Steve Norfleet, PESteve Norfleet, PESteve Norfleet, PESteve Norfleet, PE
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.
Energy, Utility and Environmental ConferenceEnergy, Utility and Environmental Conference
Phoenix, Arizona Phoenix, Arizona -- February 3February 3--5, 20145, 2014
�� MATS Applies to Coal and OilMATS Applies to Coal and Oil--fired EGUs fired EGUs
�� Notification of Applicability was Due 8/14/12Notification of Applicability was Due 8/14/12
�� PM, Hg, and PM, Hg, and HClHCl (or SO(or SO22) Limits/Monitoring) Limits/Monitoring
�� Reporting Requirements:Reporting Requirements:
�� NotificationsNotifications�� NotificationsNotifications
�� Monitoring and QA PlansMonitoring and QA Plans
�� QA Test ResultsQA Test Results
�� Monitored EmissionsMonitored Emissions
�� Excess Emissions and Excess Emissions and
Deviation ReportsDeviation Reports
�� MATS Rule and Part 63 General ProvisionsMATS Rule and Part 63 General Provisions
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
�� Must Qualify Using CEMS or Test DataMust Qualify Using CEMS or Test Data
�� Same Subcategory and Same FacilitySame Subcategory and Same Facility
Due: 120 days before 4/16/15Due: 120 days before 4/16/15(submittal upon requested)(submittal upon requested)
§§ 63.10009(f)63.10009(f)
�� Same Subcategory and Same FacilitySame Subcategory and Same Facility
�� Same Basis for Group (lb/MMBtu or lb/MW)Same Basis for Group (lb/MMBtu or lb/MW)
�� Allow Units that “OverAllow Units that “Over--Controlled” to Controlled” to Compensate for “UnderCompensate for “Under--Controlled” UnitsControlled” Units
�� Deadline Does Not Seems to Allow Later Deadline Does Not Seems to Allow Later Choice of this Option Choice of this Option
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
�� Differs from Part 75 Monitoring PlanDiffers from Part 75 Monitoring Plan
Due: 60 Days before Initial Due: 60 Days before Initial Performance Evaluation Performance Evaluation (submittal upon requested)(submittal upon requested)
§§ 63.10000(d)(1)63.10000(d)(1)
�� Differs from Part 75 Monitoring PlanDiffers from Part 75 Monitoring Plan
�� Sampling Location & Control DevicesSampling Location & Control Devices
�� Performance Specifications & SchedulePerformance Specifications & Schedule
�� QA, Operation and Maintenance ProceduresQA, Operation and Maintenance Procedures
�� RecordRecord--Keeping and Reporting ProceduresKeeping and Reporting Procedures
�� Compliance Between Performance TestsCompliance Between Performance Tests
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
Due: 60 days before Due: 60 days before performance testperformance test
§§ 63.7(b)63.7(b)
�� Initial and Ongoing Performance TestsInitial and Ongoing Performance Tests
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
Due: 60 days beforeDue: 60 days beforeperformance evaluationperformance evaluation
§§ 63.8(e)(2)63.8(e)(2)
�� Initial Certification, RATAs, RCAs, RRAsInitial Certification, RATAs, RCAs, RRAs
�� PM CEMS, Hg CEMS and HCl CEMSPM CEMS, Hg CEMS and HCl CEMS
Due: No SpecificDue: No Specific -- Before Before certificationcertification
e.g., e.g., §§5.4.3.2, App 5.4.3.2, App A for Hg sorbent A for Hg sorbent trap systemstrap systems
�� “Step“Step--byby--Step” Procedures for QA/QC and Step” Procedures for QA/QC and Preventive MaintenancePreventive Maintenance
�� Data Recording, Calculations, and ReportingData Recording, Calculations, and Reporting
�� Corrective Action Program for MalfunctionsCorrective Action Program for Malfunctions
�� For Hg CEMS, Must Detail Ongoing Procedures For Hg CEMS, Must Detail Ongoing Procedures to Maintain Calibrator NISTto Maintain Calibrator NIST--TraceabilityTraceability
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
�� Test Program SummaryTest Program Summary
Due: 60 calendar days before Due: 60 calendar days before performance test performance test (submittal upon request)(submittal upon request)
§§ 63.7(b) and (c)63.7(b) and (c)
�� Test Program SummaryTest Program Summary
�� Test ScheduleTest Schedule
�� Data Quality ObjectivesData Quality Objectives
�� Internal & External QA ProgramsInternal & External QA Programs
�� Assessment of Test Data PrecisionAssessment of Test Data Precision
�� Include Blind Audit Samples (When Available)Include Blind Audit Samples (When Available)
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
Due: 60 days prior to Due: 60 days prior to scheduled performance scheduled performance evaluationevaluation(submittal upon request)(submittal upon request)
§§ 63.8(e)(3)63.8(e)(3)
�� SiteSite--Specific Performance Evaluation Plans forSpecific Performance Evaluation Plans for
Certification Tests, RATAs, RCAs, RRAsCertification Tests, RATAs, RCAs, RRAs
�� Program Summary & ScheduleProgram Summary & Schedule
�� Data Quality ObjectivesData Quality Objectives
�� Internal and External QA program DetailsInternal and External QA program Details
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
�� Source/Controls/Fuels DescriptionSource/Controls/Fuels Description
Due: 60 days after completion Due: 60 days after completion of performance test and/or of performance test and/or compliance demonstrationcompliance demonstration
§§ 63.9(h)63.9(h)§§ 63.9,63.10030(e)63.9,63.10030(e)§§ 63.10031(f)(4)63.10031(f)(4)
