Page 1: Status EuropeanaConnect May 2010

www.europeanaconnect.eu

Introduction

EuropeanaConnect All-Staff Meeting

Berlin, May 10–12, 2010

Max Kaiser, Austrian National Library

Page 2: Status EuropeanaConnect May 2010

Welcome to the All-Staff Meeting!

Page 3: Status EuropeanaConnect May 2010
Page 4: Status EuropeanaConnect May 2010

Introduction

• This is a quite big meeting….

• This is the end of successfulproject year…

• Project established as largest single Europeana technology provider

• Goals of the All-Staff Meeting:• Get up-to-date about the different strands of work• Open the “work silos” and profit from synergies

Page 5: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Meeting structure

• Plenary sessions• Update on achievements

in all work packages

• Demonstrations of project results

• Updates on Europeana and sync with Europeana developments

• Administrative issues

• Dissemination and project marketing

• Parallel sessions• All-Developers meetings

• Work packages meetings

• Inter-WP meetings for synchronisation

Page 6: Status EuropeanaConnect May 2010

Looking foward to three productive and pleasant days!

Page 7: Status EuropeanaConnect May 2010

www.europeanaconnect.eu

Status of EuropeanaConnect

EuropeanaConnect All-Staff Meeting

Berlin, May 10–12, 2010

Max Kaiser, Austrian National Library

Page 8: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

A unusual project …

• EuropeanaConnect is a unusual European project:• We don't only have to deliver according to our Description of Work• But also according to the release planning and requirements of

Europeana

• In the end: we will be measured for our success in delivering sustainable products for Europeana

• This is what will remain from the project (hopefully…)

• In contrast to many other projects, most EuropeanaConnect deliverables are not prototypes but should be production-ready components

• Requires a very different project culture and a different approach to planning!

Page 9: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Rhine and Danube…

Page 10: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Complexity and synchronisation

• Main challenge in year 1:

• Synchronise the project with the requirements and planning of Europeana

• Europeana Techical Requirements:• Use cases

• Coding requirements

• Development environment

• Release schedule

• Europeana Business and Policy Requirements:• Branding and marketing

• Data Provider Agreements (Licensing Framework)

• User Generated Content Policy (Annotations)

• User Testing

Page 11: Status EuropeanaConnect May 2010

http://www.armypictorialcenter.com/the_big_picture.htm

Page 12: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Key Objectives of EuropeanaConnect

1. Provide a critical mass of audio content to Europeana and implement an audio-enabling infrastructure

2. Build the Semantic Layer for Europeana

3. Facilitate multilingual access to Europeana

4. Develop novel access channels to Europeana (like mobile access)

5. Provide tools and methodologies for user-driven development and for testing and evaluation

6. Build value-added services (like e-Books-on-Demand)

7. Implement key infrastructure components (like OAI-PMH infrastructure)

8. Build the Europeana Licensing Framework

9. Enable stronger and wider collaborative networking

Page 13: Status EuropeanaConnect May 2010

http://static.open.salon.com/files/applause1234363884.gif

Achievements in Year 1

Page 14: Status EuropeanaConnect May 2010

Add the music dimensionto Europeana

Page 15: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

New audio content for Europeana

• EuropeanaConnect will add the music dimension to Europeana

• WP6, lead by RBB

• Five audio archives are consortium members

• Continuous approach to involvement of new audio archives for the entire duration of the project

Page 16: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Main strands of work / Highlights | 1

• Europeana Audio Aggregation Platform (AAP)

• Based on already existing DISMARC portal and infrastructure

• Used for harvesting, analysing and storing audio metadata

• Mapping adjusted, improved connectivity and more storage space on server (used by audio content providers)

• New audio integrated by upload and by links into the AAP

• Data provision for Europeana using OAI-PMH

• How to start?• Audio Starter Kit on EuropeanaConnect Website

http://www.europeanaconnect.eu/results-and-resources.php

• Describes process of providing audio content to Europeana via the AAP

Page 17: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Main strands of work / Highlights | 2

• Already 41.000 items aggregated from 100 collections in 16 countries

• Most items already available via Europeana

• Estimated 150.000 – 200.000 music tracks by project end

• Continuous dissemination, Newsletters, personal contacts etc.

• Targeting at and in contact with more than 300 potential partners

Page 18: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Challenges / Next Steps

Challenges:• Uncertainty about IPR issues underlying most communications

• Approached by delivering necessary information • Audio archives extremely hesitant towards joint operations

• Answered by various activities• Only now Europeana Data Provider Agreement available

Next steps:• Workshop in September• Active newsletter publishing • Handbook for content owners under preparation • Work with the provider agreement

Page 19: Status EuropeanaConnect May 2010

Building the Semantic Layer

Page 20: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Build the Europeana Semantic Layer

• WP1, lead by HUB• Organise Europeana data space as network of interlinked resources for

object discovery and further use

• Prerequisite for integration of and with other semantically aware WWW services

• Build a repository of harvested semantic resources

• Vocabularies, classification schemes …

• Convert data into semantic representations

• Semantic processing will mostly use SKOS

• Semantically enrich Europeana content by mapping it to these semantic representations

