  • 2013-2015 Strategic Plan San Francisco Department of Public Works

  • DPW: Making progress

  • Goal 1 - Ensure Safe, Clean, and Green

    Infrastructure and Public Rights-of-Way

  • 1A: Enable the safe use of public spaces

  • 1A: Enable the safe use of public spaces

    Achieving our goals in Fiscal Year 2012-13

  • 1A: Enable the safe use of public spaces

    Preventive

    maintenance: 333 (contractor)

    Blocks paved: 434 (BSSR and contractor)

    Achieving our goals in Fiscal Year 2012-13

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1A: Enable the safe use of public spaces

    Blocks Paved

    Bureau of Street

    and Sewer Repair

    134

    Contractor

    300

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1A: Enable the safe use of public spaces

    Preventative maintenance

    Old: slurry seal (took too long to dry)

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1A: Enable the safe use of public spaces

    Preventative maintenance

    Old: slurry seal (took too long to dry)

    New: micro-surfacing (dries fast)

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1A: Enable the safe use of public spaces

    Alternate sidewalk treatment

    Less costly than concrete Makes use of recycled materials Less material sent to landfill Reusable panels Eases tree-root maintenance

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1A: Enable the safe use of public spaces

    Alternate sidewalk treatment

    Pour-in-place rubberized

    sidewalk

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1A: Enable the safe use of public spaces

    Alternate sidewalk treatment - BSSR

    Rubberized panels

    piloting on Oakdale and 3rd streets

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1A: Enable the safe use of public spaces

    Alternate sidewalk treatment

    Fiberglass panels

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1A: Enable the safe use of public spaces

    Alternate sidewalk treatment

    Curb ramp lip project

    Cement Shop is piloting on Market Street between Van Ness and Main

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1A: Enable the safe use of public spaces

    Alternate sidewalk treatment

    Sidewalk cutting

    BSSR is developing contract for pilot project

    Before After

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1A: Enable the safe use of public spaces

    Thank you

    IDC BSSR Liz Lerma Jada Durden Ramon Kong Richard Lee Siew Chin Yeong Edmund Lee Ken Spielman Cynthia Chono

    Soyeb Palya Iria Talbert Mike Haase Bernie Tse Cristina Olea Fernando Cisneros Paul Barradas Jason Hui Peg Divine

  • 1B: Enhance the cleanliness of the City

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1B: Enhance the cleanliness of the City

    Tablets: Moving inspections to the 21st century

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1B: Enhance the cleanliness of the City

    In February our graffiti unit began using mobile tablets in the field to perform inspections

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1B: Enhance the cleanliness of the City

    The tablet:

    increases productivity and efficiency

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1B: Enhance the cleanliness of the City

    The tablet:

    increases productivity and efficiency expands the knowledge of inspectors in the field

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1B: Enhance the cleanliness of the City

    The tablet:

    increases productivity and efficiency expands the knowledge of inspectors in the field allows for easy communication between field workers and office staff

  • Thank you

    The Entire Street Environmental Services and Urban Forestry Team David Allan Jon Beazor Kenny Bruce Marie Chavez Karl Dyson Maria Espina Mike Fincher Phil Galli Walter Ang Tim Hines Artie Kelly

    Linda Lee-Robbins Peachy Mathias Norflis McCullough Alison Mickels Mario Montoya, Jr. Kingston Pang Tessa Jones Rafael Ramirez John Reily Paul Renzi Gretchen Rude Khaleed Shehadeh Tom Smith Larry Stringer Anna Wong

    Jerad Weiner Eugenia Wong Aaron Wu Rodney Hampton Sandra Zuniga Joey Furuto Djaida Durden Ian Schneider

    1B: Enhance the cleanliness of the City

    Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

  • 1C: Green the Citys infrastructure & DPWs business practices

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1C: Green the Citys infrastructure & DPWs business practices

    Hardscape to softscape

    Goal: 80,000 sq ft

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    Hardscape to softscape

    Goal: 80,000 sq ft Current: 100,910 sq ft

    1C: Green the Citys infrastructure & DPWs business practices

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    Hardscape to softscape

    2.1 football fields

    1C: Green the Citys infrastructure & DPWs business practices

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    Streetscape projects

    1C: Green the Citys infrastructure & DPWs business practices

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    Divert 100% of solid waste by 2020