�� Source/Controls/Fuels DescriptionSource/Controls/Fuels Description
�� Performance Tests Results SummaryPerformance Tests Results Summary
�� Methods Used to Determine ComplianceMethods Used to Determine Compliance
�� Summary of Deviations /Summary of Deviations / “Operational “Operational changes...that could increase emissions"changes...that could increase emissions"
�� Certifications Signed by “Responsible Official”Certifications Signed by “Responsible Official”
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
�� Submitted via ERT/CEDRISubmitted via ERT/CEDRI
Due: 60 days after the date of Due: 60 days after the date of completing each performance completing each performance test or evaluationtest or evaluation
§§ 63.10031(f)63.10031(f)
�� Submitted via ERT/CEDRISubmitted via ERT/CEDRI
�� Performance Tests, RATA, RCA and RRA dataPerformance Tests, RATA, RCA and RRA data
�� Duplicative Reporting (RATAs also Reported Duplicative Reporting (RATAs also Reported Using ECMPS)Using ECMPS)
�� ERT ERT -- Problematic Format and Unnecessary Problematic Format and Unnecessary Level of DetailLevel of Detail
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
�� Electronic Report Submitted via CEDRIElectronic Report Submitted via CEDRI
�� Source and Monitoring IdentificationSource and Monitoring Identification
Due: Every 7/31 or 1/31Due: Every 7/31 or 1/31FirstFirst Report: Report: 1/31/161/31/16
§§ 63.10031(a)(1)63.10031(a)(1)
�� Source and Monitoring IdentificationSource and Monitoring Identification
�� Emission Limitations (lb/MMBtu or lb/MW)Emission Limitations (lb/MMBtu or lb/MW)
�� QA/QC and Operating SummaryQA/QC and Operating Summary
�� Date of Recent and Next Scheduled TuneDate of Recent and Next Scheduled Tune--upup
�� Excess Emissions/Monitoring Downtime Excess Emissions/Monitoring Downtime
�� Duration/Reason and Action CodesDuration/Reason and Action Codes
�� Report for Each ParameterReport for Each ParameterRMB Consulting & Research, Inc.RMB Consulting & Research, Inc.
Providing Environmental Services to Industry
�� SOSO22, Hg and HCl CEMS or Sorbent Trap Data , Hg and HCl CEMS or Sorbent Trap Data Reported via ECMPSReported via ECMPS
Due: 30 Days after the End of Due: 30 Days after the End of each Quartereach Quarter
§§ 63.10031(f)63.10031(f)
Reported via ECMPSReported via ECMPS
�� Draft MATS ECMPS Reporting Instructions Draft MATS ECMPS Reporting Instructions and XML Schemasand XML Schemas
�� Initial Drafts Initial Drafts –– April 2013April 2013
�� Reporting Instruction Revisions 12/13 and 1/14Reporting Instruction Revisions 12/13 and 1/14
�� Sorbent Traps Transitions / Optional RecordsSorbent Traps Transitions / Optional Records
�� Upcoming Webinar Upcoming Webinar –– 2/6/142/6/14
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
�� All Data All Data –– Including Startup/ShutdownIncluding Startup/Shutdown
�� Hourly (lb/MMBtu or lb/MWh)Hourly (lb/MMBtu or lb/MWh)
�� Auxiliary Parameters (e.g., Diluent, Moisture)Auxiliary Parameters (e.g., Diluent, Moisture)
�� Currently No Diluent Cap Except for HgCurrently No Diluent Cap Except for Hg
�� BAF and Missing Data Do Not ApplyBAF and Missing Data Do Not Apply�� BAF and Missing Data Do Not ApplyBAF and Missing Data Do Not Apply
�� QA/QC Including Weekly Integrity ChecksQA/QC Including Weekly Integrity Checks
�� Hourly Gas Flow Meter Records for Each Trap Hourly Gas Flow Meter Records for Each Trap Sorbent Trap Monitoring System Documenting Sorbent Trap Monitoring System Documenting Sample/Stack Flow RatioSample/Stack Flow Ratio
�� HCl QA Still Not Well Defined in DraftsHCl QA Still Not Well Defined in Drafts
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
�� Reporting Emissions (PM CEMS/CPMS)Reporting Emissions (PM CEMS/CPMS)
�� 3030--boiler Operating Day Rolling Average values boiler Operating Day Rolling Average values derived from PM CMS or PM CPMSderived from PM CMS or PM CPMS
�� Submit within 60 days Following Each QuarterSubmit within 60 days Following Each Quarter
�� Utilize CEDRI or Other Approved Electronic FormatUtilize CEDRI or Other Approved Electronic Format�� Utilize CEDRI or Other Approved Electronic FormatUtilize CEDRI or Other Approved Electronic Format
�� No No Hourly Hourly DData Submittal (Currently)ata Submittal (Currently)
�� DiluentDiluent Cap Not Permitted (Currently)Cap Not Permitted (Currently)
�� CEDRI Forms Not Yet Available for PM DataCEDRI Forms Not Yet Available for PM Data
RMB Consulting & Research, Inc.RMB Consulting & Research, Inc.Providing Environmental Services to Industry
�� MATS Introduces Many New Reporting and MATS Introduces Many New Reporting and Recordkeeping RequirementsRecordkeeping Requirements
�� Documentation of Compliance ActivitiesDocumentation of Compliance Activities
�� Electronic Reporting Applied to Compliance Electronic Reporting Applied to Compliance Data and New EmissionsData and New EmissionsData and New EmissionsData and New Emissions
�� EPA Behind with Reporting Details EPA Behind with Reporting Details
�� ERT Problematic ERT Problematic –– Alternative Reporting Alternative Reporting NeededNeeded
�� Startup/Shutdown Reconsideration IssuesStartup/Shutdown Reconsideration Issues
�� Electronic Reporting Changes PossibleElectronic Reporting Changes PossibleRMB Consulting & Research, Inc.RMB Consulting & Research, Inc.