storefront / entrance physical test · 2019-09-30 · door size frame size glass size opening...
TRANSCRIPT
![Page 1: STOREFRONT / ENTRANCE PHYSICAL TEST · 2019-09-30 · door size frame size glass size opening dimension verify in field finished floor not to scale # # detail/page reference 1 g1](https://reader033.vdocuments.net/reader033/viewer/2022042003/5e6e7e2276fbac39620cddde/html5/thumbnails/1.jpg)
AR
CH
ITEC
TUR
AL
GLA
SS &
MET
AL
TEC
HN
ICIA
NC
ERTI
FIC
ATI
ON
PR
OG
RA
M
DRAWN BY:
DATE:
SCALE:
SHEET:
N/A
BDB
PER
FOR
MAN
CE
BASE
D T
EST
- STO
REF
RO
NT/
ENTR
ANC
E
C-1
STOREFRONT / ENTRANCE PHYSICAL TEST
9/27/19
PD-33 SF Shop Drawings
![Page 2: STOREFRONT / ENTRANCE PHYSICAL TEST · 2019-09-30 · door size frame size glass size opening dimension verify in field finished floor not to scale # # detail/page reference 1 g1](https://reader033.vdocuments.net/reader033/viewer/2022042003/5e6e7e2276fbac39620cddde/html5/thumbnails/2.jpg)
AR
CH
ITEC
TUR
AL
GLA
SS &
MET
AL
TEC
HN
ICIA
NC
ERTI
FIC
ATI
ON
PR
OG
RA
M
DRAWN BY:
DATE:
SCALE:
SHEET:
N/A
BDB
PER
FOR
MAN
CE
BASE
D T
EST
- STO
REF
RO
NT/
ENTR
ANC
E
T-1
ANCHOR LOCATIONS
DO N
OT G
LAZE
THIS
OPE
NING
DO NOT FASTENTHRESHOLDTO FLOOR
NOTE: APPLICANT MAY USE ANY PRE-DRILLED AND UNCOVERED HOLE WITHIN A GROUPING OF HOLES FOR ANCHORING FRAME.ONLY 1 FASTENER/ANCHOR PER HOLE GROUPING.APPLICANT IS NOT TO DRILL ANY HOLES IN THE STOREFRONT SYSTEM.
DEMONSTRATE ALL WATER MAMAGEMENTAND SEALING PROCEDURES THAT ARE REQUIREDWITHIN THIS AREA
DEMONSTRATE ALL SEALING PROCEDURES THAT ARE REQUIRED WITHIN THIS AREA(EXCLUDING PERIMETER CAULKING)
CL DEMONSTRATE ALL SEALING PROCEDURESTHAT ARE REQUIRED WITHIN THIS AREA(EXCLUDING VERTICAL PERIMETER CAULKING)
TEST DIRECTIONS FOR INSTALLATIONAND SEALING LOCATIONS
OMIT ALL PERIMETER MATERIALS NECESSARY FOR GLAZING THIS OPENING
SETBACKDIMENSION
FRONT OF OPENING
SETBACK LOCATION
[NOTE: REFER TO "SETBACK LOCATION APPENDIX" FOR SET BACK DIMENSION] 9/27/19
![Page 3: STOREFRONT / ENTRANCE PHYSICAL TEST · 2019-09-30 · door size frame size glass size opening dimension verify in field finished floor not to scale # # detail/page reference 1 g1](https://reader033.vdocuments.net/reader033/viewer/2022042003/5e6e7e2276fbac39620cddde/html5/thumbnails/3.jpg)
AR
CH
ITEC
TUR
AL
GLA
SS &
MET
AL
TEC
HN
ICIA
NC
ERTI
FIC
ATI
ON
PR
OG
RA
M
DRAWN BY:
DATE:
SCALE:
SHEET:
N/A
BDB
GENERAL NOTES
G1 1"INSULATED UNITS (1/4" LEXAN-1/2"A.S.-1/4" LEXAN)
PARTS LIST
GLASS LEGEND
ABBREVIATIONS
PRODUCTS
SYMBOLSG.C.D.L.O.D.O. D.S. F.S. G.S.O.D. V.I.F.F.F. N.T.S.