    1C: Green the Citys infrastructure & DPWs business practices

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    Divert 100% of solid waste by 2020

    REDUCE REUSE RECYCLE

    COMPOST

    3RC

    1C: Green the Citys infrastructure & DPWs business practices

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    Thank you

    Ramon Kong John Kwong Tony Leung Mindy Linetzky Cristina Olea Steve Shih Carla Short Ken Spielman Larry Stringer John Thomas Meghan Tiernan Michael Matsuoka Jerad Weiner Nancy Wong

    Paul Barradas Sue Black Maurice Chee Cynthia Chono Clinton Choy Fernando Cisneros John Dennis Iqbal Dhapa Mike Fernandez Frank Filice Lynn Fong Ananda Hirsch Sherman Hom Jason Hui

    BSSR BBR BSM BDC IDC

    1C: Green the Citys infrastructure & DPWs business practices

  • 1D: Enhance the attractiveness and utility of public rights-of-way

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1D: Enhance the attractiveness and utility of public rights-of-way

    Utilizing the right-of-way

    Coordinating construction

    Mitigate the construction impacts that you

    see all around the City

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1D: Enhance the attractiveness and utility of public rights-of-way

    Utilizing the right-of-way

    Mitigate the construction impacts that you

    see all around the City

    Minimizing inconvenience

    to the public

    Coordinating construction

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1D: Enhance the attractiveness and utility of public rights-of-way

    Current projects

    Cesar Chavez Boulevard

    Balboa Avenue

    Great Highway Folsom Street

  • 1D: Enhance the attractiveness and utility of public rights-of-way

    Of the 31 projects, 17 projects are joined with one agency and 11 are joined with two or more agencies

    Paving / Slurry Seal Streetscape

    Folsom Street Balboa Avenue

    28th Avenue Cesar Chavez Boulevard

    Kirkham Street Folsom Street

    Balboa Ave Great Highway

    Bayshore Blvd & San Bruno Ave. Sewer/Water with Paving

    24th Street Plymouth Avenue

    Various Locations #16 9th Street Joint with SFWD

    Various Loc. Slurry Contract #1 Western Addition/North Beach/ Marina Dist.

    Various Loc. Slurry Contract #4 Mission Street

    Divisadero St. & Franklin St. Mason, Bay, Powell Streets Joint

    Guerrero St. & Market St. Fulton, Euclid, Vallejo, Laguna

    20th Ave. and Lincoln Blvd. Sickles Street & Alemany Blvd

    Pine, Sacramento, Stockton St. 17th Street and 18th Street

    Alemany Street Clay Street - Arguello to Divisadero

    Silver Avenue 16th/21st/24th/25th Ave & Cabrillo/California

    Various locations Richmond

    20th/Arkansas/Connecticut/ Mississippi/ Missouri/ Wisconsin

    Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    Proposed FY 12-13 DPW projects

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1D: Enhance the attractiveness and utility of public rights-of-way

    Maintain safe, clean and clear path of travel at various job sites

    envista

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1D: Enhance the attractiveness and utility of public rights-of-way

    Activating the rights-of-way

    Destinations

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1D: Enhance the attractiveness and utility of public rights-of-way

    Activating the rights-of-way

    Destinations

    Parklets, tables & chairs,

    landscaped areas

  • Goal 1 - Ensure Safe, Clean, and Green Infrastructure and Public Rights-of-Way

    1D: Enhance the attractiveness and utility of public rights-of-way

    Thank You

    Ajay Kumar

    Carla Short

    Dmitriy Lashkevich

    Eddy Ching

    Fernando Cisneros

    Iqbal Dhapa

    John Kwong

    Lesley Wong

    Lynn Fong

    Melissa Dagdagan

    Nancy Lynch

    Nick Elsner

    Nicky Woo

    Richard Lee

    Ramon Kong

  • Goal 2 Create and maintain beautiful, highly

    functional and sustainable facilities

  • 2A: Design, build and renovate facilities to meet and exceed intended uses

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Landscape architecture projects

