AWADUKT THERMO ANTIMICROBIALInstallation of Ground-Air Heat Exchanger (GAHE) in commercial buildings
Case study TESCO supermarket in Zdzieszowice/ Poland
-
OVERVIEW
1. BUILDING CONCEPT
2. INSTALLATION OF GAHE
3. ANALYSIS OF MEASURED RESULTS
4. AWADUKT THERMO
CASE STUDY: AWADUKT THERMO IN COMMERCIAL BUILDINGS
www.rehau.de Bau
Industrie
Automotive
4. AWADUKT THERMO ANTIMICROBAL
-
BUILDING CONCEPTINITIAL SITUATION
TESCO One of the leading supermarket chains in Poland
173 markets, 20 petrol stations, 3 logistic centers
Commercial area in total approx. 427.300 m2
Approx. 23.000 employees
Total sales of Tesco Group in Poland approx. 1,4 Mrd in 2005
www.rehau.de Bau
Industrie
Automotive
Target: Reduction of the Energy Costs about 20 30 %
The energy demand of the new build TESCO market in Zdzieszowice (finished in March 2007) was to be reduced by approx. 20-30% through an optimized energy management. Sun, wind and ground-source energy were to be used as natural energy sources.
TESCOs target is to reduce the energy demand of a square meter about 50 % until 2010.
-
BUILDING CONCEPT
First Pilot Project in Zdzieszowice
The new supermarket is the first one in which alternative energy sources were used to reduce the energy costs.
The pilot project had a big importance within the Tesco group and was supported
NEW ENERGY CONCEPT
www.rehau.de Bau
Industrie
Automotive
the Tesco group and was supported intensively. In the meantime further markets with the same concept have been realized.
-
BUILDING CONCEPT
Photovoltaic modules and wind generators produce electricity that is saved in batteries.
NEW ENERGY CONCEPT
www.rehau.de Bau
Industrie
Automotive
The air for the air conditioning is pre-heated in winter and pre-cooled in summer with an AWADUKT THERMO Ground-Air Heat Exchanger from REHAU that was installed below the building.
-
BUILDING CONCEPT
1.Photovoltaics
- 18 photovoltaic panels (ca. 5% of roof area)- Production of approx. 5,000 kWh/year
2. Wind generator
- 4 Wind Generators
ELECTRICITY GENERATED BY PHOTOVOLTAICS AND WIND GENERATORS
www.rehau.de Bau
Industrie
Automotive
- 4 Wind Generators- Production of approx. 15,000 kWh/year
Total: ca. 20,000 kWh/year
The electric energy demand of the building amounts ca. 72, 000 kWh/Year.
>> approx. 30% of the electric energy demand is generated by renewable energy sources.
-
BUILDING CONCEPT : GROUND-AIR HEAT EXCHANGER
Scheme of the GAHE AWADUKT THERMO system
INSTALLATION OF THE PIPE SYSTEM BELOW THE MARKET
www.rehau.de Bau
Industrie
Automotive
AWADUKT THERMO DN 200
20 Pipes 35m
In total 700 m DN 200
Header Pipe AWADUKT
THERMO DN 500 with
welded connectors DN 200
-
BUILDING CONCEPT : GROUND-AIR HEAT EXCHANGER
Winter Operation Data: Calculated Data:
Ambient Temperature - 15 C Energy Saving by GAHE 20.500 kWh
Ground Temperature + 8 C Outlet Temperature of GAHE + 2 C
Heat Demand 46.320 kWh
DESING DATA FOR WINTER OPERATION
Inlet Temperature at the
Outlet Temperature
at the end of the
www.rehau.de Bau
Industrie
Automotive
Inlet Temperature at the
suction element : -15C GAHE: +2C
Ground Temperature:
+8 C
Ground-Air Heat Exchanger