TYP.SIM.OPP.B.O.T.O.S.R.P.CONT.
TYPICALSIMILAROPPOSITEBY OTHERSTOP OF SLABREFERENCE POINTCONTINUOUS
GENERAL CONTRACTORDAYLIGHT OPENINGOPENINGDOOR SIZEFRAME SIZEGLASS SIZEOPENING DIMENSIONVERIFY IN FIELDFINISHED FLOORNOT TO SCALE
##
DETAIL/PAGEREFERENCE
1
G1
REVISION
GLASS ELEVATION MARKER
1/4" GLAZING (1/4" lEXAN)G2
DOOR SWING
OPEN BACK HEAD, JAMB, VERTICAL
OPEN BACK HORIZONTAL SILL
A1414
A0414
PER
FOR
MAN
CE
BASE
D T
EST
- STO
REF
RO
NT/
ENTR
ANC
E
1D1D1
D1
D1
D1
G1
G2
4
2
3
5
D2 D2 D26 7 8
1 47'
-2" F
RAM
E DIM
ENSI
ON [
86"]
84" D
OOR
OPEN
ING
7' -2
1 4" OPE
NING
DIM
ENSI
ON [
861 4"]
5' -8
1 4" OPE
NING
DIM
ENSI
ON [
681 4"]
1 4"
1' -6
"
2
305 8" D
.L.O.
2"
305 8" D
.L.O.
2" 3 4"
EQ.
2"
2"
36" DOOR OPENING
4' -6" FRAME DIM. [54"] EQ.
12"D.L.O.
2" 2"
14"KNEE WALL
T-2
CLOSURE POCKET FILLER
SILL FLASHING
HORIZONTAL GLASS STOP
OPEN BACK DOOR JAMB
STANDARD TUBULAR DOOR HEADER
A5444
A9504
A4014
A4414
A4214
A3014 TUBULAR INTERMEDIATE HORIZONTAL
D2
D2
10
9
CONTENTT-1 TEST DIRECTIONS
T-2 ELEVATION
D-1 VERTICAL SECTION DETAILS
D-2 HORIZONTAL SECTION DETAILS
S-1 ASSEMBLY AND WATER MANAGEMENT DETAILS
S-2 ASSEMBLY AND WATER MANAGEMENT DETAILS
S-3 ASSEMBLY AND WATER MANAGEMENT DETAILS
SNAP-IN DOOR STOPA1354
H2728 ROLL-IN GLAZING GASKET
F691
#10-24 X 1" IND HEX HEAD TYPE FF944
F201 #12 X 3" PHILLIPS HEAD FLAT HEAD SHEET METAL SCREW
FLAT SNAP-IN FILLER PLATEA3454
SHEAR BLOCK
F900
H4311
41" O.D.
H313 SETTING BLOCK
H531 WATER DIVERTER
H554 SILL FLASHING END DAM
F191 #10 X 1/2" PHILLIPS TRUSS HEAD SCREW(Fastens sill to shear block)
#10 X 1-3/4" type B PHILLIPS PAN HEAD (Fastens shear block to verticals)
4' -7" OPENING DIM. [55"]
5' -7
1 4" FRA
ME D
IMEN
SION
[67
1 4"]
1. ALL SEALANTS AND/OR CAULKING ARE TO BE APPLIED IN STRICT ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS.
2. ALL FRAMING SHALL BE INSTALLED PLUM, SQUARE, AND LEVEL, AND IN STRICT ACCORDANCE WITH MANUFACTURER'S PROVIDED INSTALLATION INSTRUCTIONS.
