohio EPA is an Equal Opportunity Employer

Page 2: Station - Ohio EPAchagrin.epa.ohio.gov/edoc/images/62000/620000009.pdfOn January 4, 2008, Tanushree Courlas conducted an inspection of the Holiday City Sanitary Sewer Overflow (SSO)

Ms. Pam Lucas, Managip, 4

February 28, 2008Page 2

5. No samples were taken at the time of inspection.

Pictures taken during the inspection are attached for your convenience. If you have anyquestions, please call Tanushree Courlas at (419) 373-3053.

Yours truly,

Elizabeth A. Wick, P.E.District EngineerDivision of Surface Water

Ill r

Enclosures

PC: Mr. Patrick Oxender, Superintendent w/enclosuresMayor and Council w/enclosures

Page 3: Station - Ohio EPAchagrin.epa.ohio.gov/edoc/images/62000/620000009.pdfOn January 4, 2008, Tanushree Courlas conducted an inspection of the Holiday City Sanitary Sewer Overflow (SSO)

tjrv 'wr O ri1v, Juiurv 4.

railroad ditch.

Picture taken by TanushreeCourlasJanuary 4th, 2008

1 lolidav? City , Ohioi

1.oation where overflow originatedfrom lift station in Holiday City.

I Picture taken by TanushreQ CourlasJanuary 4 111 , 2008

Holiday City, OhioI ----------------------------

t(..pc

k.

-; 'ir.•I' d

- . -. .. • ,...•. -. •ç' '1 ;-.'_2 Li.wV

/-,1'11r

------------------------

1 Fungus that had formed from the sewageoverflow towards the railroad ditch.

Picture taken by Tanushree Courlas

I January 4th, 2008Holiday City , Ohio

I ------------------------------

Page 4: Station - Ohio EPAchagrin.epa.ohio.gov/edoc/images/62000/620000009.pdfOn January 4, 2008, Tanushree Courlas conducted an inspection of the Holiday City Sanitary Sewer Overflow (SSO)

}ioItdLl\' Cit y SanLirv Sver Overfkw, 1anurv 4, 8

Hewer overflow entry poinL

Picture taken by Tanushree CourlasJanuary 41h, 2008

Holida y City, Ohio

Upstream of sewer overflow entry point.

Picture taken by Tanushree CourlasJanuary 4 111 , 2008

}Iolidav City, OhioI

DownstTealu of sewer overflow ent point.

Picture taken by Tanushree CourlasJanuary 4th, 2008 I

holiday City , Ohio

Page 5: Station - Ohio EPAchagrin.epa.ohio.gov/edoc/images/62000/620000009.pdfOn January 4, 2008, Tanushree Courlas conducted an inspection of the Holiday City Sanitary Sewer Overflow (SSO)

Upstream manhole oil NI.

Picture taken b 'I'anushree CourlasJanuary 41h, 2008

SSO from upstream manhole of CR NI.

Picture taken h' Tanushree CourlasJanuary 41h, 2008

Holiday City, OhioI

Holida y Cliv SdntLtrv \vt'r Cs rI1iw, anudrv 4,

Close-up of sludge from SSO from Manhole on CR NI

Picture taken h' Tanushree CourlasJanuary 41h, 2008

Flolidav City, Ohio