AWADUKT THERMO
-
BUILDING CONCEPT : GROUND-AIR HEAT EXCHANGER
Summer Operation: Calculated Data:
Ambient temperature + 30 C Energy Saving by GAHE 10.700 kWh
Ground temperature + 8 C Outlet Temperature of GAHE + 16 C
DESIGN DATA FOR SUMMER OPERATION
Outlet Temperature
at the end of the Inlet Temperature at the
www.rehau.de Bau
Industrie
Automotive
GAHE: +16CInlet Temperature at the
suction element : +30C
Ground Temperature:
+8 C
Ground-Air Heat Exchanger
AWADUKT THERMO
-
OVERVIEW
1. BUILDING CONCEPT
2. INSTALLATION OF GAHE
3. ANALYSIS OF MEASURED RESULTS
4. AWADUKT THERMO
CASE STUDY: AWADUKT THERMO IN COMMERCIAL BUILDINGS
www.rehau.de Bau
Industrie
Automotive
4. AWADUKT THERMO ANTIMICROBAL
-
GROUND-AIR HEAT EXCHANGER AWADUKT THERMO
- Volume flow 2,700 m/h- AWADUKT THERMO DN 200 700 meter- Header pipe DN 500 70 meter- Number of register pipes 20 Rows
Calculated energy saving:(heating and cooling) 31,200 kWh
DATA OF GAHE SYSTEM
www.rehau.de Bau
Industrie
Automotive
(heating and cooling) 31,200 kWh
-
GROUND-AIR HEAT EXCHANGER AWADUKT THERMOPHOTOS FROM BUILDING SITE SEPTEMBER 2006
www.rehau.de Bau
Industrie
Automotive
-
GROUND-AIR HEAT EXCHANGER AWADUKT THERMOPHOTOS FROM BUILDING SITE SEPTEMBER 2006
www.rehau.de Bau
Industrie
Automotive
-
GROUND-AIR HEAT EXCHANGER AWADUKT THERMOPHOTOS FROM BUILDING SITE SEPTEMBER 2006
www.rehau.de Bau
Industrie
Automotive
-
GROUND-AIR HEAT EXCHANGER AWADUKT THERMOPHOTOS FROM BUILDING SITE SEPTEMBER 2006
www.rehau.de Bau
Industrie
Automotive
-
TESCO-SUPERMARKET
Present guests amongst others: - Management of the TESCO-Group International (England)- Project Leader TESCO - Poland- Ambassador of England- Department of the Environment- Specialized Press- Television of Poland- Involved Planning Offices
OFFICIAL OPENING ON 06.03.2007
www.rehau.de Bau
Industrie
Automotive
- Involved Planning Offices
-
OVERVIEW
1. BUILDING CONCEPT
2. INSTALLATION OF GAHE
3. ANALYSIS OF MEASURED RESULTS
4. AWADUKT THERMO
CASE STUDY: AWADUKT THERMO IN COMMERCIAL BUILDINGS
www.rehau.de Bau
Industrie
Automotive
4. AWADUKT THERMO ANTIMICROBAL
-
ANALYSIS OF MEASURED RESULTS
Research concerning operation performance:
In cooperation with the University of Poznan the operation performance of the GAHE was measured and
analyzed over a period of one year.
The following parameters were analyzed:
- Ambient temperature
- Outlet temperature of the GAHE
RESEARCH IN COOPERATION WITH THE UNIVERSITY OF POZNAN
www.rehau.de Bau
Industrie
Automotive
- Outlet temperature of the GAHE
- Air humidity
- Flow Speed of the air in the GAHE.
Start of Project: April 2007
End of Project: April 2008
The final report was created by the University of Poznan.
-
ANALYSIS OF MEASURED RESULTSWINTER OPERATION
T
15
10
5
0
Temperature [C]Temperature Profile on 27.12.2007 (Coldest Day)
Inlet Temperature [C]
Out let Temperature [C]
Ambient Temperature [C]
www.rehau.de Bau
Industrie
Automotive
Daily activation of the GAHE at 7.00 am
Even on the coldest day the GAHE outlet temperatures is approx.: 12c
=> Due to the installation of the GAHE under the building, whose temperature is approx. 20C.