Page 21: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Main strands of work / Highlights

• Survey of controlled and structured vocabularies among Europeana data providers

• Successful migration of selected vocabularies to SKOS

• Specification of semantics functionality• Checking with selected expert users

• Substantial contribution to the Europeana Data Model (EDM)• Specification and stabilisation of the EDM

Page 22: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Challenges and next steps

Challenges:

• Triggering the EDM development

• Getting commitment for an EDM-based planning

Next steps:

• Contribute to Europeana v1.0, making the EDM and related functionality part of the 'Danube' specifications

• Continue work on data migration and (semi-)automated object contextualisation

Page 23: Status EuropeanaConnect May 2010

Multilingual Access

Page 24: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Multilingual Access to Europeana

• WP2, lead by HUB

• Provide multilingual access capabilities for Europeana• Users should be able to find relevant content even if its not described in their

native / preferred language

• Build Europeana Repository of Language Resources

• Tools for multilingual mapping of controlled vocabularies

• Suite of translation services for querying and browsing

• Supported set of languages:• Start with English, French, German, Italian, Spanish, Polish

• Expand with Dutch, Hungarian, Portuguese, Swedish

Page 25: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Main strands of work / Highlights

• Report on User Preferences and Information Retrieval Scenarios for Multilingual Access in Europeana

• Specification and development of the Europeana Language Resources Repository

• Currently in review

• Multilingual mapping of controlled vocabularies• Languages and vocabularies for selection

Page 26: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Challenges / Next steps

Challenges:• Data gathering

• Licensing issues

• Criteria for construction of repository

• Evaluation of language resources

Next steps:• Populating the Europeana Language Resource Repository

• Selection of vocabularies in different languages for mapping

• Query Translation Module

Page 27: Status EuropeanaConnect May 2010

What do users really want?

Page 28: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

User Orientation – Why, How?

• Why:• We want Europeana to be used widely by people• We are not necessarily identical with these ”people”

• How:• Log file analysis• Personas• Surveys• User Tests

• Part of WP3, lead by KB-DK

Page 29: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Log File Analysis

• Task 3.1, UCLC

• Log File Analysis for Europeana to evaluate the use of the services

• How do users really navigate and search in Europeana?

• Method: Deep log analysis

• First log file analysis report fed into version 1

Page 30: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Personas / User Testing

• Task 3.2, KB-DK

• Development of Europeana Personas• Archetypical representations of our users

• Workshop on Personas

• Personas Catalogue completed• 7 personas and relating scenarios defined• Should guide development process

• User Testing of Europeana services with different user communities

• Registry of Test Users

• First draft of Usability Guidelines

Page 31: Status EuropeanaConnect May 2010

New Access Channels to Europeana

Page 32: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Spatio-temporal User Interface

• Task 3.3, UGOE

• Make use of time-related and geographical metadata of the Europeana Semantic Layer

• Provide a new visual access channel for Europeana• Combination of spatial and temporal metadata for visualisation

• Interactive and generic map of geo-related tagged events, places and characters in Europe – combined with timeline

• Prototype of spatio-temporal interface and search available• Pure JavaScript based approach on the client side• Different possible back-ends for maps

Page 33: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Prototype of the Spatio-temporal User Interface

Page 34: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Mobile Access Channel to Europeana

• Task 3.4, OFFIS

• Generic Mobile Client, adapting to the user‘s mobile device

• 2 main requirements:• Adaptation of the mobile Europeana portal

to the capabilities of the user's mobile device • Location-based searching

• Allow users to search for works inside Europeanaaround their current position

• Integration with Europeana

• Basic mobile interface for Rhine Release

Page 35: Status EuropeanaConnect May 2010

User Generated Content

Page 36: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Annotation Service

• Task 5.6, ARC-AIT

• Allows users to make their own contribution to Europeana content

• Annotation of multimedia resources

• Comments, discussion, linking

• Add value to existing content

• Enhance Europeana searchability through user-provided metadata

• Annotation Tool Suite fully integrated with the Europeana Portal

• Acceptance tests have been executed, currently under review

Page 37: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Image Annotations

Page 38: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Video Annotations

Page 39: Status EuropeanaConnect May 2010

eBooks-on-Demand

Page 40: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

eBooks-on-Demand

• Task 5.7, UIBK

• Integration of eBooks on Demand (EOD) Service into Europeana• Existing digitisation-on-demand service

• http://www.books2ebooks.eu/

• Allow for an automatic and generic transfer of Books from EOD to Europeana

Status:

• EOD harvesting and metadata aggregation infrastructure implemented

• EOD workflow software adapted to include workflow for metadata submission and Print-on-Demand

• 1st prototype of the EOD connector will be implemented by July

Page 41: Status EuropeanaConnect May 2010

Back-office Components

Page 42: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Europeana OAI-PMH Management Infrastructure (REPOX)

Part of WP5, managed by ARC-AIT

• Task 5.3, IST

• REPOX: Service for metadata harvesting from a large number of OAI data providers

• Management of OAI data providers of administration of harvested metadata records

