street tree and sidewalk maintenance contractor workshop april...

7
Street Tree and Sidewalk Maintenance Contractor Workshop April 12, 2018

Upload: others

Post on 16-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Street Tree and Sidewalk Maintenance Contractor Workshop April …sfpublicworks.org/sites/default/files/Contractor Workshop... · 2018. 4. 12. · Contractor Workshop. April 12, 2018

Street Tree and Sidewalk Maintenance

Contractor Workshop

April 12, 2018

Page 2: Street Tree and Sidewalk Maintenance Contractor Workshop April …sfpublicworks.org/sites/default/files/Contractor Workshop... · 2018. 4. 12. · Contractor Workshop. April 12, 2018

Tree PlantingYoung Tree Care

Landscape MaintenanceIntegrated Pest Management

Landscape installationsGreen Infrastructure

And…

Cement WorkTree Maintenance

Bureau of Urban Forestry

Page 3: Street Tree and Sidewalk Maintenance Contractor Workshop April …sfpublicworks.org/sites/default/files/Contractor Workshop... · 2018. 4. 12. · Contractor Workshop. April 12, 2018

StreetTreeSF

• Starting with the “worst first”• Removing unhealthy and unsound trees• Treating tree-related sidewalk damage• Prune trees on a three- to five-year cycle

is the citywide street tree and sidewalk maintenance program managed by San Francisco Public Works.

San Francisco’s high priority work needs have been organized by geographic area known as “keymaps.”

Page 4: Street Tree and Sidewalk Maintenance Contractor Workshop April …sfpublicworks.org/sites/default/files/Contractor Workshop... · 2018. 4. 12. · Contractor Workshop. April 12, 2018

Keymap (Grid) Pruning

Page 5: Street Tree and Sidewalk Maintenance Contractor Workshop April …sfpublicworks.org/sites/default/files/Contractor Workshop... · 2018. 4. 12. · Contractor Workshop. April 12, 2018

Work has already begun in areas where there are trees and sidewalks in high need of maintenance.

Work Completed So Far

Page 6: Street Tree and Sidewalk Maintenance Contractor Workshop April …sfpublicworks.org/sites/default/files/Contractor Workshop... · 2018. 4. 12. · Contractor Workshop. April 12, 2018

We need your help

More than 100,000 tree sites need to be addressed in the next three years.

Master As-Needed Concrete Sidewalk Repair Contract - $1M

Master As-Needed Tree Services [Micro-LBE] - $500K

Master As-Needed Tree Services - $1M

Master As-Needed Tree Services [Micro-LBE] - $1M

Master As-Needed Tree Services – $2M

M01

M03

M04

M11

M12

The following opportunities are available:

• Arborists

• Tree Care

• Cement

Page 7: Street Tree and Sidewalk Maintenance Contractor Workshop April …sfpublicworks.org/sites/default/files/Contractor Workshop... · 2018. 4. 12. · Contractor Workshop. April 12, 2018

sfpublicworks.org