    completed or under construction: FY 2012-13

    Pier 43 Bay Link Project

    Brannan Street Wharf

    Heron's Head Park

    North Beach Library

    Sunset Recreation Center

    Alta Plaza

    Jefferson Park

    Palega Playground Renovation

    Lafayette Park

    Fulton Playground

    St. Mary's Playground

    McLaren Park Playground

    Glen Canyon Park Improvements

    Betty Ong Chinese Rec Center

    Potrero Hill Community Garden

    Retaining Wall Cayuga Playground

    and Clubhouse Renovation

    Marina Green Playground

    Helen Diller Playground Parkside

    Mountain Lake, Larsen Park

    Cabrillo Playground and Clubhouse

    Renovation

    Phelan Bus Loop

    Larsen Playground

    Rossi Playground Restrooms

    Alamo Square Restrooms

    McCoppin Hub Plaza

    Soma West Alleys

    MTA Public Plaza at Phelan & Ocean

    South of Market Alleys

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Visitacion Valley Greenway Native Plan Garden

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Pier 27 Cruise Ship Terminal Park

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Parks and playgrounds

    Mission Playground West Sunset Playground Lafayette Park

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Buena Vista Path

    Stairways and paths

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Glen Canyon Park: saddle

    area staircase

    Stairways and paths

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Architecture and engineering projects

    Completed or under construction: FY 2012-13

    Pier 43 Bay Link Project

    Brannan Street Wharf

    Heron's Head Park

    North Beach Library

    Sunset Recreation Center

    Alta Plaza

    Jefferson Park

    Palega Playground Renovation

    Lafayette Park

    Glen Canyon Park Improvements

    Betty Ong Chinese Rec Center

    Potrero Hill Community Garden

    Retaining Wall Cayuga Playground and Clubhouse

    Renovation

    Cabrillo Playground and Clubhouse

    Phelan Bus Loop

    Rossi Playground Restrooms

    Alamo Square Restrooms

    McCoppin Hub Plaza

    Soma West Alleys

    MTA Public Plaza at Phelan & Ocean

    South of Market Alleys

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Ortega Library

    LEED Gold (certification pending)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Anza Library

    LEED Gold

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Merced Library

    LEED Gold

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Visitacion Valley Library

    LEED Gold

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Sunset Recreation Center

    LEED Silver (certification pending)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Bayview Library

    LEED Gold (certification pending)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Betty Ong Recreation Center

    LEED Gold

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    San Francisco General Hospital Learning Center

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Calaveras Valley Damn Intake Center

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    War Memorial Veterans Building

    LEED Gold (certification pending)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Construction management

    More than 30 projects completed or under construction: FY 2012-13

    Pier 43 Bay Link Project

    Brannan Street Wharf

    Heron's Head Park

    North Beach Library

    Sunset Recreation Center

    Alta Plaza

    Jefferson Park

    Palega Playground Renovation

    Lafayette Park

    Mission Pool

    Fulton Playground

    St. Mary's Playground

    McLaren Park Playground

    Hall of Justice Emergency Generator

    Hall of Justice Fire Alarm Upgrade

    Sunset Mental Health

    Glen Canyon Park Improvements

    Betty Ong Chinese Rec Center

    Potrero Hill Community Garden Retaining

    Wall Cayuga Playground and Clubhouse

    Renovation 5th and Mission Garage

    Maintenance States Street Restroom Marina

    Green Playground Helen Diller Playground

    Parkside

    Mountain Lake, Larsen Park Restroom

    Cabrillo Playground and Clubhouse

    Renovation

    Calaveras Valley Intake Center

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    North Beach Branch Library

    LEED Gold (under construction)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Brannan Street Wharf

