success in exporting bha annual conference 2012. sme established in 1991 engineering consultancy...

41
Success in Exporting BHA Annual Conference 2012

Upload: noe-hollands

Post on 31-Mar-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Success in Exporting

BHA Annual Conference 2012

Page 2: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

SME established in 1991 Engineering Consultancy with 30

Engineers

We specialise in Hydraulic Steel Structures for:

• Hydro Power• River Control and Flood Defence• Leisure Marinas• Commercial Docks & Harbours

In addition to; • Moving Bridges and Linkspans• Special Purpose Machinery

Page 3: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Office Locations

PooleSuite 4, Bourne Gate, Bourne Valley Road, Poole BH12 1DY

Tel: +44 (01202) 311766Fax: +44 (01202) 318472

www.kgal.co.uk

Wakefield16 Appleton Court Calder Park Wakefield WF2 7AR

GloucesterThe Small Barn, Marina Walk Offices, Walk Farm, Frampton on Severn GL2 7PR

Page 4: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Typical UK Projects

Page 5: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Hydro Power

Replacement of Reservoir Regulating Spillway Radial Gates

Page 6: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Flood Defence

River Hull Tidal Surge Barrier

30m Clear Span x 10.7m Deep x 220 Tonnes

Page 7: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Leisure Marina

Sector Lock Gates – Swansea Marina

Page 8: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Commercial Docks and Harbours

Port of Barrow Mitre Gates

460 Tonnes Fabrication

Page 9: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Special Purpose Machinery

Falkirk Wheel Exemplar Design and Performance Specification

Page 10: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Previous export projects in;

India

Mexico

Thailand

Oman

Korea

Vietnam

Brunei

USA

Current export projects in;

Australia

Laos

Page 11: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Xayaburi Hydro Electric Power Project

Laos

Page 12: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Location of Site

Page 13: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Owner – Xayaburi Power Co.(J.V. between GOL & C.H.Karnchang

Const’n)

GOL Engineer - Poyry

Main Contractor – C.H.Karnchang

30 Year B.O.T.

Page 14: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

1285 MW Run of River

8 Kaplan Turbines

7 x Power for Export

1 x Power for Laos

Page 15: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Early impression of barrage

Looking Up Stream

Page 16: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Location of Barrage – June 2012

Dry Season

Page 17: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Location of Barrage – August 2012

Wet Season

Page 18: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Close up – June 2012

Dry Season

Page 19: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Close up – August 2012

Wet Season

Page 20: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Remote location of barrage

Difficult access to site

New main access roads going in

Page 21: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Remote location of barrage

Until then:

Every visit is an adventure!!

Page 22: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Layout of Barrage

Page 23: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Main Components of the Barrage

Navigation Lock

Spillway

Power House

Fish Pass

Page 24: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Package 1 – Civil WorksC.H.Karnchang

AF Consult + Team Consult

Package 2 – Hydro mechanical Whessoe Sdn.Bhd. + KGAL

Package 3 – Electro mechanicalTBC

Page 25: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Package 2 – Hydro mechanical

Whessoe Sdn.Bhd.Manufacture, Installation and

Commissioning

KGALDesign, Quality Surveillance,

Technical Support, Site Supervision

Page 26: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

KGAL Scope on the Barrage

Design of Hydraulic Steel Structures including; 7x Spillway Radial Gates 19m Span x 25m High 4x Flushing Radial Gates 12m Span x 16m High 3x Nav Lock Mitre Gates 12m Span x 30m High 23x Power Intake Gates 7m Span x 18m High23x Power Intake Screens 7m Span x 45m High23x Draft Tube Gates 7m Span x 12m High14x Sand Flushing Gates 4m Span x 6m High

71 Gates of Varying sizes for the Fishpass System

Fishpass Pumping System

Numerous Lock Filling Sluice Gates

Small Boat Lift & Transfer System for Navigation Lock

Page 27: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Section Through Main Spillway Radial Gate

19m Span x 25m High

Page 28: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Solid Model of Flushing Radial Gate

12m Span x 16m High

Page 29: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Solid Model of Mitre Lock Gates

12m Span x 30m High

Page 30: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Seismic Analysis of Mitre Lock Gates

12m Span x 30m High

Page 31: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Seismic Analysis of Mitre Lock Gates

12m Span x 30m High

Page 32: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

KGAL Scope on the Barrage

In excess of 30,000 man hours UK design work

Seismic assessment of all gates in accordance with the latest ICOLD Requirements

Quality surveillance of local fabrication drawing office

“Sign off” of all fabrication drawings

Quality surveillance of manufacture at site facility

Technical support and supervision of site installation

Page 33: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

KGAL programme of works

Duration of UK design work – Years 1 to 3

Drawing office quality surveillance – Years 1 to 3

Manufacture quality surveillance – Years 2 to 4

Technical support for site works – Years 2 to 6

Page 34: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Xayaburi Current status of Site

construction

Page 35: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Everything comes in by haul road

Page 36: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

New site access roads and accommodation

Page 37: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Main site office comlex

Page 38: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Early excavations adjacent to the River for the Navigation lock and

Spillway

Page 39: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Excavation and foundations for Whessoe site fabrication facility

Page 40: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Very little flat land available

Fabrication shop will be 300m Long

Page 41: Success in Exporting BHA Annual Conference 2012. SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures

Summary

It is possible to reverse the trend and win export work

Market place is difficult and competitive

UK no longer regarded the leader in Hydropower

Financial support no longer available from UKTI

Websites provide access to World Market

Essential to get out and meet people

BHA provide a very cost effective way to do it

Hydro 2012 next week in Bilbao