Start of GAHE operation
-5
-10
0
0
:
5
9
:
1
9
0
1
:
5
9
:
1
9
0
2
:
5
9
:
1
9
0
3
:
5
9
:
1
9
0
5
:
5
9
:
1
9
0
6
:
5
9
:
1
9
0
7
:
5
9
:
1
9
0
8
:
5
9
:
1
9
1
1
:
5
9
:
1
9
0
4
:
5
9
:
1
9
0
9
:
5
9
:
1
9
1
0
:
5
9
:
1
9
1
9
:
5
9
:
1
9
1
8
:
5
9
:
1
9
1
7
:
5
9
:
1
9
1
6
:
5
9
:
1
9
1
5
:
5
9
:
1
9
1
4
:
5
9
:
1
9
1
3
:
5
9
:
1
9
1
2
:
5
9
:
1
9
2
0
:
5
9
:
1
9
2
1
:
5
9
:
1
9
2
2
:
5
9
:
1
9
2
3
:
5
9
:
1
9
-
ANALYSIS OF MEASURED RESULTS
Q in KW Night deactivation
Max. Q
18
16
14
12
10
8
6
Q [KW] Heating Performance in December 2007
WINTER OPERATION
www.rehau.de Bau
Industrie
Automotive
4
2
0
0
1
.
1
2
.
2
0
0
7
0
2
.
1
2
.
2
0
0
7
0
3
.
1
2
.
2
0
0
7
0
4
.
1
2
.
2
0
0
7
0
5
.
1
2
.
2
0
0
7
0
6
.
1
2
.
2
0
0
7
0
8
.
1
2
.
2
0
0
7
0
7
.
1
2
.
2
0
0
7
1
1
.
1
2
.
2
0
0
7
1
0
.
1
2
.
2
0
0
7
1
3
.
1
2
.
2
0
0
7
1
2
.
1
2
.
2
0
0
7
1
4
.
1
2
.
2
0
0
7
1
5
.
1
2
.
2
0
0
7
1
6
.
1
2
.
2
0
0
7
1
7
.
1
2
.
2
0
0
7
1
8
.
1
2
.
2
0
0
7
1
9
.
1
2
.
2
0
0
7
2
5
.
1
2
.
2
0
0
7
2
0
.
1
2
.
2
0
0
7
2
1
.
1
2
.
2
0
0
7
2
3
.
1
2
.
2
0
0
7
2
2
.
1
2
.
2
0
0
7
2
4
.
1
2
.
2
0
0
7
2
6
.
1
2
.
2
0
0
7
2
7
.
1
2
.
2
0
0
7
2
8
.
1
2
.
2
0
0
7
2
9
.
1
2
.
2
0
0
7
3
0
.
1
2
.
2
0
0
7
3
1
.
1
2
.
2
0
0
7
Maximum heating performance: 15 KW
Under standard conditions (Outdoor temp.: -16C) a maximum performance of 20 KW
would have been achieved
The zero points in the graph represent the deactivation of the GAHE at night
In December the highest number of operating hours (503hrs) was achieved
-
ANALYSIS OF MEASURED RESULTS
Humidity [%]
SUMMER OPERATION
Humidity at 100 %40
35
30
25
20
15
120
100
80
60
Temperature and Humidity Profile on 27.7.2007Temperature [C]
5
10
15Inlet Temperature [C]
Outlet Temperature [C]
Ambient Temperature
Inlet Humidity [%]
Outlet Humidity [%]
www.rehau.de Bau
Industrie
Automotive
Even at the hottest day the GAHE outlet temperature does not exceed 18C
Profile of the relative air humidity shows a longer period 100% Condensation!
Start of GAHE operation
15
10
5
0
0
0
:
5
9
:
1
9
0
1
:
5
9
:
1
9
0
2
:
5
9
:
1
9
0
3
:
5
9
:
1
9
0
5
:
5
9
:
1
9
0
6
:
5
9
:
1
9
0
7
:
5
9
:
1
9
0
8
:
5
9
:
1
9
1
1
:
5
9
:
1
9
0
4
:
5
9
:
1
9
0
9
:
5
9
:
1
9
1
0
:
5
9
:
1
9
1
9
:
5
9
:
1
9
1
8
:
5
9
:
1
9
1
7
:
5
9
:
1
9
1
6
:
5
9
:
1
9
1
5
:
5
9
:
1
9
1
4
:
5
9
:
1
9
1
3
:
5
9
:
1
9
1
2
:
5
9
:
1
9
2
0
:
5
9
:
1
9
2
1
:
5
9
:
1
9
2
2
:
5
9
:
1
9
2
3
:
5
9
:
1
9
40
20
0
-
ANALYSIS OF MEASURED RESULTS
Night deactivation
10
5
0
-5
-10
Q [KW]Cooling Performance in July 2007
Q in KW
SUMMER OPERATION
www.rehau.de Bau
Industrie
Automotive
Max. Q
-10
-15
-20
0
1
.