3. REFER TO SHOP DRAWING DOCUMENT LABELLED "CONTROL LINES APPENDIX" FOR SETBACK OF FRAME FROM FRONT OF OPENING.
4. PERIMETER CAULKING NOT BY AGMT CERTIFICATION APPLICANT.
5. ALL SYSTEM SEALING/CAULKING IS TO BE DEMOSTRATED BY THE USE OF AN UNOPENED SEALANT TUBE TO INDICATE LOCATION AND DIMENSION OF CAULKING.
6. ACTUAL EXTRUSIONS AND PARTS MAY VARY SLIGHTLY IN APPEARANCE FROM THOSE DEPICTED IN THIS SHOP DRAWING.
1/4"-20 X 1/4" HWH TYPRE 'CA' SCREW
9/27/19
![Page 4: STOREFRONT / ENTRANCE PHYSICAL TEST · 2019-09-30 · door size frame size glass size opening dimension verify in field finished floor not to scale # # detail/page reference 1 g1](https://reader033.vdocuments.net/reader033/viewer/2022042003/5e6e7e2276fbac39620cddde/html5/thumbnails/4.jpg)
AR
CH
ITEC
TUR
AL
GLA
SS &
MET
AL
TEC
HN
ICIA
NC
ERTI
FIC
ATI
ON
PR
OG
RA
M
DRAWN BY:
DATE:
SCALE:
SHEET:
N/A
BDB
D-1
PER
FOR
MAN
CE
BASE
D T
EST
- STO
REF
RO
NT/
ENTR
ANC
E
2"2"
FRAM
E DIM
ENSI
ON
412"
412"
134"
1
2
4 SHIM AS REQUIRED
PERIMETER CAULKING NOT BY AGMT APPLICANT
5
OPEN
ING
DIM
ENSI
ONOP
ENIN
G DI
MEN
SION
2
21 8"1 2"
FRAM
E DIM
ENSI
ON
1 8"1 2"
4"11 16
"
FRAM
E DIM
ENSI
ON
OPEN
ING
DIM
ENSI
ON
3 16"
1 2"
OPEN
ING
DIM
ENSI
ON
DOOR
OPE
NING
SEALANT
H554 SILL FLASHING END DAMATTACH WITH (2) F691 SCREWS
F201
32"FRAM
E DIM
ENSI
ON
3 8"
3 4"
MIN
. 1 4"
MIN
. 1 4"
THRESHOLD SET IN CONTINUOUS BED OF SEALANT. SEAL OPEN ENDS WHERE NECESSARY.
SEAL ENDS OF HORIZONTAL @ VERTICAL MEMBERS (TYP.)
NOTE: SEE PAGES S-1 THROUGH S-3 FOR FULL SEALING PROCEDURES
A3454
F201
A141
4
H2728
A4014 A3014
H313
H2728
A4014
H313
H2728 A0414
WEEP
A950
4
F201
A1354
A421
4
INSTALL OVERHEAD CLOSER AS REQUIRED
SCREW SPLINE ASSEMBLY
SHIM AS REQUIRED
SCREW SPLINE ASSEMBLY
SHEAR BLOCK ASSEMBLY
SETTING BLOCKSAT 1/4 POINTS (TYP.)