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Parks

    and playgrounds

    Cayuga Playground Fulton Playground

    Lafayette Park Cabrillo Playground

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Pier 43 Link Park

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Project management

    Projects completed or under construction: FY 2012-13

    SFPUC Headquarters

    Moscone Center Expansion

    Cruise Ship Terminal At Pier 27

    Fire Stations 5 & 16

    Fire Station 35 New Boat House

    Fire Station 36 Renovation

    War Memorial Veterans Building

    San Francisco General Hospital

    Hall Of Justice Replacement Jail

    SFPD Forensic Services Relocation

    Bayview Opera House Renovation

    Ocme Facility 1 Newhall Street

    Public Safety Building

    Multiple Fire Station Improvements

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    San Francisco Public Utilities Commission Headquarters

    LEED Platinum (certification pending)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    San Francisco Public Utilities Commission Headquarters

    LEED Platinum (certification pending)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Moscone Center Expansion

    LEED Gold

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Pier 27 Cruise Ship Terminal

    LEED Gold (certification pending)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Public Safety Building

    LEED Gold (certification pending)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    San Francisco General Hospital

    LEED Gold (certification pending)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Client satisfaction survey

    Measurement goal:

    Achieve 75% or higher rating from client satisfaction surveys

    Department heads

    Average 3.96 rating out of 5.0 (79%)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Client satisfaction survey

    Measurement goal:

    Achieve 75% or higher rating from client satisfaction surveys

    Project managers

    Average 4.0 rating out of 5.0 (80%)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Client satisfaction survey

    Measurement goal:

    Achieve 75% or higher rating from client satisfaction surveys

    BBR client

    departments

    Average 3.5 rating out of 5.0 (70%)

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    DPW University

    Measurement Goal: Achieve 75% or higher rating from client satisfaction surveys

    BBR client department

    March 11 launch April 10 first course offered with two

    following later in the month

    May two courses offered June two courses scheduled Six more courses are in development

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    DPW University

    BBR client department

    Four courses offered in FY 2012-13:

    General Conditions & Contract Administration Change Orders Basic Scheduling, Delay Claims & Constructive

    Acceleration How to Communicate Design Ideas Effectively

    to Clients

    To be Scheduled in June:

    Constructability Review Training

    Ethics in Construction Projects

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    DPW lessons learned sessions

    BBR client department

    BDC & IDC:

    Hamilton Pool (Architecture/Landscape/Engineering) (three sessions)

    Ortega Library (Architecture/Landscape/Engineering)

    Landscape Department provided one lessons learned Site Tour for various projects

    IDC provided seven lessons learned sessions for various paving & curb ramp projects

    To be Scheduled:

    Betty Ong Chinese Recreation Center (Architecture/Landscape)

    All-staff report on Ortega Library

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    DPW lessons learned sessions

    BBR client department

    - George Santayana,

    philosopher

    Experience is simply the name we give our mistakes

    What we have learned:

    Provide partnering sessions at the

    beginning of a project to promote team alignment

    Constructability reviews both in-house and with outside consultants

    Tight specifications with alignment to construction documents

    Clear and organized CA/CM processes with close collaboration between CM Group and A/E Team

    Those who cannot learn from history are doomed to repeat it

    - Oscar Wilde,

    playwright

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Quality Control / Quality Assurance

    Strategic goal:

    Conduct at least two Quality Assurance audits per year for each discipline

    QA audits completed

    BDC- Architecture completed two

    audits.

    BDC-Landscape will have completed two audits before end of Fiscal Year 2012-13

    IDC completed four audits

    QC-QA goal Fiscal Year 2013-14:

    Goal for Fiscal Year 2013-14 is not only

    to complete QA audits but to implement checklists and ongoing interdisciplinary & constructability reviews for each project as a matter of course.

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    Good enough for government work

    The work should be able to pass the most rigorous of standards

    This phrase actually originated in World War II. When something was Good enough for Government work it meant it could pass the most rigorous of standards. And the standards were high at that time. It was a time made famous by the hard work provided to our allies and our soldiers, the very best ships, planes and weapons. Over the years this phrase has become more of an idiom and taken on an ironic meaning that is now the primary sense, referring to poorly executed work.