0
7
.
2
0
0
7
0
2
.
0
7
.
2
0
0
7
0
3
.
0
7
.
2
0
0
7
0
4
.
0
7
.
2
0
0
7
0
5
.
0
7
.
2
0
0
7
0
6
.
0
7
.
2
0
0
7
0
8
.
0
7
.
2
0
0
7
0
7
.
0
7
.
2
0
0
7
1
1
.
0
7
.
2
0
0
7
1
0
.
0
7
.
2
0
0
7
1
3
.
0
7
.
2
0
0
7
1
2
.
0
7
.
2
0
0
7
1
4
.
0
7
.
2
0
0
7
1
5
.
0
7
.
2
0
0
7
1
6
.
0
7
.
2
0
0
7
1
7
.
0
7
.
2
0
0
7
1
8
.
0
7
.
2
0
0
7
1
9
.
0
7
.
2
0
0
7
2
5
.
0
7
.
2
0
0
7
2
0
.
0
7
.
2
0
0
7
2
1
.
0
7
.
2
0
0
7
2
3
.
0
7
.
2
0
0
7
2
2
.
0
7
.
2
0
0
7
2
4
.
0
7
.
2
0
0
7
2
6
.
0
7
.
2
0
0
7
2
7
.
0
7
.
2
0
0
7
2
8
.
0
7
.
2
0
0
7
2
9
.
0
7
.
2
0
0
7
3
0
.
0
7
.
2
0
0
7
3
1
.
0
7
.
2
0
0
7
Maximum cooling output of 15 KW
Due to the cool outside conditions (Ambient Temperature Outlet Temperature GAHE) the bypass was
activated frequently and therefore in July only 223 operating hours were achieved.
-
ANALYSIS OF MEASURED RESULTS
T
TRANSITION PERIOD
18
16
14
12
10
8
120
100
80
60
Temperature [C] Humidity [%]
Temperature and Humidity Profile on 17.4.2008
Temperat ure [ C ]Inlet Temperature [C]
Outlet Temperature [C]
Ambient Temperature [C]
Inlet Humidity [%]
Outlet Humidity [%]
www.rehau.de Bau
Industrie
Automotive
The GAHE was deactivated from 14.00 17.00 because the ambient temperature was higher
than the GAHE outlet temperature
The log shows the need to optimize the control technique: obviously the bypass is wongly activated
by the GAHE inlet temperature and not by the ambient temperature
Start of GAHE operating Deactivation of the GAHE
6
4
2
0
0
0
:
5
9
:
1
9
0
1
:
5
9
:
1
9
0
2
:
5
9
:
1
9
0
3
:
5
9
:
1
9
0
5
:
5
9
:
1
9
0
6
:
5
9
:
1
9
0
7
:
5
9
:
1
9
0
8
:
5
9
:
1
9
1
1
:
5
9
:
1
9
0
4
:
5
9
:
1
9
0
9
:
5
9
:
1
9
1
0
:
5
9
:
1
9
1
9
:
5
9
:
1
9
1
8
:
5
9
:
1
9
1
7
:
5
9
:
1
9
1
6
:
5
9
:
1
9
1
5
:
5
9
:
1
9
1
4
:
5
9
:
1
9
1
3
:
5
9
:
1
9
1
2
:
5
9
:
1
9
2
0
:
5
9
:
1
9
2
1
:
5
9
:
1
9
2
2
:
5
9
:
1
9
2
3
:
5
9
:
1
9
40
20
0
-
ANALYSIS OF MEASURED RESULTS
Due to the ambient temperature the GAHE
was deactivated
Heating
Q in KW12
10
8
6
4
2
Q [KW] Profil of Q in April 2008
TRANSITION PERIOD
www.rehau.de Bau
Industrie
Automotive
Night deactivation of the
GAHE Cooling
0
-2
-4
-6
0
1
.
0
4
.
2
0
0
8
0
2
.
0
4
.
2
0
0
8
0
3
.
0
4
.
2
0
0
8
0
4
.
0
4
.
2
0
0
8
0
5
.
0
4
.
2
0
0
8
0
6
.
0
4
.
2
0
0
8
0
8
.
0
4
.
2
0
0
8
0
7
.
0
4
.
2
0
0
8
1
1
.
0
4
.
