STEAM SYSTEMS

Critical Components of Detailed Design Drawings

Page 2: STEAM SYSTEMS - District Energy

Communicate Design Concepts

Expansion: Anchoring and Movement

Flow: Draining and Trapping

Access: Maintenance, Egress, and Water!

What you should expect

Discussion

Steam System Designs

Page 3: STEAM SYSTEMS - District Energy

System Schematics

Expansion Concepts

Anchors

Joints

Loops

Flow of Systems

Traps, Valves, Service Points

Problems?

Page 4: STEAM SYSTEMS - District Energy

Campus Steam Schematic

Page 5: STEAM SYSTEMS - District Energy

Horizontal Loops Vertical Loops

Slip Pack Joint Ball Joint Bellows Joint

Externally Pressurized

Bellows Joint

Piping Expansion Compensation

Page 6: STEAM SYSTEMS - District Energy

Expansion – Anchoring and Movement

Tunnel Systems

Typically Anchors, Guides, Slides and Joints

Direct Buried Systems

Typically Anchors and Loops

Sometimes Joints

Mixed Systems

Critical to understand Design

Page 7: STEAM SYSTEMS - District Energy

Expansion – Anchor Forces

559 LBF

(Thermal)

200 LF 6” SCH STD A106 Carbon Steel

125 PSIG Sat Steam (353ºF, 50ºF ambient)

9,435 LBF

(Hydrostatic)

10,312 LBF

(Thermal)

Externally Pressurized Bellows

Guided Loop

Slip Type Expansion Joint

Page 8: STEAM SYSTEMS - District Energy

Triflex® Software

Forces, Stresses, Supports and Deflections

Determine Anchor Locations

Compliance with ASME B31.1

Guides and Supports

Deflection Calculations

Page 9: STEAM SYSTEMS - District Energy

Anchor Design

Control Movement, transmit forces

Page 10: STEAM SYSTEMS - District Energy

Supports and Deflections

Design expected movements of guides and slides

Cold Hot!

Page 11: STEAM SYSTEMS - District Energy

So far we have…

Knowledge of System-

Expansion and Anchoring

Flow

Isolation

Detailed Component Design

Anchor Details

Supports, Slides and Guides

Movement of System

Page 12: STEAM SYSTEMS - District Energy

System Plan

Ball

Loop

EPB

Page 13: STEAM SYSTEMS - District Energy

System Plan

Page 14: STEAM SYSTEMS - District Energy

System Profile

Profile design is critical to controlling condensate

System Schematic – add elevations and traps

Page 15: STEAM SYSTEMS - District Energy

System Profile

Page 16: STEAM SYSTEMS - District Energy

System Profile

Page 17: STEAM SYSTEMS - District Energy

Now we’ve added…

Design and Identify the trapping concepts

Detailed Plans

Based on good survey information

Detailed Profiles

Get utility crossings identified!

Page 18: STEAM SYSTEMS - District Energy

Vault Details

Manway Access and Egress

Number, Size, Configuration, Covers

Ladder Position

Relationship to Service Items

Mechanical Details

Valves, Drip Legs, Traps, Pumps, etc.

Ventilation

Waterproofing

Page 20: STEAM SYSTEMS - District Energy

Vault Details

Valve Position

Valve Orientation

Trap Position

Removable

Expansion

Insulation

Redundant

Testable

Page 21: STEAM SYSTEMS - District Energy

Vault Details

Page 22: STEAM SYSTEMS - District Energy

Vault Details

Supports

Penetrations

Auxiliaries

Page 23: STEAM SYSTEMS - District Energy

Ventilation

Natural Convection

Forced Ventilation

Page 24: STEAM SYSTEMS - District Energy

Water!

Waterproofing approach

Multiple lines of defense

Backup Plan!

Page 25: STEAM SYSTEMS - District Energy

Waterproofing Systems

Integrally bonded membrane

Bentonite / HDPE

Bituthene Membrane

Fluid applied system

Page 26: STEAM SYSTEMS - District Energy

Waterproofing

If it’s not on the bottom too, you might as well skip

Concrete Admixtures

Joint Sealants and Waterstops

Page 27: STEAM SYSTEMS - District Energy

Waterproofing – Pipe Penetrations

Page 28: STEAM SYSTEMS - District Energy

Waterproofing – Backup Plan

Steam powered pump

Electric Pump

Temporary pump provisions

Page 29: STEAM SYSTEMS - District Energy

Waterproofing – Backup Plan

Gravity Drain

Page 30: STEAM SYSTEMS - District Energy

Design Intent, Details and Schedules

State Design Intent and Assumptions

Details, Details, and more Details

Schedules

Page 31: STEAM SYSTEMS - District Energy

The Checklist

System Schematic – Design Intent

Expansion Concept – Anchors, Joints, Loops, etc.

Draining Concept – Profiles, Traps

Flow Concept – Direction, Isolation and Trapping

Access, Operability and Maintainability

Details Details Details

Schedules – Information on Drawings

Page 32: STEAM SYSTEMS - District Energy

Thank you!

Vance Nall, PE