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    This is NOT what the phrase should mean:

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    It should mean this:

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2A: Design, build and renovate facilities to meet and exceed intended uses

    and this:

    Moscone Center Expansion

    SF Public Utilities Commission Headquarters

  • 2B: Provide services and maintain City facilities to ensure long-term sustainability

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2B: Provide services and maintain City facilities to ensure long-term sustainability

    Bureau of Building Repair

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2B: Provide services and maintain City facilities to ensure long-term sustainability

    Improve turnaround time of CMMS estimates and service orders

    Reduced from 23 days to 16 days.

    Improve CMMS client utilization 10% year after year

    Met with 12 clients and client

    usage increased from 80% to 87%

    Support citywide facility sustainability through on active facility inspection program that includes maintenance

    100%

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2B: Provide services and maintain City facilities to ensure long-term sustainability

    Replaced 69 toilets and 17 urinals

    City Hall fixture retrofit completed

    Under budget

    Ahead of schedule

  • 2B: Provide services and maintain City facilities to ensure long-term sustainability

    5 to 7 gallons per flush (GPF)

    Water efficiency

    Toilets

    Old New

    1.25 gallons per flush (82% reduction)

    Existing Toilets

    5.0 + gallons per flush

    1.25 + gallons per flush

    New high-efficiency

    toilets

  • 2B: Provide services and maintain City facilities to ensure long-term sustainability

    Water efficiency

    Toilets 82% water-use reduction

  • 2B: Provide services and maintain City facilities to ensure long-term sustainability

    2 gallons per flush (GPF)

    Water efficiency

    Urinals

    Old New

    0.13 gallons per flush (GPF)

    2 gallons per flush 0.13 gallons per flush

  • Water efficiency

    Urinals

    2B: Provide services and maintain City facilities to ensure long-term sustainability

    93% water-use reduction

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2B: Provide services and maintain City facilities to ensure long-term sustainability

    San Francisco City Hall indoor water consumption

  • 2B: Provide services and maintain City facilities to ensure long-term sustainability

    7 gallons per minute

    Water efficiency

    Faucets

    City Hall restrooms use:

    200 new faucets with

    aerators will use:

    0.5 gallons per minute

  • 2B: Provide services and maintain City facilities to ensure long-term sustainability

    Water efficiency

    Faucets 93% water-use reduction

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2B: Provide services and maintain City facilities to ensure long-term sustainability

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2B: Provide services and maintain City facilities to ensure long-term sustainability

  • 2C: Establish DPW as the service provider of choice

  • Goal 2 - Create and maintain beautiful, highly functional and sustainable facilities

    2C: Establish DPW as the service provider of choice

    Bureau of Building Repair increased projects that were within 10% of estimate from 25% to 55%