2
0
0
8
1
0
.
0
4
.
2
0
0
8
1
3
.
0
4
.
2
0
0
8
1
2
.
0
4
.
2
0
0
8
1
4
.
0
4
.
2
0
0
8
1
5
.
0
4
.
2
0
0
8
1
6
.
0
4
.
2
0
0
8
1
7
.
0
4
.
2
0
0
8
1
8
.
0
4
.
2
0
0
8
1
9
.
0
4
.
2
0
0
8
2
5
.
0
4
.
2
0
0
8
2
0
.
0
4
.
2
0
0
8
2
1
.
0
4
.
2
0
0
8
2
3
.
0
4
.
2
0
0
8
2
2
.
0
4
.
2
0
0
8
2
4
.
0
4
.
2
0
0
8
2
6
.
0
4
.
2
0
0
8
2
7
.
0
4
.
2
0
0
8
2
8
.
0
4
.
2
0
0
8
2
9
.
0
4
.
2
0
0
8
3
0
.
0
4
.
2
0
0
8
In transition periods, both heating and cooling is required
Due to the frequent bypass operation, 298 operating hours had been achieved in April
-
ANALYSIS OF MEASURED RESULTSSUMMARY OF THE RESULTS
Annual Energy Savings from the GAHE:
Heating:
Investigated energy savings: 26,000 KWh
Calculated energy savings before installation: 20,500 KWh
Cooling:
Investigated energy savings: 9,000 KWh
Calculated energy savings before installation: 10,700 KWh
Potential downsizing of the HVAC equipment:
www.rehau.de Bau
Industrie
Automotive
Potential downsizing of the HVAC equipment:
Heating: The GAHE allows a reduction of the heating unit from 48 KW to 28 KW
Cooling: The GAHE allows a reduction of the cooling unit from 38 KW to 23 KW
Operational performance:
Annual operation hours of the air conditioning: 5,100 h
Bypass Activation: 1,600 h
Annual GAHE operation:
3,500 h
(equivalent to 68,6% of the operating hours of the air conditioning).
-
OVERVIEW
1. BUILDING CONCEPT
2. INSTALLATION OF GAHE
3. ANALYSIS OF MEASURED RESULTS
4. AWADUKT THERMO
CASE STUDY: AWADUKT THERMO IN COMMERCIAL BUILDINGS
www.rehau.de Bau
Industrie
Automotive
4. AWADUKT THERMO ANTIMICROBAL
-
- Antimicrobial Inner Layer
>> Hygienic and germ-free fresh air supply
- High heat conductivity through optimized PP
>> Improved heat transfer between
ground and sucked air
- High resistance and rigidity through PP
AWADUKT THERMO ANTIMICROBIALCONVINCING ARGUMENTS
www.rehau.de Bau
Industrie
Automotive
- High resistance and rigidity through PP
>> Protection against external attacks
>> No condensate accumulation
- Radon proof System
>> No permeation of radon into the system
- Extensive pipe range and sizes
>> Tailored installation
-
AWADUKT THERMO PIPE SYSTEMANTIMICROBIAL INNER LAYER
With PP-Standard-
Material
Transported air is considered a food item according to VDI 6022/1.
The unique and patented antimicrobial Polymer pipe from
AWADUKT Thermo prevents microbe growth. The antimicrobial
effect is due to the integration of silver particles into the pipe
material.
An experiment by the Institut Fresenius (Jan 2003) confirmed the
significant reduction in microbe growth:
www.rehau.de Bau
Industrie
Automotive
- Pseudomonas aeruginosa
- Staphylococcus aureus rod bacteria
- Bacillus subtilis - bacteria
- Aspergillus niger - mould
- Candida albicans yeast bacteria
- Escherichia coli faecal germs
Material
With AWADUKT Thermo
antimicrobial
significant reduction in microbe growth:
-
Keimzahl
AWADUKT THERMO ANTIMIKROBIELLSPECIAL ANTIMICROBIAL INNER LAYER
www.rehau.de Bau
Industrie
Automotive
Source:
Results Institute Fresenius Jan 2003
-
www.rehau.de Bau
Industrie
Automotive
AWADUKT THERMO ANTIMICROBIALInstallation of Ground-Air Heat Exchanger (GAEA) in commercial buildings
Case study TESCO supermarket in Zdzieszowice/ Poland