stm wt 2015 two pages

2
Poland $580 Apr 3-11 * May 29Jun 6 * Aug 14-22 * 9 days $625 Mar 28-Apr 11 * May 23Jun 6 * Aug 8-22 * 2 weeks $705 Project: Training Center Drywall, Electrical All finish inside work This is phase one Canada * Owen Sound $425 Saturday to Saturday work trips. Call us! Project: Renovations on camp buildings, drywall, roofing, siding, exterior trim, new windows Bolivia $605 August 7-15, 2015 Project: finish work on inside of 3 staff houses, rock wall along lake, main entrance to meeting hall Mexico $477 June 19-27, 2015 Project: Discipleship Center housing, Staff hous- ing; Landscaping, Roof repairs, Flower gardens Work Trip Cost Includes Your Meals, lodging, in-country ground transportation, travel insurance and background check. Trip Price does not include passport, visa if required, souvenirs, special dinners out, optional sightseeing or airfare. Your next step: Start the process to secure a current passport ASAP. Chose a trip to attend. $200 deposit is due 3 months before the trip dates to confirm your attendance. Balance of trip cost is due 6 weeks before departure. Contact Ron if the due date is past. There may still be room for you! ([email protected]) Updated work trip info is available for each country at GO.wol.org E-mail Ron for more info or questions on team schedules, airline ticketing, arrival & departure times, etc. Chile $535 October 9-17, 2015 Project: Upgrade cabin restrooms, remodel staff housing, Peru $580 Mar 27-Apr 4, 2015 Projects: 500 seat Auditorium inside finish work, ceiling Summer staff housing with 4 apartments Staff duplex Sonido

Upload: ron-morton

Post on 23-Jan-2018

59 views

Category:

Documents


0 download

TRANSCRIPT

Poland $580 Apr 3-11 * May 29–Jun 6 * Aug 14-22 * 9 days $625 Mar 28-Apr 11 * May 23–Jun 6 * Aug 8-22 * 2 weeks $705

Project: Training Center Drywall, Electrical All finish inside work This is phase one

Canada * Owen Sound $425 Saturday to Saturday work trips. Call us! Project: Renovations on camp buildings, drywall, roofing, siding, exterior trim, new windows

Bolivia $605 August 7-15, 2015 Project: finish work on inside of 3 staff houses, rock wall along lake, main entrance to meeting hall

Mexico $477 June 19-27, 2015 Project: Discipleship Center housing, Staff hous-ing; Landscaping, Roof repairs, Flower gardens

Work Trip Cost Includes Your Meals, lodging, in-country ground transportation, travel insurance

and background check.

Trip Price does not include

passport, visa if required, souvenirs, special dinners out, optional sightseeing or airfare.

Your next step:

Start the process to secure a current passport ASAP. Chose a trip to attend. $200 deposit is due 3 months before

the trip dates to confirm your attendance. Balance of trip cost is due 6 weeks before departure.

Contact Ron if the due date is past. There may still be room for you! ([email protected])

Updated work trip info is available for each country at GO.wol.org E-mail Ron for more info or questions on team schedules, airline ticketing, arrival & departure times, etc.

Chile $535 October 9-17, 2015 Project: Upgrade cabin restrooms, remodel staff housing,

Peru $580 Mar 27-Apr 4, 2015 Projects: 500 seat Auditorium inside finish work, ceiling Summer staff housing with 4 apartments Staff duplex

Patio

Sonido

Up

Up

Up

Up

Up

Hungary $527 Mar 24-Apr 6, 2015 or anytime Mar-June & Oct-Nov Project: Dorm floor replacements, replace audi-torium roof, new campfire benches

Updated work trip info is available for each country at GO.wol.org

Contact Ron for more info [email protected]

Costa Rica $545 & $732 Feb 27-Mar 7 & Feb 21-Mar 7, 2015 Project: Surface dining hall parking area Missionary and camp staff housing Gal’s dorm. Landscaping front of dining hall

Guatemala $553 October 9-17, 2015 Project: pave road to conference hotel (pour

concrete curbs and place pavers) carpenter shop

Dominican Republic $530 March 15-24 * May 24-June 2, 2015 Projects: 2 Camper dorms Sidewalks Staff apartments 500 seat auditorium Sports fields Park & picnic area Pave camp roads

Ecuador $530 Jan 10-18; Sept 11-19 & Oct 2-10, 2015 Project: rock retention walls by basketball court, camper cabin, staff housing, covered sports court

Honduras $463 January 30 – February 7, 2015 Project: 100 metal camper bunk beds, finish de-tails on buildings, service center, staff offices

South Korea $325 You set your time to go in 2015 Project: Entire Bible Institute, student dorms, sports complex, staff housing

El Salvador $478 Jan 30-Feb 7, 2015 & Nov 6-14, 2015 Projects: Swimming pool changing area

Camper dorms Staff offices Camp entrance

Landscaping

Painting