9/27/19
![Page 5: STOREFRONT / ENTRANCE PHYSICAL TEST · 2019-09-30 · door size frame size glass size opening dimension verify in field finished floor not to scale # # detail/page reference 1 g1](https://reader033.vdocuments.net/reader033/viewer/2022042003/5e6e7e2276fbac39620cddde/html5/thumbnails/5.jpg)
AR
CH
ITEC
TUR
AL
GLA
SS &
MET
AL
TEC
HN
ICIA
NC
ERTI
FIC
ATI
ON
PR
OG
RA
M
DRAWN BY:
DATE:
SCALE:
SHEET:
N/A
BDB
PER
FOR
MAN
CE
BASE
D T
EST
- STO
REF
RO
NT/
ENTR
ANC
E
D-2
DOOR OPENING2" 2"
FRAME DIMENSION
218" 1
2"116"
6 7
OPENING DIMENSION
ALUMINUM THRESHOLD
EDGE OF KNEE WALL
116"
PERIMETER CAULKING B.O. (TYPICAL)
MIN. 14"MIN. 14" 2"
FRAME DIMENSION
8H2728
A1414
F201
OPENING DIMENSION
A3454
MIN. 14"
SILL FLASHING
SEALANT @WATER DAM
EDGE OF KNEE WALL
9 10DOOR FRAME @ KNEE WALL
SILL FLASHING @ KNEE WALL
SEALANT
THRESHOLD
A4414
A1354
A345
4
F201
A4414
A544
4
SEAL BOTTOM OF DOOR FRAME AND THRESHOLD
BACKER ROD AND SEAL OVER@ SILL FLASHING
H272
8
KNEE WALL
REFER TO SETBACK APPENDIX
FRONT OF OPENING
9/27/19
![Page 6: STOREFRONT / ENTRANCE PHYSICAL TEST · 2019-09-30 · door size frame size glass size opening dimension verify in field finished floor not to scale # # detail/page reference 1 g1](https://reader033.vdocuments.net/reader033/viewer/2022042003/5e6e7e2276fbac39620cddde/html5/thumbnails/6.jpg)
AR
CH
ITEC
TUR
AL
GLA
SS &
MET
AL
TEC
HN
ICIA
NC
ERTI
FIC
ATI
ON
PR
OG
RA
M
DRAWN BY:
DATE:
SCALE:
SHEET:
N/A
BDB
S-1
PER
FOR
MAN
CE
BASE
D T
EST
- STO
REF
RO
NT/
ENTR
ANC
E
INSTALL SILL FLASHING END DAMS
END DAM
F691
SEAL JOINT BETWEENEND DAM AND SILL FLASHING
SUPPLEMENTAL INSTALLATION INSTRUCTIONS (GENERIC)
INSTALL SILL FLASHING
WEEP HOLE
F201
HOLE
1/4" MINIMUM(IF OPENING DIMENSION ALLOWS)
END DAM
SHIM AT HIGH POINTOF SUBSTRAQTE FIRST. sHIMREMAINDER OF LENGTH ASREQUIRED TO LEVEL.
SHIM BETWEENEND DAMANDSTRUCTURE
NOTE:SHIMS TO BE POSITIONEDUNDER EACH FASTENER LOCATION
SEALING SILL FLASHING ON KNEE WALLAT DOOR JAMB
KNEE WALL
DOOR FRAME
SEAL JOINT BETWEEN SILL FLASHINGAND VERTICAL
INSERT BACKER ROD AND SEAL POCKET
ATTACH MEMBER TO SHEAR BLOCK USING F191 SCREW AT EACH END.