    Improving the way we estimate our repair projects

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    FY 2012 Q1 Q2 Q3 Q4

    Actuals within 10% of estimate

    Correctives

    Projects

  • Goal 3 - Deliver world-class service

  • 3A: Retain, develop and recruit a capable, motivated and diverse workforce

  • Goal 3 Deliver world-class service

    3A: Retain, develop and recruit a capable, motivated and diverse workforce

    Prevention: Good for the worker, good for DPW, good for the City

    DPW injuries and preventable

    motor vehicle accidents

    Fiscal Year 2008-09

    to Fiscal Year 2012-13

  • DPW workers' compensation

    costs Fiscal Year 2008-09

    to Fiscal Year 2012-13

    Prevention: Good for the worker, good for DPW, good for the City

    3A: Retain, develop and recruit a capable, motivated and diverse workforce

    Goal 3 Deliver world-class service

  • Making workplace safety a top priority

    Training for new employees,

    supervisors and front-line

    employees

    Recruitment of the most

    highly skilled and diverse

    workforce

    3A: Retain, develop and recruit a capable, motivated and diverse workforce

    Goal 3 Deliver world-class service

  • Implementing a smart and effective return-to-work program

    DPW health fair

    Fitness facility planned

    for Fiscal Year 2013-14

    3A: Retain, develop and recruit a capable, motivated and diverse workforce

    Goal 3 Deliver world-class service

  • Education and prevention

    Incorporating stretching

    into the workday routine

    Ergonomic assessments

    and proper equipment

    3A: Retain, develop and recruit a capable, motivated and diverse workforce

    Goal 3 Deliver world-class service

  • 3B: Embrace organizational efficiency and innovation

  • 3B: Embrace organizational efficiency and innovation

    DPWStat

    Goal 3 Deliver world-class service

  • Close monitoring of health status

    3B: Embrace organizational efficiency and innovation

    Goal 3 Deliver world-class service

  • 3B: Embrace organizational efficiency and innovation

    FY10 Overall: 42%

    Goal 3 Deliver world-class service

    Public graffiti

    monthly response

  • Public graffiti

    monthly response

    3B: Embrace organizational efficiency and innovation

    FY10 Overall: 42%

    FY11 Overall: 65%

    Goal 3 Deliver world-class service

  • 3B: Embrace organizational efficiency and innovation

    FY10 Overall: 42%

    FY11 Overall: 65%

    FY12 Overall: 72%

    Goal 3 Deliver world-class service

    Public graffiti

    monthly response

  • 3B: Embrace organizational efficiency and innovation

    FY10 Overall: 42%

    FY11 Overall: 65%

    FY12 Overall: 72%

    FY13 Overall: 97%

    Goal 3 Deliver world-class service

    Public graffiti

    monthly response

  • October 2012: 567 projects in Enterprise

    Project Management (EPM) 54% of active projects with

    unknown phase

    3B: Embrace organizational efficiency and innovation

    Projects dashboards

    Goal 3 Deliver world-class service

  • 3B: Embrace organizational efficiency and innovation

    Projects dashboards

    April 2013 (six months later):

    767 projects in EPM (33% increase) 2% of active projects with unknown phase

    Goal 3 Deliver world-class service

  • 3B: Embrace organizational efficiency and innovation

    DPWStat for Design + Construction

    Change orders

    Goal 3 Deliver world-class service

  • 3B: Embrace organizational efficiency and innovation

    Streetscape map

    Goal 3 Deliver world-class service

  • 3B: Embrace organizational efficiency and innovation

    Curb ramp map

    Goal 3 Deliver world-class service

  • Enterprise Project Management

    (EPM) System

    Goal 3 Deliver world-class service

    Technology: Swifter response

  • Thank you

    Alexandra Bidot Anne Jenkins Rachel Alonso Yan Chao Geoffrey Schneider Ken McCormick Shwe Hnin Wayne Chang Eddy Ching Simone Jacques Ananda Hirsch Carla Short Capital Planning Program

    3B: Embrace organizational efficiency and innovation

    Goal 3 Deliver world-class service

  • 3C: Communicate effectively

  • Communications: Getting our message out

    3C: Communicate effectively

    Training for new employees, supervisors and front-line employees

    Goal 3 Deliver world-class service

    Social media messages

    Our target by June 30: 720 Where we are today: 967

    134% over target

  • Communications: Getting our message out

    Factsheets

    More than 15 factsheets convey information about our programs and projects in an easily accessible and visually dynamic way

    3C: Communicate effectively

    Goal 3 Deliver world-class service

  • Communications: Getting our message out

    Press releases

    Our target by June 30: 48 Where we are today: 48

    3C: Communicate effectively

    Goal 3 Deliver world-class service

    Bullseye! 100% on target

  • 3C: Communicate effectively

    plain speak

    Use language that is clear, effective and accessible

    Goal 3 Deliver world-class service

  • BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    Goal 3 Deliver world-class service

