Client • STFA Software 1 x Pontoon Guide 1 x QINSy Dredging Instruments 2 x Radio Modem 1 x Inclinometers 2 x Computer JLT Rugger GPS System 2 x Rover Receivers GPS GS5M-20 Hz double antenna GNSS 1 x GPS 1200 Reference Base Target Speed up Pontoon changing positions to maximize excavating operations with extreme precision and reli- ability. Planning Elements Perfect Excavator positioning for dredging operations. Complete independence from specialized personnel to ensure exact pontoon position construction site on water. . Reduction of positioning times of the Pontoon moving to contiguous areas. . Memorization of work and report production on produc- tivity rates and remaining work. Personnel reduction in the construction site. Benefits Guide Solution for Pontoon and Excavator for see bed dredging. Commission Location We are in Kingdom of Bahrain, an archi- pelago of Persic Gulf bordering on Saudi Arabia and Qatar STFA is realizing a project for Jan De Nul NV this consists in designing and realizing infrastructures and flooring on see level for an extension of 41 Km. Also building two moorages, respec- tively at North and South side of the en- tire construction, in addition all the nec- essary structures for ferry-boats docking. The hardest part of the job to realize the raised road consists of main bridge with a length of 2.4 Km, five bridges 180 m each and eight channels structured by 250 ele- ments 5mx3mx3m. Leica Geosystems challenge was to create a GPS guiding solution to maneuver the Pontoon to transport the excavator exactly on project areas. Also a GPS guiding solu- tion for the Excavator mounted on the Pontoon, that displays in real time dredging op- erations updating project plan. The entire solu- tions had to be designed to up stand environ- mental conditions, both in daily high tempera- tures ( more then 50°C) and high dust concentra- tion. STFA - Bahrain Kingdom

Upload: emilio-palchetti

Post on 09-Mar-2016

214 views

Category:

Documents


1 download

DESCRIPTION

DREDGE SOLUTION with GPS LEICA

TRANSCRIPT

Page 1: STFA DREDGE MACHINE

STFA - Regno del Bahrain

Client

• STFA

Software• 1 x Pontoon Guide• 1 x QINSy Dredging

Instruments• 2 x Radio Modem• 1 x Inclinometers• 2 x Computer JLT Rugger

GPS System• 2 x Rover Receivers GPS GS5M-20 Hz double antenna

GNSS• 1 x GPS 1200 Reference Base

Target• Speed up Pontoon changing positions to maximize

excavating operations with extreme precision and reli-ability.

Planning Elements

• Perfect Excavator positioning for dredging operations. • Complete independence from specialized personnel to

ensure exact pontoon position construction site on water..• Reduction of positioning times of the Pontoon moving to

contiguous areas..• Memorization of work and report production on produc-

tivity rates and remaining work.• Personnel reduction in the construction site.

Benefits

Guide Solution for Pontoon and Excavator for see bed dredging.

Commission

Location

We are in Kingdom of Bahrain, an archi-pelago of Persic Gulf bordering on Saudi Arabia and QatarSTFA is realizing a project for Jan De Nul NV this consists in designing and realizing infrastructures and flooring on see level for an extension of 41 Km. Also building two moorages, respec-tively at North and South side of the en-tire construction, in addition all the nec-essary structures for ferry-boats docking.The hardest part of the job to realize the raised road consists of main bridge with a length of 2.4 Km, five bridges 180 m each and eight channels structured by 250 ele-ments 5mx3mx3m. Leica Geosystems challenge was to create a GPS guiding solution to maneuver the Pontoon to transport the excavator exactly on project areas. Also a GPS guiding solu-tion for the Excavator mounted on the Pontoon, that displays in real time dredging op-erations updating project plan. The entire solu-tions had to be designed to up stand environ-mental conditions, both in daily high tempera-tures ( more then 50°C) and high dust concentra-tion.

STFA - Bahrain Kingdom