SCREW SPLINE ASSEMBLY(PRE ASSEMBLED)
FRAME ASSEMBLY
SHEAR BLOCK ASSEMBLY(IN FIELD)
9/27/19
![Page 7: STOREFRONT / ENTRANCE PHYSICAL TEST · 2019-09-30 · door size frame size glass size opening dimension verify in field finished floor not to scale # # detail/page reference 1 g1](https://reader033.vdocuments.net/reader033/viewer/2022042003/5e6e7e2276fbac39620cddde/html5/thumbnails/7.jpg)
AR
CH
ITEC
TUR
AL
GLA
SS &
MET
AL
TEC
HN
ICIA
NC
ERTI
FIC
ATI
ON
PR
OG
RA
M
DRAWN BY:
DATE:
SCALE:
SHEET:
N/A
BDB
PER
FOR
MAN
CE
BASE
D T
EST
- STO
REF
RO
NT/
ENTR
ANC
E
S-2
INSTALL FRAMES
SEAL ALONG BACK LEG
SEAL END DAM
TOP VIEW
FRONT VIEW
SUPPLEMENTAL INSTALLATION INSTRUCTIONS (GENERIC)
SEAL VERTICAL GLAZING REGLET
SEAL JOINTS BETWEEN SILL MEMBER AND VERTICALS
SEALING AT INTERMEDIATES
CAP SEALFASTENER HEADS
SEALING AT SILL MEMBER
9/27/19
![Page 8: STOREFRONT / ENTRANCE PHYSICAL TEST · 2019-09-30 · door size frame size glass size opening dimension verify in field finished floor not to scale # # detail/page reference 1 g1](https://reader033.vdocuments.net/reader033/viewer/2022042003/5e6e7e2276fbac39620cddde/html5/thumbnails/8.jpg)
AR
CH
ITEC
TUR
AL
GLA
SS &
MET
AL
TEC
HN
ICIA
NC
ERTI
FIC
ATI
ON
PR
OG
RA
M
DRAWN BY:
DATE:
SCALE:
SHEET:
N/A
BDB
PER
FOR
MAN
CE
BASE
D T
EST
- STO
REF
RO
NT/
ENTR
ANC
E
S-3
SUPPLEMENTAL INSTALLATION INSTRUCTIONS (GENERIC)
SEAT BOTTOM OF DOOR FRAME IN A BED OF SEALANT
SEAL ENDS OF THRESHOLDWHERE THEY EXTEND IN FRONTOF DOOR FRAME
SEAL ENTIRE LENGTH OF THRESHOLDMARRYING INTO SEALANT AT BASE OF DOOR FRAME
FILL JAMB POCKET WITH SEALANTAT THRESHOLD, FLUSH WITH
TOP OF POCKET
THRESHOLD/DOOR FRAME SEALING
DOOR INSTALLATION
DOOR HEIGHT ADJUSTMENT
9/27/19
![Page 9: STOREFRONT / ENTRANCE PHYSICAL TEST · 2019-09-30 · door size frame size glass size opening dimension verify in field finished floor not to scale # # detail/page reference 1 g1](https://reader033.vdocuments.net/reader033/viewer/2022042003/5e6e7e2276fbac39620cddde/html5/thumbnails/9.jpg)
AR
CH
ITEC
TUR
AL
GLA
SS &
MET
AL
TEC
HN
ICIA
NC
ERTI
FIC
ATI
ON
PR
OG
RA
M
DRAWN BY:
DATE:
SCALE:
SHEET:
N/A
BDB
PER
FOR
MAN
CE
BASE
D T
EST
- STO
REF
RO
NT/
ENTR
ANC
E
CLOSER LATCHING AND CLOSING SPEED ADJUSTMENTS-4
SUPPLEMENTAL INSTALLATION INSTRUCTIONS (GENERIC)
CHECK CLOSING TIME, AND ADJUST CLOSER AS NECESSARY.TYPICAL CLOSING TIME IS 5 TO 7 SECONDS,EVENLY DIVIDED BETWEEN MAIN (CLOSING) SPEED AND LATCHING SPEED.
CLOSER MOUNTED ON PUSH SIDE OF THE DOOR (OPPOSITE OF THE HINGE SIDE). ATTACH ARM PIECES AS SHOWN.
PARALLEL ARM INSTALLATION
PRETENSION CLOSER PRIOR TO ATTACHING MAIN ARM TO CLOSER PINION
NOTE: DIAGRAM ABOVE IS FOR A CLOSER FOREARM WITH ASLIDE, LENGTH ADJUSTMENT. SUPPLIED CLOSER MAY HAVE A THREADED, ROTARY LENGTH ADJUSTMENTAS ILLUSTRATED BELOW.
1"
WITH DOOR CLOSED, ADJUST LENGTH OF FOREARM SO THAT THE TIP OF THE MAIN ARM (AT ELBOW) IS APPROXIMATELY 1" FROM THE DOOR RAIL, WHEN CONNECTED TO FOREARM.
MAIN ARM
FOREARM
9/27/19