sts-125 hubble space telescope(hst) servicing mission 4 (sm4) overview presented by: jerry l. ross...
TRANSCRIPT
STS-125Hubble Space Telescope(HST) Servicing Mission 4 (SM4) Overview
Presented By: Jerry L. RossOctober 6, 2009Prague, Czech Republic
1
Wide Field Planetary Camera 2COSTARGyrosSolar Arrays
Launch!
Imaging SpectrographNear Infrared CameraFine Guidance Sensor
GyrosAdvanced ComputerFine Guidance Sensor
Advanced CameraSolar ArraysPower Control UnitNICMOS Cooling System
GyrosWide Field Camera 3Cosmic Origins SpectrographBatteriesFine Guidance SensorSTIS RepairACS RepairNew Outer Blanket LayerSoft Capture Mechanism
SM1
SM2
SM3A
SM3B
SM4 De-OrbitMission
HUBBLE MISSIONSHUBBLE
MISSIONS
1990 1993 1997 1999 2002 2009 NET 2020 2070108_PMB_SM4_Overview_PAO.ppt
2
HST SM4 Flight CrewScott
AltmanGreg
JohnsonMegan
McArthur
John Grunsfeld
DrewFeustel
Mike Good
MikeMassimino
3
4
STS-400 is being prepared as the rescue mission for STS-125. It will be processed in parallel with STS-125 and will be available
for launch if needed
HST Launch on Need (LON) Rescue Mission STS-400
5
Flight Support System
Super Lightweight Interchangeable
Carrier
Orbital Replacement Unit Carrier
Multi-use Logistic
Equipment Carrier
HST Servicing Mission 4 (SM4) Configuration
6
SI C&DH (Bay 10)
SI C&DH
7
WFC3 will be the first Hubble wide-field camera spanning Ultraviolet – Visible - Infrared
8
Battery Bays (2 & 3)Bays 2 and 3
Bays 2 Bays 3
9
Battery Details
10
Rate Sensor Unit (RSU) HST Rate Gyro Assembly (RGA)
Rate Sensor Unit and Electronic Control Unit
COS will be the most sensitive UV spectrograph ever to fly on Hubble
12
ACS Worksite
CCD ElectronicsBox (CEB)Radiators
13
ACS Worksite/Tools
View from bottom of ACS looking upCover Plate(32 Non-Captive Fasteners)
Grid – To Be Cut
14
Grid Cutter
15
Fastener Capture Plate
16
Card Removal from ACS
Card Extraction Tool
17
CEB Replacement Module
Power Supply Module
Power Connectors
ACS Repair
18
L-Handle
EVA Handle
MEB Cover
LVPS-2 Card
(Internal)
STIS
Cover Clamp
Fastener Capture Plate
The Fastener Capture Plate is attached to the STIS MEB cover and is used to capture the 111 screws that EVA astronauts will remove in order to gain access to the failed LVPS-2 power supply card
19
Low Voltage Power Supply (LVPS) Card
20
STIS Card Removal
21
FGS R&R
Access to HST
Access to FSIPE
22
Soft Capture Mechanism
SCM attached to HST
EM Soft Capture Mechanism (SCM) Fitcheck with Lightweight Berthing
and Positioning System (BAPS) ring
The Soft Capture Mechanism will be attached to the aft bulkhead of Hubble during SM4. It greatly increases the likelihood of a successful autonomous rendezvous and capture. It is a risk reduction opportunity for a future de-orbit mission
23
24
25