• First REPOX prototype available

• Functionally complete version in June

• Aligned with Europeana technology specifications in October

Page 43: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Metadata and Service Registries

• Europeana Metadata Registry• Task 5.1, IST

• Registration and management of metadata terms and schemas created by various communities in multiple contexts

• Specification and Design document in review

• Europeana Service Registry• Task 5.2, KB

• Will manage service descriptions of Web Services and support integration of external services into Europeana

• Final prototype and documentation delivered

• Server integration for both Europeana and The European Library will be implemented by end of May

Page 44: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Europeana Persistent Identifier Resolution Service (ERDS)

• Task 5.4, DNB

• Meta-Service: forward Persistent Identifier resolution requests to resolution services of national libraries and other identifier networks

• Two-day workshop on PIs on 17/18 February 2010 at DNB in Frankfurt

• Report available on EuropeanaConnect Website

• Alpha version of ERDS available

• Final version will be implemented by July

Page 45: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Integration of Geographical Information Services

• Task 5.5, BNP

• Geoparser and Gazetteer: will enrich Europeana metadata and content with explicit geographical metadata and references

• Protoypes and showcases of both tools available

• 2nd Protoypes will be implemented by July

Page 46: Status EuropeanaConnect May 2010

And now for the legal stuff…

Page 47: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Europeana Licensing Framework

• WP4, BNL

• EuropeanaConnect is building the Europeana Licensing Framework

• Goals:

• Create and validate the Data Provider and Aggregator Agreements which govern the Europeana Rhine release

• Create the draft Europeana Licensing Framework and validate it

• Build, test and validate tools for implementation of the Framework

Page 48: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Main strands of work / Highlights

• Data Provider and Data Aggregator Agreements• Collecting requirements, several consultation rounds and final validation for

Rhine Release

• Final versions released in late April

• Europeana Public Domain Charter• Controversial topic, as tightly linked to funding of digitisation programs

• Endorsed by Europeana Foundation and European Commission

• Positive reactions

• Public Domain Helper tools• Defining decision trees to translate the law into a tool to decide if a work is in

the public domain

• Available in Beta Version

Page 49: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Challenges / Next steps

• Multi stakeholder nature of rights issues made progress in legal questions slow and complex

• Next steps:• Collecting feedback on agreements from commercial partners and

those beyond the immediate cultural heritage sector• Planning the Danube legal framework

Page 50: Status EuropeanaConnect May 2010

Status EuropeanaConnect Max Kaiser, Austrian National LibraryEuropeanaConnect All-Staff Meeting, Berlin, 10–12 May 2010

www.europeanaconnect.eu

Image Credits

• http://www.bildarchivaustria.at• http://en.wikipedia.org/wiki/File:Eyjafjallajokull_volcan

o_plume_2010_04_18.JPG• http://www.liverpoolmuseums.org.uk/conservation/exh

ibitions/metropolis/graphics/large/meccano_factory.jpg

• http://commons.wikimedia.org/wiki/File:Bundesarchiv_B_145_Bild-P101341,_Berlin,_Hochhaus_Sender_Freies_Berlin.jpg

• http://web.fu-berlin.de/chronik/picts/sitin-gr.jpg • http://upload.wikimedia.org/wikipedia/commons/d/d0/L

oreley_mit_tal_von_linker_rheinseite.jpg

• http://de.wikipedia.org/w/index.php?title=Datei:Donaueschingen_Donauzusammenfluss_20080714.jpg&filetimestamp=20090102094801

• http://www.zoonar.de/img/www_repository3/a9/4a/b9/10_ff3477d256c76a48a9e0c384c3144692.jpg

• http://www.armypictorialcenter.com/The_Big_Picture_2.JPG

• http://static.open.salon.com/files/applause1234363884.gif

• http://www.theaudioarchive.com/images/STUDER-A810-VU-sm.jpg

• Max Kaiser• http://upload.wikimedia.org/wikipedia/commons/e/e1/

Brueghel-tower-of-babel.jpg• http://www.flickr.com/photos/nationallibrarynz_commo

ns/3326203787/• http://www.openpr.de/images/articles/b/2/b23be7b165

a6cf0e415d2794eb0df18c_g.jpg

• http://www.imdb.com/media/rm3515258880/tt0060827 • Max Kaiser• http://www.flickr.com/photos/cobra/5465955/ • http://www.onb.ac.at• http://www.bildarchivaustria.at• http://www.nps.gov/brvb/historyculture/justices.htm • http://blogs.voices.com/voxdaily/thank-you-

blackboard.jpg• http://upload.wikimedia.org/wikipedia/commons/

0/00/Bundesarchiv_B_145_Bild-P101340,_Berlin,_Hochhaus_Sender_Freies_Berlin.jpg

Page 51: Status EuropeanaConnect May 2010

[email protected]

http://www.onb.ac.at http://www.europeanaconnect.eu

http://www.linkedin.com/in/maxkaiser http://www.slideshare.net/maxkaiser http://twitter.com/maxkaiser

Page 52: Status EuropeanaConnect May 2010

Looking forward to a successful and productive

meeting!