Strategic Alliance Awareness SessionEnhancing Durability
Increasing the performance of granular materials- Producing higher standard materials
Robert Vos – reporting for the Quarry Industry
Feedback from the Quarry Industry
Rocks into civil engineering materialsEconomy of operation requires balancing production to demandRange of markets for quarry products• Concrete / road base
surfacing aggregate (coated) asphalt (dust, sand, aggregates)ballast
• Seasonal variation in demandstorage limitations / costs of stock holding
Supply capacity• Commercial operations / Long lead times for
establishment and expansion / Environmental constraints• Long term equipment pay-off periods 15 to 30 years /
Low assured volumes / Investment risk• Predictability of demand / boom bust climate related freak events /
base demand low
Changing expectations• Change in product types (new specifications & expectations)• Specification material properties not matched to alternates
available / Flexibility & appropriate specifications
Consequences• With draw from the market / Closing of quarries • Cost increases / Scarcity • Market mechanism requires assured demand in
sufficient quantity• Restrictions of program execution / Inability to deliver
/ Much more finely tuned programing
Demand & supply balance
Communication• Understand local industry supply capacity and availability
– asphalt / seal / aggregates / concrete• communicate risk and investment requirements for changes in demand• Accept responsibility for base load demand and natural cycles in weather &
maintenance• Gain understanding of market changes in supply
Program development• Closer matching and balancing product demand to availability• Sealing program: balance double seals (7 & 14mm) with single seals (10mm) • Microsurfacing: (4.75mm & dust) for rut filling
Opportunities 1
Improving performance• Quality control• Identification of quality ranges / variability in quarry – PAFV, better than
minimum• Process to “quarantine & stockpile” high value materials• Changing production for higher standard outcomes – impacts on outputs &
balance / investments
Way forward• Long term programs reflecting demand across product range (4 years plus)
– for investments• Two yearly program with quarterly demand profile linked or matched to
supply points • Three monthly review - operational
Opportunities 2