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

    BBR

    WBE

    CBD

    LEED

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

    BBR

    WBE

    CBD

    LEED

    GSA

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

    BBR

    WBE

    CBD

    LEED

    GSA

    BMS

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

    BBR

    WBE

    CBD

    LEED

    GSA

    BMS

    CAC

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

    BBR

    WBE

    CBD

    LEED

    GSA

    BMS

    CAC

    CMMS

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

    BBR

    WBE

    CBD

    LEED

    GSA

    BMS

    CAC

    CMMS

    BLIP

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

    BBR

    WBE

    CBD

    LEED

    GSA

    BMS

    CAC

    CMMS

    BLIP

    PCS

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

    BBR

    WBE

    CBD

    LEED

    GSA

    BMS

    CAC

    CMMS

    BLIP

    PCS

    BUF

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

    BBR

    WBE

    CBD

    LEED

    GSA

    BMS

    CAC

    CMMS

    BLIP

    PCS

    BUF ICS

  • Goal 3 Deliver world-class service

    BDC

    3C: Communicate effectively

    Acronym should be a four letter word

    IDC SSR

    BBR

    WBE

    CBD

    LEED

    GSA

    BMS

    CAC

    CMMS

    BLIP

    PCS

    BUF ICS

    DPW

  • Goal 3 Deliver world-class service

    Generate

    positive press

    3C: Communicate effectively

  • Goal 3 Deliver world-class service

    Dont run

    from the truth

    3C: Communicate effectively

  • Short and tweet

    We control the message

  • Short and tweet

    More opportunity to be edgy and fun

  • Short and tweet

    Communicate from anywhere, anytime

  • Thank you

    Greg Crump Mindy Linetzky Shih-Wei Lu Alex Murillo Dadisi Najib Julian Pham And the dozens of DPW employees in each bureau and division who respond to our requests for information

    Goal 3 Deliver world-class service

    3C: Communicate effectively

  • Goal 4 - Expand the San Francisco economy.

    Lead in the creation of jobs for our residents

  • 17-points jobs plan

  • 4A: Provide training opportunities for San Francisco residents

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4A: Provide training opportunities for San Francisco residents

    1. Pre-apprentice 3. Environmental service worker

    4. Cement mason 5. Horticultural/

    Gardener

    6. Asphalt

    Apprentice programs

    2. Stationary engineer

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    Horticultural/Gardener apprentice program

    Program began January 2012

    4A: Provide training opportunities for San Francisco residents

    4 of 10 gardener

    apprentices now have full-time

    employment at the SF Recreation and Park

    Department

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    Cement mason apprentice program

    4A: Provide training opportunities for San Francisco Residents

    379 applications being reviewed

    for 6 positions

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    arborist

    carpenter

    electrician

    4A: Provide training opportunities for San Francisco Residents

    More apprentice programs coming soon to DPW

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4A: Provide training opportunities for San Francisco Residents

  • 4B: Ensure San Francisco residents and businesses are employed on DPW contracts

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    Bayview Library

    Local Business Enterprise (LBE) target: 30%

    LBE accomplished: 68%

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    Bayview Library

    43 workers from District 10

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    Freddie Carter, Bayview Library contractor

    "Oftentimes, local contractors only get to look through the fence at what's being built," Carter said. "This demonstrates that if given the opportunity to succeed, local contractors can."

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    151 LBE contracts =

    $63 million to local companies

    San Francisco General Hospital - $650 million

    129 CityBuild hires

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    Jefferson Street and Great Highway streetscapes

    Jefferson Street

    LBE goal: 25%

    Current: 39%

    Great Highway

    LBE goal: 25%

    Current: 61%

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    Helping the

    local

    economy

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    $85,000

    per year

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    $56,000

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    $688

    per month

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    Buddy Rose

    Concrete

    Local Artisans Made in SF

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    Anna and Julian

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    Phoenix Day

    4B: Ensure San Francisco residents and business are employed on DPW contracts

    Craftspeople since 1850

  • 4C: Use DPW resources to improve blighted areas and spur economic growth

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    Enhance Central Market

    4C: Use DPW resources to improve blighted areas and spur economic growth

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    Enhance Central Market

    62 out of 118

    curb lips complete

    4C: Use DPW resources to improve blighted areas and spur economic growth

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    Community Corridors Partnership Program

    38 new blocks this year

    Total: 564 blocks

    4C: Use DPW resources to improve blighted areas and spur economic growth

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    New home for DPW workers?

    2,150 employees

    4 different locations

    4C: Use DPW resources to improve blighted areas and spur economic growth

  • Goal 4 - Expand the San Francisco economy. Lead in the creation of jobs for our residents

    New home for DPW workers?

    4C: Use DPW resources to improve blighted areas and spur economic growth

  • Got

    questions?

  • 2013-2015 Strategic Plan San Francisco Department of Public Works